share_log

Intrepid Metals Drills 20.20% Cu, 8.51 Gpt Au and 250.00 Gpt Ag (23.85% CuEq) at Its Corral Copper Property in Arizona

Intrepid Metals Drills 20.20% Cu, 8.51 Gpt Au and 250.00 Gpt Ag (23.85% CuEq) at Its Corral Copper Property in Arizona

英特瑞德金属在亚利桑那州的Corral铜矿产区钻获20.20%的铜、8.51克/吨的金和250.00克/吨的银(23.85%的贵金属铜当量)。
newsfile ·  07/09 07:00

Vancouver, British Columbia--(Newsfile Corp. - July 9, 2024) - Intrepid Metals Corp. (TSXV: INTR) (OTCQB: IMTCF) ("Intrepid" or the "Company") is pleased to announce final results from its initial drill program on the Company's Corral Copper Property ("Corral" or the "Property") in Cochise County, Arizona. The final three holes contain the highest-grade intercept from the initial drill program and are all located within the Ringo Zone (Figure 1 & Photo 1), which is located along the southern margin of the 3.5-kilometer-long trend of near surface copper-gold-silver-zinc mineralization.

2024年7月9日,卑诗省温哥华(新闻稿 - Newsfile Corp.) - 勇往直前金属(TSXV:INTR)(OTCQB:IMTCF)(“勇往直前”或“公司”)很高兴地宣布其戈切斯县(亚利桑那州) Corral铜矿产权(“Corral”或“产权”)上进行的首个钻探计划的最终结果。最终的三个钻孔含有初步钻探计划中最高品位的拦截结果,所有这些结果均位于Ringo区(图1和照片1)内,该区域位于近地表铜 - 金 - 银 - 锌成矿趋势的3.5公里长的南侧边缘。

Highlights from the final drill holes include:

最后的钻探孔亮点包括:

  • 112.95 meters ("m") of 1.50% Copper ("Cu"), 0.53 grams per ton ("gpt") Gold ("Au") and 8.22 gpt Silver ("Ag") (1.66% Copper Equivalent ("CuEq")1) in Hole CC24_023; including,
    • 63.40m of 2.57% Cu, 0.91 gpt Au and 14.14 gpt Ag (2.83% CuEq1)
    • 13.40m of 6.72% Cu, 1.49 gpt Au and 46.93 gpt Ag (6.90% CuEq1) and
    • 1.40m of 20.20% Cu, 8.51 gpt Au and 250.00 gpt Ag (23.85% CuEq1).
  • 64.95m of 0.84% Cu, 0.35 gpt Au and 2.83 gpt Ag (0.96% CuEq1) in Hole CC24_025 including,
    • 15.65m of 1.55% Cu, 0.55 gpt Au and 2.52 gpt Ag (1.71% CuEq1) and
    • 3.80m of 2.75% Cu, 1.07 gpt Au and 8.25 gpt Ag (3.13% CuEq1).
  • CC24_023号孔,112.95米铜(Cu)1.50%,金(Au)0.53克/吨和银(Ag)8.22克/吨(相当于1.66%的铜当量(CuEq));其中,
    • 6340万的铜2.57%,金0.91克/吨和银14.14克/吨(2.83%的铜当量1),
    • 1340万的铜6.72%,金1.49克/吨和银46.93克/吨(6.90%的铜当量1),以及
    • 140万的铜20.20%,金8.51克/吨和银250.00克/吨(23.85%的铜当量1)。
  • CC24_025号孔,6495米的铜(Cu),0.35克/吨的金(Au)和2.83克/吨的银(Ag)(相当于0.96%的铜当量1); 其中,
    • 1565万的铜1.55%,金0.55克/吨和银2.52克/吨(相当于1.71%的铜当量1);以及
    • 380万的铜2.75%,金1.07克/吨和银8.25克/吨(3.13%的铜当量1)

"We've ended our initial drill program at Corral with our best results," stated Ken Brophy, Chief Executive Officer of the Company. "We are just beginning to scratch the surface of the potential with shallow and high-grade copper and gold mineralization within private lands at Corral Copper. We've completed additional mapping and are compiling all the data we have collected to date. This will guide our planning for our next drill program, which we anticipate taking place later this year."

该公司的首席执行官Ken Brophy表示:“我们在Corral的首个钻探计划取得了最佳成果。在Corral Copper的私有土地内,我们只是开始挖掘浅层和高品位的铜和金矿化的潜力。我们已经完成了额外的勘测,并正在编制我们迄今为止收集的所有数据。这将指导我们计划进行的下一次钻探计划,我们预计将在今年晚些时候进行。

Mark Morabito, the founder and Chairman of Intrepid, expresses, "On behalf of the Board of Directors, I want to extend congratulations to our CEO Ken Brophy and the entire team in Vancouver and southern Arizona. They have successfully completed an inaugural drill program with outstanding results, showcasing the significant potential of the Corral Copper Project. This marks just the beginning at Corral, and we are incredibly pleased with our initial progress."

