share_log

Grid Metals Corp Provides Activities Update on Donner Lithium and MM Copper Nickel Projects

Grid Metals Corp Provides Activities Update on Donner Lithium and MM Copper Nickel Projects

Grid Metals Corp对Donner锂矿和Mm铜镍项目进行了活动更新
Accesswire ·  08/13 07:00

TORONTO, ON / ACCESSWIRE / August 13, 2024 / Grid Metals Corp. (TSXV:GRDM)(OTCQB:MSMGF) ("Grid" or the "Company") is pleased to provide an update at both its Donner Lithium and MM Copper/Nickel Projects which are located in southeastern Manitoba. The Company has made significant progress with its permitting initiatives at Donner and is preparing to resume drilling at its MM Copper Nickel Project this fall. The new drill campaign will focus on a largely untested ~4 km long outcropping trend of Cu-rich magmatic sulfide mineralization that includes the historical New Manitoba deposit that was acquired by Grid in 2023. MM and Donner are both located on the northern part of the Bird River Greenstone Belt 150 km northeast of Winnipeg Manitoba.

2024年8月13日,Grid Metals Corp(TSXV:GRDM)(OTCQB:MSMGF)(以下简称“Grid”或“公司”)很高兴地向位于曼尼托巴省东南部的Donner Lithium和Mm Copper / Nickel项目提供更新。公司在Donner的许可倡议上取得了重要进展,并准备在今年秋季恢复在Mm Copper Nickel项目上的钻探。新的钻探活动将专注于大部分未受测试的~4公里长的Cu-rich岩浆硫化物矿化露头趋势,其中包括历史性的New Manitoba矿床,该矿床于2023年被Grid收购。Mm和Donner都位于Bird River Greenstone Belt的北部,距曼尼托巴省温尼伯东北约150公里。

Donner Lithium Property Highlights

Donner Lithium项目亮点

  • Grid has received notice from the Mines Branch of Manitoba regarding its Advanced Exploration Permit ("AEP") for the Donner Lithium Project that the permit has been approved subject to the posting of a reclamation bond by Grid. The permit application was coordinated with and supported by the Sagkeeng First Nation in whose ancestral territory the Donner Project is located. Grid agreed to coordinate with SFN on environmental mitigation measures and economic benefits relating to the permit activities.

  • As lithium prices have further declined in 2024 the Company does not plan to immediately proceed with the bulk sample outlined in the AEP. Grid will keep the market informed on the timing of the bulk sample and finalization of the AEP for Donner which is expected to be re-initiated with the occurrence of higher lithium prices.

  • Grid has reduced its near-term financial payments for the lease of the True North Mill in Bissett for the processing of lithium spodumene material from Donner. The Company most recently made a C$100,000 payment with the next payment (C$200,000) scheduled for the end of 2024.

  • The continued focus of Grid is to explore and develop critical mineral resources located in southeastern Manitoba and specifically in the Bird River greenstone belt where the Company holds mineral title over the most advanced lithium project in the region (Donner) and controls over 50 km of Cu- and Ni-rich exploration targets including four separate 43-101 compliant Cu-Ni-PGE-Co resources: the Makwa, Mayville, Ore Fault and Page deposits.

  • Grid收到了来自曼尼托巴州矿业分部的有关其Donner Lithium项目的Advanced Exploration Permit(“AEP”)的通知,该许可证已获批,但需要Grid发布一份保证金债券。该许可证申请经过与Sagkeeng First Nation(SFN)的协调和支持,后者在Donner项目所在的祖传领土上。Grid同意在与SFN协调的环境缓解措施和与许可证活动有关的经济利益方面进行协调。

  • 随着锂价格在2024年进一步下跌,公司不打算立即按照AEP中概述的批量样品进行。Grid将及时向市场通报Donner的批量样品时间和AEP的最终确定,预计随着锂价格的上涨而重新启动。

  • Grid已经减少了在比赛特市True North Mill的租金支付,用于处理来自Donner的锂辉石材料的租赁。公司最近做出了100,000加元的支付,下一笔支付(200,000加元)定于2024年底。

  • Grid的持续专注于勘探和开发位于曼尼托巴东南部,特别是Bird River greenstone belt中的关键矿产资源,该公司在该地区拥有最先进的锂项目(Donner)和超过50公里的Cu-和Ni-rich探矿靶区,包括四个单独的43-101符合Cu-Ni-PGE-Co资源:Makwa、Mayville、Ore Fault和Page存款。

Above: Grid Metals Corp Properties and location of metal deposits in the Bird River Greenstone Belt Manitoba.

上图:Grid Metals Corp属性及Bird River Greenstone Belt曼尼托巴省金属矿床的位置。

MM Copper/Nickel Project

Mm Copper / Nickel项目

On May 6, 2024, Grid announced the results of an updated mineral resource estimate that was prepared in compliance with National Instrument 43-101 on the Mayville and Makwa Deposits. In order to expand the known resources and test new targets in the belt the Company plans to complete an approximately 5,000-meter drill program focused on the Mayville arm of the Bird River Belt in the area of the historic New Manitoba Deposit and covering areas featuring untested, outcropping mineralization over a cumulative strike length of ~4 km. Details of the new drill program will be provided in the near future.

