share_log

Calibre Reports Q2, 2024 and Year-To-Date Financial Results and Remains on Track to Deliver Into Full Year Production Guidance While the Multi-Million Ounce Valentine Gold Mine Progresses to Construction Completion in Canada

Calibre Reports Q2, 2024 and Year-To-Date Financial Results and Remains on Track to Deliver Into Full Year Production Guidance While the Multi-Million Ounce Valentine Gold Mine Progresses to Construction Completion in Canada

Calibre报告了2024年Q2和截至当年的财务结果,并保持了交付全年产量指引的进展,而百万盎司的瓦伦泰黄金矿在加拿大施工进展顺利。
GlobeNewswire ·  08/12 19:00

VANCOUVER, British Columbia, Aug.  12, 2024  (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) ("Calibre" or the "Company") announces financial and operating results for the three ("Q2 2024") and six months ("YTD 2024") ended June 30, 2024. Consolidated Q2 and YTD 2024 filings can be found at  and on the Company's website at . All figures are expressed in U.S. dollars unless otherwise stated.

加拿大卑诗省,温哥华,2024年8月12日 (环球新闻社)——Calibre Mining Corp.(TSX: CXB; OTCQX:CXBMF)(以下简称“Calibre”或“公司”)宣布截至2024年6月30日为期三(“2024年Q2”)和六个月的财务和运营结果。2024年Q2和截至2024年的一年的合并报告可以在以下链接找到,也可以在公司网站上找到。所有数字以美元计算,除非另有说明。

Darren Hall, President and Chief Executive Officer of Calibre, stated: "Calibre continues to generate strong operating cash flow, while the fully funded Valentine Gold Mine progresses to construction completion. With the recent approvals for the Volcan open pit and subsequent ore deliveries into the Libertad mill we, as planned, expect a stronger H2 and remain on track to deliver into our 2024 gold production guidance of 275,000 - 300,000 ounces.

Calibre的总裁兼首席执行官Darren Hall表示:"Calibre继续产生强劲的运营现金流,同时充分资助的Valentine Gold矿继续推进施工完工。随着Volcan露天矿山的最近获批和随后的矿石运送到Libertad选矿厂,我们按计划预计较强的下半年,并按计划实现2024年产量为27.5万至30万盎司的金产量目标。

During the quarter we made excellent progress advancing the construction of the Valentine Gold Mine with SAG mill, ball mill and primary crusher installation well underway. Pleasingly the team have recently surpassed 2 million hours worked without a lost time injury. A key development recently announced was the receipt of the Federal Environment approval and issuance of Provincial mine and surface leases for development of the Berry deposit and associated infrastructure. With this approval we now have all the major approvals for the current life of mine plan, providing certainty as well as flexibility to optimize for near term cash flow.

在本季度,我们在Valentine Gold矿的施工方面取得了巨大进展,SAG磨、球磨和初级破碎机的安装正在进行中。让人高兴的是,团队最近在没有失时伤的情况下工作了超过200万小时。最近公布的一个关键发展是,我们获得了联邦环保批准,并收到了发展Berry矿床及其相关基础设施的省级矿业和表面租约。通过这个批准,我们现在拥有了当前生产计划的所有主要批准,提供了确定性以及优化近期现金流的灵活性。

We have extensive exploration drilling underway across all our assets. Previously disclosed results at the Valentine Gold Mine indicate robust growth potential below and adjacent to existing Mineral Resources. Consequently, we have expanded the current drill program with 100,000 metres of additional drilling as we begin to unlock the incredible opportunity of resource expansion and discovery potential across the 32 kilometre long Valentine Lake Shear Zone."

