share_log

HSS Group JV Secures RM1.5 Billion Metro Project In Iraq

HSS Group JV Secures RM1.5 Billion Metro Project In Iraq

HSS集团合资公司在伊拉克获得15亿马来西亚罗吉美罗项目。
Business Today ·  07/01 01:15

HSS Engineers Berhad announced that its wholly owned subsidiary, HSS Engineering Sdn Bhd, in a joint venture has
secured its largest ever contract worth USD315.9 million (equivalent to RM1.5 billion).

HSS Engineers Berhad 宣布,其全资子公司 HSS Engineering Sdn Bhd 是一家合资企业
获得了其有史以来最大的合同,价值3.159亿美元(相当于15亿令吉)。

The contract involves providing Project Management Consultancy and Supervision Services for the Baghdad Metro rail system in Iraq's capital. The estimated services fee is divided into two components: the Project Management Scope and the Construction Supervision Scope, at 0.6% and 1.2% of the total estimated construction costs, respectively. The entire construction cost of the project is valued at USD17.5 billion.

该合同涉及为伊拉克首都巴格达地铁系统提供项目管理咨询和监督服务。估计的服务费分为两个部分:项目管理范围和施工监理范围,分别占估计建筑成本总额的0.6%和1.2%。该项目的全部施工成本为175亿美元。

To kick start the project, the JV will receive an advance payment of 15% for project management, totaling USD15.8 million (equivalent to RM74.5 million). It was awarded by the Mayoralty of Baghdad to a JV company comprising HSS Engineering
Sdn Bhd and UAE-registered Consultant HSS, LLC ("CHSS"), entails the JV providing project management and supervision services for the Baghdad Metro. CHSS has been a long-standing partner of HEB, collaborating on multiple engineering consultancy projects in the Middle East.

为了启动该项目,合资企业将获得15%的项目管理预付款,总额为1,580万美元(相当于7,450万令吉)。它由巴格达市长授予了包括HSS Engineering在内的合资公司
Sdn Bhd和阿联酋注册的顾问公司HSS, LLC(“CHSS”)要求合资企业为巴格达地铁提供项目管理和监督服务。CHSS一直是HEB的长期合作伙伴,在中东合作开展了多个工程咨询项目。

HSSE and CHSS each hold a 50% equity stake in the JV. The USD17.5 billion Baghdad Metro is a national transformative project that aims to provide a sustainable and efficient mass transit solution to the capital's residential population of over eight million. The five-year undertaking entails the construction of a comprehensive seven-line, 148-km driverless metro network across 64 stations that will traverse underground, surface and elevated sections for seamless city-wide connectivity.

HSSE和CHSS各持有该合资企业50%的股权。耗资175亿美元的巴格达地铁是一个全国性的变革性项目,旨在为首都超过800万的居住人口提供可持续和高效的公共交通解决方案。这项为期五年的计划包括建设一个横跨64个车站的全面的七条线、148公里的无人驾驶地铁网络,该网络将穿越地下、地面和高架路段,实现全市范围的无缝连接。

HSS said the project attracted significant international interest, with multinational corporations from China, Germany, Italy, Spain, and Qatar submitting their prequalification to become the Design, Finance, Build, Operate, Maintain, and Transfer proponents.

HSS表示,该项目引起了极大的国际兴趣,来自中国、德国、意大利、西班牙和卡塔尔的跨国公司提交了成为设计、融资、建造、运营、维护和转让支持者的资格预审。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发