NEW PACIFIC REPORTS FINANCIAL RESULTS FOR THE THREE MONTH AND YEAR ENDED JUNE 30, 2024
NEW PACIFIC REPORTS FINANCIAL RESULTS FOR THE THREE MONTH AND YEAR ENDED JUNE 30, 2024
VANCOUVER, BC, Sept. 9, 2024 /PRNewswire/ - New Pacific Metals Corp. ("New Pacific" or the "Company") reports its financial results for the three months and year ended June 30, 2024. All figures are expressed in US dollars unless otherwise stated.
不列颠哥伦比亚省温哥华,2024年9月9日 /PRNewswire/-新太平洋金属公司(“新太平洋” 或 “公司”)公布了截至2024年6月30日的三个月和年度的财务业绩。除非另有说明,所有数字均以美元表示。
FISCAL 2024 HIGHLIGHT
2024 财年亮点
- The Company filed its independent National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") Pre-Feasibility Study for the Silver Sand Project (the "Silver Sand PFS Technical Report") on August 8, 2024. The Silver Sand PFS Technical Report shows an post-tax net present value ("NPV") at a 5% discount rate of $740 million with an internal rate of return ("IRR") of 37% at a base case price of $24.00 per ounce ("oz") of silver, underpinned by a production of approximately 157 million oz ("Moz") of silver over 13 years of mine life with average life of mine ("LOM") all-in sustaining cost ("AISC") of $10.69/oz silver.
- The Company filed its inaugural NI 43-101 mineral resource estimate for its Carangas Project (the "Carangas MRE") on September 18, 2023. Total indicated mineral resources of 214.9 million tonnes ("Mt") containing 205.3 Moz of silver, 1,588.2 thousand oz ("Koz") of gold, 1,444.9 million pounds ("Mlbs") of lead, 2,653.7 Mlbs of zinc, and 112.6 Mlbs of copper; or collectively 559.8 Mozs silver equivalent ("AgEq"). Total inferred mineral resources are 45.0 Mt containing 47.7 Mozs of silver, 217.7 Kozs of gold, 297.9 Mlbs of lead, 533.7 Mlbs of zinc, and 16.8 Mlbs of copper; or collectively 109.8 Mozs AgEq.
- Successfully closed a bought deal financing on September 29, 2023. A total of 13,208,000 common shares of the Company were sold under the bought deal financing at a price of $1.96 (CAD $2.65) per common share for total gross proceeds of approximately $25.9 million (CAD $35 million). The underwriter's fee and other issuance costs for the transaction were approximately $1.4 million.
- 该公司于2024年8月8日提交了独立的国家仪器43-101——矿业项目披露标准(“NI 43-101”)银砂项目预可行性研究(“银沙PFS技术报告”)。Silver Sand PFS技术报告显示,税后净现值(“NPV”)的折扣率为5%,为7.4亿美元,内部回报率(“IRR”)为37%,白银的基准价格为每盎司24美元(“盎司”),白银的产量在矿山寿命13年内产量约为15700万盎司(“Moz”),平均矿山寿命为矿山寿命(“Moz”)。“LOM”)的总维持成本(“AISC”)为每盎司白银10.69美元。
- 该公司于2023年9月18日提交了其卡兰加斯项目(“Carangas MRE”)的首份北爱尔兰43-101矿产资源估算。标明的矿产资源总量为21490万吨(“Mt”),其中含有205.3摩兹的银、158.82万盎司(“Koz”)、144490万磅(“Mlbs”)的铅(“Mlbs”)、2653.7毫升的锌和112.6毫升的铜;或合计559.8摩兹白银当量(“AgeQ”)。推断的矿产资源总量为4500万吨,其中含有47.7摩兹的银、217.7千克的金、297.9百万升的铅、5337毫升的锌和16.8百万磅的铜;或合计109.8摩兹的AgeQ。
- 2023 年 9 月 29 日成功完成了收购交易融资。通过收购交易融资,公司共出售了13,208,000股普通股,价格为每股普通股1.96美元(合2.65加元),总收益约为2590万美元(合3500万加元)。承销商的费用和其他发行成本约为140万美元。
FINANCIAL RESULTS
财务业绩
Net loss attributable to equity holders of the Company for the three months and year ended June 30, 2024 of $1.48 million and $6.02 million or $0.01 and $0.04 per share, respectively (three months and year ended June 30, 2023 – net loss of $1.86 million and $8.10 million or $0.01 per share and $0.05 per share, respectively). The Company's financial results were mainly impacted by the following items:
截至2024年6月30日的三个月和年度中,归属于公司股东的净亏损分别为148万美元和602万美元,合每股亏损0.01美元和0.04美元(截至2023年6月30日的三个月和年度——净亏损186万美元和810万美元,合每股亏损0.01美元,每股亏损0.05美元)。该公司的财务业绩主要受以下项目的影响:
- Operating expenses for the three months and year ended June 30, 2024 of $1.53 million and $6.94 million, respectively (three months and year ended June 30, 2023 - $1.89 million and $8.26 million, respectively).