我们在所有资产上进行了广泛的勘探钻探。之前在Valentine Gold矿公布的结果表明,在现有矿产资源下方和相邻的地方有强大的增长潜力。因此,我们扩大了当前的钻探计划,增加了10万米的额外钻探,因为我们开始解锁Valentine Lake Shear Zone 32公里长的具有丰富资源扩张和发现潜力的难得机会。

Q2 2024 Highlights

2024年Q2亮点

  • Construction of the multi-million-ounce Valentine Gold Mine surpasses 77% construction as of July 31, 2024, with a cost to complete of C$211 million and remains on track for gold production in Q2 2025;          

    • Operations leadership team employed;

    • Onsite assay lab construction completed and operating;

    • Primary crusher installation underway;

    • Primary conveyor from crusher to grinding building onsite;

    • Reclaim tunnel and coarse ore stockpile construction progressing;

    • SAG mill and ball mill installation underway;

    • CIL leaching tanks construction well underway; and

    • Tailings Management Facility progressing, embankment liner at 96%;

  • Received Federal Environmental approval for the development of the Berry open pit at the Valentine Gold Mine, with this, the major approvals are in place for the three-pit mine plan;

  • Continuous gold mineralization discovery at the Valentine Gold Mine reinforces the vast upside potential;

  • Commenced the largest pure exploration drilling campaign in Valentine's history following up on recent results and providing new discovery opportunities along multiple kilometres of identified shear zones;

  • Valentine Gold Mine achieves 2 million hours worked with no lost time injury a significant milestone;

  • Achieved another significant milestone with receipt of the Environmental approval for operation of the Volcan Gold deposit in Nicaragua and within a month delivered first ore to the Libertad mill located 5km away, demonstrating the value of the Company's hub and spoke operating strategy as it organically grows gold production;

  • Consolidated production is expected to be weighted to the second half of 2024 with Q4 2024 anticipated to be the strongest quarter of the year while Total Cash Cost ("TCC") and All-In Sustaining Costs ("AISC") are forecast to be lower;

  • Gold and silver drill results from Eastern Borosi ("EBP") reinforce the significant mineral endowment and potential for discovery and resource expansion within the 176 km2 EBP land package;

  • Included in the S&P/TSX Composite Index, reflecting Calibre's growth and value generation for shareholders;

  • Consolidated gold sales of 58,345 ounces grossing $137.3 million in revenue at an average realized gold price1 of $2,302/oz;

  • Consolidated TCC1 of $1,264/oz; Nicaragua $1,232/oz and Nevada $1,435/oz;

  • Consolidated AISC1 of $1,533/oz; Nicaragua $1,407/oz and Nevada $1,766/oz; and

  • Cash and restricted cash of $127.6 million and $125.0 million, respectively, as at June 30, 2024.

  • Valentine Gold矿的多百万盎司建设超过了77%的建设进度,截至2024年7月31日,完成成本为C$21100万,保持在2025年Q2的金产量轨道上;

    • 运营领导团队已聘用;

    • 现场分析实验室建设已完成并运营;

    • 初级破碎机的安装正在进行中;

    • 从破碎机到磨粉建筑的主要运输带现场;

    • 回收隧道和粗矿仓库的建设正在进展;

    • SAG磨和球磨的安装正在进行中;

    • CIL浸出槽的建设正在有条不紊地进行;以及

    • 尾矿管理设施正在进展,筑堤衬里达到96%;

  • 美国联邦环保局批准了Valentine Gold矿Berry露天矿场的开发,有了这个批准,现有的390英亩基础设施现在可以被使用,包括挖掘、选矿和浸出设施。收到这个批准后,当前矿山生命周期的所有主要批准都已获得,为优化近期现金流提供了确定性和灵活性。

  • Valentine Gold矿连续发现金矿物化妆品,加强了巨大的上涨潜力;

  • 在Valentine Lake Shear Zone确定的多个公里上启动了规模最大的探矿钻探活动,对最近的结果进行跟踪,并提供新的发现机会;

  • Valentine Gold矿的工作时间达到200万小时,未发生失时伤,这是一个重大的里程碑;

  • 为了有机地增加黄金产量,Nicaragua的Volcan黄金矿的运营已获得环境批准并在一个月内将第一批矿石交付给位于5公里外的Libertad选矿厂,展示了公司集线枢纽和骨干运营策略的价值;

