share_log

Sun Peak Metals Announces First Assay Results From 2024 Drill Program

Sun Peak Metals Announces First Assay Results From 2024 Drill Program

Sun Peak Metals宣布2024年钻探计划的首个化验结果
Accesswire ·  07/25 07:00

VANCOUVER, BC / ACCESSWIRE / July 25, 2024 / As part of its goal in discovering significant Copper-Gold VMS deposits in northern Ethiopia, Sun Peak Metals Corp. (the "Company" or "Sun Peak") (TSXV:PEAK)(OTCQB:SUNPF) is pleased to report results from the first nine holes of its initial 2024 drill program on Sun Peak's extensive 1,450 sq km Shire Project in Ethiopia. The Company drilled 24 diamond drill holes, totaling 5,236 meters, testing the Terer and Hamlo VMS Targets, which are both located on the Terer Exploration License. The results confirm the effectiveness of Sun Peak's discovery methodology, and the Company is eager to resume drilling after the rainy season concludes in October.

作为其在发现埃塞俄比亚北部重要的铜金属硫化物矿床方面的目标之一,Sun Peak Metals Corp.(以下称为“本公司”或“Sun Peak”)(TSXV: PEAK)(OTCQB: SUNPF)非常高兴地宣布了其于2024年首个钻探项目前九个孔的结果。本公司已在埃塞俄比亚Shire项目广阔的1,450平方公里面积内综合钻探了5000多米,一共钻了24个金刚石钻孔,并测试了位于Terer勘探许可证上的Terer和Hamlo VMS Target的矿床。结果验证了Sun Peak的发现方法的有效性,该公司迫不及待地希望在雨季结束后的10月继续进行钻探。

Highlights

亮点

Terer Target:

Terer目标:

  • Drill hole TR-002 intersected:

    • 18.46 meters of 1.34% copper-equivalent ("CuEq")

      • including 9.80 meters of 2.13% CuEq

      • and 8.71 meters of 1.04% CuEq

  • Drilling has intercepted VMS style alteration and mineralization, including massive and semi-massive sulphide and sulphide stringer zones

    • The Terer VMS zone is located 2 km west and directly along strike of the Anguda North gravity high anomaly, which will be tested in the next drilling phase.

  • TR-002号钻孔的相交部分:

    • 相当于1.34%铜当量的18.46米(“CuEq”)

      • 其中包括2.13%CuEq的9.80米

      • 以及1.04%CuEq的8.71米

  • 钻探已拦截了VMS类型的蚀变和矿化,包括大量和半量堆积的硫化物和硫化物链带带。

    • Terer VMS区位于Anguda North重力异常的西侧2公里处,并沿着走向直接延伸,将在下一钻探阶段进行测试。

Hamlo Target:

Hamlo目标:

  • Defined a new VMS mineralized zone with extensive hydrothermal alteration, trending over 1 km along strike.

  • Assay results received for the initial seven holes at Hamlo indicate a pyrite-rich VMS mineralized system, which appears to increase in metal content at greater depths. This is consistent with typical VMS metal zoning.

  • Drill hole HM-006 intersected

    • 10.90m of 0.29 g/t Au and 1.36% Zn,

      • including 4.88m of 3.04 % Zn.

  • 定义一个新的VMS矿化区,具有广泛的热液蚀变,走向跨越1公里。

  • 收到的Hamlo最初7个钻孔的化验结果表明,存在富含黄铁矿的VMS矿化系统,并且在更深的深度处金属含量似乎会增加,这与典型的VMS金属分区一致。

  • 钻探孔Hm-006相交

    • 1090万0.29g/t金和1.36%锌,其中包括488万3.04%锌。

      • Terer和Hamlo的钻探结果,加上Anguda South的发现,证实VMS系统跨越10公里,验证了Sun Peak使用的地质模型和勘探方法。 VMS趋势得到支持的原因是映射的VMS赤铁矿露头,热液蚀变带,VTEm空中地球物理,地球化学和重力异常,包括Anguda North的大型重力目标。

The drill results at Terer and Hamlo, combined with findings from Anguda South, confirm a significant VMS system extending over 10 km, validating the geological model and exploration methods used by Sun Peak. The VMS trend is supported by mapped VMS gossan outcrops, hydrothermal alteration zones, VTEM airborne geophysics, geochemistry, and gravity anomalies, including the large gravity target at Anguda North.

