share_log

Silver Tiger Intersects 59.0 Metres of 66.7 G/t Silver Equivalent in the Stockwork Zone Including 2.0 Metres of 635.1 G/t Silver Equivalent Within the High-Grade El Tigre Vein

Silver Tiger Intersects 59.0 Metres of 66.7 G/t Silver Equivalent in the Stockwork Zone Including 2.0 Metres of 635.1 G/t Silver Equivalent Within the High-Grade El Tigre Vein

Silver Tiger在矿脉区内遇到了包括2米长的635.1g/t白银当量在内的59.0米长的66.7g/t白银当量的股状矿体
Accesswire ·  07/09 07:00

HALIFAX, NS / ACCESSWIRE / July 9, 2024 / Silver Tiger Metals Inc. (TSXV:SLVR)(OTCQX:SLVTF) ("Silver Tiger" or the "Company") is pleased to provide an update on the first 125 drill holes of the Company's Pre-Feasibility Study ("PFS") drilling program on its El Tigre Project in Sonora, Mexico. These new results are highlighting the expansion of the mineralization along the Hanging Wall Zone of the PEA "Starter Pit".

新泽西州哈利法克斯/ACCESSWIRE/2024年7月9日/银虎金属公司(多伦多证券交易所股票代码:SLVR)(OTCQX: SLVTF)(“Silver Tiger” 或 “公司”)很高兴提供该公司在墨西哥索诺拉的El Tigre项目预可行性研究(“PFS”)钻探计划前125个钻孔的最新情况。这些新结果突显了PEA “起始坑” 悬壁区沿线矿化的扩大。

Silver Tiger Attends the Rule Symposium

Silver Tiger 出席规则研讨会

This week Silver Tiger is attending the Rule Symposium in Boca Raton, Florida. Glenn Jessome, Silver Tiger's CEO, will be delivering a breakfast presentation at the Rule Symposium on Thursday, July 11. The Rule Symposium is a resource investing forum hosted by Rick Rule. Silver Tiger will be located in Booth 44 at the Symposium.

本周,Silver Tiger将参加在佛罗里达州博卡拉顿举行的规则研讨会。银虎首席执行官格伦·杰索姆将于7月11日星期四在规则研讨会上发表早餐演讲。规则研讨会是由里克·鲁尔主办的资源投资论坛。Silver Tiger 将设在研讨会的44号展位上。

Drill hole ET-24-592 intersected the Hanging Wall Stockwork Zone with 59.0 metres grading 66.7 g/t silver equivalent or 0.89 g/t gold equivalent from 80.3 to 139.3 metres, consisting of 0.62 g/t gold and 20.4 g/t silver INCLUDING the high-grade El Tigre Vein with 2.0 metres grading 635.1 g/t silver equivalent or 8.47 g/t gold equivalent from 134.5 to 136.5 metres, consisting of 2.33 g/t gold and 460.5 g/t silver (Figures 1). The hole was lost in the open stope of the El Tigre vein and abandoned at a depth of 143.3 metres.

钻孔 Et-24-592 与 59.0 米的悬壁库存区相交,品位为 66.7 g/t 银当量或 0.89 g/t 金当量,从 80.3 到 139.3 米,由 0.62 g/t 金和 20.4 g/t 银组成,包括 2.0 米的等级 635.1 g/t 银当量或 8.47 g/t 金当量,从 134.5 到 136.5 米,含 2.33 g/t 的高品位的 El Tigre 矿脉黄金和 460.5 克/吨白银(图 1)。这个洞在埃尔蒂格雷矿脉的露天采场丢失了,在143.3米的深度被遗弃了。

Highlighted Intersections

突出显示的十字路口

New intersections through the Stockwork gold deposit, comprised of the Footwall, Hanging Wall and high-grade Keel Zones, are highlighted below, shown on Figure 2 and listed in Table 1.

下文突出显示了穿过Stockwork金矿的新十字路口,包括足墙、悬挂墙和高品位龙骨区域,如图2所示,并在表1中列出。

  • Drill hole ET-24-590: 72.0 metres grading 60.8 g/t silver equivalent or 0.81 g/t gold equivalent from 148.0 to 220.0 metres, consisting of 0.62 g/t gold and 14.5 g/t silver INCLUDING 24.0 metres grading 90.2 g/t silver equivalent or 1.20 g/t gold equivalent from 181.5 to 205.5 metres consisting of 1.02 g/t gold and 14.0 g/t silver. The hole shows consistent, high-grade mineralization some 100 metres north of the Starter Pit area, expanding mineralization to the north.