  • 预计整个生产将在2024年的后半年集中于Q4 2024,并预计TCC和AISC将降低;

  • Eastern Borosi (EBP)的黄金和银钻探结果加强了该176平方公里的EBP土地包的显著矿物储量和发现和资源扩张的潜力;

  • 作为S&P/tsx综合指数的组成部分,反映了Calibre的增长和价值创造能力;

  • 58,345盎司金子销售额,总营业收入1.373亿美元,平均实现金价1为2,302美元/盎司;

  • 综合TCC1为1,264美元/盎司; 尼加拉瓜1,232美元/盎司和内华达1,435美元/盎司;

  • 综合AISC1为1,533美元/盎司; 尼加拉瓜1,407美元/盎司和内华达1,766美元/盎司;

  • 截至2024年6月30日,现金和受限制的现金分别为1.276亿美元和1.25亿美元。

YTD 2024 Highlights

2024年至今的亮点

  • Consolidated gold sales of 120,122 ounces grossing $269.2 million in revenue, at an average realized gold price1 of $2,194/oz;

  • Consolidated TCC1 of $1,302/oz; Nicaragua $1,276/oz and Nevada $1,468/oz;

  • Consolidated AISC1 of $1,545/oz; Nicaragua $1,441/oz and Nevada $1,685/oz; and

  • Cash provided by operating activities of $106.6 million including the proceeds from the gold prepay net of the deferred revenue recognized in Q2 2024.

  • 综合金子销售额120,122盎司,总营业收入2.692亿美元,平均实现金价1为2,194美元/盎司;

  • 综合TCC1为1,302美元/盎司; 尼加拉瓜1,276美元/盎司和内华达1,468美元/盎司;

  • 综合AISC1为1,545美元/盎司; 尼加拉瓜1,441美元/盎司和内华达1,685美元/盎司;

  • 经营活动现金流为1.066亿美元,包括黄金预付款的收益减去2024年第二季度确认的递延收益。

CONSOLIDATED RESULTS: Q2 and YTD 2024

综合结果:2024年第二季度和截至2024年的年度结果

Consolidated Financial Results2

综合财务结果2

$'000 (except per share and per ounce amounts)

Q2 2024

Q2 2023

YTD 2024

YTD 2023

Revenue

$

137,325

$

139,310

$

269,213

$

266,223

Cost of sales, including depreciation and amortization

$

(94,685)

$

(85,769)

$

(197,316)

$

(180,429)

Mine operating income

$

42,640

$

53,541

$

71,897

$

85,794

Net income

$

20,762

$

33,203

$

17,126

$

49,612

Net income per share (basic)

$

0.03

$

0.07

$

0.02

$

0.11

Net income per share (fully diluted)

$

0.03

$

0.07

$

0.02

$

0.10

Adjusted net income1,3

$

19,035

$

33,633

$

24,345

$

49,831

Adjusted net income per share (basic)

$

0.02

$

0.07

$

0.03

$

0.11

Cash provided by operating activities

$

60,826

$

59,803

$

106,641

$

86,550

Capital investment in mine development and PPE

$

107,939

$

35,719

$

183,796

$

56,759

Capital investment in exploration

$

8,967

$

8,181

$

16,604

$

13,743

Gold ounces produced

58,754

68,776

120,521

134,526

Gold ounces sold

58,345

69,009

120,122

134,779

Average realized gold price1 ($/oz)

$

2,302

$

1,974

$

2,194

$

1,933

TCC ($/oz)1

$

1,264

$

977

$

1,302

$

1,068

AISC ($/oz)1

$

1,533

$

1,178

$

1,545

$

1,239

$'000(每股和每盎司金额除外)

2024年第二季度

2023年第二季度

2024年全年累计

截至2023年底

营业收入

$

137,325

$

139,310

$

269,213

$

266,223

包括折旧和摊销的销售成本

$

(94,685)

