share_log

Golden Rapture Mining Receives Near Surface Drill Results as High as 285.00 G/t Au or (10.05 Oz/t Gold)

Golden Rapture Mining Receives Near Surface Drill Results as High as 285.00 G/t Au or (10.05 Oz/t Gold)

金色迷恋矿业收到近地表钻探结果,黄金品位高达285.00克/吨(10.05盎司/吨黄金)
newsfile ·  09/05 05:00

Edmonton, Alberta--(Newsfile Corp. - September 5, 2024) - Newly listed Golden Rapture Mining Corporation (CSE: GLDR) ("Golden Rapture" or "the Company") is pleased to announce high-grade near-surface drill results at its 10,000-acre Tier 1 Phillips Township Gold Property located in the Rainy River District, Nestor Falls, NW Ontario.

艾伯塔省埃德蒙顿--(Newsfile Corp.,2024年9月5日)——新上市的Golden Rapture矿业公司(CSE:GLDR)(“Golden Rapture” 或 “公司”)欣然宣布其位于安大略省西北部内斯特福尔斯雷尼河区的占地1万英亩的菲利普斯镇黄金地产的高品位近地表钻探结果。

Our small 500-metre exploratory program involved drilling 18 shallow drill holes with an average depth of approximately 90 ft using a small portable diamond drill. We are pleased to have successfully discovered a series of vertical veins at shallow depths that we believe could have played an important role in the gold deposition in this area known for originally only hosting a large flat-lying quartz structure around the old Combined Mine shafts.

我们的 500 米小型勘探计划包括使用小型便携式金刚石钻机钻进 18 个浅层钻孔,平均深度约为 90 英尺。我们很高兴成功地在浅层发现了一系列垂直矿脉,我们认为这些矿脉本可以在该地区的金沉积中发挥重要作用,该地区最初仅在旧的联合矿井周围有一个大型平坦的石英结构。

Highlights included 114.96 g/t Au across 2.55 meters (4.05 oz/t gold over 8.4 ft) and 111.16 g/t Au across 1.50 meters (3.9 oz/t gold over 4.9 ft).

亮点包括横跨2.55米(超过8.4英尺的4.05盎司/吨黄金)的114.96克/吨金和1.50米(超过4.9英尺的3.9盎司/吨黄金)的111.16克/吨金。

Mr. Richard Rivet, CEO of Golden Rapture, commented:

Golden Rapture首席执行官理查德·里维特先生评论说:

"This is our first drilling program since becoming listed on the CSE on March 12, 2024. Our team is extremely pleased to have discovered near-surface high-grade gold in what we believe could be vertical feeder zones. These newly discovered veins and results have given us a positive outlook about the future of our company as we now have a series of high-grade vertical veins to further explore instead of just a large flat-lying quartz structure.

“这是我们自2024年3月12日在CSE上市以来的第一个钻探项目。我们的团队非常高兴在我们认为可能是垂直馈线的区域发现了近地表的高品位金。这些新发现的矿脉和结果使我们对公司的未来有了积极的展望,因为我们现在有一系列高品位的垂直矿脉可供进一步探索,而不仅仅是大型的平坦石英结构。

We are also very fortunate that we were able to rent a portable diamond drill giving us a low cost of drilling, and the ability to drill at our own pace and time. We excitingly look forward to additional follow-up drilling of these series of high-grade vertical veins that are open in all directions as they could get wider and richer at depth as is typical in the area."

我们还很幸运,我们能够租用一台便携式金刚石钻机,从而降低了钻探成本,并且能够按照自己的节奏和时间进行钻探。我们激动地期待着对这些高品位垂直矿脉进行更多后续钻探,这些矿脉向各个方向开放,因为它们在深度上可以像该地区一样变得更宽、更丰富。”

Highlight intervals are summarized below. Additional full results are provided in Table 2.

突出显示间隔汇总如下。表 2 中提供了其他完整结果。

Hole No. Dip From (m) To (m) Interval (m) Au g/t
Results
GRM24-12 66 ° 22.75 25.30 2.55 m 114.96 g/t
Including 22.75 23.25 0.50 m 285.00 g/t
GRM24-17 45° 6.50 8.00 1.50 m 111.16 g/t
Including 6.50 7.00 0.50 m 252.00 g/t
洞号 从 (m) 到 (m) 间隔 (m) Au g/t
结果
GRM24-12 66° 22.75 25.30 2.55 米 114.96 克/吨
包括 22.75 23.25 0.50 米 285.00 克/吨
GRM24-17 45° 6.50 8.00 1.50 米 111.16 克/吨
包括 6.50 7.00 0.50 米 252.00 克/吨

Included are pictures of our highest-grade quartz veins

其中包括我们最高等级石英脉的图片

Figure 1

图 1

Figure 2

图 2

Figure 3

图 3

Our land package totals 236 claim cells for approx. 10,000+ acres and is located near the New Gold Rainy River Gold Mine located just 30 kms away with (+8 million Oz.).