勇往直前的创始人兼主席Mark Morabito表示:“我代表董事会向我们的首席执行官Ken Brophy和整个位于温哥华和美国南部亚利桑那州的团队表示祝贺。他们已经成功完成了首个钻探计划,并逐步展示了Corral Copper项目的重要潜力。这只是Corral的开始,我们对我们的初步进展非常满意。

Daniel MacNeil, MSc PGeo, Technical Advisor to Intrepid stated, "The highly successful 2024 drill program intercepted extensive and locally high-grade copper-gold-silver-zinc mineralization across a 3.5-kilometer metal endowed trend that contains the Holliday, Earp and Ringo zones at Corral Copper. The exciting new geological data will be leveraged to target porphyry copper-gold root sources to the mineralization, as well as to build out and extend the high-grade replacement style polymetallic domains. The drill results indicate that the mineralized footprint is more extensive than historically appreciated because robust copper-gold-silver-zinc mineralization has now been detected beyond the favourable Abrigo Formation host rocks in structural corridors and traps, porphyry intrusions, reactive diabase dikes and newly recognized hydrothermal breccias. The widespread mineralization is a reflection of the intensity of the hydrothermal system and the economic potential of the project."

勇往直前的技术顾问Daniel MacNeil,MSc,PGeo表示:“2024年高度成功的钻探计划拦截了Corral Copper的3.5公里金属禀赋趋势,涵盖了Holliday,Earp和Ringo区域,采掘了广泛和当地高品位的铜 - 金 - 银 - 锌矿化。激动人心的新地质数据将被用于挖掘矿物化产生的斑岩铜 - 金根源,并建立和扩展高品位可替代多金属域。钻探结果表明,矿化足迹比历史上所认识的更加广泛,因为强健的铜 - 金 - 银 - 锌矿化现在已在结构走廊和陷阱,斑岩侵入体,反应性辉绿岩岩脉和新认可的热液角砾岩之外被检测到。广泛的矿化反映了热液系统的强度和该项目的经济潜力。"