  • Drill hole ET-24-588: 22.0 metres grading 101.5 g/t silver equivalent or 1.35 g/t gold equivalent from 76.5 to 98.5 metres, consisting of 0.62 g/t gold and 54.7 g/t silver AND 11.0 metres grading 139.4 g/t silver equivalent or 1.86 g/t gold equivalent from 146.5 to 157.5 metres consisting of 0.16 g/t gold and 127.7 g/t silver. The hole confirms the Hanging Wall Zone 400 metres south of the Starter Pit and confirms unmined, high-grade El Tigre Vein in the area.

  • Drill hole ET-24-586: 18.2 metres grading 46.2 g/t silver equivalent or 0.62 g/t gold equivalent from 1.0 to 19.2 metres, consisting of 0.53 g/t gold and 6.6 g/t silver in the Footwall Zone AND 1.8 metres grading 1123.4 g/t silver equivalent or 14.98 g/t gold equivalent from 33.7 to 35.5 metres consisting of 1.10 g/t gold and 1041.0 g/t silver in the El Tigre Vein showing high-grade, consistent mineralization to south of PEA 'Starter Pit.

  • 钻孔Et-24-590:从148.0到220.0米的72.0米品位为60.8克/吨的银当量或0.81克/吨的金当量,由0.62克/吨的金和14.5克/吨的银包括24.0米品位为90.2克/吨的银当量或181.5至205.5米的1.20克/吨金当量,由1.02克/吨的金和14.0克/吨的银当量组成。该洞在 Starter Pit 区域以北约 100 米处显示出持续的高品位矿化,矿化向北扩展。

  • 钻孔Et-24-588:从76.5到98.5米的22.0米品位为101.5克/吨的银当量或1.35克/吨的黄金当量,包括0.62克/吨的金和54.7克/吨的银,以及11.0米品位为139.4克/吨的银当量或1.86克/吨的黄金当量,由0.16克/吨的金和127.7克/吨的银当量组成。该洞证实了起始矿坑以南 400 米处的悬墙区域,并证实了该地区未开采的高等级 El Tigre 矿脉。

  • Et-24-586 钻孔:从 1.0 到 19.2 米的 18.2 米品位为 46.2 g/t 银当量或 0.62 g/t 的黄金当量,在 Footwall Zone 中包含 0.53 g/t 的金和 6.6 g/t 的银,品位为 1123.4 g/t 银当量或 14.98 g/t 金当量从 33.7 到 35.5 米,包括 El Tigre Vein 中的 1.10 g/t 金和 1041.0 g/t 银在 PEA 'Starter Pit 以南的高品位、稳定的矿化作用。


Figure 1 : Stockwork Zone Cross Section 4100 N
图 1:库存区域横截面 4100 N

Silver Tiger's CEO, Glenn Jessome, stated, "We continue to receive promising results for our PFS Drilling Program, especially in the newly defined Hanging Wall Zone and high-grade El Tigre Vein" Mr. Jessome further stated, "These results further de-risk the project, as we increase the confidence and size of the new MRE. We intend to release our PFS by September 2024."

Silver Tiger的首席执行官格伦·杰索姆表示:“我们的PFS钻探计划继续获得令人鼓舞的结果,尤其是在新定义的悬挂墙区和高品位的El Tigre矿脉。” 杰索姆进一步表示,“随着我们增加新MRE的信心和规模,这些结果进一步降低了该项目的风险。我们打算在2024年9月之前发布我们的PFS。”

On May 20 th , Silver Tiger has completed PFS Drilling, totalling 24,550 metres focused on expanding the Mineral Resource, upgrading the classification, completing metallurgical test work and geotechnical studies as it progresses from an exploration to a development project. The value-added PFS progress is on schedule for publication in H2-2024.

5月20日,Silver Tiger完成了PFS钻探,总长度为24,550米,重点是扩大矿产资源、升级分类、完成冶金测试工作和岩土工程研究,同时从勘探项目向开发项目推进。增值的 PFS 进展按计划在 H2-2024 中公布。


Figure 2: Stockwork Zone - Plan View
图 2:库存区域-平面图视图

Highlights from the on-going Pre-Feasibility Study Drilling Program include the following:

正在进行的预可行性研究钻探计划的亮点包括以下内容:

  • Expanding known mineralization by 10 to 15%, to the footwall and hanging wall zones, as well as the higher-grade 'Keel' at PEA pit bottom associated with the El Tigre and SK Veins;

  • Converting first two to three years of mineralized material in the potential 'Starter Stockwork Zone' from Indicated Mineral Resource to Measured;

  • Converting a significant portion of the 2 kilometres strike length 'ultimate' PEA pit-constrained Inferred Mineral Resource to Indicated;

  • Completion of enhanced PFS Metallurgical Drilling, with samples underway comminution and leach testing; and

  • Completion of enhanced PFS Geotechnical Drilling, with samples undergoing testing.

