share_log

Minim Merger Company E2Companies To Install Patented R3Di System At Pennsylvania Pipe Manufacturer Oil Creek Plastics

Minim Merger Company E2Companies To Install Patented R3Di System At Pennsylvania Pipe Manufacturer Oil Creek Plastics

Minim Merger公司将在宾夕法尼亚州的Oil Creek Plastics管道制造商安装R3Di专利系统。
Benzinga ·  07/01 23:44

Integrated Energy Generation and Storage Solution Will Eliminate Costly Power Disruptions While Reducing Costs and Carbon Emissions

融合能量生成与存储方案将消除昂贵的电力中断,同时降低成本和碳排放。

Bonita Springs, Florida, July 1, 2024e2Companies, a leading provider of integrated solutions for power generation and distribution, will install its patented R3Di System to improve power quality and reliability for Oil Creek Plastics, a family owned and operated business in Titusville, Pennsylvania.

2024年7月1日,位于佛罗里达州博尼塔斯普林斯 — e2Companies,一家领先的综合供电和分配解决方案提供商,将安装其专利的R3Di系统,以改善宾夕法尼亚州提塔斯维尔的Oil Creek Plastics公司的电力质量和可靠性。

Located in the birthplace of the oil industry, the company has been an industry leader in the small diameter pipe and tubing market since 1972 and is known for its innovative products designed for multiple infrastructure applications. However, in recent years, disruptions in the power supply have become increasingly common at the facility, impacting production and leading to tens of thousands of dollars in downtime and material costs each month.

该公司位于石油工业的发源地,自1972年以来一直是小直径管道和管材市场的行业领导者,并因其为多种基础设施应用设计的创新产品而闻名。然而,近年来,设施的电力供应中断变得越来越普遍,这影响了生产,并导致每月数万美元的停机和材料成本。

The facility uses sensitive electronic equipment used to manufacture large rolls of plastic pipe. When operations experienced a disruption in power, they had to restart production and recalibrate equipment.

该设施使用敏感的电子设备用于制造大卷塑料管。当运营遇到电力中断时,必须重新启动生产并重新校准设备。

To solve these challenges, the R3Di System will provide two megawatts (2MW) of uninterruptible, conditioned power for the building. In addition to connecting to the electric grid and a natural gas generator, the R3Di System will store energy from the facility's 1000kW solar photovoltaic panels.

为了解决这些问题,R3Di系统将为建筑物提供2兆瓦(2MW)的不间断、调节电力。除了连接到电网和天然气发电机外,R3Di系统还将储存来自该设施的1000千瓦太阳能光伏面板的能量。

e2Companies combines the system with grid optimization software and services to strategically dispatch power based on weather, market pricing, and grid conditions to make it a full-service Virtual UtilityR, the first utility-grade network of Distributed Energy Resources (DERs) operating as a turnkey, integrated solution.

e2Companies结合网格优化软件和服务,根据天气、市场定价和网格条件战略性地调度电力,使其成为全方位的Virtual UtilityR,也是第一个作为一体化解决方案运作的分布式能源资源(DERs)的公用事业级网络。

The project is expected to be completed and commissioned by the end of 2025.

该项目预计将于2025年底完成并投入使用。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发