Table 1: New Drill Intercepts for the Ringo Zone1

表1:Ringo区的新钻探拦截结果1

COMPOSITE DRILL INTERCEPTS CC24-023 TO CC24-025
DRILL HOLE DETAILS ANALYZED GRADE ANALYZED METAL EQUIVALENT DILUTED METAL EQUIVALENT
HOLE FROM TO LENGTH COPPER GOLD SILVER ZINC CUEQ AUEQ CUEQ AUEQ
ID (m) (m) (m) (%) (ppm) (ppm) (%) (%) (g/t) (%) (g/t)
CC24-023 68.40 181.35 112.95 1.50 0.53 8.22 0.071 1.98 2.71 1.66 2.27
Incl. 117.95 181.35 63.40 2.57 0.91 14.14 0.093 3.38 4.64 2.83 3.89
Incl. 130.60 140.20 9.60 3.12 2.21 9.98 0.254 4.89 6.71 4.07 5.58
Incl. 144.15 174.00 29.85 4.09 0.77 24.91 0.025 4.87 6.67 4.10 5.62
And 144.15 167.90 23.75 4.47 0.85 29.36 0.029 5.35 7.34 4.50 6.17
And 160.60 174.00 13.40 6.72 1.49 46.93 0.043 8.21 11.26 6.90 9.47
And 163.75 170.50 6.75 10.95 2.64 88.53 0.080 13.65 18.72 11.47 15.73
And 165.15 166.55 1.40 20.20 8.51 250.00 0.110 28.55 39.15 23.85 32.71
CC24-024 34.00 86.00 52.00 0.29 0.10 0.89 0.003 0.38 0.52 0.32 0.44
Incl. 54.00 59.30 5.30 0.71 0.18 1.52 0.001 0.85 1.17 0.72 0.98
Incl. 78.00 86.00 8.00 0.39 0.23 0.91 0.002 0.57 0.78 0.47 0.65
CC24-024 119.00 202.20 83.20 0.33 0.20 4.00 0.425 0.64 0.88 0.53 0.72
Incl. 119.00 129.85 10.85 0.57 0.37 1.50 0.230 0.92 1.26 0.76 1.05
Incl. 158.20 159.35 1.15 5.90 0.51 15.70 0.026 6.41 8.79 5.42 7.44
Incl. 185.70 189.10 3.40 2.06 0.66 4.26 0.008 2.58 3.54 2.17 2.97
And 185.70 186.80 1.10 1.89 0.11 2.40 0.006 1.99 2.73 1.69 2.32
CC24-025 19.50 41.00 21.50 0.20 0.04 0.93 0.004 0.24 0.34 0.21 0.28
CC24-025 64.00 105.00 41.00 0.38 0.08 1.08 0.011 0.45 0.62 0.38 0.52
Incl. 79.55 82.00 2.45 2.81 0.11 4.01 0.033 2.93 4.02 2.49 3.41
And 79.55 80.35 0.80 7.07 0.08 6.50 0.047 7.20 9.87 6.11 8.38
CC24-025 117.00 181.95 64.95 0.84 0.35 2.83 0.134 1.15 1.58 0.96 1.32
Incl. 129.50 145.15 15.65 1.55 0.55 2.52 0.199 2.04 2.79 1.71 2.34
CC24-025 162.40 173.15 10.75 1.72 0.58 4.51 0.203 2.24 3.08 1.88 2.58
Incl. 162.40 166.80 4.40 1.66 0.33 2.31 0.009 1.93 2.64 1.62 2.23
Incl. 169.35 173.15 3.80 2.75 1.07 8.25 0.493 3.74 5.13 3.13 4.30
复合钻探CC24-023至CC24-025
钻探孔细节 分析品位 分析金属当量 稀释后的金属当量
长度 黄金 铜等价量 金等价量 铜等价量 金等价量
ID (米) (米) (米) (%) (ppm) (ppm) (%) (%) (克/吨) (%) (克/吨)
CC24-023 68.40 181.35 112.95 1.50 0.53 8.22 0.071 1.98 2.71 1.66 2.27
包括。 117.95 181.35 63.40 2.57 0.91 14.14 0.093 3.38 4.64 2.83 3.89
包括。 130.60 140.20 9.6 3.12 2.21 9.98 0.254 是行业板块平均水平的1.87倍市销率,表明相对同行而言,该公司的市销表现可能过高。 商业票据加权平均利率5.45%,2024年5月4日为5.43%,2023年8月26日为5.43% 4.07 5.58
包括。 144.15 174.00 29.85 ,有效利率为4.09% 0.77 24.91 0.025 4.87 6.67 4.10 5.62
以及 144.15 167.90 23.75 4.47 0.85 29.36 0.029 5.35%(2022年12月31日为4.41%) 7.34 4.50 6.17
以及 160.60 174.00 13.40 6.72 1.49 市销率46.93 0.043 8.21 11.26 6.90 9.47
以及 163.75 170.50 2021年债务支付 10.95 2.64 88.53 0.080 13.65 18.72 11.47元 15.73
以及 165.15 166.55 1.40 20.20 8.51 250.00 0.110 28.55 39.15 23.85 32.71美元
CC24-024 34.00 86.00 52.00 0.29 0.10 0.89 0.003 0.38 0.52 0.32 0.44
包括。 54.00 59.30 5.30 0.71 0.18 1.52美元 0.001 0.85 1.17 0.72 0.98
包括。 78.00 86.00 8.00 0.39 0.23 0.91 0.002 0.57 0.78 0.47 12,666
CC24-024 119.00 202.20 83.20 0.33 0.20 4.00 0.425 0.64 0.88 0.53 0.72
包括。 119.00 129.85 10.85 0.57 0.37 1.50 0.230 0.92 1.26 0.76 1.05
包括。 158.20 159.35 1.15 5.90 0.51 通道样品的记录和采样使用石灰岩空白材料和标准参考材料加入样品序列和/或在银或钴矿化的视觉识别之后进行。 样品由通道锯切成垂直于脉石的切口,并被固定在带标签的乙烯基样品袋中。 样品被运往安大略省蒂明斯(Timmins)的AGAT实验室,在那里称重,粉碎和研磨。 0.026 6.41 8.79 5.42 7.44
包括。 185.70 189.10 3.40 2.06 0.66 4.26 0.008 2.58 3.54 2.17 2.97
以及 185.70 186.80 1.10 1.89 0.11 2.40 0.006 1.99 2.73 1.69 2.32
CC24-025 19.50 41.00 21.50 0.20 0.04。 0.93 0.004 0.24 0.34 0.21 0.28
CC24-025 64.00 105.00 41.00 0.38 0.08 1.08 0.011 0.45 0.62 0.38 0.52
包括。 79.55 82.00 2.45 2.81 0.11 4.01 0.033 2.93 4.02 2.49 3.41
以及 79.55 80.35 0.80 7.07 0.08 6.50 0.047 7.20 9.87 6.11 8.38
CC24-025 117.00 181.95 64.95 0.84 0.35 2.83 0.134 1.15 1.58 0.96 1.32
包括。 129.50 145.15 15.65 1.55 0.55 2.52美元 0.199 2.04 2.79 1.71 2.34
CC24-025 162.40 173.15 10.75 1.72 0.58 4.51 0.203 2.24 3.08 1.88 2.58
包括。 162.40 166.80 4.40 1.66 0.33 2.31 0.009 1.93 2.64 1.62 2.23
包括。 169.35 173.15 3.80 2.75 1.07 8.25 0.493 3.74 5.13 3.13 4.30

2024 Corral Copper Diamond Drill Program

2024年Corral铜金刚石钻探计划 Intrepid在Corral铜私有地区完成了25口金刚石钻探孔(~4805.7米),其中295955万在Ringo,73640万在Earp和110975万在Holliday。Intrepid正在钻探一个3.5×1.5公里的铜-金-银-锌矿化足迹,以展示其容纳经济性CRD、混矿和相关斑岩铜矿化的潜力。有关钻探结果的详细信息,请参阅Intrepid于2024年5月1日、5月14日和6月19日发布的新闻稿。有关金属当量计算和真实宽度假设的信息,请参阅脚注。