$

(85,769)

$

(197,316)

$

(180,429)

矿山营业收入

$

本公司遵守ASC主题260“每股收益”的会计和信息披露要求。净亏损每股按期间内普通股的平均权重数进行计算,不包括受待遇的普通股。截至2024年3月31日和2023年3月31日,不考虑与首次公开发行有关的权证和作为私募配售单位成分的认股权证发生的影响,因为认股权证的行使取决于未来事件的发生,包括这些认股权证会导致抗稀释。因此,期间呈现的摊薄收益(亏损)每股与基本每股亏损相同。赎回的A类普通股的权益累计不计入每股盈利,因为2024年3月31日的赎回价值超过公平价值。赎回的A类普通股的资本累计不包括在每股盈利中,因为在2023年3月31日时赎回价值接近公允价值。

$

53,541

$

71,897

$

85,794

净收入

$

20,762

$

33,203

$

17,126

$

49,612

每股净利润 (基本)

$

0.03

$

0.07

$

0.02

$

0.11

每股净利润(全面稀释)

$

0.03

$

0.07

$

0.02

$

0.10

调整后的净利润1,3

$

19,035

$

33,633

$

24,345

$

49,831

每股调整后的净利润(基本)

$

0.02

$

0.07

$

0.03

$

0.11

经营活动产生的现金流量

$

60,826

$

59,803

$

106,641

$

86,550

对矿山开发和长期资产的投资

$

107,939

$

35,719

$

183,796

$

56,759

勘探的资本投资

$

8,967

$

8,181

$

16,604

$

13,743

生产的黄金盎司数

58,754

68,776

120,521

134,526

黄金盎司已售出

58,345

69,009

120,122

134,779

平均实现黄金价格1(每盎司美元)

$

2,302

$

1,974

$

2,194

$

1,933

总现金成本(每盎司美元)1

$

1,264

$

977

$

1,302

$

1,068

全成本(每盎司美元)1

$

1,533

$

1,178

$

1,545

$

1,239

Operating Results

运营结果

NICARAGUA

Q2 2024

Q2 2023

YTD 2024

YTD 2023

Ore mined (t)

359,295

613,536

894,082

1,096,797

Ore milled (t)

455,616

515,478

986,626

998,567

Grade (g/t Au)

3.48

4.06

3.40

3.85

Recovery (%)

92.5

92.4

92.0

92.7

Gold produced (ounces)

49,208

58,392

104,215

113,389

Gold sold (ounces)

49,210

58,588

104,217

113,583

NEVADA

Q2 2024

Q2 2023

YTD 2024

YTD 2023

Ore mined (t)

1,080,242

1,096,313

2,068,936

2,384,906

Ore placed on leach pad (t)

1,062,001

1,072,046

2,037,355

2,375,878

Grade (g/t Au)

0.44

0.39

0.41

0.38

Gold produced (ounces)

9,546

10,384

16,306

21,137

Gold sold (ounces)

9,135

10,420

15,905

21,195

尼加拉瓜

2024年第二季度

2023年第二季度

2024年全年累计

2023年截至当日

采矿(吨)

359,295

613,536

894,082

1,096,797

矿石磨(吨)

455,616

515,478

986,626

998,567

品位(g/t Au)

3.48

4.06

3.40

3.85

回收率 (%)

92.5

92.4

92.0

92.7

黄金产量(盎司)

49,208

58,392

104,215

113,389

黄金销售量(盎司)

49,210

58,588

104,217

113,583

内华达

2024年第二季度

2023年第二季度

2024年全年累计

截至2023年底

采矿(吨)

1,080,242

1,096,313

2,068,936

2,384,906

堆浸矿(吨)

1,062,001

1,072,046

2,037,355

2,375,878

品位(g/t Au)

0.44

0.39

0.41

0.38

黄金产量(盎司)

9,546

10,384

16,306

21,137

黄金销售量(盎司)

9,135

10,420

15,905

21,195

CONSOLIDATED Q2 and YTD 2024 FINANCIAL REVIEW

2024年Q2和YTD财务综述

TCC and AISC for Q2 2024 were $1,264 per ounce and $1,533 per ounce, respectively. The higher cash costs and AISC were due to lower gold production and sales tied to the sequencing of mining different orebodies with lower ore grades, along with higher tonnes moved and higher strip ratios. Q2 2024 gold production was impacted by the geotechnical issue at Limon Norte. The ore tonnes that were not mined in Q2 from Limon Norte are expected to be mined in the second half of 2024.

