Amex Announces Mineral Resource Estimate on Perron Project
Amex Announces Mineral Resource Estimate on Perron Project
Montreal, Quebec--(Newsfile Corp. - September 5, 2024) - Amex Exploration Inc. (TSXV: AMX) (FSE: MX0) (OTCQX: AMXEF) ("Amex" or the "Company") is pleased to announce that it has completed a Mineral Resource Estimate ("MRE") on the company's flagship Perron Project in the northwestern Abitibi region of Quebec. The majority of ounces come from the Company's High-Grade Zone ("HGZ"), with important contributions from the Denise Zone ("Denise"), the Gratien Zone ("Gratien"), the Grey Cat Zone ("Grey Cat") and the Team Zone ("Team"). The drillhole database for the resource was closed on June 30, 2024, meaning recent drilling has not been included in this resource iteration at Perron. All zones on the property remain open in multiple directions for further expansion and Amex's current continuing drill program is fully funded until the conclusion of 2025.
蒙特利尔,魁北克州-(新闻报道公司-2024年9月5日)-Amex Exploration Inc.(TSXV:AMX)(FSE:MX0)(OTCQX:AMXEF)(“Amex”或“公司”)很高兴宣布,已完成对该公司位于魁北克西北阿比提比地区旗舰佩龙项目(Perron Project)的矿产资源估算(“MRE”)。大部分盎司来自公司的高品位带(“HGZ”),还有来自Denise区(“Denise”),Gratien区(“Gratien”),Grey Cat区(“Grey Cat”)和Team区(“Team”)的重要贡献。资源的钻孔数据库于2024年6月30日关闭,意味着最近的钻探没有纳入此次在Perron的资源迭代中。该属性上的所有区域在多个方向上仍然开放,以便进行进一步扩展,Amex目前的持续钻探计划的资金将持续到2025年的结束。
See Figure 1 for the location of the Perron Project, Figure 2 for a plan view of mineral resources at the Perron Project, Figure 3 for a sectional view of mineral resources of the Perron Project, and Table 1 for a summary of total mineral resources, Table 2 for summary of total mineral resources by zone and Table 3 for parameters used to constrain resources at Perron.
请参见图1以了解Perron项目的位置,图2以了解Perron项目的矿产资源平面图,图3以了解Perron项目的矿产资源剖面图,以及表1以了解总体矿产资源情况,表2以了解各区域的总体矿产资源情况,表3以了解Perron资源约束所使用的参数。
Amex will be hosting a webinar today with Victor Cantore, CEO and Aaron Stone, VP Exploration at 1:00pm EDT to discuss the MRE in more detail. Please register here:
Amex将于今天下午1:00举办网络研讨会,邀请Victor Cantore首席执行官和Aaron Stone勘探副总裁讨论更详细的MRE。请在此处注册:
MRE Highlights:
MRE亮点:
- Open pit and underground stope constrained 594,100 of measured and indicated ounces at 4.28 g/t Au and 1,049,650 of inferred ounces at 3.80 g/t Au.
- The MRE shows excellent continuity throughout the project with exceptional high grade throughout, specifically in the High-Grade Zone (HGZ) which alone hosts 336,170 of measured and indicated ounces at 12.05 g/t Au and 415,470 of inferred ounces at 10.49 g/t Au.
- Of important significance within the HGZ is with improved confidence, comes increased grade. With regard to the HGZ under Table 2, as drill spacing is tightened to upgrade resources from inferred to indicated to measured, the grade improves. This is rare in the gold industry and speaks to exceptional continuity of the zone.
- The MRE is a base case for the gold at Perron and includes drilling up to June 30, 2024. Approximately 600,000 m of accumulative fully funded drilling is expected to be completed by the end of 2025.
- All zones remain open at Perron, providing excellent future mineral resource expansion potential.
- Metallurgical test work by SGS Canada achieved an overall gold recovery of up to 99% in the HGZ and up to 95% in the Denise, Team, Gratien and Grey Cat Zones.
- Near by housing, roads, electricity and labour are expected to favourably impact the economics of the Perron project in the upcoming PEA expected later this year.
- The Perron project also hosts VMS (copper-zinc) mineralization which has not been included in today's MRE nor any of the silver credits that exist in some zones of the property. The Company plans to complete the modelling requirements surrounding these additional metals in the future, which is expected to enhance the economics of the project.
- 露天矿和地下采场约束下,4.28克/吨的Au测定和指示矿量594,100盎司,以及3.80克/吨的Au推断量1,049,650盎司。
- MRE显示整个项目具有极佳的连续性,特别是在高品位带(HGZ)中,其单独拥有12.05克/吨的Au测定和指示矿量336,170盎司以及10.49克/吨的Au推断量415,470盎司。
- 在HGZ中,有一个重要的意义是,随着信心的提高,成绩得到了提升。关于表2下的HGZ,随着钻孔间距的减小,从推断资源升级到指示资源再到测定资源,成绩提升。这在黄金行业很少见,说明带区的连续性非常好。
- 金属期货(MRE)是Perron项目黄金的基准情况,包括截至2024年6月30日的钻探。预计到2025年底,将完成大约60000000万的全资钻探。
- Perron的所有区块均保持开放,具有良好的未来矿产资源扩展潜力。
- 由SGS Canada进行的冶金试验在HGZ区域的金回收率达到99%,在Denise、Team、Gratien和Grey Cat区域的金回收率达到95%。
- 附近的住房、道路、电力和劳动力预计将有利于Perron项目的经济状况,在今年晚些时候预计将推出PEA(初步经济评估)。
- Perron项目还拥有未包含在今天的MRE中的VMS(铜锌)矿化区以及土地某些区域存在的银信贷。该公司计划在未来完成与这些额外金属相关的建模要求,预计将提高项目的经济效益。
Jacques Trottier, PhD, Executive Chairman of Amex Exploration, commented, "I am very proud of our progress to date. Throughout my time at Perron, I was convinced that the project hosted a significant high-grade gold resource, so it is fantastic to have realised this. In my opinion, the high-grade nature of Perron is what truly sets its apart from its peers and we have just begun to scratch the surface of the potential. The grade at Perron compares very favourably to many of the recent world class projects in Canada and elsewhere. There is significant room for this resource to grow, as much of the property is yet to be explored. New machine learning and AI techniques have generated new high priority targets for us, some of which we have begun to test with success. Given the projects quality high-grade ounces, proximity to infrastructure and workforce, we look forward to releasing our project economics in the PEA, which remains on track for Q4 of this year. It should also be noted that this resource is purely gold focused. None of the silver credits that may exist across our zones have been modelled, neither have any of our copper-zinc mineralization of the QF Zone, Central Polymetallic Zone and Donna Copper Zone. We do plan on looking at these additional metals in future work, which should be accretive to the project."
