18.0 EH/s and 762 MW under management in mining

在挖矿领域,我们拥有18.0 EH/s和762 MW的能源管理能力。

Announced plans for a 205 MW site in Texas

在德克萨斯州计划建设205 MW的能源站点。

Miami, FL, Aug. 05, 2024 (GLOBE NEWSWIRE) -- Hut 8 Corp. (Nasdaq | TSX: HUT) ("Hut 8" or the "Company"), a leading, vertically integrated operator of large-scale energy infrastructure and one of North America's largest Bitcoin miners, today released its operations update for July 2024.

2024年8月5日,佛罗里达州迈阿密(GLOBE NEWSWIRE)-Hut 8公司(纳斯达克| TSX:HUT)是主导大型能源基础设施和北美最大的比特币矿工之一的领先垂直一体化运营商,今天公布了其2024年7月的运营更新。

"We are continuing to see the impact of our ongoing optimization efforts in our self-mining business," said Asher Genoot, CEO of Hut 8. "Our average energy cost has declined materially since bringing Salt Creek online and completing the planned deployment of our curtailment software, and we continue to build and refine our data science platform to drive further efficiencies and margin expansion."

Hut 8的CEO阿舍尔·格诺特表示:"我们正在继续看到自我挖矿业务的持续优化工作的影响。自Salt Creek上线以来,我们的平均能源成本已大幅下降,并完成了我们减少软件部署的计划,我们继续建立和完善我们的数据科学平台,以推动更大的效率和毛利率扩张。"

"We also announced the first conversion from our previously announced pipeline of energy capacity under exclusivity, a site in the Texas Panhandle located adjacent to a windfarm with 205 megawatts of immediately available power capacity. The site will be able to pull power directly from the ERCOT grid when the wind farm is not generating power. Across our platform, we now own or manage energy infrastructure representing access to 1.3 gigawatts of power capacity. We look forward to sharing more details on this site and our second quarter 2024 results during our earnings call on August 13th."

"我们还宣布首次转换我们之前在排他性下宣布的能源产能管道,将在得克萨斯州潘柄地区建立一个场地,与一座205兆瓦的风电场相邻。当风力发电站没有发电时,该站点将能够直接从ERCOt电网汲取电力。在我们的平台上,我们现在拥有或管理能源基础设施,代表可访问1.3千兆瓦的功率能力。我们期待在8月13日的业绩会上分享有关该站点和我们2024年第二季度业绩的更多细节。"

Highlights:

亮点:

  • Announced plans for a site in Texas with 205 MW of immediately available power capacity
  • Further progress in developing Cedarvale, with new capacity being brought online in tranches of 50 MW
  • 宣布在德克萨斯州计划建设一个场地,该场地具有205兆瓦的即时可用电力容量。
  • 在开发Cedarvale方面,新的容量正在以50 MW为单位逐步加入。

Operating Metrics

操作指标

Average during the period unless otherwise noted July 2024 June 2024
Total energy capacity under management1,2,3 762 MW 762 MW
Total deployed miners under management4 174.2K 172.1K
Total hashrate under management5 18.0 EH/s 17.8 EH/s
该期间的平均值,除非另有说明 2024年7月 2024年6月
管理的总能源容量 1,2,3 762 MW 762 MW
管理的总矿机数 4 174.2K 172.1K
管理的总算力数量 5 18.0 EH / s 17.8 EH/s
Self-Mining6
Deployed miners7 58.2K 58.4K
Deployed hashrate8 5.5 EH/s 5.7 EH/s
Bitcoin produced1,9 105 BTC 107 BTC
Bitcoin on balance sheet1 9,102 BTC 9,105 BTC
自我挖矿6
部署的矿机数量7 58.2K 58.4K
部署的算力8 5.5 EH/s 5.7 EH/s
所生产的比特币1,9 105 BTC 107 BTC
平衡表上的比特币资产1 9,102比特币 9,105 BTC
Managed Services2,10
Energy capacity under management1 582 MW 582 MW
Deployed miners under management 125.4K 123.1K
Hashrate under management 13.4 EH/s 13.1 EH/s
管理服务2,10
能源管理能力1 582 MW 582 MW
管理下的矿机 125.4千瓦时 123.1K
管理下的算力 13.4艾克哈希/秒 13.1 EH/s
Hosting
Deployed miners under management11,12 76.7K 76.7K
Hashrate under management13 8.5 EH/s 8.4 EH/s
托管
管理的矿机数量11,12 76.7K 76.7K
管理的算力13 8.5艾克哈希/秒 8.4 EH/s