  • 将已知的矿化范围扩大10%至15%,扩展到脚下和悬壁区,以及与El Tigre和SK矿脉相关的PEA矿坑底部更高品位的 “龙骨”;

  • 将潜在的 “初始库存区” 中的前两到三年的矿化材料从指示矿产资源转化为已测矿产资源;

  • 将受矿坑限制的 2 千米走向长度 “极限” PEA 矿坑限制的推断矿产资源中的很大一部分转换为指示矿产资源;

  • 完成增强型 PFS 冶金钻探,样品正在进行粉碎和渗滤测试;以及

  • 完成增强型 PFS 岩土工程钻探,样品正在测试中。

Mineral Resource Drilling

矿产资源钻探

P&E Mining Consultants Inc. ("P&E") of Brampton, Ontario completed the initial MRE in 2017. On Oct 27, 2023, P&E released an updated El Tigre Project NI 43-101 and NI 43-01 F1 compliant MRE technical report titled "Technical Report and Updated Mineral Resource Estimate of the El Tigre Silver-Gold Project, Sonora, Mexico" authored by William Stone, Ph.D., P.Geo.,Yungang Wu, P.Geo., Fred H. Brown, P.Geo., Jarita Barry, P.Geo., David Burga, P.Geo., D. Grant Feasby, P.Eng., Eugene Puritch, P.Eng., FEC, CET and David Salari, P.Eng. The MRE has a pit-constrained Indicated Mineral Resource totaling 43.0 million tonnes containing 818 thousand ounces AuEq grading 0.59 g/t AuEq; and a pit-constrained Inferred Mineral Resource of 11.5 million tonnes containing 267 thousand ounces AuEq grading 0.72 g/t AuEq (see update MRE press release dated September 12 th 2023).

位于安大略省布兰普顿的P&E Mining Consultants Inc.(“P&E”)于2017年完成了最初的MRE。2023年10月27日,宝洁发布了最新的符合北卡罗来纳州El Tigre项目43-101和NI 43-01 F1标准的MRE技术报告,标题为 “墨西哥索诺拉州El Tigre银金项目的技术报告和最新矿产资源估算”,由P.Geo博士撰写。,P.Geo. Wu.、P.Geo. Fred H. Brown、P.Geo. Jarita Barry、P.Geo. David Burga、P.Eng. D. Grant Feasby、P.Eng. Eng. Eng.Eng. Eng. Eng.E.u.Eng. Eng. Eng.E.u.Eng. Eng.E.MRE拥有矿坑受限的指示矿产资源总量为4300万吨,含818万盎司AuEq,品位为0.59 g/t auEq;矿坑受限的推断矿产资源为1150万吨,含26.7万盎司AuEq,品位为0.72克/吨AuEq(见2023年9月12日最新的MRE新闻稿)。

PEA-level bench optimization of the pit-constrained Mineral Resource highlighted the higher-grade (~0.80 gpt AuEq), low strip ratio (~0.3) potential Starter Stockwork Zone (see PEA press release dated November 1 st , 2023). Recommendations of the PEA-level study included increasing Mineral Resource confidence in potential 'Starter Stockwork Zone' and additional exploratory drilling to target the 1) Footwall, 2) Hanging Wall and 3) 'Keel' areas of the Stockwork Zone. P&E were again retained to lead the current El Tigre PFS-level study. Complete and final assay results are listed in Table 1.

对矿坑受限的矿产资源进行PEA级别的基准优化凸显了更高品位(约0.80 gpt auEq)、低剥离率(约0.3)的潜在初始库存区(见PEA新闻稿,2023年11月1日)。PEA级别研究的建议包括提高矿产资源对潜在的 “初级库存区” 的信心,以及进行更多勘探性钻探,以瞄准库区的 1) 脚墙、2) 悬挂墙和3) “龙骨” 区域。P&E 再次获聘领导当前的 El Tigre PFS 级别研究。表 1 中列出了完整和最终的化验结果。

Below, highlighted intersections are enumerated with reference to the three (3) zones targeted (Figure 2):

下面,参照目标三 (3) 个区域列举了突出显示的交叉点(图 2):

  • Drill hole ET-24-590: The hole shows consistent, high grade mineralization some 100 metres north of the Starter Pit area, expanding mineralization to the north;

  • Drill hole ET-24-592: The hole carries the stockwork zone mineralization in the Hanging Wall of the Stater Pit area,

  • Drill hole ET-24-588 The hole confirms the Hanging Wall Zone 400 metres south of the Starter Pit and confirms unmined, high-grade El Tigre Vein in the area; and

  • Drill hole ET-24-586: The Hole intersects the El Tigre Vein showing high-grade, consistent mineralization to south of PEA 'Starter Pit.