就成果发表的评论,总裁兼首席执行官Greg Davis表示:“结合2024年5月28日的Sun Peak新闻发布中的结果,这些来自Terer和Hamlo的首批化验结果证明了Sun Peak在发现有价值的VMS矿床方面探矿方法的有效性,我们比以往任何时候都更有信心Shire Project可以容纳多个VMS Deposit。我们预计余下的化验结果将于8月接收,并期待在10月雨季结束后概述Sun Peak的勘探和钻探计划。这将包括对大型Anguda North重力异常的钻井测试,以及继续在Meli Trend上工作。Sun Peak已从银行获得了超过330万美元的完全资助,以继续进行钻探。”

Commenting on the results, Greg Davis, President and CEO stated, "Combined with the results in the Sun Peak news release dated May 28, 2024, these first assay results from Terer and Hamlo demonstrate the effectiveness of Sun Peak's discovery methodology in uncovering valuable VMS deposits and we are more confident than ever that the Shire Project can host multiple VMS Deposits. We expect the remainder of the assays to be received in August and we look forward to outlining Sun Peak's exploration and drill plans when drilling can resume in October, after the rainy season is over. This will include drill testing the large Anguda North gravity anomaly, as well as continuing work on the Meli Trend. Sun Peak is fully funded to continue drilling this fall with over $3.3 million in the bank."

Terer摘要:

Terer Summary

完成了12个钻石钻孔,总计2660.26米。 TR-001和TR-002两个钻孔的化验结果已接收。

  • 12 diamond drill holes completed, totaling 2660.26 meters. Assay results have been received for two holes, TR-001 and TR-002.

  • Drill hole TR-002 intersected 18.46 meters of 1.34% CuEq comprised of 0.47% Cu, 1.85% Zn, 0.32 g/t Au, and 7.2 g/t Ag and 8.71 m of 1.04% CuEq comprised of 0.56% Cu, 0.65% Zn, 0.29 g/t Au, and 5.14 g/t Ag (See Table 1).

  • Terer VMS prospect now extends of over a kilometer long with VMS gossan outcrops that trend mainly east-west, and steeply dipping to the north, with coincident VTEM conductors and moderate gravity high anomalies.

  • The VMS mineralized zone is hosted within chlorite altered, strongly foliated mafic volcanic rocks (See Figure 1), that forms the hanging wall and the footwall rock units.

  • The Terer VMS zone appears to consist of thinly stacked massive sulphide lenses, crosscut by faulting and possibly displaced by at least 4 different dyke systems (mafic, felsic, granitic, and gabbroic). Most of these dykes were emplaced along normal fault zones (See Figure 2: Section A).

  • The Terer VMS zone is located 2 km west and directly along strike of the Anguda North gravity high anomaly, potentially representing continuity of a greater VMS zone (See Figure 3).

  • 钻探孔TR-002相交18.46米,其中1.34%CuEq由0.47%Cu,1.85%Zn,0.32g / t Au和7.2g / t Ag组成,871万1.04CuEq由0.56%Cu,0.65%Zn,0.29g / t Au和5.14 g / t Ag组成(参见表1)。

  • Terer VMS远景现在延伸到长达一公里,具有主要以东西向为趋势的VMS赤铁矿露头,并陡峭向北倾斜,与VTEm导体和中等重力高异常相结合。

  • Terer VMS勘探区现在延伸超过1公里长,具有主要东西向倾向和向北陡峭倾斜的VMS鸟瞰露头,具有VTEm导体和中等重力高异常。

  • VMS矿化带位于绿泥石蚀变、强烈复盘的镁铁质火山岩中(见图1),形成了顶板和底板岩层。

  • Terer VMS带似乎由薄层堆叠的厚硫化物透镜组成,被断层切割,可能由至少4个不同的岩脉系统(镁、黑云母、花岗岩和辉长岩)位移。其中大多数岩脉沿正常断层带(见图2:A断面)堆放。

  • Terer VMS带位于Anguda North重力高异常的西侧2公里处,可能代表更大的VMS带的连续性(见图3)。

Figure 1: Terer Drilling Plan Map: Results received for TR-001 and TR-002 - Results in Table 1.

图1:Terer钻探计划图:TR-001和TR-002的结果-表1中的结果。

Figure 2: Terer Drilling - Cross-Section A

图2:Terer钻探——A断面

Figure 3: Terer-Anguda regional VMS trend.