Energy Infrastructure Platform1

能源基础设施平台1

Current Revenue Stream(s)14
Site Location Owner Power Capacity Self-
Mining
Managed Services Hosting HPC Power Sales
Expansion Site 115 Texas Panhandle Hut 8 205 MW
Medicine Hat Medicine Hat, AB Hut 8 67 MW Yes
Salt Creek Orla, TX Hut 8 63 MW Yes
Alpha Niagara Falls, NY Hut 8 50 MW Yes Yes
Drumheller16 Drumheller, AB Hut 8 42 MW
Kelowna Kelowna, BC Hut 8 1.1 MW Yes
Mississauga Mississauga, ON Hut 8 0.9 MW Yes
Vaughan Vaughan, ON Hut 8 0.6 MW Yes
Vancouver II Vancouver, BC Hut 8 0.5 MW Yes
Vancouver I Vancouver, BC Hut 8 0.3 MW Yes
King Mountain17 McCamey, TX Hut 8 (JV) 280 MW Yes Yes Yes Yes
Iroquois Falls18 Iroquois Falls, ON Hut 8 (JV) 120 MW Yes
Kingston18 Kingston, ON Hut 8 (JV) 110 MW Yes
North Bay18 North Bay, ON Hut 8 (JV) 40 MW Yes
Kapuskasing18 Kapuskasing, ON Hut 8 (JV) 40 MW Yes
Cedarvale3 Barstow, TX Managed 215 MW Yes
East Stiles Midland, TX Managed 30 MW Yes
Rebel Midland, TX Managed 25 MW Yes
Stiles Midland, TX Managed 20 MW Yes
Garden City Midland, TX Managed 12 MW Yes
Total 1,322 MW
目前的营业收入流(14)
地点 地点 所有者 电力容量 自助服务
采矿业
管理服务 托管 高性能计算 电力销售
扩建地点15 德克萨斯州潘汉德尔地区 Hut8 205百万瓦特
Medicine Hat Medicine Hat, AB Hut8 67兆瓦
Salt Creek Orla,德克萨斯州 Hut8 63兆瓦
Alpha 纽约尼亚加拉瀑布城市 Hut8 50 兆瓦
德拉姆赫勒16 德拉姆贺勒,阿尔伯塔省 Hut8 42兆瓦
基洛纳 基洛纳,不列颠哥伦比亚省 Hut8 1.1兆瓦
Mississauga 密西沙加,安大略省 Hut8 0.9兆瓦
沃恩 沃恩,安大略省 Hut8 0.6兆瓦
温哥华二 卑诗省温哥华市 Hut8 0.5兆瓦
温哥华一 卑诗省温哥华市 Hut8 0.3兆瓦
King Mountain17 McCamey, TX Hut 8 (JV) 280 兆瓦
Iroquois Falls18 安大略省伊罗quois Falls镇 Hut 8 (JV) 120 MW
Kingston18 Kingston,安大略省 Hut 8 (JV) 110 MW
North Bay18 North Bay,安大略省 Hut 8 (JV) 40 MW
Kapuskasing18 Kapuskasing,安大略省 Hut 8 (JV) 40 MW
Cedarvale3 Barstow,德克萨斯州 管理的 215兆瓦
East Stiles 中德兰,德克萨斯州 管理的 30兆瓦
Rebel 中德兰,德克萨斯州 管理的 25兆瓦
Stiles 中德兰,德克萨斯州 管理的 20兆瓦
花园城市 中德兰,德克萨斯州 管理的 12兆瓦
总费用 1,322兆瓦

Notes:

票据 :

