share_log

Aramco's Strategic Gas Expansion Progresses With $25bn Contract Awards

Aramco's Strategic Gas Expansion Progresses With $25bn Contract Awards

阿美(沙特国家石油公司)通过签署了总值250亿美元合同,使其战略性燃料币扩张计划得以继续推进。
PR Newswire ·  06/30 12:27
  • Phase two of ambitious Jafurah gas development commences with award of contracts worth around $12.4bn
  • Contracts worth around $8.8bn awarded for phase three expansion of Company's Master Gas System
  • 23 additional unconventional gas rig contracts valued at $2.4bn and two directional drilling contracts worth $612 million also awarded, while 13 well tie-in contracts at Jafurah worth $1.63bn have been awarded between December 2022 and May 2024
  • Projects aim to support growth of Aramco's gas production, diversify its portfolio, and add significant volumes of ethane, NGL and condensate
  • 雄心勃勃的Jafurah天然气项目第二阶段已经开始,奖项合同总值约124亿美元。
  • 公司的总管气系统扩展第三阶段获得了价值约88亿美元的奖项合同。
  • 除了2012年之外,Jafurah项目的其他23个非常规气井和2个定向钻井合同总价值达24亿美元,以及Jafurah的13个井口连接合同价值16.3亿美元已在2022年12月至2024年5月之间获得。
  • 本项目旨在支持阿美的天然气生产增长,多样化其投资组合,并增加大量的乙烯、天然气液体和凝析油。

DHAHRAN, Saudi Arabia, June 30, 2024 /PRNewswire/ -- Aramco, one of the world's leading integrated energy and chemicals companies, has awarded contracts worth more than $25 billion to progress its strategic gas expansion, which targets sales gas production growth of more than 60% by 2030, compared to 2021 levels.

沙特阿拉伯达兰,2024年6月30日/ PRNewswire /- as 世界领先的综合能源和化学品公司之一,阿美已经授予超过250亿美元的合同,以推进其战略性天然气扩张。目标是到2030年,与2021年相比,销售气增长60%以上。

The contracts relate to phase two development of the vast Jafurah unconventional gas field, phase three expansion of Aramco's Master Gas System, new gas rigs and ongoing capacity maintenance.

合同涉及Jafurah非常规气田的第二阶段开发,阿美总管气系统的第三阶段扩展,新的气井和持续的容量维护。

Amin H. Nasser, Aramco President & CEO, said: "These contract awards demonstrate our firm belief in the future of gas as an important energy source, as well as a vital feedstock for downstream industries. The scale of our ongoing investment at Jafurah and the expansion of our Master Gas System underscores our intention to further integrate and grow our gas business to meet anticipated rising demand. This complements the diversification of our portfolio, creates new employment opportunities, and supports the Kingdom's transition towards a lower-emission power grid, in which gas and renewables gradually displace liquids-based power generation. To get where we are today, a lot of hard work, innovation and a strong 'can do' spirit has been demonstrated by teams across our vast network of suppliers and service providers, who have joined Aramco on this journey to build and expand our world-class energy infrastructure."

阿美总裁兼首席执行官Amin H. Nasser表示:“这些奖项合同表明我们坚定地相信,天然气作为重要的能源来源以及下游行业的重要原料,将会迎来更加广阔的发展前景。我们在Jafurah不断投资和扩展总管气系统的规模,体现了我们进一步整合和发展天然气业务以满足预期上升的需求的意愿。这与我们组合的多元化相得益彰,创造了新的就业机会,支持了王国转向低排放电网的转型,其中天然气和可再生能源逐渐取代基于液体的发电模式。我们的团队在庞大的供应商和服务提供商网络中展示了很多辛勤工作、创新和强烈的“团结一心”的精神,加入阿美一起走过这条建造和扩展世界一流能源基础设施的路程。”

Contract awards

奖项合同

The Company has awarded 16 contracts, worth a combined total of around $12.4 billion, for phase two development at Jafurah. The work will involve construction of gas compression facilities and associated pipelines, expansion of the Jafurah Gas Plant including construction of gas processing trains, and utilities, sulfur and export facilities. It will also involve construction of the Company's new Riyas Natural Gas Liquids (NGL) fractionation facilities in Jubail — including NGL fractionation trains, and utilities, storage and export facilities — to process NGL received from Jafurah.