Intrepid has completed 25 diamond drill holes (~4805.7m) within the private lands at Corral Copper including 2959.55m at Ringo, 736.40m at Earp and 1109.75m at Holliday. Intrepid is drill testing a 3.5 by 1.5 km copper-gold-silver-zinc mineralized footprint to demonstrate the potential to host economic CRD, skarn, and related porphyry copper mineralization. Please refer to Intrepid News Releases dated May 1, 2024, May 14, 2024 and June 19, 2024 for additional drill results. Please refer to footnotes for information regarding assumptions for metal equivalent calculations and true widths.

Corral铜的贵金属和基础金属矿化集中在东北倾斜的硅质碎屑岩和碳酸盐岩,包括(从旧到新)寒武系Bolsa石英岩、上寒武统Abrigo灰岩、泥盆纪Martín灰岩和二叠纪Escabrosa灰岩。最强烈的矿化出现在Abrigo灰岩(主要寄主岩)和Bolsa石英岩中,在局部被一系列侵入的侵入体所包围,其中包括Star Hill、Copper Bell和Sniveler斑岩、石英角闪岩岩床和交错的矿化角砾岩体。

Precious and base metal mineralization at Corral Copper is concentrated in structurally controlled northeast dipping siliciclastic and carbonate sedimentary rocks including (oldest to youngest) Cambrian Bolsa Quartzite, upper-Cambrian Abrigo Limestone, Devonian Martín limestone and Mississippian Escabrosa limestone. The most intense mineralization occurs in the Abrigo Limestone (main host) and Bolsa Quartzite, which are intruded locally by a series of Jurassic (and possibly younger) mineralized intrusions including the Star Hill, Copper Bell and Sniveler porphyries, quartz latite sills, and cross-cutting mineralized breccia bodies.

Corral铜物业包括从西北到东南的Holliday、Earp和Ringo区(),它们是不连续露头、局部高品位的CRD和斑岩铜有关的矿化和相关的超基因富集矿化的有关区,据解释它们形成于远离斑岩铜地质环境的地方。有关金属当量计算和真实宽度假设的详细信息,请参阅脚注。

The Corral Copper Property includes the Holliday, Earp and Ringo zones (northwest to southeast), which are related zones of discontinuously outcropping, locally high grade CRD and skarn related mineralization and associated supergene enrichment mineralization that are interpreted to have formed in the distal porphyry copper geological environment. Please refer to footnotes for details regarding assumptions for metal equivalent calculations and true widths.

Corral Copper Property包括从西北到东南的Holliday、Earp和Ringo区域,它们是不连续露头的相关区域,局部高品位CRD和skarn相关的矿化和相关的超基因浸染矿化物。据推断,这些相关的矿化物是在远离斑岩铜地质环境中形成的。有关金属当量计算和真实宽度的假设的详细信息,请参阅脚注。

As part of the initial 2024 drill program, Intrepid has executed 2959.55m of diamond drilling at Ringo, where near-surface copper-gold-sliver-zinc skarn and replacement style mineralization is spatially associated with magnetite and hematite. The Ringo Zone is located at the southern end of a 3km long string of copper-gold-silver-zinc bearing carbonate replacement bodies (Figure 1). The Ringo Zone measures approximately 900m (northwest to southeast) by 800m (southwest to northeast) and contains favorable Abrigo Limestone (and Bolsa Formation), pre-mineral intrusions, alteration and copper-gold-silver-zinc replacement style mineralization and secondary enriched copper oxide zones that are locally high-grade.

作为 2024 初期钻探计划的一部分,无畏公司已在 Ringo 进行了 295955 万克拉的金刚石钻探,其中地表附近的铜-金-银-锌矽卡岩和置换型矿化物与磁铁矿和赤铁矿有空间关联。Ringo 区位于一个长达 3 公里的铜-金-银-锌轴承碳酸盐置换体带的南端(图 1)。Ringo 区的面积约为 9,000 万平方米(从西北到东南),8000 万平方米(从西南到东北),包含了有利的 Abrigo 石灰岩(和 Bolsa 形成),矿前侵入体,蚀变和铜-金-银-锌置换型矿化和局部高品位的富集铜氧化物带。

Technical Information

技术信息

All scientific and technical information in this news release has been prepared by, or approved by Daniel MacNeil, P.Geo. Mr. MacNeil is a Technical Advisor to the Company and is a qualified person for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

本新闻稿中所有科学技术信息均由公司技术顾问 Daniel MacNeil,P.Geo. 准备或审核。MacNeil 先生是该公司的技术顾问,也是符合《加拿大证券管理局 43-101 号规定 - 矿产项目披露标准》的资格人员。

Mr. MacNeil has verified the drilling data disclosed in this news release, including the assay and test data underlying the information or opinions contained in this news release. Mr. MacNeil verified the data disclosed (or underlying the information disclosed) in this news release by reviewing imported and sorted assay data; checking the performance of blank samples and certified reference materials; reviewing the variance in field duplicate results; and reviewing grade calculation formulas. Mr. MacNeil detected no significant QA/QC issues during review of the data and is not aware of any sampling, recovery or other factors that could materially affect the accuracy or reliability of the drilling data referred to in this news release.