  1. As of the end of the period
  2. Includes all Self-Mining, Managed Services, and Hosting infrastructure, including 100% of the energy capacity at the King Mountain site, which is owned by the King Mountain JV in which the Company has a 50% membership interest and a Fortune 200 renewable energy producer has the remaining 50% membership interest (the "King Mountain JV").
  3. Includes 215 megawatts assuming full capacity at Cedarvale, which was first energized in April and is currently under construction.
  4. Includes all miners that are racked with power and networking, rounded to the nearest 100, in Self-Mining, Managed Services, and Hosting infrastructure with power and networking, including all miners at the King Mountain site.
  5. Includes all Self-Mining, Managed Services, and Hosting hashrate, including 100% of the hashrate at the King Mountain site.
  6. Self-Mining operations for Hut 8 include 100% of operations at the King Mountain site.
  7. Deployed miners are defined as those physically racked with power and networking, rounded to the nearest 100; deployed self-mining miners net of the 50% share of the King Mountain JV held by Hut 8's joint venture partner was 49.2K during July and 49.4K during June.
  8. Indicates the target hashrate of all deployed miners; deployed self-mining hashrate net of the 50% share of the King Mountain JV held by Hut 8's joint venture partner was 4.7 EH/s during July and 4.8 EH/s during June.
  9. Bitcoin produced net of the 50% share of the King Mountain JV held by Hut 8's joint venture partner was 88 BTC during July and 90 during June.
  10. The Managed Services figures reflected in this table include the Self-Mining and Hosting metrics from the sites where Hut 8's Managed Services business is an additional service layer in the operation of the site (at King Mountain, Rebel, Stiles, East Stiles, and Garden City). As a result, the sum of the Self-Mining, Managed Services, and Hosting numbers will not add up to the "Total energy capacity under management", "Total deployed miners under management", and "Total hashrate under management" figures that are also reflected in the table.
  11. Miners are rounded to the nearest 100.
  12. 42.6K deployed miners under management net of the 50% share of the King Mountain JV held by Hut 8's joint venture partner during both July and June.
  13. 4.7 EH/s and 4.6 EH/s under management net of Hut 8's joint venture partner's 50% share of the King Mountain JV during July and June, respectively.
  14. Reflects revenue sources to Hut 8, its subsidiaries, and/or joint ventures in which they participate.
  15. Site is currently under development.
  16. Site currently shut down; Hut 8 maintaining lease with option value of re-energizing site.
  17. Owned by a JV between Hut 8 and a Fortune 200 renewable energy producer in which Hut 8 has an approximately 50% membership interest.
  18. Owned by a JV between Hut 8 and Macquarie in which Hut 8 has an approximately 80% membership interest.
  1. 至期末为止
  2. 包括所有自挖、托管服务和托管基础设施,包括King Mountain JV拥有的全部光伏电站容量,该JV由公司持有50%的会籍权益和一家财富200强的可再生能源生产商持有剩余的50%会籍权益(“King Mountain JV”)。
  3. 包括在Cedarvale的全部功率达到215兆瓦,该矿场于4月首次通电,目前正在施工中。
  4. 包括所有通过电力和网络架设的挖矿机,自挖、托管服务和托管基础设施中的电力和网络架设,包括King Mountain现场的所有挖矿机。
  5. 包括所有自挖、托管服务和托管哈希率,其中King Mountain现场的哈希率占全部的100%。
  6. Hut 8的自挖运营包括King Mountain现场100%的运营。
  7. 部署的挖矿机被定义为那些通过电源和网络进行实际机架安装,按最近100台设备四舍五入计;自挖矿机净数除Hut 8联营企业伙伴持有King Mountain JV股权的50%外,在7月份为4.92万台,在6月份为4.94万台。
  8. 指部署的所有挖矿机的目标哈希率;自挖哈希率净数除Hut 8联营企业伙伴持有King Mountain JV股权的50%外,在7月份为4.7 EH/s,在6月份为4.8 EH/s。
  9. Hut 8合资伙伴所持有的King Mountain JV50%股权除外,比特币在7月份净产量为88枚,在6月份为90枚。
  10. 此表格反映的托管服务数字包括Hut 8的自行挖掘和托管指标,这些指标是作为网站运营的额外服务层提供的(在King Mountain、Rebel、Stiles、East Stiles和Garden City)。因此,自行挖掘、托管和托管数字的总和将不会添加到该表格中反映的“托管的总能量容量”、“托管的总矿工”和“托管的总算力”数字中。
  11. 矿机数量按最近100台取整。
  12. King Mountain JV的合资伙伴所持有的50%股权除外,净经营4.26万架矿机,且在7月和6月均如此。
  13. King Mountain JV的合资伙伴所持有的50%股权除外,在7月和6月均经营净价为4.7EH/s和4.6EH/s。
  14. 反映Hut 8及其子公司和/或Joint Ventures中所参与的收入来源。
  15. 该网站目前正在建设中。
  16. 该地点目前处于关闭状态;Hut 8保留租赁权利,有望重新启动该地点。
  17. 该矿场由Hut 8和一家财富200强的可再生能源生产商组成的合资企业共同拥有,其中Hut 8的成员权益约为50%。
  18. 由Hut 8和麦格理JV持有,其中Hut 8拥有约80%的成员权益。


