share_log

LITHIUM SOUTH: TEST WORK/ DEVELOPMENT WORK /BUSINESS DEVELOPMENTS UPDATE

LITHIUM SOUTH: TEST WORK/ DEVELOPMENT WORK /BUSINESS DEVELOPMENTS UPDATE

南锂:测试工作/开发工作/业务发展更新
PR Newswire ·  08/08 21:00

VANCOUVER, BC, Aug. 8, 2024 /PRNewswire/ -- Lithium South Development Corporation (the "Company" or "Lithium South") (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to provide an update regarding test work, on site development work, and business developments.

2024年8月8日,British Columbia, Vancouver / PRNewswire / -Lithium South Development Corporation(以下简称“公司”或“Lithium South”)(TSX-V:LIS)(OTCQB:LISMF)(Frankfurt:OGPQ)很高兴地就测试工作、现场开发工作和业务发展提供更新。

Lithium Iron Phosphate Test Work

锂铁磷酸盐检测工作

The Company is pleased to report the laboratory scale production of Lithium Iron Phosphate (LiFePO4) directly from concentrated brine obtained from its Hombre Muerto North Lithium Project (HMN Li Project), located in Salta Province, Argentina. Test work was undertaken in cooperation with an independent laboratory based in (note 1). Salta, Argentina. The product was then forwarded to the Research and Development Center for Advanced Materials and Energy Storage (CIDMEJu), located in Jujuy province, Argentina. At this facility, a basic operating button type battery was constructed using the HMN Li Project LiFePO4 product. This facility is part of the CONICET / National Scientific and Technical Research Council, an Argentine government agency which directs and co-ordinates most of the technical and scientific research done in Argentine universities and institutes.

公司很高兴地宣布可以直接从其位于阿根廷萨尔塔省Human Muerto North锂项目(HMN Li Project)开采的浓缩卤水中生产出锂铁磷酸盐(LiFePO4)的实验室规模产品。检测工作是与位于阿根廷萨尔塔市的独立实验室合作进行的(注1)。该产品随后被转交到位于Argentina Jujuy省的先进材料和能源存储研究和开发中心(CIDMEJu)。在该中心,使用HMN Li项目LiFePO4产品构建了基本的操作按钮电池。该设施是CONICEt / National Scientific and Technical Research Council的一部分,该阿根廷政府机构指导和协调大多数阿根廷大学和研究所的技术和科学研究。

The laboratory (patent pending) process resulted in a LiFePO4 product directly from lithium chloride, eliminating the need for lithium carbonate. LiFePO4 batteries (LFP) are being utilized by Tesla, BYD and others due to their lower manufacturing costs, long cycle life and high-power density. LFP batteries are cobalt free and are finding increased demand in utility scale stationary applications in addition to the Electric Vehicle market. LFP demand is expected to rise considerably over the coming years

这项实验室(申请专利中)的“过程”可以直接从氯化锂中获得LiFePO4产品,从而消除了需要碳酸锂的必要性。Tesla,BYD和其他公司正使用LFP电池(LiFePO4),因为它们具有更低的制造成本、更长的循环寿命和更高的功率密度。LFP电池不含钴,除了电动汽车市场外,在公用事业规模的静止应用中也找到了越来越多的应用。预计未来几年LFP需求将大幅上升。

The LiFePO4 battery test work is important to Lithium South as it is helping to define potential options for the production of higher priced value-added lithium products. Evaporation test work is also continuing at the HMN Li Project site as part of the process validation for a planned Feasibility Study.

对于Lithium South,锂铁磷酸盐电池测试工作很重要,因为它正在帮助定义生产更高价值锂产品的潜在选择。由于将制程确认工作作为可行性研究的一部分,HMN Li项目现场的蒸发试验工作也正在继续进行。

HMN Li Project Site

HMN Li项目区域

At the HMN Li Project Alba Sabrina claim block, a second phase pump test is being planned for well PW23-AS-02, a 400-meter-deep production well. With recent test work indicating a good pumping rate from a single pump, it has been determined that two pumps down the same hole will be necessary to provide additional brine lift and to fully evaluate the wells pumping capacity. The Company is in the process of acquiring two new pumps and support equipment to continue the test work. In addition, the Company plans to conduct new pumping tests on the Tramo and Natalia Maria claim blocks.

在HMN Li项目Alba Sabrina索赔区块中,正在计划对PW23-AS-02井进行第二阶段抽水试验,该井为深度为400米的生产井。最近的试验结果表明,单一泵的泵送速率良好,因此已经确定需要两个泵在同一个井井下来提供额外的溴升力,全面评估井的泵送能力。该公司正在购买两个新泵和支持设备来继续进行测试工作。另外,该公司计划在特拉莫(Tramo)和纳塔利娅玛丽亚(Natalia Maria)索赔区块上进行新的抽水测试。

Business Discussions

业务讨论

Management is in ongoing discussions with several automotive and lithium industry corporations regarding potential strategic alliances or business arrangements. In spite of a challenging market environment, project interest remains high. These discussions include a bulk sample site visit planned for one interested party in September. Management remains on a trading blackout.