Amex Exploration(AMEX勘探)执行主席Jacques Trottier博士评论道:“我对我们迄今为止的进展非常自豪。在Perron的时候,我就相信该项目拥有重要的高品位金资源,所以能够实现这一目标非常出色。在我看来,Perron的高品位性质是真正使其与同行区别开来的地方,而我们只是开始探索其潜力。Perron的品位与加拿大和其他地方的许多最近的世界级项目相比非常有利。该资源仍有很大的增长空间,因为该地产的大部分还没有被开发。新的机器学习和人工智能技术为我们提供了新的高优先级目标,其中一些我们已经开始成功地测试。由于该项目的高品位金矿石质量、接近基础设施和劳动力,我们期待在今年第四季度发布我们的项目经济情况。还应该指出的是,这个资源纯粹是以黄金为主。我们尚未对我们的所有区域可能存在的银信贷进行建模,也没有对我们的QF区、中央多金属区和Donna铜区的铜锌矿化进行建模。我们计划在未来的工作中研究这些额外的金属,这将对项目产生积极影响。”
Aaron Stone, P.Geo, Vice President Exploration of Amex Exploration, continued, "This resource is an excellent starting point for Amex. Drilling never stops at Perron and we continue to work diligently on expanding and defining our known zones as well as exploring for further discoveries. Work has begun at site to better understand the mineralization and structure of the Team and Denise Zones to better guide infill drilling to increase their ounce count. Recent work in western zones such as Gratien, Grey Cat and Alizée have also yielded some very interesting high-grade results which need to be followed up on with further drilling. Since discovery of the JT Zone only a few months ago, our understanding of gold emplacement at Perron has been rapidly evolving and we are starting to see some geological similarities with the Windfall project. The mineralized felsic to intermediate dike that was found has given us a lot to think about for the genesis of all gold-bearing zones within the Beaupré Block. Studies have begun to validify this new theory, but if gold enrichment at Perron does turn out to be intrusion related, this will change our approach on how we search for another High-Grade Zone on the property. I am personally very excited by this as we continue to work closely with our strategic partners to unlock the full value that we believe is still to be discovered at Perron."
Amex Exploration的副总裁Aaron Stone, P.Geo继续表示:"这一资源对Amex来说是一个很好的起点。Perron的钻探工作从未停止,我们一直在努力扩大和定义已知区域,并继续探索更多的发现。现场工作已经开始,以更好地了解Team区和Denise区的矿化和结构,从而更好地引导填充钻探以增加其盎司计数。在Gratien、Grey Cat和Alizée等西部区域最近的工作也产生了一些非常有趣的高品位结果,需要跟进进一步钻探的工作。自几个月前发现Jt区以来,我们对Perron的金成矿机制的理解在快速发展,并且我们开始看到与Windfall项目一些地质相似之处。发现的富含矿化的英安岩到中间岩体给了我们很多关于Beaupré Block内所有含金矿化区带起源的思考。研究已经开始验证这个新理论,但如果Perron的金富集确实与侵入有关,这将改变我们在物业上寻找另一个高品位矿区的方法。作为个人,我对此感到非常兴奋,因为我们继续与战略合作伙伴密切合作,解锁我们认为在Perron仍有待发现的全部价值。"
Victor Cantore, President and CEO, Director of Amex Exploration, added, "There are limited projects around the world that are this high-grade in nature, and the grade of the HGZ puts the Perron Project in line with these world class assets. As we move forward our goal is to build ounces while simultaneously advancing the project towards production through advancing economic studies and permitting."
Amex Exploration的总裁兼首席执行官Victor Cantore补充道:"全球范围内这种高品位的项目非常有限,HGZ的品位使Perron项目与这些世界级资产保持一致。我们的目标是在向前推进的同时通过进行经济研究和许可审批来建立金矿产量,使该项目向生产推进。"
Figure 1: Location of Perron Project, central Abitibi, 4km to the east of the Quebec-Ontario border. Perron is marked by a gold star and is directly adjacent to number 11, the historical producing Normétal VMS mine. Note the location of the Windfall Project, number 28, to the east along the same deformation corridor as the Perron Project.
图1:Perron项目位于Abitibi中部,距魁北克 - 安大略边界以东4公里。Perron用一个金色的星星标记,并且与历史生产的Normétal VMS矿场11号相邻。请注意Windfall项目28号位于同一变形走廊沿线以东的位置,
Figure 2: Plan view of constrained mineral resources at Perron.
图2:Perron矿产受限计划视图。
Figure 3: View looking to the north of mineral resources delineated at Perron. Note the HGZ has been defined to 1.3km vertically and remains open at depth.
