Rolls-Royce SMR Signs $1.5M Contract With GSE Solutions To Develop A Power Station Simulator
Rolls-Royce SMR Signs $1.5M Contract With GSE Solutions To Develop A Power Station Simulator
Rolls-Royce SMR has enlisted GSE Solutions to develop a power station simulator, as it continues to mature the design of its Small Modular Reactor (SMR) technology and remains on track to complete Step 2 of the Generic Design Assessment this summer.
作为Rolls-Royce SMR技术的设计不断完善,并计划于今年夏天完成通用设计评估步骤二,Rolls-Royce SMR已经邀请GSE Solutions开发电站模拟器。
COLUMBIA, Md., July 10, 2024 /PRNewswire/ -- GSE Solutions ("GSE Systems, Inc." or "GSE") (NASDAQ:GVP) is a world leader in advanced engineering and workforce solutions across the clean-energy and power industries. This simulator will play a key role in Rolls-Royce SMR's program to develop, verify and validate the performance and control systems of its unique 'factory-built' nuclear power plant. It forms part of a much wider program of development activities that are focussed on ensuring the 'delivery-certain' nature of the plant.
美国GSE Solutions(“GSE Systems Inc.”或“GSE”)(纳斯达克:GVP)是一个跨清洁能源和电力行业的高级工程和劳动力解决方案的世界领先者。这个模拟器将在Rolls-Royce SMR的计划中发挥关键作用,用于开发、验证和验证其独特“工厂建造”的核电厂数字化控制系统。它是广泛的发展活动计划的一部分,旨在确保核电厂项目的“交付确定性”。