share_log

CopAur Minerals Consolidates 100% Interest in Kinsley Mountain Gold Project

CopAur Minerals Consolidates 100% Interest in Kinsley Mountain Gold Project

CopAur矿业公司巩固了Kinsley Mountain黄金项目的100%权益
newsfile ·  08/12 18:04

Vancouver, British Columbia--(Newsfile Corp. - August 12, 2024) - CopAur Minerals Inc. (TSXV: CPAU) (OTCQX: COPAF) ("CopAur" or the "Company") is pleased to announce that it has completed its previously announced (see news release disseminated July 8, 2024) acquisition from Nevada Sunrise Metals Corporation ("Nevada Sunrise") of Nevada Sunrise's 18.74% ownership interest in Kinsley Gold LLC ("LLC"), the joint venture vehicle that holds rights to the Kinsley Mountain Gold Project in Nevada ("Kinsley Project"). The Company now owns 100% of the Kinsley Project, a gold exploration project in Elko County, Nevada. The Kinsley Project comprises 513 unpatented lode claims on U.S. Bureau of Land Management land plus 6 leased patents totaling 4,213 hectares (10,410 acres), and hosts a past-producing mine with an extensive exploration database and numerous, untested gold targets. The leased claims are subject to a 3% net smelter returns royalty on production.

Newsfile Corp.(资讯公司)2024年8月12日消息——CopAur Minerals Inc.(TSXV: CPAU)(OTCQX: COPAF)(以下简称“CopAur”或“公司”)很高兴宣布,公司已完成此前(参见2024年7月8日发布的新闻稿)从Nevada Sunrise Metals(“Nevada Sunrise”)收购Kinsley Gold LLC(“LLC”)的18.74%股权,该公司是持有内华达金斯利山黄金项目(“Kinsley Project”)权益的合资公司。公司现持有Kinsley Project 100%的股权,该项目是内华达州埃尔科县的一项黄金勘探项目。金斯利项目由美国国土管理局颁发的513个未保证的裂隙矿权组成,另外还有6份租赁专利,总面积达到4,213公顷(约10,410英亩),项目主持着一个有着广泛探矿数据库和多个未经探测的金矿目标的已生产矿山。 leased专利在生产中需支付3%净残留收益。

Under the terms of a membership purchase agreement CopAur acquired Nevada Sunrise's 18.74% ownership interest in the LLC in consideration of the payment of CDN$475,000 and the issuance of 1,000,000 common shares of CopAur ("Consideration Shares") to Nevada Sunrise. The Consideration Shares are subject to a four-month statutory hold period (the "Statutory Hold Period") and voluntary hold periods for an additional nine month period. The first 250,000 Consideration Shares will be released on expiry of the Statutory Hold Period and the remaining shares will be released in equal tranches every three months following the first release.

根据会员购买协议,CopAur以支付CDN$475,000和向Nevada Sunrise发行100,000股普通股(“Consideration Shares”)的方式收购了Nevada Sunrise在LLC中持有的18.74%股权。考虑期为四个月(“Statutory Hold Period”)和另外九个月的志愿保留期。前250,000股Consideration Shares将在统计保管期到期后释放,其余股份将在第一次释放后每三个月平均释放。

Chief executive officer Jeremy Yaseniuk stated: "We are pleased to have completed this transaction to acquire 100% ownership of the LLC, which provides us with full control over the Kinsley Project and the ability to concentrate our efforts on further advancing this exciting project. The Kinsley Project has both oxide and sulphide gold resources. Recent drilling by the Company has yielded multiple near-surface oxide intercepts at the Main Pit North target and high-grade sulphide gold mineralization at the Western Flank (news releases Oct. 4, 2023 and Nov. 10, 2023)."

首席执行长Jeremy Yaseniuk表示:“我们很高兴完成了这笔交易,以收购LLC 100%的所有权,这使我们能够完全控制Kinsley Project,并将精力集中在进一步推进这个令人兴奋的项目上。Kinsley Project拥有氧化物和硫化物黄金资源。公司近期的钻探钻在Main Pit North目标处取得了多个近地表氧化截获和Western Flank(2023年10月4日和11月10日的新闻发布会)高品位硫化黄金矿化。”

The Kinsley Project hosts a National Instrument 43-101 mineral resource that CopAur is working to upgrade and expand. The Kinsley Project is a historical past producer that yielded 138,000 ounces of near-surface open-pit gold between 1995 and 1999, when mining was suspended.