图3:向北看Perron划定的矿产资源。请注意HGZ在垂直方向上已定义为1.3公里,并且在深度处仍然是开放的。
Table 1: Summary of total Mineral Resources at the Perron Project
表1:Perron项目总矿产资源汇总
All Zones | Open Pit Constrained | UG stopes | Total | ||||||
COG 0.42 Au g/t | COG 1.29 Au g/t | ||||||||
Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | |
Measured | 131,250 | 1.395,880 | 445,250 | 6.6094,530 | 576,500 | 5.42100,400 | |||
Indicated | 706,600 | 1.8040,780 | 3,030,580 | 4.65452,920 | 3,737,200 | 4.11493,700 | |||
Indicated+Measured | 837,850 | 1.7346,660 | 3,475,830 | 4.90547,450 | 4,313,700 | 4.28594,100 | |||
Inferred | 996,500 | 2.0164,420 | 7,597,300 | 4.03985,220 | 8,593,800 | 3.801,049,650 |
所有区域 | 露天限制 | 地下矿井停工 | 合计 | ||||||
COG 0.42 克/吨黄金 | COG 1.29 克/吨黄金 | ||||||||
吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | |
测量 | 131,250 | 1.395,880 | 445,250 | 6.6094,530 | 576,500 | 5.42100,400 | |||
指示资源 | 706,600 | 1.8040,780 | 3,030,580 | 4.65452,920 | 3,737,200 | 4.11493,700 | |||
显示+测量 | 837,850 | 1.7346,660 | 3,475,830 | 4.90547,450 | 4,313,700 | 4.28594,100 | |||
详见2024年4月3日新闻稿 | 996,500 | 2.0164,420 | 7,597,300 | 4.03985,220 | 8,593,800 | 3.801,049,650 |
Table 2: Summary of Mineral Resources at the Perron Project by zone
表2:佩龙项目矿产资源总结(按区域划分)
Open Pit Constrained | UG stopes | Total | |||||||
COG 0.42 Au g/t | COG 1.29 Au g/t | ||||||||
HG Zone | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. |
Measured | 400 | 1.3820 | 136,000 | 15.9569,740 | 136,400 | 15.9069,750 | |||
Indicated | 13,590 | 1.18515 | 717,800 | 11.52265,900 | 731,400 | 11.33266,410 | |||
Indicated+Measured | 14,000 | 1.18530 | 853,800 | 12.23335,630 | 867,800 | 12.05336,170 | |||
Inferred | 3,330 | 0.5660 | 1,228,060 | 10.52415,410 | 1,231,400 | 10.49415,470 |
露天限制 | 地下矿井停工 | 合计 | |||||||
COG 0.42 克/吨黄金 | COG 1.29 克/吨黄金 | ||||||||
HG带 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 |
测量 | 400 | 1.3820 | 136,000 | 15.9569,740 | 136,400 | 15.9069,750 | |||
指示资源 | 13,590 | 1.18515 | 717,800 | 11.52265,900 | 731,400 | 11.33266,410 | |||
显示+测量 | 14,000 | 1.18530 | 853,800 | 12.23335,630 | 867,800 | 12.05336,170 | |||
详见2024年4月3日新闻稿 | 3,330 | 0.5660 | 1,228,060 | 10.52415,410 | 1,231,400 | 10.49415,470 |
Note: As ounces in the High-Grade Zone increase in confidence from inferred to indicated to measured, so does the grade. This is rare in gold deposits and displays the exceptional continuity of high-grade mineralization within this zone.
注意:随着高品位区内的盎司从推测到指示到实测的信心水平提高,品位也会提高。这在黄金矿床中是罕见的,显示了该区域内高品位矿化的卓越连续性。
Open Pit Constrained | UG stopes | Total | |||||||
COG 0.42 Au g/t | COG 1.29 Au g/t | ||||||||
Denise Zone | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. |
Measured | 92,800 | 1.113,310 | 208,550 | 2.4616,520 | 3,013,410 | 2.0519,820 | |||
Indicated | 324,760 | 1.3614,230 | 1,304,960 | 2.45102,730 | 1,629,720 | 2.23116,960 | |||
Indicated+Measured | 417,560 | 1.3117,540 | 1,513,500 | 2.45119,250 | 1,931,060 | 2.20136,780 | |||
Inferred | 3,400 | 0.6070 | 2,239,690 | 2.94211,600 | 2,243,100 | 2.93211,660 | |||
Open Pit Constrained | UG stopes | Total | |||||||
COG 0.42 Au g/t | COG 1.29 Au g/t | ||||||||
Team Zone | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. |
Measured | 38,040 | 2.092,560 | 93,640 | 2.607,810 | 131,680 | 2.4510,370 | |||
Indicated | 205,450 | 2.3415,470 | 629,150 | 2.4449,420 | 834,600 | 2.4264,880 | |||
Indicated+Measured | 243,490 | 2.3018,030 | 722,790 | 2.4657,230 | 966,280 | 2.4275,250 | |||
Inferred | 273,450 | 2.1618,980 | 1,039,890 | 2.7391,320 | 1,313,340 | 2.61110,300 | |||
Open Pit Constrained | UG stopes | Total | |||||||
COG 0.42 Au g/t | COG 1.29 Au g/t | ||||||||
AZ Zone | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. |
Measured |
|
||||||||
Indicated |
|
|
|
||||||
Indicated+Measured |
|
|
|
||||||
Inferred |
19,310 |
1.871,160 | 19,310 | 1.871,160 | |||||
Open Pit Constrained | UG stopes | Total | |||||||
COG 0.42 Au g/t | COG 1.29 Au g/t | ||||||||
N110 Zone | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. |
Measured |
5,720 |
1.83340 | 5,720 | 1.83340 | |||||
Indicated |
7,500 |
2.40580 | 7,500 | 2.40580 | |||||
Indicated+Measured |
13,220 |
2.16920 | 13,220 | 2.16920 | |||||
Inferred | 240 | 2.4820 | 87,300 | 2.206,200 | 87,540 | 2.206,220 | |||
Open Pit Constrained | UG stopes | Total | |||||||
COG 0.42 Au g/t | COG 1.29 Au g/t | ||||||||