2024年5月6日,Grid公布了符合国家43-101法规的Mayville和Makwa Deposit的更新矿产资源估计结果。为了扩大已知资源并测试腰带中的新目标,该公司计划完成约5000米的钻探计划,重点针对Bird River Belt的Mayville臂,该地区具有历史性的New Manitoba Deposit和覆盖未经测试的露头矿化物化区域,累计长度约4公里。新钻探计划的详细信息将在不久的将来提供。

Qualified Persons Statements

合格人员声明

Dr. Dave Peck, P.Geo., is the Qualified Person for purposes of National Instrument 43-101 and has reviewed and approved the technical content of this release.

Dave Peck博士,P.Geo.,是National Instrument 43-101的合格人员,已审查并批准了本次发布的技术内容。

About Grid Metals Corp.

关于Grid Metals Corp。

Grid Metals is focused on both lithium and copper/nickel projects in the Bird River area, approximately 150 km northeast of Winnipeg Manitoba. The Donner lithium project is a 75% owned property subject to a joint venture agreement The MM copper/nickel project is a resource-stage project that is undergoing exploration and development work.

Grid Metals专注于位于曼尼托巴省温尼伯东北约150公里的Bird River区域的锂和铜/镍项目。Donner锂项目是一份75%的所有权,受合资协议约束。Mm铜/镍项目是一项正在进行勘探和开发工作的资源级项目。

All of the Company's southeastern Manitoba projects are located on the Traditional Lands of the Sagkeeng First Nation with whom the Company maintains an Exploration Agreement.

公司在所有位于曼尼托巴东南部的项目上均位于Sagkeeng First Nation的传统土地上,与该国签署了勘探协议。

On Behalf of the Board of Grid Metals Corp.

代表Grid Metals Corp的董事会

For more information about the Company, please see the Company website at or contact:

欲了解更多公司信息,请参阅公司网站 或联系:

Robin Dunbar - President, CEO & Director Telephone: 416-955-4773 Email: rd@gridmetalscorp.com
Brandon Smith - Chief Development Officer - bsmith@gridmetalscorp.com
David Black - Investor Relations Email: info@gridmetalscorp.com

Robin Dunbar - 总裁,CEO和董事电话:416-955-4773 邮箱:rd@gridmetalscorp.com
Brandon Smith - 首席发展官 - bsmith@gridmetalscorp.com
David Black - 投资者关系 邮箱:info@gridmetalscorp.com

We seek safe harbour. This news release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of the Securities Act (Ontario) (together, "forward-looking statements"). Such forward-looking statements include the Company's closing of the proposed financial transactions, sale of royalty and property interests. the overall economic potential of its properties, the availability of adequate financing and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements expressed or implied by such forward- looking statements to be materially different. Such factors include, among others, risks and uncertainties relating to potential political risk, uncertainty of production and capital costs estimates and the potential for unexpected costs and expenses, physical risks inherent in mining operations, metallurgical risk, currency fluctuations, fluctuations in the price of nickel, cobalt, copper and other metals, completion of economic evaluations, changes in project parameters as plans continue to be refined, the inability or failure to obtain adequate financing on a timely basis, and other risks and uncertainties, including those described in the Company's Management Discussion and Analysis for the most recent financial period and Material Change Reports filed with the Canadian Securities Administrators and available at .

我们谋求安全避风港。本新闻稿包含美国1995年《私人证券诉讼改革法》和证券法(安大略省)的前瞻性声明和证券法内的前瞻性信息(统称“前瞻性声明”)。此类前瞻性声明包括公司的拟议金融交易的完成、版税和财产权益的出售,其属性的整体经济潜力,获得足够融资的可用性并涉及已知和未知风险、不确定性及其他因素,这些风险、不确定性和其他因素可能导致这样的前瞻性声明所表达的实际结果、业绩或成就存在重大差异。这些因素包括但不限于,潜在的政治风险、生产和资本成本估计的不确定性以及其导致的潜在的意外费用和费用、采矿作业固有的物理风险、冶金风险、货币波动、镍、钴、铜等金属价格的波动以及经济评估的完成、随着计划不断完善而项目参数的变化等风险和不确定性,无法或未能及时获得充足融资,以及其他风险和不确定性,包括公司的最近财务期间管理讨论和分析和向加拿大证券管理机构提交的重大变动报告以及在 手头。

Neither the TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

TSX Venture Exchange和其监管服务提供商(在TSX Venture Exchange政策中定义为该术语)不对本新闻稿的充分性或准确性负责。

SOURCE: Grid Metals Corp.

来源:Grid Metals Corp。


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发