  • Et-24-590钻孔:该孔在起始矿区以北约100米处显示出持续的高品位矿化,矿化向北扩展;

  • 钻孔 Et-24-592:该孔承载着斯塔特矿区悬壁中的堆积区矿化,

  • 钻孔 Et-24-588 该洞证实了起始矿以南 400 米处的悬墙区域,并证实了该地区未开采的高品位 El Tigre 矿脉;以及

  • 钻孔 Et-24-586:该洞与埃尔蒂格雷矿脉相交,在 PEA 'Starter Pit 以南显示出高品位、稳定的矿化作用。

Table 1-Mineral Resource Drill Hole Results

表 1-矿产资源钻孔结果

AuEq Total (2)

AgEq Total (2)

Hole ID

Comment

From

To

Length (1)

Gold

Silver

m

m

m

g/t

g/t

g/t

g/t

ET-24-586

STOCKWORK ZONE

1.0

19.2

18.2

0.53

6.6

0.62

46.2

Mining VOID

32.0

33.7

1.7

*

*

*

*

El Tigre Vein

33.7

39.5

5.8

0.43

328.3

4.81

360.6

including

33.7

35.5

1.8

1.10

1041.0

14.98

1123.4

STOCKWORK ZONE

49.5

57.0

7.5

0.52

4.8

0.59

44.1

Seitz Kelly

66.0

78.4

12.4

0.54

13.7

0.72

54.1

ET-24-587

STOCKWORK ZONE

100.0

108.0

8.0

0.43

1.6

0.46

34.2

STOCKWORK ZONE

129.0

185.8

56.8

0.26

3.5

0.31

23.0

STOCKWORK ZONE

237.3

244.0

6.7

0.13

12.8

0.30

22.4

Mining VOID

245.8

249.0

3.2

*

*

*

*

ET-24-588

STOCKWORK ZONE 3

76.5

98.5

22.0

0.62

54.7

1.35

101.5

STOCKWORK ZONE

114.0

122.5

8.5

0.37

1.8

0.39

29.2

STOCKWORK ZONE

146.5

157.5

11.0

0.16

127.7

1.86

139.4

including

147.5

152.0

4.5

0.25

268.8

3.83

287.4

ET-24-590

STOCKWORK ZONE

148.0

220.0

72.0

0.62

14.5

0.81

60.8

including

181.5

205.5

24.0

1.02

14.0

1.20

90.2

ET-24-592

STOCKWORK ZONE

80.3

139.3

59.0

0.62

20.4

0.89

66.7

including

125.5

136.5

11.0

1.18

86.6

2.34

175.5

including

134.5

136.5

2.0

2.33

460.5

8.47

635.1

Mining VOID

139.3

143.3

4.0

*

*

*

*

ET-24-593

STOCKWORK ZONE

26.9

40.6

13.7

0.67

4.4

0.73

54.7

STOCKWORK ZONE

66.8

77.5

10.7

1.04

1.6

1.06

79.5

STOCKWORK ZONE

136.5

145.5

9.0

0.87

0.6

0.88

65.8

ET-24-594

STOCKWORK ZONE 4

186.5

231.5

45.0

0.43

10.6

0.57

42.7

ET-24-595

STOCKWORK ZONE

7.0

10.0

3.0

1.03

1.8

1.06

79.3

STOCKWORK ZONE

64.5

73.5

9.0

0.39

1.3

0.40

30.1

ET-24-596

STOCKWORK ZONE

29.8

37.9

8.1

1.08

1.7

1.10

82.4

including

34.1

35.4

1.3

3.03

3.0

3.07

230.2

ET-24-597

STOCKWORK ZONE

33.2

42.1

8.9

0.48

46.5

1.10

82.2

Mining VOID

42.1

46.0

3.9

*

*

*

*

ET-24-598

STOCKWORK ZONE 5

13.0

47.0

34.0

0.31

9.2

0.43

32.4

STOCKWORK ZONE

61.0

67.0

6.0

0.46

0.8

0.47

35.0

auEQ 总计 (2)

AgeQ 总计 (2)