CPZ Zone | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. |
Measured |
1,340 |
2.81120 | 1,340 | 2.81120 | |||||
Indicated |
63,980 |
2.024,150 | 63,980 | 2.024,150 | |||||
Indicated+Measured |
65,320 |
2.034,270 | 65,320 | 2.034,270 | |||||
Inferred |
148,210 |
1.507,140 | 148,210 | 1.507,140 | |||||
Open Pit Constrained | UG stopes | Total | |||||||
COG 0.42 Au g/t | COG 1.29 Au g/t | ||||||||
Gratien Zone | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. |
Measured | |||||||||
Indicated | 22,530 | 2.191,580 | 127,350 | 3.9616,220 | 149,880 | 3.7017,800 | |||
Indicated+Measured | 22,530 | 2.191,580 | 127,350 | 3.9616,220 | 149,880 | 3.7017,800 | |||
Inferred | 147,330 | 3.5916,990 | 1,361,620 | 3.39148,500 | 1,508,950 | 3.41165,500 | |||
Open Pit Constrained | UG stopes | Total | |||||||
COG 0.42 Au g/t | COG 1.29 Au g/t | ||||||||
Grey Cat Zone | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. |
Measured |
|
|
|||||||
Indicated | 135,390 | 2.028,790 | 111,750 | 2.468,860 | 247,140 | 2.2217,650 | |||
Indicated+Measured | 135,390 | 2.028,790 | 111,750 | 2.468,860 | 247,140 | 2.2217,650 | |||
Inferred | 291,020 | 1.9718,400 | 996,130 | 2.2973,210 | 1,287,150 | 2.2191,610 |
露天限制 | UG采场 | 合计 | |||||||
COG 0.42 克/吨黄金 | COG 1.29 克/吨黄金 | ||||||||
Denise Zone | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 |
测量 | 92,800 | 1.113,310 | 208,550 | 2.4616,520 | 3,013,410 | 2.0519,820 | |||
指示资源 | 324,760 | 1.3614,230 | 1,304,960 | 2.45102,730 | 1,629,720 | 2.23116,960 | |||
显示+测量 | 417,560 | 1.3117,540 | 1,513,500 | 2.45119,250 | 1,931,060 | 2.20136,780 | |||
详见2024年4月3日新闻稿 | 3,400 | 0.6070 | 2,239,690 | 2.94211,600 | 2,243,100 | 2.93211,660 | |||
露天限制 | 地下矿井停工 | 合计 | |||||||
COG 0.42 克/吨黄金 | COG 1.29 克/吨黄金 | ||||||||
Team 领域 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 |
测量 | 38,040 | 2.092,560 | 93,640 | 2.607,810 | 131,680 | 2.4510,370 | |||
指示资源 | 205,450 | 2.3415,470 | 629,150 | 2.4449,420 | 834,600 | 2.4264,880 | |||
显示+测量 | 243,490 | 2.3018,030 | 722,790 | 2.4657,230 | 966,280 | 2.4275,250 | |||
详见2024年4月3日新闻稿 | 273,450 | 2.1618,980 | 1,039,890 | 2.7391,320 | 1,313,340 | 2.61110,300 | |||
露天限制 | 地下矿井停工 | 合计 | |||||||
COG 0.42 克/吨黄金 | COG 1.29 克/吨黄金 | ||||||||
AZ区域 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 |
测量 |
|
||||||||
指示资源 |
|
|
|
||||||
显示+测量 |
|
|
|
||||||
详见2024年4月3日新闻稿 |
19,310 |
1.871,160 | 19,310 | 1.871,160 | |||||
露天限制 | 地下矿井停工 | 合计 | |||||||
COG 0.42 克/吨黄金 | COG 1.29 克/吨黄金 | ||||||||
N110区 | 吨 | 黄金gpt | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 |
测量 |
5720 |
1.83340 | 5720 | 1.83340 | |||||
指示资源 |
7500 |
2.40580 | 7500 | 2.40580 | |||||
显示+测量 |
13,220 |
2.16920 | 13,220 | 2.16920 | |||||
详见2024年4月3日新闻稿 | 240 | 2.4820 | 87,300 | 2.206,200 | 87,540 | 2.206,220 | |||
露天限制 | 地下矿井停工 | 合计 | |||||||
COG 0.42 克/吨黄金 | COG 1.29 克/吨黄金 | ||||||||
CPZ区 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 |
测量 |
1,340 |
2.81120 | 1,340 | 2.81120 | |||||
指示资源 |
63,980 |
2.024,150 | 63,980 | 2.024,150 | |||||
显示+测量 |
65,320 |
2.034,270 | 65,320 | 2.034,270 | |||||
详见2024年4月3日新闻稿 |
148,210 |
1.507,140 | 148,210 | 1.507,140 | |||||
露天限制 | 地下矿井停工 | 合计 | |||||||
COG 0.42 克/吨黄金 | COG 1.29 克/吨黄金 | ||||||||
Gratien区 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 |
测量 | |||||||||
指示资源 | 22,530 | 2.191,580 | 127,350 | 3.9616,220 | 149,880 | 3.7017,800 | |||
显示+测量 | 22,530 | 2.191,580 | 127,350 | 3.9616,220 | 149,880 | 3.7017,800 | |||
详见2024年4月3日新闻稿 | 147,330 | 3.5916,990 | 1,361,620 | 3.39148,500 | 1,508,950 | 3.41165,500 | |||
露天限制 | 地下矿井停工 | 合计 | |||||||
COG 0.42 克/吨黄金 | COG 1.29 克/吨黄金 | ||||||||
灰猫区 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金GPT | 黄金盎司 |
测量 |
|
|
|||||||
指示资源 | 135,390 | 2.028,790 | 111,750 | 2.468,860 | 247,140 | 2.2217,650 | |||
显示+测量 | 135,390 | 2.028,790 | 111,750 | 2.468,860 | 247,140 | 2.2217,650 | |||
详见2024年4月3日新闻稿 | 291,020 | 1.9718,400 | 996,130 | 2.2973,210 | 1,287,150 | 2.2191,610 |
Open Pit Constrained | UG stopes | Total | |||||||
COG 0.42 Au g/t | COG 1.29 Au g/t | ||||||||
UHGZ Zone | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt |
Au oz. |
Measured | |||||||||
Indicated |
38,780 |
2.082,590 | 38,780 | 2.082,590 | |||||
Indicated+Measured |
38,780 |
2.082,590 | 38,780 | 2.082,590 | |||||
Inferred |
118,800 |
1.867,110 | 118,800 | 1.867,110 | |||||
Open Pit Constrained | UG stopes | Total | |||||||
