share_log

Southern Silver Files NI43-101 Technical Report for Its Updated Preliminary Economic Assessment for the Cerro Las Minitas Project

Southern Silver Files NI43-101 Technical Report for Its Updated Preliminary Economic Assessment for the Cerro Las Minitas Project

南部白银公司提交了Cerro Las Minitas项目的最新初步经济评估的NI43-101技术报告。
newsfile ·  07/24 13:20

Vancouver, British Columbia--(Newsfile Corp. - July 24, 2024) - Southern Silver Exploration Corp. (TSXV: SSV) ("Southern Silver") reports that it has filed on SEDAR its National Instrument 43-101 Technical Report titled Cerro Las Minitas, NI43-101 Technical Report, Preliminary Economic Assessment dated July 23, 2024 (the "Technical Report"). The authors are Ausenco Engineering USA South Inc. and Ausenco Sustainability ULC. ("Ausenco"), Kirkham Geosystems Ltd. ("KGL"), Entech Mining Limited ("Entech"), and MPC Metallurgical Process Consultants Limited ("MPC"). The report can also be found on Southern Silver's website by clicking here.

加拿大不列颠哥伦比亚省—(Newsfile Corp. - 2024年7月24日)—Southern Silver Exploration Corp.(TSXV: SSV)("南方白银")报告称,已在SEDER上提交了其国家43-101技术报告,题为Cerro Las Minitas, NI43-101 Technical Report, Preliminary Economic Assessment dated July 23, 2024(技术报告)。作者是Ausenco Engineering USA South Inc和Ausenco Sustainability ULC. ("Ausenco"), Kirkham Geosystems Ltd. ("KGL"), Entech Mining Limited ("Entech")和MPC Metallurgical Process Consultants Limited ("MPC")。该报告也可以通过点击Southern Silver的网站来查看。

Filing of the Technical Report follows Southern Silver's news release issued June 10th, 2024 announcing the results of its Updated Preliminary Economic Assessment ("PEA") on its 100% owned Cerro Las Minitas Project, Durango State, Mexico.

技术报告的提交是在南方银行6月10日发布了新闻稿之后进行的,该新闻稿宣布了其在墨西哥杜兰戈州拥有的Cerro Las Minitas项目的最新初步经济评估("PEA")。

PEA Highlights (all figures in $US unless otherwise noted):

PEA亮点(所有数字以$US为单位,除非另有说明):

  • Robust Project Economics - Base Case1: after-tax NPV5% of $501M (C$682M) and IRR of 21.2% with a 48-month payback;
  • Excellent Silver and Zinc Price Leverage - Base-case + 20% Metal Prices2: after-tax NPV5% of $876M (C$1,193M) and IRR of 30.1% with a 37-month payback;
  • 强大的项目经济-基础案例1:税后NPV5%为50100万美元(C$682M),IRR为21.2%,48个月回收期;
  • 优异的白银和锌价值杠杆-基本情况+ 20%金属价格2:税后NPV5%为87600万美元(C$1,193M),IRR为30.1%,37个月回收期;
  1. Base Case Metal Prices: Ag- $23.00/oz, Au - $1850/oz, Cu - $4.00/lb, Pb - $1.00/lb and Zn - $1.25/lb
  2. Base Case +20% metal prices: Ag- $27.60/oz, Au - $2220/oz, Cu - $4.80/lb, Pb - $1.20/lb and Zn - $1.50/lb
  1. 基础金属价格:Ag- $23.00/oz, Au - $1850/oz, Cu - $4.00/lb, Pb - $1.00/lb and Zn - $1.25/lb
  2. 基准+20% 金属价格:Ag- $27.60/oz, Au - $2220/oz, Cu - $4.80/lb, Pb - $1.20/lb and Zn - $1.50/lb

The 2024 Preliminary Economic Assessment features:

2024 年初步经济评估特点:

  • A Large-Scale Underground Mining Operation with a 17-year mine life and an annual average plant feed of 14.3 Mozs AgEq3 (inc. 5.8 Mozs Ag) and life-of-mine (LOM) feed totalling 243.2 Mozs AgEq3; (inc. 98.6 Mozs Ag). LOM product sales total 194.3Mozs AgEq3 at an AISC of $13.23/oz AgEq3 sold; and
  • A High-Revenue Project with gross revenues totalling $4.47B with silver and gold representing 45% of revenues, and zinc representing 35% of projected revenues. The project has an Initial CapEx of $388M, an NPV5%-to-CapEx ratio of 1.3X and a paydown of 48 months on a post-tax basi.
  • 大规模的地下矿业运营,矿产年限为17年,年平均工厂饲料为14.3 Mozs AgEq3(含5.8 Mozs Ag),全部矿产(LOM)量为243.2 Mozs AgEq3;(含98.6 Mozs Ag)。LOM产品销售总量为194.3Mozs AgEq3,销售的AISC为13.23/oz AgEq3;
  • 高收入项目,总收入为44.7亿美元,其中白银和黄金占收入的45%,而锌占预计收入的35%。该项目的初始资本支出为38800万美元,NPV5% – CapEx比率为1.3X,税后基础上回收期为48个月。
  1. AgEq is calculated on a (contained metal x metal price)/ Ag price basis
  1. AgEq是基于(重量金属数 × 金属价格)/ 银价基础计算出来的

This latest economic update of Cerro Las Minitas is the culmination of a number of technical improvements of the earlier PEA, developed over the last 18 months, which together result in a significant increase in the value of the Cerro Las Minitas asset. This includes the addition of new mineral resources from the North Felsite zone as first reported in March 2023; the standardization of the metallurgical recoveries and charges across each of the deposits, including the addition of gold revenues into the project cash-flow; improvements in the mine scheduling and optimization both the Operating and Capital costs of the project.

Cerro Las Minitas的这次最新经济更新是早期PEA的许多技术改进的综合体,这些改进在过去的18个月中开发,共同导致Cerro Las Minitas资产价值的显著增加。这包括自2023年3月首次报告的新矿物资源North Felsite带来的新矿物资源;在每个存款的冶金回收和费用方面的标准化,包括将金收入加入到项目现金流中;对项目的采矿进度表和优化方面进行改进,同时优化了项目的操作和资本成本。

The updated PEA:

更新的PEA:

  • Increases the Life of Mine (LOM) production by 5Mt, representing an approximate 20% increase;
  • Increases daily mine production capacity to 5300 tonnes per day ("tpd"), representing an approximate 18% increase;
  • Extends the mine life by 2.6yrs;
  • Increases the LOM Revenue by $765M, representing an approximate 17% increase in revenues;
  • Increases the after-tax NPV5% by 45% to $501M; and
  • Similarly, increases the post-tax IRR by 3.3% to 21.2%.
  • 将矿山寿命(LOM)生产增加5 Mt,约占20%增加;
  • 将每日矿山生产能力提高到5300吨/天("tpd"),约占18%增加;
  • 延长矿山寿命2.6年;
  • 增加LOM收入76500万美元,收入增长约17%;
  • 将税后NPV5%增加45%至5.01亿美元;
  • 同样,将税后IRR提高3.3%至21.2%。

Cautionary Statement

声明

The PEA is preliminary in nature, it may include mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Mineral resources that are not mineral reserves have not demonstrated economic viability. The mineral resources may be affected by subsequent assessment of mining, environmental, processing, permitting, taxation, socio-economic, and other factors.

PEA初步性质,可能包含被认为在地质上过于投机的矿产资源,无法对它们应用经济考虑的矿产储备分类,亦无法保证PEA会实现。未经证明具有经济可行性的矿产资源可能会受到挖掘、环保、加工、许可、税收、社经等因素的影响。

Recommendations

建议

The Technical Report recommends the continued development of the Cerro las Minitas project toward pre-feasibility. Specific recommendations include:

技术报告建议继续推进Cerro las Minitas项目,进入可行性阶段。具体建议包括:

  • further drilling to upgrade the classification of areas of high-value tonnes within the payback years and to expand mineral resources;
  • further geotechnical assessment for mining and mineral processing (tailings) purposes;
  • the initiation of base-line environmental studies; and
  • continued social engagement with the local populations in the vicinity of the project.
  • 进一步钻探,以提高回收期内价值高的吨位的分类,并扩大矿物资源;
  • 进行更多的岩土工程评估,以进行开采和矿物处理(尾矿)目的;
  • 启动基线环境研究; 和
  • 继续与项目附近的当地居民进行社会接触。

The company plans to initiate a core drilling program of up to 6000m in 11 holes to test shallow targets along the north side of the Cerro between the North Felsite and Skarn Front deposits. Drilling will start in early September. The work is the first stage of a larger 25,000 metre exploration program on the property with the goal of adding an additional 4 million to 8 million tonnes of mineralization to the resource base.