洞 ID

评论

来自

长度 (1)

m

m

m

g/t

g/t

g/t

g/t

ET-24-586

库存区

1.0

19.2

18.2

0.53

6.6

0.62

46.2

挖矿 VOID

32.0

33.7

1.7

*

*

*

*

El Tigre Vein

33.7

39.5

5.8

0.43

328.3

4.81

360.6

包括

33.7

35.5

1.8

1.10

1041.0

14.98

1123.4

库存区

49.5

57.0

7.5

0.52

4.8

0.59

44.1

塞茨·凯利

66.0

78.4

12.4

0.54

13.7

0.72

54.1

ET-24-587

库存区

100.0

108.0

8.0

0.43

1.6

0.46

34.2

库存区

129.0

185.8

56.8

0.26

3.5

0.31

23.0

库存区

237.3

244.0

6.7

0.13

12.8

0.30

22.4

挖矿 VOID

245.8

249.0

3.2

*

*

*

*

ET-24-588

StockWork 区域 3

76.5

98.5

22.0

0.62

54.7

1.35

101.5

库存区

114.0

122.5

8.5

0.37

1.8

0.39

29.2

库存区

146.5

157.5

11.0

0.16

127.7

1.86

139.4

包括

147.5

152.0

4.5

0.25

268.8

3.83

287.4

ET-24-590

库存区

148.0

220.0

72.0

0.62

14.5

0.81

60.8

包括

181.5

205.5

24.0

1.02

14.0

1.20

90.2

ET-24-592

库存区

80.3

139.3

59.0

0.62

20.4

0.89

66.7

包括

125.5

136.5

11.0

1.18

86.6

2.34

175.5

包括

134.5

136.5

2.0

2.33

460.5

8.47

635.1

挖矿 VOID

139.3

143.3

4.0

*

*

*

*

ET-24-593

库存区

26.9

40.6

13.7

0.67

4.4

0.73

54.7

库存区

66.8

77.5

10.7

1.04

1.6

1.06

79.5

库存区

136.5

145.5

9.0

0.87

0.6

0.88

65.8

ET-24-594

StockWork 区域 4

186.5

231.5

45.0

0.43

10.6

0.57

42.7

ET-24-595

库存区

7.0

10.0

3.0

1.03

1.8

1.06

79.3

库存区

64.5

73.5

9.0

0.39

1.3

0.40

30.1

ET-24-596

库存区

29.8

37.9

8.1

1.08

1.7

1.10

82.4

包括

34.1

35.4

1.3

3.03

3.0

3.07

230.2

ET-24-597

库存区

33.2

42.1

8.9

0.48

46.5

1.10

82.2

挖矿 VOID

42.1

46.0

3.9

*

*

*

*

ET-24-598

StockWork 区域 5

13.0

47.0

34.0

0.31

9.2

0.43

32.4

库存区

61.0

67.0

6.0

0.46

0.8

0.47

35.0

Notes:

注意事项:

  1. Not true width.

  2. Silver Equivalent ("AgEq") ratios are based on a silver to gold price ratio of 75:1 (Au:Ag).

  3. Excludes 2.00 metres of Mining void

  4. Excludes 1.80 metres of Mining void

  5. Excludes 1.70 metres of Mining void

  1. 不是真正的宽度。

  2. 白银当量(“AgeQ”)比率基于白银与黄金的价格比率为 75:1(Au: Ag)。

  3. 不包括 2.00 米的采矿空隙

  4. 不包括 1.80 米的采矿空隙

  5. 不包括 1.70 米的采矿空隙

Drill hole ET-24-589 has no assays to report as the holes was aborted due to technical issues. Drill holes ET-24-591 and ET-24-599 have no assays to report as the holes were exploration-oriented and located on periphery of mineralization.

由于技术问题钻孔中止,Et-24-589没有化验结果可报告。Et-24-591和Et-24-599的钻孔没有可报告的化验结果,因为这些钻孔是以勘探为导向的,位于矿化边缘。