COG 0.42 Au g/t | COG 1.29 Au g/t | ||||||||
E2 Zone | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. |
Measured | |||||||||
Indicated |
28,850 |
2.642,450 | 28,850 | 2.642,450 | |||||
Indicated+Measured |
28,850 |
2.642,450 | 28,850 | 2.642,450 | |||||
Inferred |
303,900 |
2.1320,850 | 303,900 | 2.1320,850 |
露天限制 | 地下矿井停工 | 合计 | |||||||
COG 0.42 克/吨黄金 | COG 1.29 克/吨黄金 | ||||||||
UHGZ带 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 |
测量 | |||||||||
指示资源 |
38,780 |
2.082,590 | 38,780 | 2.082,590 | |||||
显示+测量 |
38,780 |
2.082,590 | 38,780 | 2.082,590 | |||||
详见2024年4月3日新闻稿 |
118,800 |
1.867,110 | 118,800 | 1.867,110 | |||||
露天限制 | 地下矿井停工 | 合计 | |||||||
COG 0.42 克/吨黄金 | COG 1.29 克/吨黄金 | ||||||||
E2带 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 |
测量 | |||||||||
指示资源 |
28,850 |
2.642,450 | 28,850 | 2.642,450 | |||||
显示+测量 |
28,850 |
2.642,450 | 28,850 | 2.642,450 | |||||
详见2024年4月3日新闻稿 |
303,900 |
2.1320,850 | 303,900 | 2.1320,850 |
Open Pit Constrained | UG stopes | Total | |||||||
COG 0.42 Au g/t | COG 1.29 Au g/t | ||||||||
JT Zone | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. | Tonnes | Au gpt | Au oz. |
Measured | - | - |
|||||||
Indicated | 4,880 | 1.23190 | 480 | 1.7530 | 5,360 | 1.28220 | |||
Indicated+Measured | 4,880 | 1.23190 | 480 | 1.7530 | 5,360 | 1.28220 | |||
Inferred | 277,700 | 1.119,900 | 54,370 | 1.572,740 | 332,080 | 1.1812,640 |
露天限制 | 地下矿井停工 | 合计 | |||||||
COG 0.42 克/吨黄金 | COG 1.29 克/吨黄金 | ||||||||
Jt 区域 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 | 吨 | 黄金克/每吨 | 黄金盎司 |
测量 | - | - |
|||||||
指示资源 | 4,880 | 1.23190 | 480 | 1.7530 | 5,360 | 1.28220 | |||
显示+测量 | 4,880 | 1.23190 | 480 | 1.7530 | 5,360 | 1.28220 | |||
详见2024年4月3日新闻稿 | 277,700 | 1.119,900 | 54,370 | 1.572,740 | 332,080 | 1.1812,640 |
Note: Drilling on the JT Zone has tripled in amount since the drill database was cut off for the resource calculation. The Company is confident that the JT Zone will significantly grow in size and is especially buoyed by its potential geological implications for mineralization contained throughout the entirety of the Beaupré Block at Perron.
注意:自打断资源计算数据库后,Jt区的钻孔数量增加了三倍。公司对Jt区的增长充满信心,特别是由其潜在地质意义对佩龙区内全部贝普雷区块的矿化产状可能带来的影响。
Cautionary statement: These mineral resources are not mineral reserves as they do not have demonstrated economic viability. The quantity and grade of reported Inferred resources in this Mineral Resource Estimate are uncertain in nature and there has been insufficient exploration to define these Inferred resources as Indicated or Measured, and it is uncertain if further exploration will result in upgrading them to these categories. Totals may not add up due to rounding of numbers.
注意事项:这些矿产资源不是矿藏,因为它们没有经济可行性的证明。这个矿产资源估算中报告的推测资源的数量和品位是不确定的,还没有足够的勘探来将这些推测资源定义为指示或测量的,而且还不确定进一步的勘探是否会将其升级为这些类别。由于数字的四舍五入,总数可能不相加。
Please note that the Company states this is not a Maiden Resource Estimate due to a previous resource estimate completed on the Gratien Zone in 2009 for 69,907 inferred ounces of gold (please refer to SEDAR filing submitted June 2, 2009. Report is titled Resource Estimate, Form 43-101F1 Technical Report, Project Perron, is dated May 10, 2009 and was authored by Qualified Person Jacques Marchand P. Eng).
请注意,公司表示这不是首次资源评估,因为2009年对Gratien区进行了先前的资源估算,获得69097盎司的推测黄金(请参阅于2009年6月2日提交的SEDAR报告,标题为Resource Estimate,表格43-101F1技术报告,Perron项目,日期为2009年5月10日,由资质人员Jacques Marchand P. Eng编写)。
Resource Estimation Methodology and Parameters
样品化验结果是通过质量控制/质量保证(“QA / QC”)程序独立监测的,包括盲认证参考材料(标准)、白样和现场复制样品的插入。测井和采样是在位于现场的安全公司设施中完成的。钻孔样品原地切割一半,样品安全地运输至Quito的ALS实验室。样品制粉发往秘鲁的Lima和加拿大的温哥华的ALS实验室进行分析。铜和钼的总含量是通过采用AAS完成的四酸消化法测定的。金是通过30克荧光分析法测定的。此外,选择的制粉核查样品被送往秘鲁的Bureau Veritas实验室。ALS Labs和Bureau Veritas实验室均独立于Solaris。Rossi先生通过亲自检查用于MRE的钻探岩心并执行多次检查以确认这些数据的准确性,核对了所披露数据,包括采样、分析和测试数据。此外,Rossi先生查看了公司钻井计划的QA / QC报告,并注意到没有出现任何可能影响对样品数据的信心的问题。Rossi先生认为采用的采样方法适用于矿床类型,采用了充分的安全和QA / QC措施,样品代表了现有矿化的特征。Rossi先生不知道任何可能影响此处所述数据的准确性或可靠性的钻探、采样、回收或其他因素。
As part of the resource estimation process, the Company and GoldMinds compiled, verified and modelled all technical information available from the Project
作为资源估算过程的一部分,公司和GoldMinds整理、验证和建立了来自项目的所有技术信息。
Parameters used in the definition of cut-of grades, modifying factors to enable reasonable prospect of economic extraction, pit constrained and mineable shapes as per CIM 2019 Guidelines.
