ATEX Announces Phase V Exploration Plans
ATEX Announces Phase V Exploration Plans
Toronto, Ontario--(Newsfile Corp. - September 9, 2024) - ATEX Resources Inc. (TSXV: ATX) ("ATEX" or the "Company") is pleased to provide an update on its exploration strategy at the Valeriano Copper-Gold Project ("Valeriano" or the "Project") located in the Atacama Region, Chile. The Phase V drill program will follow on from the Company's most successful drill program to date and is anticipated to commence in October 2024.
安大略省多伦多--(Newsfile Corp.,2024年9月9日)——ATEX Resources Inc.(TSXV:ATX)(“ATEX” 或 “公司”)很高兴提供其位于智利阿塔卡马地区的瓦莱里亚诺铜金项目(“瓦莱里亚诺” 或 “项目”)勘探战略的最新情况。第五阶段钻探计划将继公司迄今为止最成功的钻探计划之后,预计将于2024年10月开始。
Highlights:
亮点:
Phase V program targeting an initial 20,000 metres of directional diamond drilling with most planned holes being daughters out of holes drilled in previous programs. This will allow for an accelerated, efficient, high impact program.
-
The following priorities will be included in the Phase V drill program:
Step out drilling to expand the late-stage epithermal overprinting system above the porphyry horizon in drill hole ATXD26 which intersected the highest grades at Valeriano to date including 68.0 metres of 2.02% CuEq (1.39% Cu, 0.60 g/t Au, 3.81 g/t Ag and 473 g/t Mo)1.
Definition and extension of the high-grade trend hosted within the larger mineralized porphyry body to increase the size and confidence of the >0.8% CuEq mineralization.
Large step-out drilling to expand the known mineralized footprint, specifically along trend where the system remains open to the north, northwest and to the southeast.
Targeting updated Mineral Resource Estimate in H2 2025.
第五阶段计划的目标是最初进行20,000米的定向钻石钻探,其中大多数计划中的钻孔是先前项目中钻孔的子孔。这将允许一个加速、高效、高影响力的计划。
-
第五阶段钻探计划将包括以下优先事项:
踏出钻探阶段,在 ATXD26 钻孔斑岩地平线上方扩展后期超热套印系统,该钻孔与瓦莱里亚诺迄今为止最高品位相交,包括 68.0 米的 2.02% CueQ(1.39% 铜、0.60 g/t 金、3.81 g/t Ag 和 473 g/t Mo)1。
定义和扩展大型矿化斑岩体内的高品位趋势,以增加超过 0.8% CueQ 矿化的规模和置信度。
大型阶梯式钻探旨在扩大已知的矿化足迹,特别是沿着系统向北、西北和东南开放的趋势。
目标是在2025年下半年更新矿产资源估算。
Ben Pullinger, President and CEO commented, "The Phase IV drill program was a transformative exploration season for the Company that yielded the highest grades and best results we have seen at Valeriano to date. Our 2024-2025 Phase V program will prioritize stepping out on the known high-grade upper epithermal zones of the system as well as further defining higher-grade trends within the porphyry. Our current understanding of the geology at Valeriano has demonstrated that the system remains open in all directions with significant opportunity for further expansion - as such, we have earmarked meters in this program to test for further significant extensions of the mineralized system. We will also continue to advance our metallurgical programs and many of our key engineering studies in 2024-2025." Mr. Pullinger continued, "We will look forward to pushing the limits of the system and to delivering an updated Mineral Resource Estimate ("MRE") in H2 2025. The updated 2025 MRE will include all drilling completed in Phase IV (9 holes totalling ~12,000m) and all drill holes completed in Phase V. The MRE will also include improved metallurgical recoveries announced in October 20232 as well as the results of a larger follow up program that is currently underway, with results expected later in 2024."