Upcoming Events
Hut 8 will be hosting a conference call to discuss the Company's second quarter 2024 results on Tuesday, August 13th, 2024 at 8:30a.m. ET. The webcast can be viewed here.


即将举行的活动
Hut 8 Corp.将于2024年8月13日星期二上午8:30 Et举行电话会议,讨论公司第二季度的业绩。您可以在 这里.

About Hut 8
Hut 8 Corp. is an energy infrastructure operator and Bitcoin miner with self-mining, hosting, managed services, and traditional data center operations across North America. Headquartered in Miami, Florida, Hut 8 Corp. has a portfolio comprising twenty sites: ten Bitcoin mining, hosting, and Managed Services sites in Alberta, New York, and Texas, five high performance computing data centers in British Columbia and Ontario, four power generation assets in Ontario, and one newly announced site in the Texas Panhandle. For more information, visit and follow us on X (formerly known as Twitter) at @Hut8Corp.

关于Hut 8
Hut 8 Corp.是一家以北美为基础的能源基础设施运营商和比特币矿工,拥有自行挖掘、托管、托管服务和传统数据中心运营。总部位于佛罗里达州迈阿密,Hut 8 Corp.拥有20个站点的组合:位于艾伯塔省、纽约州和得克萨斯州的10个比特币采矿、托管和托管服务站点、位于不列颠哥伦比亚省和安大略省的5个高性能计算数据中心、在安大略省的4个发电资产以及得克萨斯州Panhandle地区的一个新公布站点。欲了解更多信息,请访问 并在X(以前称为Twitter)上关注我们 @Hut8Corp。

Cautionary Note Regarding Forward–Looking Information
This press release includes "forward-looking information" and "forward-looking statements" within the meaning of Canadian securities laws and United States securities laws, respectively (collectively, "forward-looking information"). All information, other than statements of historical facts, included in this press release that address activities, events or developments that Hut 8 expects or anticipates will or may occur in the future, including such things as future business strategy, competitive strengths, goals, expansion and growth of the business, operations, plans and other such matters is forward-looking information. Forward-looking information is often identified by the words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "allow", "believe", "estimate", "expect", "predict", "can", "might", "potential", "predict", "is designed to", "likely" or similar expressions. Specifically, such forward-looking information included in this press release includes statements relating to the impact of the Company's optimization efforts, building and refining the Company's data science platform to drive further efficiencies and margin expansion, and the Company's progress developing its Cedarvale site.

关于前瞻性信息的警示
本新闻稿包含“前瞻性信息”和“前瞻性声明”,分别指加拿大证券法和美国证券法中的“前瞻性信息”(统称“前瞻性信息”)。本新闻稿中包含的除历史事实陈述外的所有信息,都属于前瞻性信息,包括未来企业战略、竞争优势、目标、业务扩展和增长、运营、计划和其他类似事项。前瞻性信息通常可通过诸如“可能”、“将”、“可”、“应该”、“将”、“打算”、“计划”、“预期”、“允许”、“相信”、“估计”、“预计”、“预测”、“能够”、“可能”、“潜在”、“预测”、“旨在”、“可能”或类似表达方式来辨别。具体而言,包含本新闻稿的前瞻性信息包括与公司优化工作的影响、构建和完善公司的数据科学平台以推动进一步的效率和利润扩张以及公司在开发其Cedarvale站点方面取得进展等方面的声明。