用于确定截止品位、修改因素以实现合理的经济开采前景、以CIm 2019指南为基础的坑限制和可采形状的参数。
Table 3: Parameters used for constraining resources at Perron
表3:在Perron限制资源时使用的参数
Pit parameters | Stope parameters | |
Open Pit | Underground | |
Total processing costs ($) | 28.00 | 28.00 |
Mining cost (rock) ($) | 5.00 | 75.00 |
Specific gravity (rock) | 2.7 | 2.7 |
Pit slopes (overburden) | 20 | |
Pit slopes (rock) | 45 | |
Mining cost (overburden) | 5 | |
Specific gravity (overburden) | 1.9 | |
Au price ($USD) | 1900 | 1900 |
Exchange rate ($CAD/$USD) | 1.35 | 1.35 |
Au price (CAD$/g) | 82.47 | 82.47 |
Recovery | 95% | 97% |
COG (g/t Au) | 0.42 | 1.29 |
坑参数 | 采场参数 | |
露天矿 | 地下矿 | |
总加工成本(美元) | 28.00 | 28.00 |
采矿成本(岩石)(美元) | 5.00 | 75.00 |
比重(岩石) | 2.7 | 2.7 |
露天边坡(覆盖土) | 20 | |
露天边坡(岩石) | 45 | |
采矿成本(覆盖土) | 5 | |
比重(覆盖层) | 1.9 | |
黄金价格(美元) | 1900 | 1900 |
汇率(加元/美元) | 每股稀释1.35美元 | 每股稀释1.35美元 |
Au价格(加元/克) | 82.47 | 82.47 |
康复 | 95% | 97% |
COG(克/吨 Au) | 0.42 | 1.29 |
Perron Gold project Mineral Estimate notes:
Perron Gold项目矿产估算说明:
- The mineral resource estimate is compliant with CIM 2019 standards and guidelines for reporting mineral resources and reserves.
- Resources are presented undiluted and in situ and are considered to have reasonable prospects for economic extraction. The resources at surface are constrained by pit optimization surfaces and the underground resources are constrained by mineable shapes.
- The database comprised a total of 1,533 drill holes for 617,836.50 metres of drilling (which includes historical drilling completed by previous operators) in the extent of the mineral resource, of which (312,051.20 metres) 264,462 samples were assayed as of June 30th, 2024, grid spacing are variable (The Genesis file is Amex_24 Aout 2024_MR.gnft and where the database file is BD_AMEX_08 Jul 2024_MR.accdb).
- All NQ core assays reported by AMEX were obtained by analytical methods described below under "QA&QC".
- Geological interpretation of the deposits was based on lithologies, mineralized zones orientation and the mineral observations. Each zone has its own characteristic of mineral occurrence and amount of free gold.
- Interpretation was initially made from cross-sections at intervals, and then completed in GENESIS, a modelling software, where selections of mineralization intervals were combined to generate mineralization wireframes. Envelopes are generally subvertical with various plunges.
- The mineral resource estimate encompasses a total of 189 envelopes, sub-vertical gold-bearing envelopes/domains each defined by individual wireframes with a minimum true thickness of 2.0 metres.
- Samples were composited within the mineralization envelopes into 1.0 metre length composites. A value of zero grade was applied in cases of core not assayed.
- High grade capping was done on composite data and established using a statistical analysis on a per-zone basis for gold. Capping varied from 5 g/t Au to 200 g/t Au and was applied on composites within each specific envelope.
- Density values were applied on the different mineralized zones (t/m3) varied from 2.67 to 2.83 from core measurement.
- Inverse distance squared grade estimation is used. The trial of Ordinary Kriging (OK) was rejected due to smearing and non-effective representation of high-grade areas.
- Most of the estimates are based on a block dimension of 2m North, 2m East and 2m height and estimation parameters determined by variography. The High-Grade zone has blocks of 2.5m East x 5m Z (Elevation) x 0.5m North.
- The Perron mineral resource estimate is categorized as Measured, Indicated and Inferred mineral resource as follows:
- The Measured mineral resource category is automatic & manually defined and encloses areas where drill spacing is generally less than 30m (search radius of 15m), blocks are informed by a minimum of three drill holes, and reasonable geological and grade continuity is shown.
- The Indicated mineral resource category is manually defined and encloses areas where drill spacing is generally less than 60m (search radius of 30m), blocks are informed by a minimum of three drill holes, and reasonable geological and grade continuity is shown.
- The Inferred mineral resource category is manually defined and encloses areas where drill spacing is less than 130m (search radius of 65m), blocks are informed by a minimum of two drill holes, and reasonable, but not verified, geological and grade continuity is observed.
- Estimates use metric units (metres, tonnes and g/t). Metal contents are presented in troy ounces (metric tonne x grade / 31.10348).
- GoldMinds is not aware of any known environmental, permitting, legal, title-related, taxation, socio-political or marketing issues, or any other relevant issue not reported in the technical report, that could materially affect the mineral resource estimate.