MacNeil 先生核实了本新闻稿中披露的钻井数据,包括信息或观点所依据的化验和测试数据。MacNeil 先生通过检查化验数据的导入和分类、检查空白样品和认证参考材料的性能、检查现场副本结果的差异以及审核品位计算公式等方式验证了本新闻稿中披露的数据(或信息的基础数据)。MacNeil 先生在审核数据期间未发现任何显著的 QA/QC 问题,并且不知道任何可能会对本新闻稿中提到的钻井数据的准确性或可靠性产生实质影响的取样、回收或其他因素。

Table 2: Drill Hole Location Information for Holes CC24-023 to CC24-0251

表 2:钻探孔位信息(CC24-023 至 CC24-0251)

HOLE EASTING NORTHING ELEVATION AZIMUTH INCLINATION DEPTH ZONE
ID (m) (m) (m) (°) (°) (m) NAME
CC24-023 613238 3513909 1425 50 -65 200.25 RINGO
CC24-024 613306 3513968 1422 320 -75 203.6 RINGO
CC24-025 613306 3513968 1422 140 -80 200.25 RINGO
东距 北纬 升高 方位角 倾角 深度 ZONE
ID (米) (米) (米) (度) (度) (米) 名称
CC24-023 613238 3513909 1425 50 -65 200.25 Ringo
CC24-024 613306 3513968 1422 320 -75 203.6 Ringo
CC24-025 613306 3513968 1422 140 -80 200.25 Ringo

Quality Assurance and Quality Control

质量保证和质量控制

Drill core was first reviewed by a geologist, who identified and marked intervals for sampling. The marked sample intervals were then cut in half with a diamond saw; half of the core was left in the core box and the other half was removed, placed in plastic bags, sealed and labeled. Intervals and unique sample numbers are recorded on the drill logs and the samples are sequenced with standards and blanks inserted according to a predefined QA/QC procedure. The samples are maintained under security on site until they are shipped to the analytical lab.

首先由地质学家对钻孔心进行了审查,确定了取样区间。然后用金刚石切割机将取样区间一分为二;一半留在岩心箱中,另一半移出放入塑料袋中,密封并贴上标签。样品区间和唯一样品编号记录在钻探日志上,并按照预定的 QA/QC 程序安排了标准和空白样品。直到运往分析实验室之前,样品都在现场保密。

All core samples were sent to ALS Geochemistry (ALS), a division of ALS Global, in Tucson, Arizona, for sample preparation, with pulps sent to the ALS Geochemistry laboratory in Reno, Nevada for analysis. ALS meets all requirements of International Standards ISO/IEC 17025:2017 and ISO 9001:2015 for analytical procedures and is independent of the Company. HQ size core was split and sampled over approximately two metre intervals. Samples were analyzed using: ALS's Fire Assay Fusion method (Au-AA23) with an AA finish for gold and by gravimetric finish (Au-GRA21) for samples assaying greater than 10 ppm (gpt) gold; by a 36-element four acid digest ICP-AES analysis (ME-ICP61) with additional analysis for Ore Grade Cu (Cu-OG62), Ore Grade Zn (Zn-OG62) and Ore Grade Pb (Pb-OG62); and for silver assays above 100 ppm (g/t) by Fire Assay Fusion method with gravimetric finish (Ag-GRA21). ME-ICP61 results were reported in parts per million (ppm), Ore Grade (OG62) results were reported in percent (%). In addition to ALS quality assurance- quality control (QA/QC) protocols, Intrepid implements an internal QA/QC program that includes the insertion of sample blanks, duplicates, and standards, with QA QC control samples comprising approximately 10% of the sample stream

所有岩心样品都被送到 ALS 地球化学公司(ALS 全球的一个分公司)位于亚利桑那州图森市的样品准备部门处理,制成的样品颗粒被送到 ALS 地球化学公司位于内华达州雷诺市的实验室进行分析。ALS 符合国际标准 ISO/IEC 17025:2017 和 ISO 9001:2015 的分析程序要求,并且与该公司无关。大型蚌状物样品是在约两米间隔内拆分和取样的。使用以下方法进行测试:ALS 的火焰吸收熔合法(Au-AA23)化验黄金,并使用重量法(Au-GRA21)化验含有大于 10 ppm 的样品;使用 36 个元素的四酸消化 ICP-AES 分析(ME-ICP61)进行分析,对矿石等级 Cu(Cu-OG62)、矿石等级 Zn(Zn-OG62)和矿石等级 Pb(Pb-OG62)进行额外分析;对 100 ppm 以上的银含量使用火焰吸收熔合法和重量法(Ag-GRA21)进行分析。ME-ICP61 的结果以百万分之一(ppm)表示,矿石等级(OG62)的结果以百分比(%)表示。除了 ALS 的质量保证-质量控制(QA/QC)协议外,无畏公司还实施了内部 QA/QC 计划,其中包括插入样品空白、重复测定和标准,QA QC 控制样品占样品流的约 10%