我们的土地一揽子计划共有236个索赔单元,占地约10,000多英亩,位于新金雷尼河金矿附近,距离仅30公里(+800万盎司)。

Our Phillips Township property hosts a total of eighteen (18) mine shafts and an adit. They include the Combined Mine, Mascotte Mine, Trojan Mine, Boulder Mine, Terrell Mine, OGS Occurrence, Kuluk Occurrence & the Young's Bay Occurrence.

我们在菲利普斯镇的房产共拥有十八(18)个矿井和一个通道。它们包括联合矿山、马斯科特矿、特洛伊矿山、博尔德矿、特雷尔矿、OGS 矿场、库鲁克矿和杨湾矿场。

The property has year-round access with a major highway and powerlines crossing the entire length of the property. It also has good local infrastructure, manpower, heavy duty equipment and a hospital with local services nearby. There is also a cell tower in the center of the property and a First Nations drilling contractor located just kms away.

该物业全年开放,一条主要的高速公路和电力线横跨该物业的整个长度。它还拥有良好的当地基础设施、人力、重型设备和附近提供当地服务的医院。该物业中心还有一座手机信号塔,距离原住民钻探承包商仅几公里远。

Table 2 Full Results

表 2 完整结果

Hole No. Dip From (m) To (m) Interval (m) Au g/t Results
GRM24-09 66° 25.50 26.00 0.50 m 8.62 g/t
GRM24-10 66° 13.50 14.50 1.00 m 8.90 g/t
Including 14.00 14.50 0.50 m 14.20 g/t
GRM24-11 66° 17.00 19.00 2.00 m 4.79 g/t
Including 18.00 19.00 1.00 m 7.61 g/t
GRM24-12 66° 22.75 25.30 2.55 m 114.96 g/t
Including 22.75 23.25 0.50 m 285.00 g/t
GRM24-12A 45° 5.75 6.30 0.55 m 55.04 g/t
GRM24-14 45° 6.50 7.50 1.00 m 3.73 g/t
GRM24-16 45° 6.00 6.50 0.50 m 1.10 g/t
GRM24-17 45° 6.50 8.00 1.50 m 111.16 g/t
Including 6.50 7.00 0.50 m 252.00 g/t
GRM24-18 45° 12.00 13.00 1.00 m 8.09 g/t
Including 12.00 12.50 0.50 m 13.90 g/t
洞号 从 (m) 到 (m) 间隔 (m) Au g/t 业绩
GRM24-09 66° 25.50 26.00 0.50 米 8.62 克/吨
GRM24-10 66° 13.50 14.50 1.00 m 8.90 克/吨
包括 14.00 14.50 0.50 米 14.20 克/吨
GRM24-11 66° 17.00 19.00 2.00 m 4.79 克/吨
包括 18.00 19.00 1.00 m 7.61 克/吨
GRM24-12 66° 22.75 25.30 2.55 米 114.96 克/吨
包括 22.75 23.25 0.50 米 285.00 克/吨
GRM24-12A 45° 5.75 6.30 0.55 米 55.04 克/吨
GRM24-14 45° 6.50 7.50 1.00 m 3.73 克/吨
GRM24-16 45° 6.00 6.50 0.50 米 1.10 克/吨
GRM24-17 45° 6.50 8.00 1.50 米 111.16 克/吨
包括 6.50 7.00 0.50 米 252.00 克/吨
GRM24-18 45° 12.00 13.00 1.00 m 8.09 克/吨
包括 12.00 12.50 0.50 米 13.90 克/吨

We are also announcing that we are dropping our second property called the Maylac/Hutchison Fulford Project located in Geraldton Ontario and will instead dedicate all of our time and resources to this Phillips Township Gold Property. Please stay tuned for more developments.

我们还宣布,我们将放弃位于安大略省杰拉尔顿的第二处名为Maylac/Hutchison Fulford项目的房产,并将把所有时间和资源投入到菲利普斯镇的黄金地产上。请继续关注更多进展。

Qualified Person

合格人士

The technical disclosure in this news release has been reviewed and approved by John Archibald, P.Geo., Qualified Person as defined by National Instrument 43-101 of the Canadian Securities Administrators.