Statements containing forward-looking information are not historical facts, but instead represent management's expectations, estimates and projections regarding future events based on certain material factors and assumptions at the time the statement was made. While considered reasonable by Hut 8 as of the date of this press release, such statements are subject to known and unknown risks, uncertainties, assumptions and other factors that may cause the actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information, including but not limited to, security and cybersecurity threats and hacks; malicious actors or botnet obtaining control of processing power on the Bitcoin network; further development and acceptance of the Bitcoin network; changes to Bitcoin mining difficulty; loss or destruction of private keys; increases in fees for recording transactions in the Blockchain; erroneous transactions; reliance on a limited number of key employees; reliance on third party mining pool service providers; regulatory changes; classification and tax changes; momentum pricing risk; fraud and failure related to digital asset exchanges; difficulty in obtaining banking services and financing; difficulty in obtaining insurance, permits and licenses; internet and power disruptions; geopolitical events; uncertainty in the development of cryptographic and algorithmic protocols; uncertainty about the acceptance or widespread use of digital assets; failure to anticipate technology innovations; the COVID19 pandemic, climate change; currency risk; lending risk and recovery of potential losses; litigation risk; business integration risk; changes in market demand; changes in network and infrastructure; system interruption; changes in leasing arrangements; failure to achieve intended benefits of power purchase agreements; potential for interrupted delivery, or suspension of the delivery, of energy to mining sites and other risks related to the digital asset mining and data center business. For a complete list of the factors that could affect Hut 8, please see the "Risk Factors" section of Hut 8's Transition Report on Form 10-K, available under the Company's EDGAR profile at www.sec.gov, and Hut 8's other continuous disclosure documents which are available under the Company's SEDAR+ profile at and EDGAR profile at www.sec.gov.

陈述包含前瞻性信息,而不是历史事实,而是基于某些物质因素和假设,反映了管理层对于未来事件的预期、估计和投影,这些因素和假设是在发表陈述时作为合理的。虽然Hut 8在本新闻稿发布之日认为该类陈述是合理的,但是这些陈述仍可能受到已知和未知的风险、不确定性、假设和其他因素的影响,这可能会导致实际结果、活动水平、业绩或成就与此类前瞻性信息所表达的实际结果、活动水平、业绩或成就存在实质性不同,包括但不限于安全和网络安全威胁和黑客攻击,有恶意的演员或Botnet获得比特币网络上的处理能力,比特币网络的进一步发展和接受,比特币挖掘难度的变化,私钥的丢失或破坏,记录区块链中的交易所需费用的增加,错误交易,依赖少量关键员工,依赖第三方矿池服务提供商,法规变更,分类和税收变化,势头价格风险,数字资产交易所欺诈和失败,难以获得银行服务和融资,难以获得保险、许可证和执照,互联网和电力中断,地缘政治事件,加密和算法协议发展的不确定性,数字资产的接受或广泛使用的不确定性,未能预见技术创新,COVID19大流行、气候变化、货币风险、贷款风险和后续损失的回收,诉讼风险,业务整合风险,市场需求变化,网络和基础设施变化,系统中断,租赁安排变化,无法实现电力购买协议的预期收益,可能会中断交割或暂停交割的能源矿场投资和数据中心业务的其他风险。欲了解可能影响Hut 8的完整因素列表,请参阅Hut 8的过渡报告,可在公司的EDGAR资料库中的公司档案下找到,在公司的SEDAR +文件文件下找到 www.sec.gov,在公司的SEDAR +档案中提供。 和EDGAR资料库下的公司档案。 www.sec.gov.

CONTACT: Hut 8 Corp. Investor Relations
Sue Ennis
sue@hut8.io

Hut 8 Corp. Media Relations
Eóin Fay
eoin.fay@hut8.com

联系:Hut 8 Corp.投资者关系
恩尼斯
sue@hut8.io

Hut 8 Corp.媒体关系
Eóin Fay
eoin.fay@hut8.com


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发