About Corral Copper

关于Corral铜

The Corral Copper Property is a district scale advanced exploration and development opportunity in Cochise County, Arizona. Corral Copper is located 15 miles east of the famous mining town of Tombstone and 22 miles north of the historical Bisbee mining camp which has produced more than 8 billion pounds of copper3. Production from the Bisbee mining camp, or within the district as disclosed in the next paragraph, is not necessarily indicative of the mineral potential at Corral.

Corral Copper Property是亚利桑那州科奇斯县一个区域规模的先进勘探和开发机会。Corral Copper位于著名矿镇Tombstone以东15英里和历史悠久的Bisbee Mining Camp以北22英里,Bisbee Mining Camp或该地区在下一段披露的开采并不一定表明Corral的矿产潜力。

The district has a mining history dating back to the late 1800s, with several small mines extracting copper from the area in the early 1900s, producing several thousand tons. Between 1950 and 2008, various companies explored parts of the district, but the effort was uncoordinated, non-synergistic and focused on discrete land positions and commodities due to the fragmented ownership. Intrepid has been able to secure data from various sources which provides a solid foundation in creating geological interpretations and identifying new target areas.

该区矿业历史可以追溯到19世纪末,在20世纪初,几个小型矿井从该地区开采铜矿,生产了几千吨。自1950年至2008年期间,各个公司都在该区部分地段进行勘探,但努力是不协调、不协同的,由于所有权分散,也只是针对离散的土地位置和商品进行的。Intrepid能够从不同来源获得数据,从而为创建地质解释和确定新的目标区域提供了坚实的基础。

The Corral Copper Property is comprised of the Excelsior Property, the CCCI Properties, the Sara Claim Group and the MAN Property. The Company has completed the acquisition of the Excelsior Property and Sara Claim Group through purchase and sale agreements. The Company has the right to acquire the corporate group that holds the CCCI Properties through an option agreement. The Company has the right to acquire the MAN Property through an option agreement. See the "Commitments" section of the Company's most recently filed Management Discussion and Analysis for further details.

Corral Copper Property由Excelsior产权、CCCI产权、Sara Claim Group和MAN产权组成。公司已通过购买和销售协议完成了对Excelsior产权和Sara Claim Group的收购。公司有权通过期权协议收购持有CCCI产权的公司集团。公司有权通过期权协议收购MAN产权。有关详情,请参见公司最近提交的《管理讨论与分析》的“承诺”部分。

Intrepid is confident that by combining modern exploration techniques with historical data and with a clear focus on responsible development, the Corral Copper Property can quickly become an advanced exploration stage project and move towards development studies.

Intrepid相信,通过结合现代勘探技术与历史数据并专注于负责任的开发,Corral Copper Property很快就能成为一个先进的勘探阶段项目,并逐步进行开发研究。

About Intrepid Metals Corp.

关于Intrepid Metals Corp。

Intrepid Metals Corp. is a Canadian company focused on exploring for high-grade essential metals such as copper, silver, and zinc mineral projects in proximity to established mining jurisdictions in southeastern Arizona, USA. The Company has acquired or has agreements to acquire several drill ready projects, including the Corral Copper Project (a district scale advanced exploration and development opportunity with significant shallow historical drill results), the Tombstone South Project (within the historical Tombstone mining district with geological similarities to the Taylor Deposit, which was purchased for $1.3B in 20184, though mineralization at the Taylor Deposit is not necessarily indicative of the mineral potential at the Tombstone South Project) both of which are located in Cochise County, Arizona and the Mesa Well Project (located in the Laramide Copper Porphyry Belt in Arizona). Intrepid has assembled an exceptional team with considerable experience with exploration, developing, and permitting new projects within North America. Intrepid is traded on the TSX Venture Exchange (TSXV) under the symbol "INTR" and on the OTCQB Venture Market under the symbol "IMTCF". For more information, visit .