2024年Q2的现金成本和AISC分别为每盎司1,264美元和1,533美元。由于采矿不同矿体的顺序与较低矿石品位有关,以及搬运的吨位和剥离比增加,导致了更高的现金成本和AISC。Limon Norte的地质问题影响了2024年Q2的黄金产量。Limon Norte未在Q2采出的矿石吨位预计将在2024年下半年采出。

Net Income

净利润

The net income per share in Q2 2024 was $0.03 for both basic and diluted shares (Q2 2023: $0.07 for both basic and diluted). YTD 2024 net income per share was $0.02 for both basic and diluted shares (YTD 2023: $0.11 for basic shares and $0.10 for diluted shares). As a result of the Marathon Gold transaction and C$115 million bought deal financing, the shares outstanding in 2024 increased resulting in the lower net income per share metric.

2024年Q2每股基本和摊薄净收益均为0.03美元(2023年Q2均为0.07美元基本和摊薄)。截至2024年YTD,每股基本和摊薄净收益分别为0.02美元(2023年YTD:基本股为0.11美元,摊薄股为0.10美元)。由于马拉松黄金交易和1.15亿加元的认购融资,2024年的股份总数增加导致净收益每股指标下降。

2024 GUIDANCE

2024年指引

CONSOLIDATED

NICARAGUA

NEVADA

Gold Production/Sales (ounces)

275,000 – 300,000

235,000 - 255,000

40,000 - 45,000

TCC ($/ounce)1

$1,075 - $1,175

$1,000 - $1,100

$1,400 - $1,500

AISC ($/ounce)1

$1,275 - $1,375

$1,175 - $1,275

$1,650 - $1,750

Growth Capital ($ million)*

$45 - $55

Updated Exploration Capital ($ million)

$40 - $45

合并 利润表

尼加拉瓜

内华达

黄金生产/销售(盎司)

275,000 - 300,000

235,000 - 255,000

40,000 - 45,000

TCC(每盎司)1

$1,075 - $1,175

$1,000 - $1,100

$1,400 - $1,500

AISC(每盎司)1

$1,275 - $1,375

$1,175 - $1,275

$1,650 - $1,750

增长资本(百万美元)*

$45-$55

更新的勘探资本(百万美元)

$40 - $45

* Growth capital excludes the capital being invested in the construction of Valentine Gold Mine

*成长资本不包括在瓦伦丁黄金矿施工中投资的资本。

Calibre's 2024 guidance reflects, what is expected to be, the fifth consecutive year of annual production growth. Given its proven track record, Calibre will continue to reinvest into exploration and growth with over 160,000 metres of drilling and development of new satellite deposits across its asset portfolio expected in 2024.

Calibre的2024指引反映了预计连续第五个年度生产增长的趋势。鉴于其经过验证的业绩,Calibre将继续重新投资于勘探和增长,并预计在2024年在其资产组合中进行超过160,000米的钻探和新卫星矿床的开发。

Consolidated production is expected to be weighted to the second half of 2024 with Q4 2024 anticipated to be the strongest quarter of the year while TCC and AISC are forecasted to be lower. Production in H2 2024 and Q4 2024 will benefit from the open pit Volcan mine expected to reach commercial production in Q3 2024, higher production from Guapinol and higher Limon and Tigra open pit ore production. Growth capital includes underground development at Panteon Norte, Volcan mine development, waste stripping and land acquisition.