图3:Terer-Anguda区域VMS趋势图。

Table 1: Terer Drill Results Summary

表1:Terer钻探结果概要。

*CuEq for drill intersections is calculated based on July 22/2024 spot prices for Cu US$4.20/lb, Au US$2395/oz, Ag US$29/oz and Zn US$1.21/lb. Recovery is assumed to be 100% as no metallurgical data is available. The formula is CuEQ % = Cu% + (Au g/t * (Au $ per oz/ 31.1034768) / (Cu $ per lb* 22.04623)) + (Ag g/t * (Ag $ per oz/ 31.1034768) / (Cu $ per lb* 22.04623)+ (Zn% * (Zn $ per lb / Cu $ per lb)).

*钻探交叉口的CuEq基于2024年7月22日铜价4.20美元/磅,金价2395美元/盎司,银价29美元/盎司和锌价1.21美元/磅。假设回收率为100%,因为没有冶金数据。公式为CuEQ%= Cu%+(Au g/t *(Au美元/盎司/ 31.1034768)/(Cu美元/磅* 22.04623))+(Ag g/t *(Ag美元/盎司/ 31.1034768)/(Cu美元/磅* 22.04623))+(Zn%*(Zn美元/磅/Cu美元/磅))。

Hamlo Summary

Hamlo概述。

  • 12 diamond drill holes completed, totaling 2576.0 meters. Assay results have been received for the first 7 holes.

  • Defined a large hydrothermally altered mixed stringer and massive sulfide zone, trending over 300m along strike (open in all directions) (See Figure 4).

  • Hosted within foliated, sheared, and hydrothermally altered felsic volcanic flows and tuffs, representing the footwall, surrounded by chlorite and epidote-altered mafic volcanics, representing the hanging wall volcanic rocks for the VMS mineralized zones.

  • The zone appears truncated to the northeast by a normal fault, with drill hole HM-010 intersecting primarily hanging wall mafic volcanics.

  • The Hamlo sulphide zone is within a 10km southwest and northeast trend which is sub-parallel to the Terer Trend (See Figure 6).

  • The initial assay results from the first 7 holes at Hamlo indicate a pyritic rich VMS mineralized system, that seems to have base metals increase at depth. It could be explained by a metal zoning, that is very common in VMS style mineralized deposits (See Table 2).

  • HM-006 ended in 10.90 m of 0.291 g/t Au and 1.36% Zn from 292.15 to 303.05m (See Figure 5: Section B).

  • 完成12个金刚石钻孔,总长度2576.0米。前7个钻孔的化验结果已收到。

  • 定义了一个大的热液变质混合琏岩和硫化物带,趋于沿着走向(沿所有方向开放)超过30000万(见图4)。

  • 位于片理状、剪切状和热液变质花岗质火山流和凝灰岩中,代表VMS矿化带的底板,被绿泥石和角闪石蚀变过的镁铁质火山岩包围,代表顶板火山岩。

  • 该区域向东北部断层截止,钻孔Hm-010主要与顶板镁铁质火山岩相交。

  • Hamlo硫化物带位于与Terer趋势(见图6)近平行的东南西北趋势的10公里内。

  • 来自Hamlo前七个孔的初步化验结果表明,它是一个硫铁矿硫化物热液矿床,且似乎深度处含有基础金属增加。这可能是由于金属分带导致的,这在VMS式矿床中非常常见(见表2)。

  • Hm-006在292.15到30305万的1090万深度结束,Au含量为0.291 g/t,Zn含量为1.36%(见图5:B断面)。

Figure 4: Hamlo Drilling Plan Map: Results received for holes in red annotation (HM-001 to HM-007) - Results in Table 2.

图4:Hamlo钻探计划图:红字注释的孔位(Hm-001到Hm-007)的结果-表2中的结果。

Figure 5: Hamlo Drilling - Cross-Section B

图5:Hamlo钻探——B断面。

VMS Trends on Terer Exploration License: From the drilling and intial assay results, it appears that the Terer property has at least two sub-parallel trending structures striking E-W and NE-SW. The main trends are very large with all the VMS gossan outcrops, hydrothermally altered extensive stringer zones,and geophysical signatures related to a very large system. Once the Company has drill data from all the holes, we will release a more fulsome statement on how Sun Peak will approach the next phase of exploration work, including drilling.

