Forum Drilling Update, Aberdeen Uranium Project, Nunavut
Forum Drilling Update, Aberdeen Uranium Project, Nunavut
Vancouver, British Columbia--(Newsfile Corp. - August 20, 2024) - Forum Energy Metals Corp. (TSXV: FMC) (OTCQB: FDCFF) ("Forum" or the "Company") is pleased to announce that drilling at Forum's 100% owned Aberdeen Uranium Project has continued to intersect uranium mineralization, prolific structural and lithological controls and intense alteration at the Main and West deposits along the Tatiggaq Fault (Figure 1). A recent tour of Directors to the Aberdeen project and the Kiggavik Core Storage Facility with Forum's Geological Advisor, Dr. Peter Wollenberg, who discovered two of the largest deposits at Kiggavik, verified that the uranium mineralization processes on Forum's property are identical to the Kiggavik uranium deposits (Figure 2). Seventeen holes have been completed, totalling 4,307 metres along the Tatiggaq Fault within the 1.5km by 0.7km Tatiggaq anomaly (Figure 3). A total of 685 samples have been shipped to SRC Laboratories in Saskatoon, Saskatchewan for analysis. Results are expected by the end of September.
加拿大英属哥伦比亚省温哥华-(新闻稿 - 2024年8月20日)- 论坛能源金属公司(tsxv:FMC)(OTCQB:FDCFF)(“论坛”或“公司”)很高兴地宣布,在Tatiggaq断层(图1)沿着Main和West矿床地区,论坛100%拥有的阿伯丁铀项目的钻探继续遇到铀矿化,富含结构和岩性控制以及强烈的蚀变。论坛的地质顾问彼得·沃伦伯格博士(Dr. Peter Wollenberg)在阿伯丁项目和Kiggavik核心储存设施的最近董事会访问中验证,论坛财产上的铀矿化过程与Kiggavik铀矿沉积物相同(图2)。 在Tatiggaq异常区域(图3)的1.5公里×0.7公里的Tatiggaq断层上已完成17个井(总共4,307米)。685个样品已被运往位于萨斯喀彻温省萨斯卡通的SRC实验室进行分析。 预计在9月底公布结果。
Rick Mazur, President & CEO, stated, "We thank Orano for access to their drill core storage facility for the three deposits at the 133 million pound Kiggavik deposit. Our visit to the Aberdeen project and the Kiggavik core storage area validates our view that we are in an emerging uranium district for unconformity-style uranium deposits akin to the prolific Athabasca Basin."
总裁兼首席执行官Rick Mazur表示:“我们感谢Orano公司允许我们进入他们位于Kiggavik沉积物13300万磅的三个沉积物的钻探岩心储存设施。我们前往阿伯丁项目和Kiggavik核心储存区验证了我们的观点,即我们正处于一个新兴的铀区,类似缺失型铀沉积物位于丰富的Athabasca盆地。”
The Company has entered into Phase Two of its drill program. One drill has moved to the Qavvik deposit and Forum will now focus on a number of other high priority targets on the property for basement-hosted and sandstone-covered unconformity targets The Company's 30-person drill camp and crew have performed well over the summer (Figure 4). Drilling is expected to continue for another four to six weeks.
公司已进入第二阶段的钻探计划。一台钻机已转移到Qavvik沉积物,论坛现在将关注于财产上的其他许多重点目标,以寻找地下室和砂岩覆盖的缺失型铀沉积物。公司30人的钻探营地和工作人员在夏季表现良好(图4)。预计钻探将继续进行长达4至6周。
Rebecca Hunter, Ph.D., P.Geo., Forum's Vice President of Exploration and Qualified Person under National Instrument 43-101, has reviewed and approved the contents of this news release.
Forum的勘探副总裁、资格认证人Rebecca Hunter博士,P.Geo.已经审查并批准了本新闻稿的内容。
Marketing Agreement
营销协议
At the request of the TSX Venture Exchange (the "TSXV") the Company wishes to provide certain disclosure with respect to an advisory agreement (the "Agreement") it has entered into with DS Market Solutions Inc. ("DS Market Solutions"), with effect as of July 1, 2024. DS Market Solutions is an equity trading advisory and liquidity provider located in Mississauga, Ontario. Pursuant to the Agreement DS Market Solutions has agreed to provide the Company with liquidity services (the "Services") in compliance with the provisions of TSXV Policy 3.4, with the object of enhancing market depth and increasing liquidity of the Company's common shares. The Agreement is on a month-by-month basis and provides for remuneration of $5,000 per month, plus applicable taxes. The $5,000 comes from the Company's working capital and DS Market Solutions has confirmed that it uses its own funds and securities in providing the Services and, other than securities used for liquidity purposes, it has no interest, directly or indirectly, in the securities of the Company nor has it any right to acquire same. It has also confirmed that, to the extent needed, DS Market Solutions provides the Services through Canaccord Direct DMA.