合并生产预计将分布在2024年下半年,预计2024年第四季度的表现将是全年最强。TCC和AISC预计将较低。2024年下半年和第四季度的生产将从Volcan露天矿获益,该矿有望在2024年第三季度实现商业生产,Guapinol的产量将增加,Limon和Tigra露天矿矿石的产量也将增加。成长资本包括Panteon Norte的地下开发,Volcan矿的开发,废石剥离和土地收购。

Since acquiring the Nicaraguan assets from B2Gold in October 2019, the Nevada assets from Fiore Gold in 2022, and the Newfoundland and Labrador assets from Marathon Gold in 2024, Calibre has consistently reinvested in mine development and exploration programs. These investments have led to the discovery of new deposits and growth in both production and Reserves. This progress positions Calibre to fulfill its commitments and enhance profitability as it expands its operations in Canada with the Valentine Gold Mine anticipated to deliver first gold during Q2 2025.

自2019年10月从B2Gold收购尼加拉瓜资产以来,自2022年从Fiore Gold收购内华达资产以及自2024年从Marathon Gold收购纽芬兰和拉布拉多资产以来,Calibre一直在不断重新投资于矿山开发和勘探计划中。这些投资已经带来了新发现的矿床,以及生产和储量的增长。这一进展使Calibre能够履行其承诺并增加盈利能力,同时扩大其在加拿大的业务,瓦伦丁黄金矿有望在2025年第二季度交付首批黄金。

The Company's mineral endowment includes 4.1 million ounces of Reserves, 8.6 million ounces of Measured and Indicated Resources (inclusive of Reserves), and 3.6 million ounces of Inferred Resources, as detailed in the press release dated March 12, 2024.

该公司的矿物储量包括410万盎司的储量,860万盎司的测得和指示资源(包括储量),以及360万盎司的推测资源,详见2024年3月12日的新闻稿。

Q2 and YTD 2024 FINANCIAL RESULTS AND CONFERENCE CALL DETAILS

2024年第二季度和至今为止的财务业绩及电话会议详情

Second quarter and YTD 2024 financial results will be released after market close on Monday, August 12, 2024, and management will be hosting a conference call on Tuesday, August 13, 2024, to discuss the results and outlook in more detail.

2024年第二季度和至今为止的财务业绩将于2024年8月12日周一收盘后发布,并于2024年8月13日周二举行电话会议,详细讨论财务业绩和前景。

Date:

Tuesday, August 13, 2024

Time:

10:00 am ET

Webcast Link:

日期:

2024年8月13日星期二

时间:

美东时间上午10:00

网络链接:

Instructions for obtaining conference call dial-in number:

获取电话会议拨号号码的详细信息说明:

  1. All parties must register at the link below to participate in Calibre's Q2 and YTD 2024 conference call.

  2. Register by clicking and completing the online registration form.

  3. Once registered you will receive the dial-in numbers and PIN number for input at the time of the call.

  1. 所有参与Calibre2024年第二季度和至今为止的电话会议的各方,必须在下面的链接处注册。

  2. 单击并填写在线注册表格即可完成注册。

  3. 完成注册后,您将收到拨入号码和输入号码的PIN码。

The live webcast and registration link can be accessed here and at  under the Events and Media section under the investors tab. The live audio webcast will be archived and available for replay for 12 months after the event at . Presentation slides that will accompany the conference call will be made available in the investors section of the Calibre website under Presentations prior to the conference call.

可以在以下链接处或在投资者选项卡下的"活动与媒体"下找到该直播,演示文稿将于电话会议前在Calibre网站的投资者选项卡下的演示文稿中提供。

Qualified Person

资格人员

The scientific and technical information contained in this news release was approved by David Schonfeldt P.GEO, Calibre Mining's Corporate Chief Geologist and a "Qualified Person" under National Instrument 43-101.

