share_log

Canter Resources Engages Cascade for Phase II Drilling at the Columbus Lithium-Boron Project

Canter Resources Engages Cascade for Phase II Drilling at the Columbus Lithium-Boron Project

Canter资源公司与卡斯卡德公司合作在哥伦布锂硼项目进行第二阶段钻探。
newsfile ·  07/16 07:00

Vancouver, British Columbia--(Newsfile Corp. - July 16, 2024) - Canter Resources Corp. (CSE: CRC) (OTC Pink: CNRCF) (FSE: 6O1) ("Canter" or the "Company") is pleased to report that the Company has engaged Cascade Drilling LP for Phase II drilling at its Columbus Lithium-Boron Project ("Columbus", "Columbus Basin", or the "Project"), located near Tonopah, Nevada. The Phase II program will include approximately 10 holes with an expected start date of August 12, 2024.

Canter资源有限公司(CSE: CRC)(OTC粉红:CNRCF)(FSE: 6O1)非常荣幸地宣布,该公司已委托Cascade钻探有限合伙公司在其Columbus锂硼项目(“Columbus”、“Columbus盆地”或“项目”)的第二阶段钻探中进行位于内华达州Tonopah附近。第二阶段计划包括大约10个孔,预计开始日期为2024年8月12日。

"Our Phase II program has been designed to target a third aquifer zone below the limits of Phase I drilling, demonstrate lateral continuity between our Phase I grids and test regional discovery targets to the north," stated Canter CEO, Joness Lang. "The Phase II program will include select multi-element geochemical analysis, provide samples suitable for preliminary direct extraction considerations, further validate and refine our exploration model and deeper lithium targets, while concurrently assessing the extent and mineral resource potential of the significant near-surface boron mineralization."

Canter的首席执行官Joness Lang表示:“我们的第二阶段计划旨在瞄准第一阶段钻探限制以下的第三个含水层区,展示我们第一阶段网格之间的横向连续性,并测试向北的区域性发现目标。” “第二阶段计划将包括选择性的多元素地球化学分析,提供适合初步直接提取考虑的样品,进一步验证和改善我们的勘探模型和深度锂目标,同时评估显著近地表硼矿化潜力的范围和矿产资源潜力。”

Phase II Geoprobe Drilling Objectives:

第二阶段地质探测目标:

  • Target third Aquifer Zone: Past downhole geophysics highlights the potential for a third shallow aquifer zone between 100-150 feet ("ft") / 30-45 metres ("m") and Phase II will employ a Geoprobe drill rig model and tooling with greater depth capabilities.
  • 针对第三个含水层区:过去的测井数据强调了第二阶段将采用Geoprobe钻探机型和工具,在100-150英尺/ 30-45米(“m”)之间具有更大的深度能力。
  • Demonstrate Lateral Continuity: Phase II drilling will include broadly spaced drill hole locations along pre-existing east-west road networks with the aim of demonstrating potential continuity within the five (5) kilometre ("km") gap between the previously completed north-south grids.
  • 展示横向连续性:第二阶段钻探将包括预先存在的东西向道路网络上广泛分布的钻孔位置,旨在证明先前完成的南北网格之间的潜在连续性。
  • Test Discovery Potential to the North: The Phase II program includes two proposed wildcat exploration holes located more than 4 km to the north near favourable structure, surface sampling and geothermal input.
  • 测试向北的发现潜力:第二阶段计划包括两个拟议的野猫勘探孔,位于距离北面四公里以上的有利构造、地表采样和地热输入。
  • Enhance Precision of Deeper Lithium Targeting: Testing a third aquifer zone and completing multi-element geochemical analysis will further support the Company's 3D geological model, mineralization patterns in brines and mobility/solubility analysis.
  • 增强深度锂目标的准确性:测试第三个含水层区并完成多元素地球化学分析将进一步支持公司的三维地质模型,卤水中的矿化模式和迁移/溶解度分析。
  • Evaluate Shallow Boron Mineral Resource Potential: Phase I delivered excellent boron concentrations in brines from shallow aquifers and Phase II will aim to further delineate, correlate and map the extent of near-surface boron mineralization.
  • 评估近地表硼矿资源潜力:第一阶段从浅层含水层中提供了卤水中的优秀硼浓度,第二阶段将旨在进一步勾勒、相关和绘制近地表硼矿化的范围。
  • Establish Preliminary Direct Extraction Considerations: The Company is actively engaging with companies that specialize in direct lithium and boron extraction and plans to supply samples suitable for preliminary considerations.
  • 建立初步直接提取考虑:该公司正在积极与专门从事直接锂和硼提取的公司进行接触,并计划提供适于初步考虑的样品。


Figure 1: Plan view showing Phase I completed and Phase II planned/proposed locations. A total of 16 permitted Phase II locations are shown and the Company plans to drill approximately 10 of these locations, which will be selected based on real-time observations in the field.