总裁兼首席执行官本·普林格评论说:“第四阶段的钻探计划对公司来说是一个变革性的勘探季节,它产生了迄今为止我们在瓦莱里亚诺看到的最高等级和最好的结果。我们的 2024-2025 年第五阶段计划将优先考虑进入系统中已知的高品位上部超热区域,并进一步定义斑岩中更高品位的趋势。我们目前对瓦莱里亚诺地质情况的了解表明,该系统仍然向各个方向开放,具有进一步扩张的重大机会——因此,我们在该项目中指定了仪表来测试矿化系统的进一步显著扩展。在2024-2025年,我们还将继续推进我们的冶金项目和许多关键工程研究。”普林格继续说:“我们将期待突破该系统的极限,并在2025年下半年发布最新的矿产资源估算(“MRE”)。更新后的2025 MRE将包括第四阶段完成的所有钻探(9个钻孔,总计约12,000米)和第五阶段完成的所有钻孔。MRE还将包括2023年10月宣布的提高冶金回收率以及目前正在进行的更大规模后续计划的结果,预计将在2024年晚些时候取得结果。”
Phase V Drill Program Details
第五阶段钻探计划详情
Preparation for the Phase V drill program is underway with drilling expected to commence in October 2024. The program contemplates having three drill rigs operating in October with the potential to add two additional rigs by December. ATEX is targeting an initial 20,000 meters of directional diamond drilling in Phase V.
第五阶段钻探计划的准备工作正在进行中,钻探预计将于2024年10月开始。该计划计划让三台钻机在10月投入运行,并有可能在12月之前再增加两台钻机。ATEX的目标是在第五阶段进行最初的2万米定向钻石钻探。
Phase V Objectives and Priorities
第五阶段的目标和优先事项
- Define Shallower High-Grade Cu-Au Epithermal Mineralization (Step-out Drilling from ATXD26)
- 定义更浅的高品位铜金超热矿化(从 ATXD26 开始逐步钻探)
The high-grade, overprinting epithermal-style mineralization encountered in drillhole ATXD26 (Phase IV) including 68.0 metres of 2.02% CuEq (1.39% Cu, 0.60 g/t Au, 3.81 g/t Ag and 473 g/t Mo) and located above the known porphyry body will be tested by step-out drilling with the objective to grow and define the size and shape of this very high-grade target. These results are intended to be used as the basis for initial resource estimations and for planning further infill and expansion drilling in the future. Selected samples from this zone have been taken and are currently being analyzed for initial metallurgical studies. (Figures 1 & 2).
在 ATXD26 钻孔(第四阶段)中遇到的高品位表温型矿化,包括 68.0 米的 2.02% CueQ(1.39% 铜、0.60 g/t Au、3.81 g/t Ag 和 473 g/t Mo)且位于已知斑岩体上方,将通过步进式钻探进行测试,目的是生长和确定这个极高品位目标的大小和形状。这些结果旨在用作初步资源估算以及规划未来进一步的填充和扩建钻探的基础。已经从该区域抽取了选定的样品,目前正在进行分析,以进行初步的冶金研究。(图 1 和 2)。
- Definition and Extension of the High-Grade Trend Hosted within the Porphyry
- 斑岩内部的高等级趋势的定义和扩展
The high-grade trend hosted within the larger porphyry body has a current strike length of ~800m from ATXD23 in the northwest to ATXD16A in the southeast. This trend will be the target of a definition and extension program during Phase V with the intention of intersecting more high-grade material and increasing the confidence of >0.8% CuEq mineralization. Specifically, drilling will test to the southeast of ATXD16A that intersected 112m of 1.42% CuEq (1.01% Cu, 0.57 g/t Au, 2.06 g/t Ag and 46 g/t Mo) within broader intervals of 594m of 0.92% CuEq (0.67% Cu, 0.32 g/t Au, 1.13 g/t Ag and 71 g/t Mo) and 852m of 0.82% CuEq (0.60% Cu, 0.28 g/t Au, 0.98 g/t Ag and 72 g/t Mo) in Phase IV.
从西北部的 ATXD23 到东南部的 ATXD16A,存在于较大斑岩体内的高品位趋势目前的走向长度约为 80000,000。这一趋势将成为第五阶段定义和扩展计划的目标,目的是交叉更多的高品位材料,并提高CueQ矿化率> 0.8% 的信心。具体而言,钻探将在 ATXD16A 东南方向进行测试,该钻探与 1.42% CueQ(1.01% Cu、0.57 g/t Au、2.06 g/t Ag 和 46 g/t Mo)相交 11200万,间隔为 0.92% CueQ(0.67% CueQ,0.32 g/t Au,1.13 g/t Ag 和 71 g/t Mo),85200万 0.82% cueQ(第四阶段为 0.60% 铜、0.28 g/t Au、0.98 g/t Ag 和 72 g/t Mo)。
- Extension of Known Mineralization
- 已知矿化的延伸
Compilation of Phase IV results along with data from previous programs has led to a revised geological interpretation for Valeriano. This new interpretation, supported by drilling, core re-logging, lithogeochemistry and geophysical data has highlighted areas of potential extensions to mineralization previously defined in the 2023 MRE3. Part of the upcoming Phase V drill program will be designed to test these extensions.