该公司计划启动一项高达600000万的核心钻探计划,对Cerro北侧沿着North Felsite和Skarn Front矿床之间的浅层目标进行11个孔的测试。钻探将开始于9月初。该工作是在该物业上进行的更大的25000米探矿计划的第一阶段,目标是将额外的400万至800万吨矿化添加到资源库中。

About Southern Silver Exploration Corp.

关于南方银探险公司

Southern Silver Exploration Corp. is an exploration and development company with a focus on the discovery of world-class mineral deposits either directly or through joint-venture relationships in mineral properties in major jurisdictions. Our specific emphasis is the 100% owned Cerro Las Minitas silver-lead-zinc project located in the heart of Mexico's Faja de Plata, which hosts multiple world-class mineral deposits such as Penasquito, Los Gatos, San Martin, Naica and Pitarrilla. We have assembled a team of highly experienced technical, operational and transactional professionals to support our exploration efforts in developing the Cerro Las Minitas project into a premier, high-grade, silver-lead-zinc mine. Our property portfolio also includes the Oro porphyry copper-gold project and the Hermanas gold-silver vein project where permitting applications for the conduct of a drill program is underway, both located in southern New Mexico, USA.

南方银探险公司是一家专注于在主要司法辖区中直接或通过合资关系发现世界级矿产矿床的勘探和开发公司。我们特别关注位于墨西哥Faja de Plata的100%拥有 Cerro Las Minitas 银铅锌项目,该项目拥有多个世界级矿产矿床,如 Penasquito,Los Gatos,San Martin,Naica和Pitarrilla。我们聚集了一支由高经验技术、运营和交易专业人士组成的团队,支持我们将 Cerro Las Minitas 项目开发成为一座优秀的高品位银铅锌矿。我们的财产组合还包括Oro斑岩铜金项目和 Hermanas 金银脉矿项目,目前均在美国南部新墨西哥州进行钻探许可申请。

On behalf of the Board of Directors

谨代表董事会

"Lawrence Page"

"劳伦斯·佩奇"

Lawrence Page, K.C.

劳伦斯·佩吉万·C。

President & Director, Southern Silver Exploration Corp.

南方银探险公司总裁兼董事

For further information, please visit Southern Silver's website at or contact us 604.641.2759 by email at corpdev@mnxltd.com.

如需更多信息,请访问Southern Silver的网站或通过corpdev@mnxltd.com电子邮件与我们联系604.641.2759。


Qualified Person


合格人士

The PEA for the Cerro Las Minitas project as summarized in this release was completed by Kirkham Geosystems Ltd. ("KGL"), Ausenco Engineering USA South Inc. and Ausenco Sustainability ULC. ("Ausenco"), Entech Mining Limited ("Entech"), and MPC Metallurgical Process Consultants Limited ("MPC"). The report is now filed on SEDAR.

Cerro Las Minitas项目的PEA概述在本报告中由Kirkham Geosystems Ltd.(“KGL”),Ausenco Engineering USA South Inc.和Ausenco Sustainability ULC(“Ausenco”),Entech Mining Limited(“Entech”)和MPC Metallurgical Process Consultants 完成(“MPC”)。该报告现已提交至SEDAR。

The scientific and technical content of this news release was reviewed and approved by Robert Macdonald, MSc. P.Geo, VP. Exploration, who is a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

本新闻稿的科学和技术内容由Robert Macdonald MSc. P.Geo,VP. Exploration审查并批准,他是根据43-101号国家仪器定义的具有资格的人员-用于矿业项目的披露标准。

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX创业公司交易所及其监管服务提供方(该术语定义在TSX创业公司政策中)不对此发布的充分性或准确性承担任何责任。

This news release contains forward-looking statements. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements. Factors that could cause actual results to differ materially from those in forward looking statements include the timing and receipt of government and regulatory approvals, and continued availability of capital and financing and general economic, market or business conditions. Southern Silver Exploration Corp. does not assume any obligation to update or revise its forward-looking statements, whether as a result of new information, future events or otherwise, except to the extent required by applicable law.

本新闻稿包含前瞻性声明。前瞻性声明涉及未来事件和条件,因此涉及固有的风险和不确定性。实际结果可能会与此类声明目前预期的结果不同。可能导致实际结果与前瞻性声明中不同的因素包括政府和监管批准的时间和接收,以及资本和融资的持续可用性和一般经济,市场或商业条件。Southern Silver Exploration Corp.不承担更新或修订其前瞻性声明的任何义务,除非适用法律要求。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发