该公司已授予16项合同,总价值约124亿美元,用于Jafurah的第二阶段开发。这项工作将涉及建设天然气压缩设施和相关的管道,扩建Jafurah天然气加工厂,包括建设天然气加工列车、公用设施、硫和出口设施。它还将涉及建设公司位于朱拜勒的新Riyas 天然气液体(NGL)分离设施-包括NGL分馏列车、公用设施、储存和出口设施-来处理从Jafurah 收到的NGL。

Another 15 lump sum turnkey contracts, worth a combined total of around $8.8 billion, have been awarded to commence the phase three expansion of the Master Gas System, which delivers natural gas to customers across the Kingdom of Saudi Arabia. The expansion, being conducted in collaboration with the Ministry of Energy, will increase the size of the network and raise its total capacity by an additional 3.15 billion standard cubic feet per day (bscfd) by 2028, through the installation of around 4,000km of pipelines and 17 new gas compression trains.

此外,还授予了另外15项总价值约88亿美元的总承包合同,用于启动总管气系统的第三阶段扩展,该系统将天然气运送给沙特阿拉伯国内的客户。这与能源部门合作进行的扩展,将通过安装约4000公里的管道和17个新的天然气压缩列车,将网络的规模扩大并将其总容量提高315亿标准立方英尺/天(bscfd),以便更多向实用和工业部门提供天然气,为发电提供低排放的选择,代替燃油。从1982年开始,该网络开始运输伴生天然气,也被称为油生废气,在石油生产过程中释放。这证明了阿美的创新和早期采用的解决方案,有助于减少排放。这个开创性的网络,现在运输伴生气和销售气,帮助阿美自2012年来实现近零常规煤气烧放量,并保持煤气烧放量小于总原始煤气生产量的1%。这也促使该公司在行业中拥有最低的上游碳强度之一。

An additional 23 gas rig contracts worth $2.4bn have also been awarded, along with two directional drilling contracts worth $612 million. Meanwhile, 13 well tie-in contracts at Jafurah, worth a total of $1.63bn, have been awarded between December 2022 and May 2024.

另外还授予了23项天然气井合同,价值24亿美元,以及两个价值6.12亿美元的定向钻井合同。与此同时,Jafurah的13个井口连接合同,总价值为16.3亿美元,已经在2022年12月至2024年5月之间获得。

Progress at Jafurah

Jafurah非常规气田预计含有229万亿立方英尺的原始气和750亿桶的锅炉罐的凝析油。 Jafurah发展计划的第一阶段,于2021年11月开始,进展顺利,预计于2025年第三季度开始投产。 Aramco预计,Jafurah的整个生命周期的投资总额将超过1000亿美元,并且销售气产量将在2030年达到持续的每天20亿标准立方英尺,以及大量乙烯、天然气液体和凝析油。

The Jafurah unconventional gas field is estimated to contain 229 trillion standard cubic feet of raw gas and 75 billion Stock Tank Barrels of condensate. Phase one of the Jafurah development program, which commenced in November 2021, is progressing on schedule with initial start-up anticipated in the third quarter of 2025. Aramco expects total overall lifecycle investment at Jafurah to exceed $100 billion and production to reach a sustainable sales gas rate of two billion standard cubic feet per day by 2030, in addition to significant volumes of ethane, NGL and condensate.