第四阶段结果以及先前项目数据的汇编使瓦莱里亚诺的地质解释得以修订。这种新的解释得到了钻探、岩心重排、岩石地球化学和地球物理数据的支持,突显了先前在 2023 年 MRE3 中定义的潜在矿化扩展区域。即将到来的第五阶段钻探计划的一部分将设计用于测试这些扩展。
- Upgrading Mineral Resource
- 升级矿产资源
The revised and updated geology model has also identified untested areas with potential to contain higher-grade mineralization. These areas will be targeted by closer-spaced drilling (nominal 150m spacing) aiming to improve the overall grade and confidence of mineralization within the resource envelope and upgrading the core of the current Inferred Mineral Resource to an Indicated Resource Category3.
修订和更新的地质模型还确定了未经测试的区域,这些区域可能含有更高品位的矿化。这些区域将以更近的间距钻探(标称间距为15000万)为目标,旨在提高资源包络内矿化的总体品位和信心,并将当前推断矿产资源的核心升级为指定资源类别3。
Figure 1: Schematic Valeriano Long Section Showing Phase V Targets and Priorities
图 1:显示第 V 阶段目标和优先事项的 Valeriano 长段示意图
Figure 2: Plan View Highlighting Phase V Priorities Above and Within Porphyry Body
图 2:计划视图突出显示了 Porphyry Body 上方和内部的第五阶段优先事项
QAQC
QAQC
Drill holes are collared with a PQ drill bit, reduced to HQ and, sequentially, to NQ as the drill holes progress at depth. Drill core produced by the drill rigs was extracted from the core tubes by the drill contractor under the supervision of ATEX employees, marked for consistent orientation and placed in core boxes with appropriate depth markers added. Full core boxes were then sealed before being transported by ATEX personnel to the Valeriano field camp. Core at the field camp is processed, quick logged, checked for recovery, photographed, and marked for specific gravity, geotechnical studies and for assays. From camp, the core is transferred to a secure core-cutting facility in Vallenar, operated by IMG, a third-party consultant. Here, the core trays are weighed before being cut using a diamond saw under ATEX personnel oversight. ATEX geologists working at this facility double-check the selected two-metre sample intervals, placing the samples in seal bags and ensuring that the same side of the core is consistently sampled. Reference numbers are assigned to each sample and each sample is weighed. The core trays with the remaining half-core are weighed and photographed. Additionally, core logs are updated, and specific gravity and geotechnical samples are collected. The remaining core is stored in racks at the Company's secure facility in Vallenar.
钻孔用 PQ 钻头开孔,钻孔缩小到总部,随着钻孔深度的推进,依次缩减到 NQ。钻机生产的钻芯由钻探承包商在ATEX员工的监督下从岩心管中提取,标记方向一致,然后放入岩心盒中,并添加了适当的深度标记。然后,完整的核心箱被密封,然后由ATEX人员运送到瓦莱里亚诺野战营地。野战营地的岩心经过处理、快速记录、检查是否恢复、拍照,并标记用于比重、岩土工程研究和化验。核心资源从营地转移到位于瓦莱纳尔的一个安全的切芯设施,该设施由第三方顾问IMG运营。在这里,在ATEX人员的监督下使用金刚石锯切割岩芯托盘之前,先对芯盘进行称重。在该设施工作的ATEX地质学家仔细检查选定的两米采样间隔,将样品放入密封袋中,并确保岩心同一侧的采样始终如一。为每个样本分配参考编号,并对每个样本进行称重。对带有剩余半芯的核心托盘进行称重并拍照。此外,还更新了岩心日志,收集了比重和岩土工程样本。剩余的核心存储在公司位于瓦莱纳尔的安全设施的机架中。
From Vallenar samples are sent to an ALS preparation facility in La Serena. ALS is an accredited laboratory which is independent of the Company. The prepared samples were sent to the ALS assay laboratories in either Santiago, Chile and Lima, Peru for gold (Au-AA24), copper (Cu-AA62), molybdenum (Mo-AA62) and silver (Ag-AA62) assays as well as and multi-element ICP (ME-MS61) analysis. No data quality problems were indicated by the QA/QC program.