Terer勘探许可证的VMS趋势:从钻探和初步化验结果来看,Terer物业至少有两个东西向和东北-西南向的亚平行构造。主导趋势非常大,并具有所有VMS针铁矿露头、热液变质广泛成指区间和地球物理特征与非常大的系统相关的特征。一旦公司获得所有孔的钻探数据,我们将发布更丰富的声明,介绍Sun Peak将如何处理下一阶段的勘探工作,包括钻孔。

Figure 6: Terer Exploration License showing VMS Trends for Terer-Anguda, Hamlo-Dermi, and Argo-Keel

图6:Terer勘探许可证显示Terer-Anguda,Hamlo-Dermi和Argo-Keel的VMS趋势。

Table 2: Hamlo Drill Results Summary

表2:Hamlo钻探结果摘要

Note: Sulphide Zone* includes massive, semi-massive and stringer zones.

注:硫化带 *包括块状、半块状和脉状带区。

QUALIFIED PERSON'S STATEMENT

David K.Daoud,P.Geo,勘探副总裁,是监督Sun Peak在埃塞俄比亚的勘探项目的有资质人员,已经审查和批准了本新闻稿。

David K. Daoud, P. Geo, Vice President Exploration is the Qualified Person overseeing Sun Peak's exploration projects in Ethiopia and has reviewed and approved this press release.

所有报告的钻孔均为金刚石钻孔。

All drill holes reported are diamond drill core holes.

采样程序中包括质量保证/质量控制计划。 这个程序包括将标准、重复和空白样品系统地提交到由采样产生的样品流中。

A Quality Assurance/Quality Control program was part of the sampling program on the Hamlo and Terer Main prospects. This program includes the systematic submittals of standards, duplicates, and blank samples into the flow of samples produced by the sampling.

质量保证/质量控制方案是Hamlo和Terer Main矿区的取样方案的一部分。该方案包括将标准样品、重复样品和空白样品有系统地提交到取样流程中。

Samples were prepared at ALS Laboratory in Addis Ababa, Ethiopia and analyzed at ALS Laboratory in Dublin, Ireland. Gold is assayed using a 50-gram of -75 micron-size pulp is fire assayed and finished by ICP-AES analysis to detect content between 0.01 and 10.0 ppm. Gold returning over limit values are re-assayed with higher detection limits using a gravimetric finish. As well, a 0.5 gram cut from the pulp of each rock sample is dissolved by aqua regia acid digestion and analyzed by mass spectrometry for a suite of 51 additional elements. Analytical values for silver, copper, zinc, and lead over detection limits are re-assayed with higher detection limits, using aqua regia digestion. Drilling intercept lengths and estimated true thicknesses are reported in the tabulations.

在埃塞俄比亚的ALS实验室准备样品,并在爱尔兰的ALS实验室分析样品。黄金以50克-75微米大小的胶浆进行火法分析,并使用ICP-AES分析法检测0.01至10.0 ppm的含量。超限黄金含量将采用重量法完成。此外,从每个岩石样品的胶浆中取0.5克,并使用王水酸溶法溶解并通过质谱法分析另外51种元素的含量。银、铜、锌和铅的分析值超过检测限将采用王水酸溶法重复分析。表中报告了钻孔截面长度和估计的真实厚度。

ABOUT SUN PEAK METALS CORP.

关于Sun Peak Metals Corp.简介。

Sun Peak is exploring the district-scale Shire VMS Project in the Tigray Region of northern Ethiopia. The Shire Project is comprised of six exploration licenses and covers approximately 1,450 square kilometers in the prospective Arabian Nubian Shield. The licenses are in the same geological environment as both the Bisha Mine and the Asmara Projects. The Meli and Terer Licenses are part of a joint-venture agreement with Ezana Mining, a private Ethiopian Company and the other four are 100% owned by Sun Peak. The Sun Peak team have worked in East Africa for more than two decades and the Company's strategy is to apply exploration techniques that have worked successfully in the region before, to build assets through major copper-gold VMS discoveries.

Sun Peak正在探索位于埃塞俄比亚北部提格雷地区的Shire VMS项目,该项目总面积约为1,450平方千米。Shire项目由6个勘探许可证组成,处于有前途的阿拉伯努比亚盾地理环境之下,这与比沙矿山和Asmara项目的地质环境相同。Meli和Terer许可证是与埃塞俄比亚私人公司Ezana Mining达成的合资协议的一部分,其他四个许可证则由Sun Peak 100%拥有。Sun Peak团队在东非工作了20多年,该公司的策略是应用在该地区已经成功的勘探技术,通过发现重要的铜金属硫化物矿床来建立资产。

ON BEHALF OF THE BOARD OF DIRECTORS OF SUN PEAK METALS CORP.