- 矿产资源估算符合2019年CIM标准和指南,用于报告矿产资源和储量。
- 资源在原位、未稀释的状态下进行展示,并被认为具有合理的经济开采前景。地表资源受到最优化的采矿边界约束,地下资源受到可采形态的约束。
- 数据库包括总计1,533个钻孔,钻孔总长度为617,836.50米(其中包括以前运营商进行的历史钻探),到2024年6月30日为止,已对264,462个样品进行了312,051.20米的化验,网格间距变量(Genesis文件为Amex_24 Aout 2024_MR.gnft,数据库文件为BD_AMEX_08 Jul 2024_MR.accdb)。
- AMEX报告的所有NQ岩心化验结果均采用下面"QA&QC"部分所描述的分析方法获取。
- 对矿床的地质解释基于岩性、矿化带取向和矿物观察。每个矿带都有其自身的矿物出现特征和游离金含量。
- 起初是根据剖面图进行解释,然后在GENESIS建模软件中完成,将矿化区间的选择组合生成矿化线框。包络线一般是次垂直的,具有不同的倾角。
- 矿产资源估计包含189个包络线,通过各个独立的线框定义的次垂直金属矿化包络/区域,最小真实厚度为2.0米。
- 样品在矿化包络内以1.0米的长度进行组合。在未进行核心化验的情况下,应用零品位值。
- 高品位上限值是根据金的各个区域基于统计分析确定的。上限值从5克/吨Au到200克/吨Au不等,并应用于每个特定包络内的样品组合。
- 密度值应用于不同的矿化区域(t/m3),核心测量值从2.67到2.83不等。
- 使用反距离平方成分估计方法。由于模糊和高品位区域的非有效表征,普通克里金法(OK)的试验被否决。
- 大部分估计是基于200万北坐标、200万东坐标和200万垂直坐标的块尺寸,以及根据变异性确定的估计参数。高品位区块的尺寸为250万东坐标x500万Z(高程)x50万北坐标。
- Perron矿产资源估计归类为经核实、指示和推测的矿产资源,如下所示:
- 测量矿产资源类别是自动定义和手动定义的,并涵盖钻孔间距通常小于3000万(搜索半径15米),区块由至少三个钻孔信息,显示合理的地质和品位连续性。
- 指示矿产资源类别是手动定义的,并涵盖钻孔间距通常小于6000万(搜索半径30米),区块由至少三个钻孔信息,显示合理的地质和品位连续性。
- 推断矿产资源类别是手动定义的,并涵盖钻孔间距小于13000万(搜索半径65米),区块由至少两个钻孔信息,观察到合理但未经验证的地质和品位连续性。
- 估算使用公制单位(米、吨和克/吨)。金属含量以金衡制盎司表示(公制吨 x 品位 / 31.10348)。
- GoldMinds不知道有任何已知的环境、许可、法律、所有权、税收、社会政治或市场问题,或任何其他未在技术报告中报告的相关问题,可能对矿产资源估计产生重大影响。
Further details regarding the 2024 mineral resource estimate, key assumptions, parameters and methods used to estimate the mineral resources of the Perron Gold Project will be available on SEDAR Plus () under the Corporation's issuer profile within 45 days in accordance with NI 43-101. The resource estimate will be the basis for the ongoing PEA to be released in Q4, 2024.
关于2024年矿产资源估计、关键假设、参数和用于估计Perron黄金项目矿产资源的方法的更多详细信息将在45天内通过公司发行人资料文件(SEDAR Plus)中提供,在符合NI 43-101的情况下。该资源估计将成为即将发布的2024年第四季度PEA的基础。
Independent Qualified Persons
独立的合格人员
The Mineral Resource Estimate was prepared for Amex Exploration Inc. under the supervision of GoldMinds Geoservices Inc. ("GMG"). The Qualified Persons ("QP's") have reviewed and approved the content of this news release. Independent QP's from GMG who have prepared and supervised the preparation of the technical information relating to this Mineral Resource Estimate are:
矿产资源估计是为Amex Exploration Inc.准备的,在GoldMinds Geoservices Inc.(“GMG”)的监督下完成。已审阅和批准本新闻稿的内容的有资质人员(“QP's”)是GMG的独立QP,他们已准备和监督准备与此矿产资源估计相关的技术信息的工作。
- Merouane Rachidi, Ph.D. P.Geo.
- Claude Duplessis, Eng.
- Merouane Rachidi博士P.Geo。
- Claude Duplessis工程师。
Perron Project Qualified Person and QA&QC
Perron项目合格人员和QA&QC
Jérôme Augustin P.Geo. Ph.D., (OGQ 2134), an independent "qualified person" as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects (the "Qualified Person"), has reviewed and approved the geological information reported in this news release. The drilling campaign and the quality control program have been planned and supervised by Jérôme Augustin. Core logging and sampling were completed by Laurentia Exploration. The quality assurance and quality control protocols include insertion of blank or standard samples every 10 samples on average, in addition to the regular insertion of blank, duplicate, and standard samples accredited by Laboratoire Expert during the analytical process.
Jérôme Augustin P.Geo.博士(OGQ 2134)是独立的“合格人士”,根据43-101号国家准则-矿产项目披露标准(“合格人士”)的定义,在该新闻发布中审查了报告的地质信息,并批准了该信息。钻探活动和质量控制计划由Jérôme Augustin规划和监督。岩心描述和采样由Laurentia Exploration完成。质量保证和质量控制方案包括在分析过程中每10个样品平均插入一次空白或标准样品,以及定期插入由Laboratoire Expert认可的空白、重复和标准样品。
For all analyses targeting gold mineralization, gold values are estimated by fire assay with finish by atomic absorption. Values over 3 ppm Au are reanalyzed by fire assay with finish by gravimetry by Laboratoire Expert Inc, Rouyn-Noranda. Samples containing visible gold mineralization are analyzed by metallic sieve. For additional quality assurance and quality control, all samples were crushed to 90% less than 2 mm prior to pulverization, in order to homogenize samples which may contain coarse gold.
对于所有靶向金矿化的分析,金的含量采用原子吸收法进行火烧测定。Laboratoire Expert Inc,Rouyn-Noranda,对于超过3 ppm Au的值进行火烧测定,并以重量法完成。含有可见金矿化的样品将通过金属筛进行分析。为了进一步保证质量控制,所有样品都要在粉碎前压碎至90%以下的2毫米,以均质可能含有粗金的样品。
Furthermore, gold mineralization associated with base metals were sent to ALS Canada Ltd., Rouyn-Noranda with the same quality assurance and quality control protocol to LabExpert. Gold values are estimated by fire assay with finish by atomic absorption. Zinc, Copper and Silver values are estimated by four acid digestion multi elements Inductively Coupled Plasma - Atomic Emission Spectroscopy (ICP-AES), ME-ICP61. Zinc values over 1%, copper values over 1% and silver values over 100 g/t are estimated by four acid digestion ICP-AES, OG62.