本新闻稿中包含的科技信息和技术信息已由David Schonfeldt P.GEO,Calibre Mining的企业首席地质师兼“合格人员”在43-101国家机构下批准。

Notes

票据

(1) NON-IFRS FINANCIAL MEASURES

(1)非IFRS财务指标

The Company believes that investors use certain non-IFRS measures as indicators to assess gold mining companies, specifically TCC per Ounce and AISC per Ounce. In the gold mining industry, these are common performance measures but do not have any standardized meaning. The Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate the Company's performance and ability to generate cash flow. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

公司认为投资者使用某些非IFRS指标作为衡量黄金采矿公司的指标,特别是TCC/盎司和AISC/盎司。在黄金采矿行业中,这些是常见的业绩衡量指标,但没有任何标准化含义。公司认为,在按照IFRS准备的传统指标之外,某些投资者使用这些信息来评估公司的业绩和产生现金流的能力。因此,它旨在提供额外的信息,并不应单独或作为根据IFRS准备的绩效指标的替代品加以考虑。

TCC per Ounce of Gold: TCC include mine site operating costs such as mining, processing, and local administrative costs (including stock-based compensation related to mine operations), royalties, production taxes, mine standby costs and current inventory write downs, if any. Production costs are exclusive of depreciation and depletion, reclamation, capital, and exploration costs. TCC per gold ounce are net of by-product silver sales and are divided by gold ounces sold to arrive at a per ounce figure.

每盎司金的TCC:TCC包括矿山现场营运成本,例如采矿,加工和当地行政成本(包括与矿山运营相关的股票补偿),赔偿费,生产税,矿山竞赛成本和当前存货减值(如有)。生产成本不包括折旧和摊销,复垦,资本和勘探成本。每盎司TCC除去副产品银销售,然后将其除以黄金盎司销售,以得出每盎司指标。

AISC per Ounce of Gold: A performance measure that reflects all of the expenditures that are required to produce an ounce of gold from current operations. While there is no standardized meaning of the measure across the industry, the Company's definition is derived from the AISC definition as set out by the World Gold Council in its guidance dated June 27, 2013, and November 16, 2018. The World Gold Council is a non-regulatory, non-profit organization established in 1987 whose members include global senior mining companies. The Company believes that this measure will be useful to external users in assessing operating performance and the ability to generate free cash flow from current operations. The Company defines AISC as the sum of TCC (per above), sustaining capital (capital required to maintain current operations at existing levels), capital lease repayments, corporate general and administrative expenses, exploration expenditures designed to increase resource confidence at producing mines, amortization of asset retirement costs and rehabilitation accretion related to current operations. AISC excludes capital expenditures for significant improvements at existing operations deemed to be expansionary in nature, exploration and evaluation related to resource growth, rehabilitation accretion and amortization not related to current operations, financing costs, debt repayments, and taxes. Total all-in sustaining costs are divided by gold ounces sold to arrive at a per ounce figure.

每盎司金的AISC:一种反映目前运营所需的产出一盎司金所需的所有支出的业绩指标。虽然该行业没有该指标的标准化含义,但该公司的定义派生自世界黄金理事会在其2013年6月27日和2018年11月16日的指南中规定的AISC定义。世界黄金理事会是成立于1987年的非监管性非营利性组织,其成员包括全球资深采矿公司。公司认为,这一指标将有助于外部用户评估公司的运营业绩和产生自由现金流的能力。公司将AISC定义为TCC的总和(如上所述),可持续资本(维持现有水平的资本),资本租赁还款,企业总部和管理开支,旨在增加在生产矿山的资源可信度的勘探开支,资产退役成本的摊销和与当前运营有关的恢复净额增量。AISC不包括视为扩张性的现有运营上的重大改进的资本支出,与资源增长相关的勘探和评估,与当前运营不相关的恢复净额和摊销,融资成本,债务偿还和税金。所有成本均要在黄金盎司销售的基础上除以所有支出,以得出每盎司指标。

Average Realized Price per Ounce Sold
Average realized price per ounce sold is a common performance measure that does not have any standardized meaning. The most directly comparable measure prepared in accordance with IFRS is revenue from gold sales.