阿美的主管气系统是一个广泛的管道网络,连接了沙特阿拉伯王国的关键天然气生产和加工现场。它的扩展将增加工业、公用事业和其他部门的国内天然气供应的可访问性,为发电提供低温室气体排放。从1982年开始,该网络开始运输伴生天然气,也被称为油生废气,在石油生产过程中释放。这证明了阿美的创新和早期采用的解决方案,有助于减少排放。这个开创性的网络,现在运输伴生气和销售气,帮助阿美自2012年来实现近零常规煤气烧放量,并保持煤气烧放量小于总原始煤气生产量的1%。这也促使该公司在行业中拥有最低的上游碳强度之一。

Master Gas System expansion

阿美的主管气系统是一个广泛的管道网络,连接了沙特阿拉伯王国的关键天然气生产和加工现场。它的扩展将增加工业、公用事业和其他部门的国内天然气供应的可访问性,为发电提供低温室气体排放。从1982年开始,该网络开始运输关联气体,也称为在石油生产过程中释放的“废气”,而不是一直被燃烧-说明阿美的创新和早期采用的解决方案,有助于减少排放。这个开创性的网络,现在运输关联气体和销售气体,帮助阿美自2012年以来实现近零常规煤气烧放,维持煤气烧放总比例略小于1%的总原始煤气生产。这也促使该公司在行业中拥有最低的上游碳强度之一。

Aramco's Master Gas System is an extensive network of pipelines that connects Aramco's key gas production and processing sites throughout the Kingdom of Saudi Arabia. Its expansion will increase access to domestic gas supplies for customers in the industrial, utility and other sectors — providing a lower greenhouse gas emission alternative to oil for power generation. From 1982, the network transported associated gas, also known as "waste gas" released during oil production, instead of being flared — illustrating Aramco's innovation and early adoption of solutions that help mitigate emissions. This pioneering network, which now transports associated gas and sales gas, has helped Aramco achieve near-zero routine gas flaring and maintain a flare volume of less than 1% of total raw gas production since 2012, contributing to the Company having one of the lowest upstream carbon intensities in the industry.

Aramco的Master Gas System是一个广泛的管道网络,连接了该王国的关键天然气生产和加工现场,从1982年开始运输关联气体,也称为在石油生产过程中释放的“废气”,而不是一直被燃烧。它的扩展将增加工业、公用事业和其他部门的国内天然气供应的可访问性,为发电提供低温室气体排放的选择。这个开创性的网络,现在运输关联气体和销售气体,帮助阿美自2012年以来实现近零常规煤气烧放,维持煤气烧放总比例略小于1%的总原始煤气生产。这也促使该公司在行业中拥有最低的上游碳强度之一。

Aramco Contact Information
@aramco

阿美联系信息
@阿美

About Aramco

关于阿美

As one of the world's leading integrated energy and chemicals companies, our global team is dedicated to creating impact in all that we do, from providing crucial oil supplies to developing new energy technologies. We focus on making our resources more dependable, more sustainable and more useful, helping to promote growth and productivity around the world.

作为全球领先的综合能源和化工公司之一,我们的全球团队致力于在我们所从事的所有方面产生影响,从提供关键的石油供应到开发新的能源技术。我们专注于使我们的资源更加可靠、更加可持续和更加有用,为全球的增长和生产力发挥作用。