此外,与基本金属相关的金矿化物样品也被送往ALS Canada有限公司,Rouyn-Noranda,遵循相同的质量保证和质量控制协议进行分析。金含量由火试金法测定,通过原子吸收完成。锌、铜和银的含量经过酸解多元素电感耦合等离子体原子发射光谱法(ICP-AES)测定,编号为ME-ICP61。锌含量大于1%,铜含量大于1%,银含量大于100克/吨的样品通过酸解ICP-AES(OG62)进行分析。
About Amex
关于美交所
Amex Exploration Inc. has made significant gold discoveries on its 100% owned high-grade Perron Gold Project located ~110 kilometres north of Rouyn-Noranda, Quebec, consisting of 117 contiguous claims covering 4,518 hectares. The project is well-serviced by existing infrastructure, on a year-round road, 10 minutes from an airport and just outside the town of Normétal (~8 km). In addition, the project is in close proximity to a number of major gold producers' milling operations. The project host both bulk tonnage and a high-grade gold style mineralization. Since January 2019, Amex has intersected significant gold mineralization in multiple gold zones and discovered copper-rich VMS zones.
Amex探险公司在其100%拥有的高品位Perron黄金项目上发现了重要的金矿,并位于魁北克省鲁伊诺兰达以北约110公里处,由117个相邻的地块覆盖4,518公顷。该项目服务良好,毗邻现有的基础设施,位于四季通行的公路上,距离机场仅有10分钟车程,距离Normétal市区(约8公里)的边缘不远,并且附近有许多主要黄金生产商的磨矿操作厂。该项目既拥有散装矿堆又拥有高品位的金矿化风格。自2019年1月以来,Amex多次在多个黄金区域相交处发现了重要的金矿化,并发现了富含铜的VMS区域。
For further information please contact:
要了解更多信息,请联系:
Victor Cantore
President and Chief Executive Officer
Amex Exploration: +1-514-866-8209
维克多·坎托雷
总裁兼首席执行官
Amex Exploration公司:+1-514-866-8209
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
TSX Venture Exchange及其监管服务提供者(如TSX Venture Exchange的政策所定义的那样)对此发布的充分性或准确性不承担任何责任。
Forward-looking statements
前瞻性声明 本新闻稿中包括的关于未来表现和结果、预期、规划、策略、重点、承诺和其他声明(包括与我们社会、环境和其他可持续性目标有关的声明)的非历史事实的前瞻性声明,是根据美国联邦证券法的定义而作出的前瞻性声明。本新闻稿中关于我们环境和其他可持续性计划和目标的前瞻性声明以及其他声明并不意味着这些声明对于投资者、我们的业务、运营结果、财务状况、前景或策略、对我们在可持续发展事项上的影响或其他当事方来说均是重要的,或者必须披露在我们向证券交易委员会(“SEC”)或其他监管机构的备案中。此外,历史、现有及未来涉及社会、环境和可持续性的相关声明可能是基于仍在发展的衡量进展的标准、不断演变的内部控制和流程以及假设,在将来可能会发生变化。前瞻性声明基于当前的信仰、期望和假设,并受到可能导致实际结果与前瞻性声明有实质性差异的重大风险、不确定性和情况变化的影响。
This news release contains forward-looking statements. All statements, other than of historical facts, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future including, without limitation, the planned exploration program on the HGZ and Denise Zone, the expected positive exploration results, the extension of the mineralized zones, the timing of the exploration results, the ability of the Company to continue with the exploration program, the availability of the required funds to continue with the exploration and the potential mineralization or potential mineral resources are forward-looking statements. Forward-looking statements are generally identifiable by use of the words "will", "should", "continue", "expect", "anticipate", "estimate", "believe", "intend", "to earn", "to have', "plan" or "project" or the negative of these words or other variations on these words or comparable terminology. Forward-looking statements are subject to a number of risks and uncertainties, many of which are beyond the Company's ability to control or predict, that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements. Factors that could cause actual results or events to differ materially from current expectations include, among other things, failure to meet expected, estimated or planned exploration expenditures, failure to establish estimated mineral resources, the possibility that future exploration results will not be consistent with the Company's expectations, general business and economic conditions, changes in world gold markets, sufficient labour and equipment being available, changes in laws and permitting requirements, unanticipated weather changes, title disputes and claims, environmental risks as well as those risks identified in the Company's annual Management's Discussion and Analysis. Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking statements prove incorrect, actual results may vary materially from those described and accordingly, readers should not place undue reliance on forward-looking statements. Although the Company has attempted to identify important risks, uncertainties and factors which could cause actual results to differ materially, there may be others that cause results not to be as anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements except as otherwise required by applicable law.
本新闻发布包含前瞻性声明,所有论述、事实、事件或未来可能发生的发展计划,均属于公司的前瞻性声明,无论是除历史事实外的情况,都包括,但不限于HGZ和Denise区的计划勘探项目,预期的正面勘探结果,矿化带的延伸,勘探结果的时机,公司能否继续进行勘探项目,所需资金的可用性以及潜在矿化或潜在矿物资源都是前瞻性声明。前瞻性声明通常可使用“将”,“应该”,“继续”,“预计”,“预期”,“估计”,“相信”,“打算”,“赚取”,“拥有”,“计划”或“项目”等词语,或这些词语的否定形式或这些词语的变体或可比的术语。前瞻性声明受到许多超出公司控制或预测范围的风险和不确定性的影响,这些风险和不确定性可能会导致公司的实际结果与前瞻性声明中讨论的结果有所不同。可能导致实际结果或事件与当前预期不同的因素包括但不限于未能达到预期、估计或计划中的勘探支出,未能建立估计的矿物资源,未来的勘探结果可能不符合公司的预期,一般业务和经济状况,世界黄金市场的变化,可用的足够的劳动力和设备,法律和许可要求的变化,未预期的天气变化,所有权争端和索赔,环境风险以及公司年度管理讨论和分析中确定的风险。如果这些风险或不确定性中的一个或多个出现,或者前瞻性声明所基于的假设被证明不正确,实际结果可能会有所不同,因此,读者不应过度依赖前瞻性声明。尽管公司已尝试识别可能会导致实际结果与预期、估计或意图不同的重要风险、不确定性和因素,但可能存在其他因素会导致结果与预期、估计或意图不同。公司无意、并且不承担任何义务,更新这些前瞻性声明,除非适用法律另有规定。