Kinsley Project拥有加拿大N43-101标准的矿产资源,CopAur正在努力升级和扩展该标准。Kinsley Project是一个历史产量骤降的项目,1995年至1999年之间的采矿期间,它在近地表露天矿开采中获得了138,000盎司的黄金。

A technical report on the Kinsley Project titled "Technical Report of the Kinsley Project, Elko and White Pine Counties, Nevada, U.S.A.", dated June 21, 2021, with an effective date of May 5, 2021, prepared by Michael M. Gustin and Gary L. Simmons, is available for review under New Placer Dome Gold Corp.'s issuer profile on SEDAR+.

有关Kinsley Project的技术报告标题为“美国内华达州Elko和White Pine县Kinsley Project的技术报告”,日期为2021年6月21日,有效日期为2021年5月5日,由Michael M. Gustin和Gary L. Simmons编制,可在New Placer Dome Gold Corp的SEDAR +发布者资料中进行审核。

About CopAur

关于CopAur

CopAur is an exploration company focused on developing projects within the emerging, mineral-rich mining regions of Nevada. The Company is backed by a dynamic and experienced team of resource professionals advancing its projects in Nevada with the flagship project being Kinsley Mountain gold property, a Carlin-style project located 90 kilometres south of the Long Canyon mine (currently in production under the Newmont/Barrick joint venture, Nevada Gold Mines).

CopAur是一家专注于在内华达州新兴的矿产丰富的采矿区内开发项目的勘探公司。该公司由一支充满活力和经验丰富的资源专业人士团队支持,在内华达州推进其项目,旗舰项目是金斯利山金矿物业,该项目是一项类似卡林式的项目,位于长峡谷矿山(目前在纽曼公司/巴里克合资企业内 Nevada Gold Mines 下)以南90公里的地方。

Qualified Person

合格人士

The scientific and technical information contained in this news release has been reviewed and approved by Kristopher J. Raffle, P.Geo. (British Columbia), principal and consultant, of Apex Geoscience Ltd. of Edmonton, Alta., and a qualified person as defined in National Instrument 43-101 (Standards of Disclosure for Mineral Projects).

本新闻稿中包含的科学和技术信息已由Kristopher J. Raffle,P.Geo.(加拿大卑诗省),Edmonton Alta.的Apex Geoscience Ltd.(顾问)的负责人进行了审查和批准,并且符合加拿大N43-101(矿产项目披露标准)中定义的合格人员(Qualified Person)标准。

For more information, please contact:

更多信息,请联系:

CopAur Minerals Inc.

CopAur Minerals Inc。

Jeremy Yaseniuk, Chief Executive Officer & Director
Tel: +1 (604) 773-1467
Email: jeremyy@CopAur.com

首席执行官兼董事Jeremy Yaseniuk
电话:+1(604)773-1467
电子邮件:jeremyy@CopAur.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

TSX Venture交易所及其监管服务提供方(如TSX Venture Exchange的政策所定义的)对此新闻发布的充分性或准确性不负任何责任。

Forward Looking Information

前瞻性信息

This news release contains forward-looking statements. These statements relate to future events or the Company's future performance. All such statements involve substantial known and unknown risks, uncertainties and other factors which may cause the actual results to vary from those expressed or implied by such forward-looking. Forward-looking statements involve significant risks and uncertainties, they should not be read as guarantees of future performance or results and they will not necessarily be accurate indications of whether or not such results will be achieved. Actual results could differ materially from those anticipated due to a number of factors and risks. Although the forward-looking statements contained in this news release are based upon what management of the Company believes are reasonable assumptions on the date of this news release, the Company cannot assure investors that actual results will be consistent with these forward-looking statements. The forward-looking statements contained in this press release are made as of the date hereof and the Company disclaims any intention or obligation to update or revised any forward-looking statements whether as a result of new information, future events or otherwise, except as required under applicable securities regulations.

本新闻稿包含前瞻性陈述。这些陈述涉及未来事件或公司未来的业绩。所有此类陈述都涉及大量已知和未知的风险、不确定性和其他因素,这些因素可能使实际结果与这些陈述所表达或暗示的结果存在差异。前瞻性陈述涉及重大风险和不确定性,不应将其视为对未来业绩或结果的保证,它们不一定是实际结果是否会实现的准确指示。由于多种因素和风险的影响,实际结果可能与投资者所预期的结果有所不同。尽管本新闻稿中的前瞻性陈述基于公司管理层在本新闻稿发布日期认为合理的假设,但公司不能保证实际结果将与这些前瞻性陈述保持一致。本新闻稿中所包含的前瞻性陈述是截至本文中的声明,公司否认有意义或义务更新或修订任何前瞻性陈述,除非适用的证券法规要求。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发