Table 2-Drill Hole Locations

表 2-钻孔位置

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Length

ET-24-586

671,202.5

3,383,902.1

1903.9

130

-45

103.0

ET-24-587

671,099.5

3,383,646.4

1981.5

90

-50

249.0

ET-24-588

671,175.5

3,383,654.4

2006.5

90

-50

264.0

ET-24-589

671,042.7

3,384,275.2

1979.1

110

-60

56.3

ET-24-590

671,038.0

3,384,544.4

2097.6

90

-75

251.5

ET-24-591

671,231.6

3,384,202.0

2024.9

90

-45

105.0

ET-24-592

671,056.2

3,384,119.6

1935.7

90

-45

143.3

ET-24-593

671,205.1

3,384,149.2

2016.6

90

-45

150.0

ET-24-594

671,044.1

3,384,589.1

2099.0

90

-85

281.5

ET-24-595

671,217.0

3,384,193.6

2015.5

90

-45

126.0

ET-24-596

671,308.0

3,383,192.1

1846.2

90

-45

76.9

ET-24-597

671,010.2

3,384,850.0

1891.8

90

-80

46.0

ET-24-598

671,011.6

3,384,850.0

1892.1

90

-45

74.0

ET-24-599

671,212.3

3,384,302.1

2004.0

90

-45

102.0

洞 ID

向东

北方

海拔

方位角

长度

ET-24-586

671,202.5

3,383,902.1

1903.9

130

-45

103.0

ET-24-587

671,099.5

3,383,646.4

1981.5

90

-50

249.0

ET-24-588

671,175.5

3,383,654.4

2006.5

90

-50

264.0

ET-24-589

671,042.7

3,384,275.2

1979.1

110

-60

56.3

ET-24-590

671,038.0

3,384,544.4

2097.6

90

-75

251.5

ET-24-591

671,231.6

3,384,202.0

2024.9

90

-45

105.0

ET-24-592

671,056.2

3,384,119.6

1935.7

90

-45

143.3

ET-24-593

671,205.1

3,384,149.2

2016.6

90

-45

150.0

ET-24-594

671,044.1

3,384,589.1

2099.0

90

-85

281.5

ET-24-595

671,217.0

3,384,193.6

2015.5

90

-45

126.0

ET-24-596

671,308.0

3,383,192.1

1846.2

90

-45

76.9

ET-24-597

671,010.2

3,384,850.0

1891.8

90

-80

46.0

ET-24-598

671,011.6

3,384,850.0

1892.1

90

-45

74.0

ET-24-599

671,212.3

3,384,302.1

2004.0

90

-45

102.0

Figure 4: El Tigre - Conceptual Cross-Section Showing Mineralization Styles

图 4:El Tigre-显示矿化风格的概念横截面

Figure 5: El Tigre-Longitudinal Projection Showing Exploration Potential

图 5:显示勘探潜力的 El Tigre-纵向投影

About Silver Tiger and the El Tigre Historic Mine District

关于 Silver Tiger 和 El Tigre 历史矿区

Silver Tiger Metals Inc. is a Canadian company whose management has more than 25 years' experience discovering, financing and building large hydrothermal silver projects in Mexico. Silver Tiger's 100% owned 28,414 hectare historic El Tigre Mining District is located in Sonora, Mexico. Principled environmental, social and governance practices are core priorities at Silver Tiger.

Silver Tiger Metals Inc. 是一家加拿大公司,其管理层在墨西哥发现、融资和建设大型热液银项目方面拥有超过25年的经验。Silver Tiger 100% 拥有占地 28,414 公顷的历史悠久的埃尔蒂格雷矿区,位于墨西哥索诺拉。有原则的环境、社会和治理实践是Silver Tiger的核心优先事项。

The El Tigre historic mine district is located in Sonora, Mexico and lies at the northern end of the Sierra Madre silver and gold belt which hosts many epithermal silver and gold deposits, including Dolores, Santa Elena and Las Chispas at the northern end. In 1896, gold was first discovered on the Property in the Gold Hill area and mining started with the Brown Shaft in 1903. The focus soon changed to mining silver veins in the area with production coming from 3 parallel veins the El Tigre Vein, the Seitz Kelley Vein and the Sooy Vein. Underground mining on the middle El Tigre Vein extended 1,450 metres along strike and was mined on 14 levels to a depth of approximately 450 metres. The Seitz Kelley Vein was mined along strike for 1 kilometre to a depth of approximately 200 metres. The Sooy Vein was only mined along strike for 250 metres to a depth of approximately 150 metres. Mining abruptly stopped on all three of these veins when the price of silver collapsed to less than US20¢ per ounce with the onset of the Great Depression. By the time the mine closed in 1930, it is reported to have produced a total of 353,000 ounces of gold and 67.4 million ounces of silver from 1.87 million tons (Craig, 2012). The average grade mined during this period was over 2 kilograms silver equivalent per ton.