在TSX Venture Exchange(“TSXV”)的要求下,公司希望就其与DS Market Solutions Inc.(“DS Market Solutions”)达成的顾问协议(“协议”)提供某些披露,自2024年7月1日起生效。 DS Market Solutions是位于安大略省密西沙加市的股票交易顾问和流动性提供商。根据协议,DS Market Solutions同意提供符合TSXV政策3.4的流动性服务(“服务”),以增强公司普通股的市场深度和流动性。该协议是以月为单位,并提供每月5,000加元的报酬,加上适用的税款。 5,000加元来自公司的营运资金,DS Market Solutions确认其在提供服务时使用自己的资金和证券,并且除了用于流动性目的的证券外,其对公司证券没有任何直接或间接的利益,并且其没有权力获得同样的证券。 它还确认,如有必要,DS Market Solutions将通过Canaccord Direct DMA提供服务。
Figure 1 The Thelon Basin is a geologic analogue to the Athabasca Basin in Saskatchewan. Orano's uranium deposits are along the same controlling structures as Forum's Tatiggaq deposit and over 20 other targets are present within the project area, which could host additional uranium deposits similar to the Athabasca Basin.
图1 Thelon盆地是萨斯喀彻温省Athabasca盆地的地质类比。 Orano的铀沉积物沿着与论坛Tatiggaq沉积物相同的控制结构,并且在项目区域内存在超过20个其他目标,这些目标可能容纳类似Athabasca盆地的铀沉积物。
Figure 2 Review of Andrew Lake uranium deposit core at the Kiggavik Core Storage Facility.
From left to right, Peter Wollenberg, Forum Geological Advisor; Brian Christie, Forum Director; Rebecca Hunter, Forum Vice President, Exploration.
图2 在Kiggavik核心储存设施审查Andrew Lake铀沉积物钻孔。
从左到右:论坛地质顾问彼得·沃伦伯格(Peter Wollenberg);论坛财务总监布赖恩·克里斯蒂(Brian Christie);论坛勘探副总裁丽贝卡·亨特(Rebecca Hunter)。
Figure 3 Tatiggaq gravity anomaly, 2023 drill holes and 2024 Phase One drilling to the west-southwest and the east-northeast along the Tatiggaq Fault. Ambient Noise Tomography (ANT) modelled sub-parallel east-northeast-trending faults have also been targeted.
图3 Tatiggaq重力异常、2023钻探孔和2024第一阶段钻探沿Tatiggaq断层向西南和东北方向。已开展对环境噪声层析成像(ANT)建模的亚平行东北-东向断层进行了定位。
Figure 4 Forum's newly-constructed 30-person drill camp located on Aberdeen Lake at the western end of the property.
图4 论坛新建的30人钻探营地位于财产的西端Aberdeen Lake。
About Forum Energy Metals
关于Forum Energy Metals
Forum Energy Metals Corp. (TSXV: FMC) (OTCQB: FDCFF) is focused on the discovery of high-grade unconformity-related uranium deposits in the Athabasca Basin, Saskatchewan and the Thelon Basin, Nunavut. For further information: .
Forum Energy Metals Corp. (TSXV: FMC) (OTCQB: FDCFF)专注于发现阿萨巴斯卡盆地,萨斯喀彻温省和Thelon盆地,努纳武特高品位失交层型铀矿床的发现。欲获取更多信息,请访问:。
This press release contains forward-looking statements. Forward-Looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements. Forward-Looking information is subject to known and unknown risks, uncertainties and other factors that may cause Forum's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Such factors include but are not limited to: uncertainties related to the historical data, the work expenditure commitments; the ability to raise sufficient capital to fund future exploration or development programs; changes in economic conditions or financial markets; changes commodity prices, litigation, legislative, environmental and other judicial, regulatory, political and competitive developments; technological or operational difficulties or an inability to obtain permits required in connection with maintaining or advancing its exploration projects.
本新闻稿包含前瞻性声明。前瞻性声明涉及未来事件和条件,因此涉及固有的风险和不确定性。实际结果可能与此类声明中目前预期的结果有所不同。前瞻性信息受到已知和未知的风险,不确定性和其他因素的影响,这些因素可能会导致论坛的实际结果,活动水平,业绩或成就与此类前瞻性信息所表达的不同。这些因素包括但不限于环境数据的不确定性,工程承诺支出,筹集足够的资金用于未来勘探或开发计划,经济条件或金融市场的变化,商品价格变化,诉讼,立法,环境和其他司法,监管,政治和竞争发展;技术或操作困难或无法获得所需的许可证来维护或推进其勘探项目。
ON BEHALF OF THE BOARD OF DIRECTORS
董事会代表
Richard J. Mazur, P.Geo.
President & CEO
Richard J. Mazur, P.Geo.
总裁兼首席执行官
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
TSX创业公司交易所或其监管服务提供商(如TSX创业公司政策中定义的那样)不对本公告的充分性或准确性负责。
For further information contact:
有关更多信息,请联系:
Rick Mazur, P.Geo., President & CEO
mazur@forumenergymetals.com
Tel: 604-630-1585
Rick Mazur,P.Geo.,总裁兼首席执行官
mazur@forumenergymetals.com
电话:604-630-1585