图1:计划完成的第I期和第II期勘探位置的平面图。总共显示了16个获得许可的第II期位置,公司计划钻探约10个这些位置,这些位置将根据现场实时观察而选择。

Phase II Program Details

第II阶段计划详细信息

Phase II GeoProbe drilling is set to commence in the second week of August, with brine results expected before the end of Q3/2024. This phase builds significantly on the findings and insights gained from Phase I and collectively the comprehensive geochemical datasets (clays and brines) will provide a more thorough understanding of the subsurface environment within the Company's district-scale property package at Columbus.

第二阶段GeoProbe钻探计划于8月第二周开始,预计在2024年第三季度结束前出现卤水结果。这一阶段极大地建立在第I阶段所获得的发现和洞察力基础之上,综合的地球化学数据集(粘土和卤水)将更加全面地了解公司的Columbus区域规模的物业包中的地下环境。

Phase II drilling will continue to utilize the low-impact and cost-effective GeoProbe direct push technology, with modified tooling aimed at allowing the Company to test a third aquifer zone (>100 ft), which has been interpreted based on previous downhole geophysics. The Phase II drilling includes a series of drill hole locations between the previously completed north-south grids from Phase I (see Figure 1), designed to further validate the HSAMT anomaly and geophysical model, while demonstrating lateral continuity of up to three (3) aquifer zones.

第二阶段钻探将继续利用低影响和费用效益的GeoProbe直接推技术,采用修改后的工具旨在允许公司测试第三个含水层区(>100英尺),该区已根据先前的测井进行了解释。第II期钻探包括一系列的钻孔位置,位于通过先前的I期南北网格之间(参见图1)设计,旨在进一步验证HSAMt异常和地球物理模型,同时演示高达三个(3)含水层区的横向连续性。

The Company is employing a science-driven approach to discovery at Columbus and the results from the multi-phased GeoProbe drilling will provide a foundation for potential near-surface mineral resource definition and the technical analysis (mineralization/migration patterns) will help guide the Company's deeper drilling to ensure exploration well locations are optimized.

Canter在Columbus采用了科学驱动的发现方法,由多阶段GeoProbe钻探的结果提供了潜在的近地表矿产资源定义基础,技术分析(矿化/迁移模式)将有助于指导公司的深度钻探,以确保优化探测井位。

To learn more about the lithium market visit the Company's Lithium 101 webpage.

欲了解更多有关锂市场的信息,请访问公司的锂101网页。

To learn more about boron and its more than 300 applications, visit the Company's Boron 101 webpage.

访问公司的 Boron 101 网页,了解关于硼及其 300 多种应用的更多信息。

Quality Assurance / Quality Control (QA/QC)

质量保证 / 质量控制(QA / QC)

In a continued commitment to ensuring the highest standards of data accuracy and reliability, the Company has implemented a rigorous quality assurance and quality control (QA/QC) protocol for both groundwater and sediment sampling and analysis. This initiative is designed to enhance the precision and credibility of sampling techniques and assay results.

为确保数据准确性和可靠性的最高标准,本公司已为地下水和沉积物采样和分析执行了严格的质量保证和质量控制(QA / QC)协议。此举旨在加强采样技术和化验结果的精度和可信度。

Upon reaching the target lithology depth during drilling, groundwater sampling is initiated with care to avoid surpassing the designated zone. Utilizing a drive-point screen sampler or mechanical bailer, groundwater is extracted to ensure a clean and uncontaminated collection process. Initial purging is conducted, and a Myron Ultrameter II is used to measure general parameters, such as temperature, pH, total dissolved solids (TDS), specific conductivity, and oxidation-reduction potential (ORP). For wet samples, a minimum 350 mL of groundwater is collected for comprehensive analysis, with all samples handled under strict chain of custody (COC) protocols and stored under optimal conditions until delivery to Western Environmental Testing (WETLAB).