本新闻稿中的技术披露已经过P.Geo. John Archibald的审查和批准,他是加拿大证券管理局National Instrument 43-101定义的合格人士。

Analytical Laboratory and QA/QC Procedures

分析实验室和质量保证/质量控制程序

All sampling completed by Golden Rapture Mining Corporation within its exploration programs is subject to a Company standard of internal quality control and quality assurance (QA/QC) programs which include the insertion of certified reference materials, blank materials and a level of duplicate analysis. Surface grab samples from the 2024 summer program were all sent to AGAT Laboratories. AGAT Laboratories conform to requirements of ISO/IEC Standard 17025 guidelines and meets assay requirements outlined for NI 43-101.

Golden Rapture Mining Corporation在其勘探计划中完成的所有采样均受公司内部质量控制和质量保证(QA/QC)标准的约束,其中包括插入经过认证的参考材料、空白材料和一定程度的重复分析。2024年夏季项目的地表采集样本全部送到了AGat实验室。AGaT 实验室符合 ISO/IEC 标准 17025 指南的要求,符合 NI 43-101 概述的化验要求。

About Golden Rapture Mining

关于金龙矿业

Golden Rapture Mining is a well-funded exploration company engaged in the acquisition, exploration, and development of high-potential assets located in favorable, established Tier 1 mining jurisdictions of NW Ontario, Canada.

Golden Rapture Mining是一家资金充足的勘探公司,从事高潜力资产的收购、勘探和开发,这些资产位于加拿大安大略省西北部有利的一级采矿司法管辖区。

On behalf of the Board

代表董事会

Richard Rivet, President & CEO
Email: goldenrapture@outlook.com
Phone: 780-729-5395
For more info please look at our website at .

总裁兼首席执行官理查德·里维特
电子邮件:goldenrapture@outlook.com
电话:780-729-5395
欲了解更多信息,请访问我们的网站。

Forward-Looking statements include predictions, projections, and forecasts and are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "forecast", "expect", "potential", "project", "target", "schedule", "budget" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions and includes the negatives thereof. All statements other than statements of historical fact included in this release, including, without limitation, statements regarding the Company's planned exploration programs and drill programs and potential significance of results are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Forward-Looking statements are based on a number of material factors and assumptions. Important factors that could cause actual results to differ materially from Company's expectations include actual exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital, and financing on acceptable terms, general economic, market or business conditions, uninsured risks, regulatory changes, defects in title, availability of personnel, materials, and equipment on a timely basis, accidents or equipment breakdowns, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the Company with securities regulators. Although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ from those described in forward-looking statements, there may be other factors that cause such actions, events, or results to differ materially from those anticipated. There can be no assurance that forward-looking statements will prove to be accurate, and accordingly readers are cautioned not to place undue reliance on forward-looking statements.

前瞻性陈述包括预测、预测和预测,通常但并非总是使用 “寻求”、“预测”、“相信”、“计划”、“估计”、“预测”、“预期”、“潜在”、“项目”、“目标”、“时间表”、“预算” 和 “打算” 等词语来识别,并陈述某一事件或结果 “可能”、“将”、“应该”,“可能” 或 “可能” 出现或实现以及其他类似的表述,包括其否定词。除历史事实陈述外,本新闻稿中包含的所有陈述,包括但不限于有关公司计划勘探计划和钻探计划以及结果潜在意义的陈述,均为前瞻性陈述,涉及各种风险和不确定性。无法保证此类陈述会被证明是准确的,实际结果和未来事件可能与此类声明中的预期有重大差异。前瞻性陈述基于许多重要因素和假设。可能导致实际结果与公司预期存在重大差异的重要因素包括实际勘探结果、计划不断完善后项目参数的变化、未来资源估算的结果、未来金属价格、资本可用性和可接受条件的融资、总体经济、市场或商业状况、未投保的风险、监管变化、所有权缺陷、人员、材料和设备的及时可用性、事故或设备故障、延迟获得政府批准,对运营的意想不到的环境影响和补救成本,以及其他勘探或其他风险,在本公司向证券监管机构提交的文件中不时详述。尽管公司试图确定可能导致实际行动、事件或结果与前瞻性陈述中描述的有所不同的重要因素,但可能还有其他因素导致此类行动、事件或结果与预期存在重大差异。无法保证前瞻性陈述会被证明是准确的,因此提醒读者不要过分依赖前瞻性陈述。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发