埃尔蒂格雷历史矿区位于墨西哥索诺拉,位于马德雷山脉银金带的北端,那里有许多超热银和金矿床,包括北端的多洛雷斯、圣埃琳娜和拉斯奇斯帕斯。1896年,金山地区的该地产首次发现了黄金,1903年从棕矿井开始开采。重点很快转向了开采该地区的银矿脉,产量来自三条平行矿脉,即埃尔蒂格雷矿脉、塞茨凯利矿脉和苏伊矿脉。埃尔蒂格雷脉中部的地下采矿沿着走向延伸了1,450米,在14层进行了地下采矿,深度约为450米。Seitz Kelley Vein 沿着走向地雷开采了 1 千米,深度约为 200 米。Sooy Vein 仅在攻击沿线 250 米处埋设地雷,深度约为 150 米。随着大萧条的开始,白银价格跌至每盎司20美分以下,这三条矿脉的采矿突然停止了。据报道,到1930年该矿关闭时,它从187万吨中总共生产了35.3万盎司黄金和6,740万盎司白银(Craig,2012年)。在此期间开采的平均品位超过每吨2千克白银当量。

The El Tigre silver and gold deposit is related to a series of epithermal veins controlled by a north-south trending structure cutting across the andesitic and rhyolitic tuffs of the Sierra Madre Volcanic Complex within a broad silver and gold mineralized prophylitic alteration zone developed in the El Tigre Formation that can be up to 150 metres wide. The veins dip steeply to the west and are typically 0.5 metre wide; however, locally can be up to 5 metres in width. The veins, structures and mineralized zones outcrop on surface and have been traced for 5.3 kilometres along strike in our brownfield exploration area. Historical mining and exploration activities focused on a 1.6-kilometre portion of the southern end of the deposits, principally on the El Tigre, Seitz Kelly and Sooy veins. The under explored Caleigh, Benjamin, Protectora and the Fundadora exposed veins continue north for more than 3 kilometres. Silver Tiger has delivered its updated NI 43-101 compliant Mineral Resource Estimate and PEA and is currently drilling to update its Mineral Resource Estimate and publish a PFS.

埃尔蒂格雷银金矿床与一系列超热矿脉有关,该矿脉由南北向结构控制,该结构横跨马德雷山脉火山群的安第斯岩和流纹凝灰岩,位于埃尔蒂格雷组开发的宽阔的银金矿化预生蚀变带内,宽度可达150米。静脉向西陡峭地倾斜,宽度通常为 0.5 米;但是,局部静脉的宽度可达 5 米。矿脉、结构和矿化带在地表露出,沿着我们的棕地勘探区域走向进行了5.3公里的追踪。历史上的采矿和勘探活动集中在矿床南端1.6公里处,主要是埃尔蒂格雷、塞茨凯利和苏伊矿脉。未开发的卡利、本杰明、Protectora和Fundadora裸露的矿脉向北延伸了3公里以上。Silver Tiger已经发布了符合NI 43-101标准的最新矿产资源估算和PEA,目前正在进行钻探,以更新其矿产资源估算并发布PFS。

VRIFY Slide Deck and 3D Presentation - Silver Tiger's El Tigre Project

VRIFY 幻灯片和 3D 演示文稿——Silver Tiger 的 El Tigre 项目

VRIFY is a platform being used by companies to communicate with investors using 360° virtual tours of remote mining assets, 3D models and interactive presentations. VRIFY can be accessed by website and with the VRIFY iOS and Android apps.

VRIFY是公司使用的一个平台,通过远程采矿资产的360°虚拟导览、三维模型和交互式演示与投资者进行沟通。可以通过网站以及 VRIFY iOS 和安卓应用程序访问 VRIFY。

Access the Silver Tiger Metals Inc. Company Profile on VRIFY at:

在 VRIFY 上访问 Silver Tiger Metals Inc. 公司简介,网址为:

The VRIFY Slide Deck and 3D Presentation for Silver Tiger Metals Inc. can be viewed at: and on the Corporation's website at: .

Silver Tiger Metals Inc. 的 VRIFY Slide Deck 和 3D 演示文稿可以在以下网址查看:也可以在公司的网站上查看:。

Procedure, Quality Assurance / Quality Control and Data Verification

程序、质量保证/质量控制和数据验证

The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the sample lengths are determined, the full drill core is sawn with a diamond blade drill core saw with one half of the drill core being bagged and tagged for assay. The remaining half portion is returned to the drill core trays for storage and/or for metallurgical test work.

金刚石钻芯(HQ 尺寸)经过地质记录、拍照并标记以供采样。确定样品长度后,使用金刚石刀片钻芯锯切割整个钻芯,将一半的钻芯装袋并标记进行化验。剩余的一半将返回钻芯托盘进行储存和/或进行冶金测试工作。

The sealed and tagged drill core sample bags are transported to the Bureau Veritas facility in Hermosillo, Mexico. Bureau Veritas crushes the samples (Code PRP70-250) and prepares 200-300 gram pulp samples with ninety percent passing Tyler 200 mesh (Code PUL85). The pulps are assayed for gold using a 30-gram charge by fire assay (Code FA630) and over limits greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code FA530). Silver and multi-element analysis is completed using total digestion (Code MA200 Total Digestion ICP). Over limits greater than 100 grams per tonne silver are re-assayed using a gravimetric finish (Code FA530).