Intrepid Metals Corp.是一家加拿大公司,致力于在美国亚利桑那州已建立的采矿区附近探索高品质的基本金属,如铜、银和锌矿项目。公司已收购或拥有协议收购几个钻探就绪的项目,包括Corral Copper Project(区域规模的先进勘探和开发机会,具有重要的浅层历史钻探结果)、Tombstone South Project(位于历史悠久的Tombstone采矿区内,具有与Taylor Deposit相似的地质特征,该铜矿坑在2018年以13亿美元的价格被收购4,但Taylor Deposit的矿化不一定表明Tombstone South Project的矿产潜力),两者均位于亚利桑那州科奇斯县,以及Mesa Well Project(位于亚利桑那州Laramide Copper Porphyry Belt地区)。Intrepid已经组建了一个经验丰富的团队,他们在北美新项目的勘探、开发和许可方面具有相当的经验。Intrepid在TSX Venture Exchange (TSXV)上交易,股票代码为「INTR」,在OTCQb Venture Market上交易,股票代码为「IMTCF」。欲了解更多信息,请访问。

INTREPID METALS CORP.
On behalf of the Company
"Ken Brophy"
CEO

INTREPID METALS CORP。
代表公司
"肯布罗菲"
首席执行官

For further information regarding this news release, please contact:

关于此新闻发布的进一步信息,请联系:

Ken Brophy, CEO
604-681-8030
info@intrepidmetals.com

Ken Brophy,CEO
604-681-8030
info@intrepidmetals.com

Notes

票据

1 Composite intervals are calculated using length weighted averages based on a combination of lithological breaks and copper, gold, silver and zinc assay values. All intervals reported are core lengths, and true thicknesses are yet to be determined. Mineral resource modeling is required before true thicknesses can be estimated. Analyzed Grade corresponds composite weighted ("composites") averages of laboratory assay results. Metal Equivalent corresponds to undiluted metal equivalent of reported composites and Diluted Metal Equivalent takes into account dilution factors of 85% for copper, and 80% for gold, silver and zinc for reported composites. Metal prices used for the CuEq and AuEQ calculations are in USD based on Ag $22.00/oz, Au $1900/oz, Cu $3.80/lb, Zn $1.15/lb The following equation was used to calculate copper equivalence: CuEq = Copper (%) (85% rec.) + (Gold (g/t) x 0.71)(80% rec.) + (Silver (g/t) x 0.0077)(80% rec.) + (Zinc (%) x 0.28)(80% rec.). The following equation was used to calculate gold equivalence: AuEq = Gold (gpt)(80% rec.) + (Copper (%) x 1.4085)(85% rec.) + (Silver (gpt) x 0.0108)(80% rec.) + (Zinc (%) x 0.4188)(80% rec.). Analyzed metal equivalent calculations are reported for illustrative purposes only. The metal chosen for reporting on an equivalent basis is the one that contributes the most dollar value after accounting for assumed recoveries.
2 Data disclosed in this news release includes historical drilling results and information derived from historic drill results, Intrepid Metals has not undertaken any independent investigation of the sampling, nor has it independently analyzed the results of the historical exploration work in order to verify the results. Intrepid considers these historical data relevant as the Company is using this data as a guide to plan exploration programs. The Company's current and future exploration work includes verification of the historical data through drilling.
3 Information disclosed in this news release regarding the historic Bisbee Camp can be found on the Copper Queen Mine website and
on the City of Bisbee website (
).
4 Details regarding the sale of the Taylor Deposit can be found in South32 News Release dated October 8, 2018 (South32 completes acquisition of Arizona Mining).

1 综合区间是根据混合岩石断层和铜、金、银和锌化验值计算的长度加权平均值。报告的所有区间都是岩芯长度,需要进行矿物资源成建模才能估算出真实厚度。分析等级对应于实验室化验结果的复合加权(“复合”)平均值。金属当量对应于所报告复合物的未稀释的金属当量,稀释的金属当量考虑了铜的85% (铜)和金、银和锌的80%为所报告的复合物。用于CuEq和AuEQ计算的金属价格以美元计,基于Ag $ 22.00/oz,Au $ 1900/oz,Cu $ 3.80/lb,Zn $ 1.15/lb。使用以下方程式计算铜当量:CuEq = 铜(%)(回收率为85%)+(金(g/t)x 0.71)(回收率为80%)+(银(g/t)x 0.0077)(回收率为80%)+(锌(%)x 0.28)(回收率为80%)。使用以下方程式计算金当量:AuEq = 金(gpt)(回收率为80%)+(铜(%)x 1.4085)(回收率为85%)+(银(gpt)x 0.0108)(回收率为80%)+(锌(%)x 0.4188)(回收率为80%)。所分析的金属当量计算仅供说明。选择用等价基础报告的金属是为了在考虑所假定的回收率后对贡献最多的美元价值形成假设。
2 本新闻发布披露的数据包括历史钻探结果和从历史探矿结果获得的信息,Intrepid Metals并未对取样进行任何独立调查,也没有独立分析历史勘探工作的结果以验证结果。Intrepid认为这些历史数据是相关的,因为公司将这些数据用作计划勘探计划的指南。公司目前和未来的勘探工作包括通过钻探检验历史数据。
3 关于Bisbee Camp的信息可以在铜皇后矿网站和City of Bisbee网站上找到。
在Bisbee市网站上()。
4 关于Taylor Deposit的销售细节可以在South32于2018年10月8日发布的新闻稿中找到(South32 completes acquisition of Arizona Mining)。

Cautionary Note Regarding Forward-Looking Information

关于前瞻性信息的警示

Certain statements contained in this release constitute forward-looking information within the meaning of applicable Canadian securities laws. Such forward-looking statements relate to: the potential of the property; the interpretation of drills results; plans to integrate data; the details of a 3.5 by 1.5 km copper-gold-silver-zinc mineralized footprint that demonstrates the potential to host economic CRD, skarn, and related porphyry copper mineralization; details about potential mineralization; plans for a future drill program later this year; the targeting of porphyry copper-gold root sources; the economic potential of the project; the exploration potential of the Corral Copper Property and the Company's other mineral projects; and potential future production.