管理层正在与汽车和锂行业公司进行持续的商业合作或业务安排的讨论。尽管市场环境具有挑战性,但项目兴趣仍然很高。其中一个利益相关方计划在9月进行批量样品场地访问。管理层仍然处于交易停止期。

Mr. William Feyerabend, CPG, a Consulting Geologist and Qualified Person under NI 43-101, participated in the production of this news release and approves of the scientific and technical disclosure.

William Feyerabend先生,CPG,是NI 43-101的磋商地质学家和合格人员,参与了此新闻发布的制作并赞成科学技术披露。

About Lithium South

关于Lithium South

Lithium South owns 100% of the HMN Li Project located in Salta and Catamarca Provinces, Argentina, in the heart of the lithium triangle. The Salar del Hombre Muerto has a history of lithium production, with Arcadium Lithium (as a result of the Alkem and Livent merger) in operation for over twenty-five years, in an area just south of the HMN Li Project. The HMN Li Project is surrounded by a US$4 billion lithium development under construction by POSCO (Korea) and the Sal de Vida Project under development by Arcadium. Exploration work to date has delineated a NI 43-101 compliant 1,583,200 tonne Lithium Carbonate Equivalent ("LCE") Resource (See Note 2 below) on the Alba Sabrina, Natalia Maria, and Tramo claim blocks, three of five non-contiguous blocks that make up the HMN Li Project. A recent Preliminary Economic Assessment published April 30, 2024, delineates potential to develop a 15,600 tonne per year lithium carbonate project. With pumping well installation and test work underway, Lithium South is transitioning from being a lithium explorer to becoming a lithium developer.

Lithium South拥有位于阿根廷Salta和Catamarca省的HMN Li项目的100%股权,位于锂三角的核心地带。 Hombre Muerto的Salar具有锂生产历史,Alkem和Livent合并后产生的Arcadium Lithium公司已经在HMN Li项目以南的区域运营了25年以上。 HMN Li项目周围正处于POSCO(韩国)正在建设的40亿美元锂开发项目和Arcadium正在开展的Sal de Vida项目之中。到目前为止,勘探工作已经在HMN Li项目的五个不相邻的区块之一的Alba Sabrina、Natalia Maria和Tramo索赔区块中确定了符合NI 43-101标准的1,583,200吨锂碳酸盐当量资源(见下面的注释2)。最近发布的初步经济评估(2024年4月30日发布)界定了开发每年15,600吨碳酸锂项目的潜力。随着泵井的安装和测试工作的进行,Lithium South正在过渡,从一家锂勘探公司过渡到一家锂开发商。

On behalf of the Board of Directors

谨代表董事会

Adrian F. C. Hobkirk
President and Chief Executive Officer
Investors / Shareholders call 855-415-8100 / website:

Adrian F. C. Hobkirk
总裁兼首席执行官
投资者/股东电话:855-415-8100 / 网站:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The TSX Venture Exchange has not reviewed the content of this news release and therefore does not accept responsibility or liability for the adequacy or accuracy of the contents of this news release.

TSX Venture Exchange和其监管服务提供商(如TSX Venture Exchange政策中所定义的那样)均不承担该版本的充分性或准确性的责任。 TSX Venture Exchange还没有审查本新闻稿的内容,因此不接受本新闻稿内容的充分性或准确性的责任或责任。

Note 1: The Salta based laboratory is a non-arm's length party controlled by a director of the Company.

注1:萨尔塔(Salta)实验室是公司董事控制的非特定方。

Note 2: A report titled Updated Mineral Resource Estimate – Hombre Muerto North Project, NI 43-101 Technical Report Catamarca and Salta, Argentina, Mark King, PhD, PGeo, Peter Ehren, M.Sc, MAusIMM, September 5th, 2023.

注2:一份题为Updated Mineral Resource Estimate – Hombre Muerto North Project,NI 43-101 Technical Report Catamarca and Salta,Argentina,Mark King,PhD,PGeo,Peter Ehren万.Sc,MAusIMm,September 5th,2023.的报告Preliminary Economic Assessment发布。

This news release contains certain "forward-looking statements" within the meaning of Section 21E of the United States Securities and Exchange Act of 1934, as amended. Except for statements of historical fact relating to the Company, certain information contained herein constitutes forward-looking statements. Forward-looking statements are based upon opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors which could cause actual results to differ materially from those projected in the forward-looking statements. The reader is cautioned not to place undue reliance on forward- looking statements. We seek safe harbor.

本新闻稿包含某些“前瞻性声明”,这些声明是根据美国1934年《证券交易法》第21E条修正案作出的。除涉及公司的历史事实的声明外,这里包含的某些信息构成前瞻性声明。前瞻性声明基于管理层在其作出声明时的意见和估计,并且受过各种风险和不确定性以及可能导致实际结果不同于前瞻性声明的因素的影响。读者应谨慎对待前瞻性声明。我们寻求安全港。

Logo:

徽标:

SOURCE Lithium South Development Corporation

资讯来源:锂矿南部开发公司

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发