密封并贴有标签的钻芯样品袋被运送到墨西哥埃莫西约的必维集团工厂。必维国际检验集团压碎样品(代码 PRP70-250),制备 200-300 克纸浆样品,百分之九十通过泰勒 200 目(代码 PUL85)。使用30克的电荷通过火法试验(代码 FA630)对纸浆进行金检测,超过每吨10克的限值使用重量法完成(代码 FA530)重新测定。银和多元素分析使用全消化(代码 MA200 总消化 ICP)完成。对于超过限值的每吨 100 克的银,使用重量法进行重新分析(代码 FA530)。

Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and includes the systematic insertion and monitoring of appropriate reference materials (certified reference materials, blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have passed Silver Tiger's QA/QC protocols.

质量保证和质量控制(“QA/QC”)程序对样品的监管链进行监管,包括系统地将适当的参考材料(经认证的参考材料、空白和副本)插入样本串并进行监测。跟踪每批中包含的质量保证/质量控制材料的分析结果,以确保分析数据的完整性。本公告中列出的所有结果均已通过Silver Tiger的质量保证/质量控制协议。

Qualified Person

合格人员

David R. Duncan, P. Geo., V.P. Exploration of the Corporation, is the Qualified Person for Silver Tiger as defined under National Instrument 43-101. Mr. Duncan has reviewed and approved the scientific and technical information in this press release.

根据国家仪器43-101的定义,公司勘探副总裁David R. Duncan,P. Geo.,是银虎合格人士。邓肯先生审查并批准了本新闻稿中的科学和技术信息。

For further information, please contact:

欲了解更多信息,请联系:

Glenn Jessome
President and CEO
902 492 0298
jessome@silvertigermetals.com

Glenn Jessome
总裁兼首席执行官
902 492 0298
jessome@silvertigermetals.com

CAUTIONARY STATEMENT:

警示声明:

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

This News Release includes certain "forward-looking statements". All statements other than statements of historical fact included in this release, including, without limitation, statements regarding potential mineralization, Mineral Resources and Mineral Reserves, the ability to convert Inferred Resources to Indicated Resources, the ability to complete future drilling programs and infill sampling, the ability to extend Mineral Resource blocks, the similarity of mineralization at El Tigre to Delores, Santa Elena and Chispas, exploration results, and future plans and objectives of Silver Tiger, are forward-looking statements that involve various risks and uncertainties. Forward-looking statements are frequently characterized by words such as "may", "is expected to", "anticipates", "estimates", "intends", "plans", "projection", "could", "vision", "goals", "objective" and "outlook" and other similar words. Although Silver Tiger believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, there can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Silver Tiger's expectations include risks and uncertainties related to exploration, development, operations, commodity prices and global financial volatility, risk and uncertainties of operating in a foreign jurisdiction as well as additional risks described from time to time in the filings made by Silver Tiger with securities regulators.

本新闻稿包括某些 “前瞻性陈述”。除本新闻稿中包含的历史事实陈述外,所有陈述,包括但不限于有关潜在矿化、矿产资源和矿产储量、将推断资源转换为指示资源的能力、完成未来钻探计划和填充采样的能力、扩展矿产资源区块的能力、埃尔蒂格雷矿化与德洛雷斯、圣埃琳娜和奇斯帕斯的相似之处、勘探结果以及银虎未来的计划和目标的陈述,均为前瞻性陈述这样的陈述涉及各种风险和不确定性。前瞻性陈述通常以 “可能”、“预期”、“预期”、“估计”、“打算”、“计划”、“预测”、“可能”、“愿景”、“目标”、“目标” 和 “展望” 等词语以及其他类似词语来表征。尽管Silver Tiger认为此类前瞻性陈述中表达的预期是基于合理的假设,但无法保证此类陈述会被证明是准确的,实际结果和未来事件可能与此类陈述中的预期存在重大差异。可能导致实际业绩与银虎预期存在重大差异的重要因素包括与勘探、开发、运营、大宗商品价格和全球金融波动相关的风险和不确定性、在外国司法管辖区经营的风险和不确定性,以及银虎向证券监管机构提交的文件中不时描述的其他风险。

SOURCE: Silver Tiger Metals Inc.

来源:银虎金属公司


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发