本公告中包含的某些声明构成适用加拿大证券法的前瞻信息。此类前瞻性声明涉及:该物业的潜力;对钻探结果的解释;整合数据的计划;一个3.5×1.5公里的铜-金-银-锌矿化足迹的详细信息,该足迹展示了举办经济CRD(沉积岩类型)、矽卡岩和相关斑状岩铜矿化的潜力;潜在矿化区的详细信息;今年晚些时候计划进行的未来钻探计划的计划;针对斑状岩铜金源的目标指向;该项目的经济潜力;Corral Copper Property和公司的其他矿产项目的勘探潜力和潜在未来产量。

In certain cases, forward-looking information can be identified by the use of words such as "plans", "expects", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might", "occur" or "be achieved" suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future events or performance. Forward-looking information contained in this news release is based on certain factors and assumptions regarding, among other things, the Company can raise additional financing to continue operations; the results of exploration activities, commodity prices, the timing and amount of future exploration and development expenditures, the availability of labour and materials, receipt of and compliance with necessary regulatory approvals and permits, the estimation of insurance coverage, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.

在某些情况下,前瞻性信息可以通过使用“计划”、“预计”、“预算”、“安排”、“估计”、“预测”、“意图”、“预期”或“相信”等词语或其变体识别出来,或者表示特定行动、事件或结果“可能”、“可能”、“将”、“可能”、“发生”或“实现”,暗示了未来的结果或其他期望、信念、计划、目标、假设、意图或针对未来事件或绩效的陈述。本新闻稿中包含的前瞻性信息基于某些因素和假设,包括:公司能够筹集额外的资金继续运营;勘探活动的结果、商品价格、未来勘探和开发支出的时间和数量、劳动力和材料的可用性、接获及遵守必要的监管批准和许可、保险覆盖估算和货币汇率、环境风险、所有权争端或索赔以及其他类似事项。虽然公司认为根据目前对其可获得的信息,这些假设是合理的,但它们可能被证明是不正确的。

Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration and development of mineral deposits, including risks relating to the ability to access infrastructure, risks relating to the failure to access financing, risks relating to changes in commodity prices, risk related to unanticipated geological or structural formations and characteristics risks related to current global financial conditions, risks related to current global financial conditions and the impact of any resurgence of COVID-19 on the Company's business, reliance on key personnel, operational risks inherent in the conduct of exploration and development activities, including the risk of accidents, labour disputes and cave-ins, regulatory risks including the risk that permits may not be obtained in a timely fashion or at all, financing, capitalization and liquidity risks, risks related to disputes concerning property titles and interests, environmental risks and the additional risks identified in the "Risk Factors" section of the Company's reports and filings with applicable Canadian securities regulators.

前瞻性信息涉及已知和未知的风险、不确定性和其他因素,这些因素可能导致该公司的实际结果、业绩或成就与前瞻性信息所表达或暗示的任何未来结果、业绩或成就存在实质性差异。这些因素包括勘探和开发矿床的固有风险,包括与能否接入基础设施有关的风险、与获取融资失败有关的风险、与商品价格变动有关的风险、与突发的地质或结构形成和特征有关的风险、与当前全球经济状况有关的风险、与当前全球金融状况有关的风险以及COVID-19疫情的复发对公司业务的影响,依赖关键人员的风险,从事勘探和开发活动固有的运营风险,包括意外事故、劳资纠纷和塌陷风险,监管风险,包括许可证可能无法及时或根本未获得的风险,融资、资本化和流动性风险,土地和利益争议方面的风险,环境风险以及公司在报告和向适用的加拿大证券监管机构提交文件的“风险因素”部分识别的其他风险。

Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. The forward-looking information is made as of the date of this news release. Except as required by applicable securities laws, the Company does not undertake any obligation to publicly update or revise any forward-looking information.

尽管该公司已经尝试确定可能导致实际行动、事件或结果与前瞻性信息描述的不同的重要因素,但可能存在其他因素导致行动、事件或结果不如预期、估计或意图。因此,读者不应过度依赖前瞻性信息。前瞻性信息是根据本新闻发布日期制作的。除适用证券法规要求外,该公司不承担任何公开更新或修订任何前瞻性信息的义务。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) has reviewed or accepts responsibility for the adequacy or accuracy of this release.

TSX Venture交易所及其监管服务提供商(根据TSX Venture交易所的政策定义)未审核或不承担本发布的充分性或准确性。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发