Disclaimer

免责声明

The press release contains forward-looking statements. All statements other than statements relating to historical or current facts included in the press release are forward-looking statements. Forward-looking statements give the Company's current expectations and projections relating to its capital expenditures and investments, major projects, upstream and downstream performance, including relative to peers. These statements may include, without limitation, any statements preceded by, followed by or including words such as "target," "believe," "expect," "aim," "intend," "may," "anticipate," "estimate," "plan," "project," "can have," "likely," "should," "could," and other words and terms of similar meaning or the negative thereof. Such forward-looking statements involve known and unknown risks, uncertainties and other important factors beyond the Company's control that could cause the Company's actual results, performance or achievements to be materially different from the expected results, performance, or achievements expressed or implied by such forward-looking statements, including the following factors: global supply, demand and price fluctuations of oil, gas and petrochemicals; global economic conditions; competition in the industries in which Saudi Aramco operates; climate change concerns, weather conditions and related impacts on the global demand for hydrocarbons and hydrocarbon-based products; risks related to Saudi Aramco's ability to successfully meet its ESG targets, including its failure to fully meet its GHG emissions reduction targets by 2050; conditions affecting the transportation of products; operational risk and hazards common in the oil and gas, refining and petrochemicals industries; the cyclical nature of the oil and gas, refining and petrochemicals industries; political and social instability and unrest and actual or potential armed conflicts in the MENA region and other areas; natural disasters and public health pandemics or epidemics; the management of Saudi Aramco's growth; the management of the Company's subsidiaries, joint operations, joint ventures, associates and entities in which it holds a minority interest; Saudi Aramco's exposure to inflation, interest rate risk and foreign exchange risk; risks related to operating in a regulated industry and changes to oil, gas, environmental or other regulations that impact the industries in which Saudi Aramco operates; legal proceedings, international trade matters, and other disputes or agreements; and other risks and uncertainties that could cause actual results to differ from the forward-looking statements in this press release, as set forth in the Company's latest periodic reports filed with the Saudi Stock Exchange. For additional information on the potential risks and uncertainties that could cause actual results to differ from the results predicted please see the Company's latest periodic reports filed with the Saudi Stock Exchange. Such forward-looking statements are based on numerous assumptions regarding the Company's present and future business strategies and the environment in which it will operate in the future. The information contained in the press release, including but not limited to forward-looking statements, applies only as of the date of this press release and is not intended to give any assurances as to future results. The Company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to the press release, including any financial data or forward-looking statements, whether as a result of new information, future events or otherwise, unless required by applicable law or regulation. No person should construe the press release as financial, tax or investment advice. Undue reliance should not be placed on the forward-looking statements.

该新闻稿包含前瞻性声明。该新闻稿中除历史事实或当前事实之外的所有声明均为前瞻性声明。前瞻性声明表达了公司关于其资本支出和投资、重大项目、上下游业绩(相对于同行业)的当前期望和预测。这些声明可能包括但不限于以下任何声明,前面、后面或包括诸如“目标”、“相信”、“期望”、“瞄准”、“打算”、“或许”、“预计”、“计划”、“项目”、“可能”、“应该”、“能够有”、“可能”、“应该”、“能够”及其他具有相似含义或其否定。此类前瞻性声明涉及公司无法控制的已知和未知风险、不确定性和其他重要因素,这些风险、不确定性和其他因素可能导致公司的实际结果、业绩或成就与此类前瞻性声明所表达或暗示的预期结果、业绩或成就有实质性差异,包括以下因素:石油、天然气和石化品的全球供应、需求和价格波动;全球经济状况;沙特阿美公司经营产业的竞争;气候变化问题,天气条件及其对碳氢化合物和碳氢化合物制品全球需求的相关影响;与沙特阿美公司能够成功实现其ESG目标相关的风险,包括其到2050年无法完全达到温室气体排放减排目标;影响产品运输的条件;石油、天然气、精炼和石化行业普遍存在的操作风险和危害;石油、天然气、精炼和石化行业的周期性特征;MENA地区和其他地区的政治和社会不稳定、动荡和实际或潜在的武装冲突;自然灾害和公共卫生疫情或流行病;沙特阿美公司的增长管理;公司子公司、合营企业、合资企业、联营企业和持有少数股权的实体的管理;沙特阿美公司暴露于通胀、利率和外汇风险;与在受管制的行业经营相关的风险,以及影响沙特阿美公司所经营行业的石油、天然气、环境或其他法规的变化;法律程序、国际贸易事务和其他争端或协议;以及可能会导致实际结果与本新闻稿中的前瞻性声明相差的其他风险和不确定性,这些风险和不确定性如在公司向沙特证券交易所提交的最新周期性报告中所述。有关有可能导致实际结果与预期结果不同的潜在风险和不确定性的额外信息,请参阅公司向沙特证券交易所提交的最新周期性报告。此类前瞻性声明基于公司现在和未来的业务策略以及公司将在未来运营的环境的众多假设。本新闻稿所包含的信息,包括但不限于前瞻性声明,仅适用于本新闻稿的发布日期,不旨在对未来结果做出任何保证。公司明确声明不承担任何更新或修订新闻稿(包括任何财务数据或前瞻性声明)的义务或承诺,除非适用法律或法规要求。任何人不应将本新闻稿视为财务、税务或投资建议。不应对前瞻性声明过度依赖。

SOURCE Aramco

Aramco消息来源

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发