来自瓦莱纳尔的样本被送到拉塞雷纳的肌萎缩性侧索硬化症制备设施。ALS 是一家独立于公司的经认证的实验室。准备好的样本被送往智利圣地亚哥和秘鲁利马的肌萎缩性侧索硬化症分析实验室进行金(Au-AA24)、铜(cu-aa62)、钼(mo-aa62)和银(Ag-AA62)的测定以及多元素ICP(ME-MS61)分析。质量保证/质量控制计划未发现任何数据质量问题。
Qualified Person
合格人员
Dr. Owen Hatton, PhD, MAusIMM., registered with the Australian Institute of Mining and Metallurgy, is the Qualified Person, as defined by National Instrument 43-101 - Standards for Disclosure for Mineral Projects, for the Valeriano Copper Gold Porphyry Project. Dr. Hatton is not considered independent under NI 43-101 as he is a full time employee of ATEX. He has reviewed and approved the disclosure of the scientific and technical information contained in this press release.
根据国家仪器43-101——矿业项目披露标准的定义,欧文·哈顿博士,在澳大利亚矿业和冶金学会注册,是瓦莱里亚诺铜金斑岩项目的合格人员。根据NI 43-101,哈顿博士不被视为独立人士,因为他是ATEX的全职员工。他已经审查并批准了本新闻稿中包含的科学和技术信息的披露。
About ATEX
关于 ATEX
ATEX is exploring the Valeriano Copper Gold Project which is located within the emerging copper gold porphyry mineral belt linking the prolific El Indio High-Sulphidation Belt to the south with the Maricunga Gold Porphyry Belt to the north. This emerging belt, informally referred to as the Link Belt, hosts several copper gold porphyry deposits at various stages of development including, Filo del Sol (Filo Mining), Josemaria (Lundin Mining), Los Helados (NGEX Minerals/JX Nippon), La Fortuna (Teck Resources/Newmont) and El Encierro (Antofagasta/Barrick Gold). Valeriano hosts a large copper gold porphyry resource: 1.41 billion tonnes at 0.67% CuEq (0.50% Cu, 0.20 g/t Au, 0.96 g/t Ag and 63.80 g/t Mo), which includes a higher-grade core totaling 200 million tonnes at 0.84% CuEq (0.62% Cu, 0.29 g/t Au 1.25 g/t Ag and 55.7 g/t Mo), as reported by ATEX on September 12, 20234.
ATEX正在勘探瓦莱里亚诺铜金项目,该项目位于新兴的铜金斑岩矿物带内,连接南部多产的埃尔印第奥高硫化带和北部的马里昆加金斑岩带。这个新兴地带被非正式地称为链接带,拥有多个处于不同开发阶段的铜金斑岩矿床,包括菲洛德尔索尔(菲洛矿业)、何塞马里亚(隆丁矿业)、洛斯赫拉多斯(NGEX矿业/JX Nippon)、拉福尔图纳(泰克资源/纽蒙特)和埃尔恩西埃罗(安托法加斯塔/巴里克金)。瓦莱里亚诺拥有大型铜金斑岩资源:14.1吨,含量为 0.67%(0.50% 铜、0.20 g/t Au、0.96 g/t Ag 和 63.80 g/t Mo),其中包括总量为 20000,000 吨的更高等级岩心,CUeQ 为 0.84%(0.62% 铜,0.29 g/t Au 1.25 g/t Ag 和 55.7 g/t Mo),据ATE报道 X 于 20234 年 9 月 12 日。
For further information, please contact:
欲了解更多信息,请联系:
Ben Pullinger,
President and CEO
Email: bpullinger@atexresources.com
本·普林格,
总裁兼首席执行官
电子邮件:bpullinger@atexresources.com
Aman Atwal,
Vice President, Business Development and Investor Relations
Email: aatwal@atexresources.com
阿曼·阿特瓦尔,
业务发展和投资者关系副总裁
电子邮件:aatwal@atexresources.com
1-647-398-9405
or visit ATEX's website at .
1-647-398-9405
或访问ATEX的网站,网址为。
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:
关于前瞻性陈述的警示性说明:
This news release contains forward-looking statements, including predictions, projections, and forecasts. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "planning", "expects" or "does not expect", "continues", "scheduled", "estimates", "forecasts", "intends", "potential", "anticipates", "does not anticipate", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements.