在钻探到达目标岩性深度时,会启动地下水采样,注意避免超过指定的区域。利用驱动点屏幕取样器或机械掏球器,地下水被提取以确保干净和未污染的收集过程。进行初始冲洗,并使用Myron Ultrameter II测量一般参数,如温度、pH、总溶解固体(TDS)、特定电导率和氧化还原电位(ORP)。对于湿样品,收集至少350毫升的地下水进行综合分析,所有样品都在严格的链式监管(COC)协议下处理,并在最佳条件下储存,直至交付给Western环境测试(WETLAB)。

The Company's QA/QC procedures involve collecting additional samples every tenth sample, including duplicates, umpire, and blank samples, to validate the consistency and accuracy of the data. Laboratory analyses cover general parameters and both total and dissolved metals, adhering to stringent testing methods and holding times. More specifically, the following analysis is carried out at WETLAB: Density and pH: SM 4500-H+B; Temperature: SM 2550 B; Total Dissolved Solids (TDS): SM 2540 C; ICP Metals Total Li, B & K: EPA 200.7; Digestion for Total Metals: EPA 200.2; ICP Metals Dissolved Li, B & K: EPA 200.7; Digestion for Dissolved Metals: EPA 200.0 and Sample Filtration: SM.

公司的QA / QC程序涉及每十个样品收集额外的样品,包括重复样品、裁判员样品和白样品,以验证数据的一致性和准确性。实验室分析涵盖一般参数和总和溶解金属,遵守严格的测试方法和保持时间。更具体地说,WETLAB进行以下分析:密度和pH:Sm 4500-H + B;温度:Sm 2550 B;总溶解固体(TDS):Sm 2540 C ;ICP 金属总Li亿和K: EPA 200.7;总金属消化:EPA 200.2;ICP 金属溶解Li亿和K:EPA 200.7;溶解金属消化:EPA 200.0和样品过滤: Sm。

Qualified Person (QP)

本新闻稿中包含的技术性信息由Canter Resources的资格认证人(QP)Eric Saderholm P.Geo,董事和技术顾问审查并批准,其定义符合43-101号国家规范,即公告矿产项目的披露标准。

The technical information contained in this news release was reviewed and approved by Eric Saderholm, P.Geo, Director and Technical Advisor of Canter, a Qualified Person (QP), as defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

本新闻稿中包含的技术信息由Canter的董事兼技术顾问Eric Saderholm,P.Geo,作为定义下的“国家仪器43-101-矿产项目披露标准”下的合格人员(QP)进行了审查和批准。

About Canter Resources Corp.

Canter Resources Corp.是一家加拿大的初级矿产勘探公司,正在推进美国内华达州的哥伦布锂硼项目和蒙大拿州的比弗克里克锂矿物产权。

Canter Resources Corp. is a junior mineral exploration company advancing the Columbus Lithium-Boron Project in Nevada, USA and the Beaver Creek Lithium Property in Montana, USA. The Company is completing a phased drilling approach at Columbus to test highly prospective brine targets at varying depths for lithium-boron enrichment and plans to leverage the Company's critical metals targeting database to generate a portfolio of high-quality projects with the aim of defining mineral resources that support the domestic technology and clean energy supply chains in North America.

Canter Resources Corp.是一家初级矿产勘探公司,推进内华达州哥伦布锂硼项目和蒙大拿州Beaver Creek锂地产。该公司正在完成逐阶段的钻探方法,在哥伦布为锂硼富集测试高度潜在的卤水靶点,并计划利用公司的关键金属定位数据库生成高质量项目组合,旨在定义支持北美技术和清洁能源供应链的矿产资源。

For further information contact:

有关更多信息,请联系:

Joness Lang
Chief Executive Officer
Canter Resources Corp.
Tel: 778.382.1193
jlang@canterresources.com

Joness Lang
首席执行官
Canter Resources公司。
电话:778.382.1193
jlang@canterresources.com

For investor inquiries contact:

投资者咨询请联系:

Kristina Pillon, High Tide Consulting Corp.
Tel: 604.908.1695
investors@canterresources.com

Kristina Pillon,High Tide Consulting Corp。
电话:604.908.1695
investors@canterresources.com

The Canadian Securities Exchange has neither approved nor disapproved the contents of this news release. The Canadian Securities Exchange does not accept responsibility for the adequacy or accuracy of this news release.

加拿大证券交易所对本新闻发布的内容既未批准也未否定。加拿大证券交易所不承担本新闻发布的充分性或准确性的责任。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发