代表Sun Peak Metals Corp.董事会。

Greg Davis
President, CEO & Director

Greg Davis
电话:416-806-6298

FOR FURTHER INFORMATION, PLEASE CONTACT:

如需更多信息,请联系:

Greg Davis
(T): +1 (604) 999 1099
(E): info@sunpeakmetals.com

Greg Davis
电话:+1 (604) 999 1099
邮箱:info@sunpeakmetals.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX创业公司交易所及其监管服务提供者(如TSX创业公司政策所定义)均不承担本发布信息充分性或准确性的责任。

Disclaimer for Forward-Looking Information

关于前瞻性信息的免责声明本新闻稿可能含有前瞻性声明。这些声明包括涉及公司的管理团队和董事会,Sanoukou Gold Project,Tilemi磷酸盐项目以及公司未来计划和目标的影响。这些声明基于目前的预期和假设,面临着风险和不确定性。实际结果可能因为在我们的中期和最近的年度财务报告的管理讨论和分析部分或其他报告和文件及TSX Venture Exchange和适用的加拿大证券法规中所讨论的因素而有所不同。我们不承担任何更新前瞻性声明的义务,除非法律规定。

Certain information and statements in this news release may be considered forward-looking information or forward-looking statements for purposes of applicable securities laws (collectively, "forward-looking statements"), which reflect the expectations of management regarding its disclosure and amendments thereto. Forward-looking statements consist of information or statements that are not purely historical, including any information or statements regarding beliefs, plans, expectations or intentions regarding the future. Such information or statements may include, but are not limited to, statements with respect to the goal of making a significant discovery and the development of a large-scale project in Ethiopia and identifying other potential properties and opportunities both in Ethiopia and globally. Such statements are subject to risks and uncertainties that may cause actual results, performance or developments to differ materially from those contained in the statements. No assurance can be given that any of the events anticipated by the forward-looking statements will occur or, if they do occur, what benefits Sun Peak will obtain from them. These forward-looking statements reflect management's current views and are based on certain expectations, estimates and assumptions, which may prove to be incorrect. A number of risks and uncertainties could cause actual results to differ materially from those expressed or implied by the forward-looking statements, including without limitation: the risk that the results of the planned exploration programs at the Shire Project do not meet expected results. These forward-looking statements are made as of the date of this news release and, except as required by applicable securities laws, Sun Peak assumes no obligation to update these forward-looking statements, or to update the reasons why actual results differed from those projected in the forward-looking statements. Additional information about these and other assumptions, risks and uncertainties are set out in the "Risks and Uncertainties" section in the Prospectus filed with Canadian security regulators.

本新闻发布中的某些信息和声明可能被视为适用证券法的前瞻信息或前瞻性声明(统称"前瞻性声明"),这反映了管理层对其披露及其修订的预期。前瞻性声明包括不纯粹历史的信息或声明,包括有关未来信仰、计划、期望或意图的任何信息或声明。这样的信息或声明可能包括但不限于有关在埃塞俄比亚取得重大发现和开发大规模项目,以及在埃塞俄比亚和全球范围内寻找其他潜在地产和机会的目标的声明。这些陈述面临风险和不确定性,可能会导致实际结果、业绩或发展与陈述中的不同。不能保证任何前瞻性声明所预期的事件会发生,或者如果它们发生,太阳峰将从中获得什么好处。这些前瞻性声明反映了管理层当前的观点,并基于某些期望、估计和假设,这些期望、估计和假设可能会被证明是不正确的。许多风险和不确定性可能导致实际结果与前瞻性声明所表达或暗示的不同,包括但不限于:计划的Shire项目勘探计划的结果不符合预期结果的风险。这些前瞻性声明是截至本新闻发布日期发表的,除了适用证券法规定的要求外,太阳峰不承担更新这些前瞻性声明或更新实际结果与前瞻性声明所展示的原因之间的差异的义务。有关这些和其他假设、风险和不确定性的附加信息,请参见与加拿大证券监管机构一起提交的招股说明书中的"风险和不确定性"部分。

SOURCE: Sun Peak Metals Corp.

来源:Sun Peak Metals Corp.


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发