每盎司实现价格的平均售价
每盎司实现价格的平均售价是一种常见的业绩衡量指标,没有任何标准化含义。根据IFRS准备的最直接可比较的措施是黄金销售收入。

TCC and AISC per Ounce of Gold Sold Reconciliations

黄金出售每盎司TCC和AISC调节

The tables below reconcile TCC and AISC for the three months ended June 30, 2024 and 2023.

以下表格是截至2024年6月30日的三个月TCC和AISC的调和表。

1. Sustaining capital expenditures are shown in the Growth and Sustaining Capital Table in the Q2 2024 MD&A dated June 30, 2024.

1、可持续资本支出列于2024年6月30日的Q2 2024 MD&A中的增长和维持资本表格中。

1. Sustaining capital expenditures are shown in the Growth and Sustaining Capital Table in the Q2 2024 MD&A dated June 30, 2024.

1. 持续性资本支出在截至2024年6月30日的Q2 2024 MD&A报告中的增长和持续性资本表中显示。

The tables below reconcile TCC and AISC for the six months ended June 30, 2024 and 2023.

以下表格是截至2024年6月30日的六个月TCC和AISC的调和表。

1. Sustaining capital expenditures are shown in the Growth and Sustaining Capital Table in the Q2 2024 MD&A dated June 30, 2024.

1、可持续资本支出列于2024年6月30日的Q2 2024 MD&A中的增长和维持资本表格中。

1. Production costs include a $0.7 million net realizable value reversal for the Pan mine.
2. Sustaining capital expenditures are shown in the Growth and Sustaining Capital Table in the Q2 2024 MD&A dated June 30, 2024.

1、生产成本包括Pan矿的70万美元净实现价值反转。
2、可持续资本支出列于2024年6月30日的Q2 2024 MD&A中的增长和维持资本表格中。

(2) CONSOLIDATED FINANCIAL AND OPERATIONAL RESULTS FOR 2024 INCLUDE THE RESULTS FROM MARATHON SINCE ITS ACQUISITION, FROM THE PERIOD OF JANUARY 25, 2024 TO JUNE 30, 2024.

(2)2024年的合并财务和运营结果包括自1月25日至6月30日的马拉松自收购以来的结果。

(3) ADJUSTED NET INCOME

基本调整后的净利润

Adjusted net income and adjusted earnings per share – basic exclude a number of temporary or one-time items described in the following table, which provides a reconciliation of adjusted net income to the consolidated financial statements:

基本调整后的净利润和基本每股收益不包括以下表格所述的一些临时或一次性项目,该表格提供了基本调整后的净利润与合并财务报表的调和表:。

(in thousands – except per share amounts)

Q2 2024

Q2 2023

YTD 2024

YTD 2023

Net income

$

20,762

$

33,203

$

17,126

$

49,612

Addbacks (net of tax impacts):

Other corporate expenses

(1,727)

430

7,206

512

Nevada inventory write-down

-

-

-

(616)

Mineral property write-off

-

-

13

323

Adjusted net income

$

19,035

$

33,633

$

24,345

$

49,831

Weighted average number of shares outstanding

776,801

454,978

715,328

453,005

Adjusted net income (loss) per share – basic

$

0.02

$

0.07

$

0.03

$

0.11

(以千美元为单位-除每股金额外)

2024年第二季度

2023年第二季度

2024年全年累计

截至2023年底

净收入

$

20,762

$

33,203

$

17,126

$

49,612

添加项(税后影响净额):

其他企业支出

(1,727)

430

7,206

512

内华达州库存减值

-

-

-

(616)

矿产物资产减值

-

-

13

323

调整后净利润

$

19,035

$

33,633

$

24,345

$

49,831

加权平均股本数

776,801

454,978

715,328

453,005

基本调整后净收益(亏损)每股

$

0.02

$

0.07

$

0.03

$

0.11