本新闻稿包含前瞻性陈述,包括预测、预测和预测。通常,但并非总是如此,前瞻性陈述可以通过使用 “计划”、“规划”、“预期” 或 “不期望”、“继续”、“预期”、“估计”、“预测”、“打算”、“潜在”、“预期”、“未预期” 等词语来识别,或者描述 “目标”,或此类词语和短语的变体,或陈述某些行动、事件或结果 “” 可能”、“可能”、“将”、“可能” 或 “将” 被采取、发生或实现。前瞻性陈述涉及已知和未知的风险、未来事件、条件、不确定性和其他因素,这些因素可能导致实际业绩、业绩或成就与前瞻性陈述所表达或暗示的任何未来业绩、预测、预测、业绩或成就存在重大差异。
Such forward-looking statements include, among others: plans for the evaluation of exploration properties including the Project; the success of evaluation plans; the success of exploration activities especially to the significant expansion of the high-grade corridor; mine development prospects; potential for future metals production; changes in economic parameters and assumptions; all aspects related to the timing and extent of exploration activities including the Phase IV and Phase V drill programs contemplated in this press release; the timing or nature of a preliminary economic study; timing of receipt of exploration results; the interpretation and actual results of current exploration activities and mineralization; changes in project parameters as plans continue to be refined; the results of regulatory and permitting processes; future metals price; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; labour disputes and other risks of the mining industry; the results of economic and technical studies; delays in obtaining governmental and local approvals or financing or in the completion of exploration; timing of assay results; as well as those factors disclosed in ATEX's publicly filed documents.
此类前瞻性陈述包括:包括项目在内的勘探财产评估计划;评估计划的成功;勘探活动的成功,尤其是高品位走廊的大幅扩建的勘探活动的成功;矿山开发前景;未来金属生产的潜力;经济参数和假设的变化;与勘探活动时间和范围有关的所有方面,包括本新闻稿中考虑的第四阶段和第五阶段钻探计划;时间或性质初步经济研究;收到勘探结果的时间;当前勘探活动和矿化的解释和实际结果;随着计划的不断完善,项目参数的变化;监管和许可程序的结果;未来金属价格;品位或回收率可能的变化;设备或工艺未能按预期运行;采矿业的劳资纠纷和其他风险;经济和技术研究的结果;延迟获得政府和地方批准或融资或完成勘探;化验结果的时机;以及ATEX公开提交的文件中披露的因素。
Although ATEX has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.
尽管ATEX试图确定可能导致实际行动、事件或结果与前瞻性陈述中描述的重大差异的重要因素,但可能还有其他因素导致行动、事件或结果与预期、估计或预期不符。无法保证前瞻性陈述会被证明是准确的,因为实际结果和未来事件可能与此类陈述中的预期存在重大差异。因此,读者不应过分依赖前瞻性陈述。
Neither the TSX Venture Exchange nor its regulation services provider has reviewed or accepts
responsibility for the adequacy or accuracy of the content of this news release.
多伦多证券交易所风险交易所及其监管服务提供商均未审查或接受
对本新闻稿内容的充分性或准确性负责。
________________________
1 See Company news dated May 15, 2024, "ATEX Discovers New High-Grade Mineralization at Valeriano Intersecting 68 metres of 2.02% CuEq within a Broader Intercept of 356 metres of 0.98% CuEq".
2 See Company news dated October 18, 2023, "ATEX Announces Excellent Metallurgical Recoveries for Cu-Au Porphyry Mineralization at Valeriano".
3 See Company news dated October 25, 2023, "ATEX Files NI 43-101 Technical Report on Updated Mineral Resource Estimate for Valeriano Project".
4 Please see NI 43-101 technical report titled "Independent Technical Report for the Valeriano Copper-Gold Project, Atacama Region, Chile" by Joled Nur, CCCRRM-Chile, and David Hopper, CGeol, with an effective date of September 1, 2023, filed at on October 25, 2023, for additional details on the 2023 Mineral Resource Estimate for the Valeriano project.
______________________
1 参见公司2024年5月15日的新闻,“ATEX在瓦莱里亚诺发现了新的高品位矿化区,在356米宽的截距内,CueQ的比例为2.02%,CueQ的宽度为68米”。
2 参见公司2023年10月18日的新闻,“ATEX宣布瓦莱里亚诺铜金斑岩矿化的冶金回收率良好”。
3 参见公司2023年10月25日的新闻,“ATEX提交了关于瓦莱里亚诺项目最新矿产资源估算的NI 43-101技术报告”。
4 有关瓦莱里亚诺项目2023年矿产资源估算的更多详情,请参阅智利CCCRRM的Joled Nur和CGeol的大卫·霍珀于2023年10月25日提交的题为 “智利阿塔卡马地区瓦莱里亚诺铜金项目独立技术报告” 的NI 43-101技术报告,生效日期为2023年9月1日。