- Income from investments for the three months and year ended June 30, 2024 of $0.32 million and $1.06 million, respectively (three months and year ended June 30, 2023 – $0.02 million and $0.18 million, respectively).
- Gain on disposal of property, plant and equipment for the three months and year ended June 30, 2024 of $nil and $0.05 million, respectively (three months and year ended June 30, 2023 – $nil and $nil, respectively).
- Provision for credit loss for the three months and year ended June 30, 2024 of $0.27 million and $0.27 million, respectively (three months and year ended June 30, 2023 – $nil and $nil, respectively).
- Foreign exchange gain (loss) for the three months year ended June 30, 2024 of $(0.01) million and $0.08 million, respectively (three months and year ended June 30, 2023 – $0.01 million and $(0.02) million, respectively).
- Working Capital: As of June 30, 2024, the Company had working capital of $21.38 million.
- 截至2024年6月30日的三个月和年度的运营支出分别为153万美元和694万美元(截至2023年6月30日的三个月和年度分别为189万美元和826万美元)。
- 截至2024年6月30日的三个月和年度的投资收入分别为32万美元和106万美元(截至2023年6月30日的三个月和年度分别为2万美元和18万美元)。
- 截至2024年6月30日的三个月和年度,处置不动产、厂房和设备的收益分别为零美元和05万美元(截至2023年6月30日的三个月和年度分别为零美元和零美元)。
- 截至2024年6月30日的三个月和年度的信用损失准备金分别为27万美元和27万美元(截至2023年6月30日的三个月和年度——分别为零美元和零美元)。
- 截至2024年6月30日的三个月年度的外汇收益(亏损)分别为01万美元和8万美元(截至2023年6月30日的三个月和年度分别为01万美元和0.2万美元)。
- 营运资金:截至2024年6月30日,该公司的营运资金为2138万美元。
PROJECT EXPENDITURE
项目支出
The following schedule summarized the expenditure incurred by category for each of the Company's projects for relevant periods:
以下附表汇总了公司每个项目在相关时期内按类别分列的支出:
Cost |
Silver Sand |
Carangas |
Silverstrike |
Total |
Balance, July 1, 2022 |
$ 79,594,886 |
$ 6,011,566 |
$ 3,324,120 |
88,930,572 |
Capitalized exploration expenditures |
||||
Reporting and assessment |
1,008,174 |
88,558 |
- |
1,096,732 |
Drilling and assaying |
1,925,695 |
8,289,678 |
977,881 |
11,193,254 |
Project management and support |
2,719,120 |
1,424,573 |
256,569 |
4,400,262 |
Camp service |
467,690 |
1,005,158 |
174,651 |
1,647,499 |
Permit and license |
195,821 |
9,389 |
- |
205,210 |
Value added tax receivable |
426,406 |
1,317,819 |
154,401 |
1,898,626 |
Foreign currency impact |
(201,972) |
(8,831) |
(24,680) |
(235,483) |
Balance, June 30, 2023 |
$ 86,135,820 |
$ 18,137,910 |
$ 4,862,942 |
$ 109,136,672 |
Capitalized exploration expenditures |
||||
Reporting and assessment |
999,402 |
408,874 |
- |
1,408,276 |
Drilling and assaying |
47,217 |
23,894 |
- |
71,111 |
Project management and support |
1,765,297 |
1,079,177 |
63,919 |
2,908,393 |
Camp service |
249,764 |
241,945 |
36,754 |
528,463 |
Permit and license |
33,073 |
9,308 |
- |
42,381 |
Value added tax receivable |
112,332 |
31,061 |
979 |
144,372 |
Foreign currency impact |
(365,571) |
(78,127) |
(30,039) |
(473,737) |
Balance, June 30, 2024 |
$ 88,977,334 |
$ 19,854,042 |
$ 4,934,555 |
$ 113,765,931 |
成本 |
银沙 |
卡兰加斯 |
白银之击 |
总计 |
余额,2022 年 7 月 1 日 |
79,594,886 美元 |
6,011,566 美元 |
3,324,120 美元 |
88,930,572 |
资本化勘探支出 |
||||
报告和评估 |
1,008,174 |
88,558 |
- |
1,096,732 |
钻探和化验 |
1,925,695 |
8,289,678 |
977,881 |
11,193,254 |
项目管理和支持 |
2,719,120 |
1,424,573 |
256,569 |
4,400,262 |
露营服务 |
467,690 |
1,005,158 |
174,651 |
1,647,499 |
许可证和执照 |
195,821 |
9,389 |
- |
205,210 |
应收增值税 |
426,406 |
1,317,819 |
154,401 |
1,898,626 |
外币影响 |
(201,972) |
(8,831) |
(24,680) |
(235,483) |
余额,2023 年 6 月 30 日 |
86,135,820 美元 |
18,137,910 美元 |
4,862,942 美元 |
109,136,672 美元 |
资本化勘探支出 |
||||
报告和评估 |
999,402 |
408,874 |
- |
1,408,276 |
钻探和化验 |
47,217 |
23,894 |
- |
71,111 |
项目管理和支持 |
1,765,297 |
1,079,177 |
63,919 |
2,908,393 |
露营服务 |
249,764 |
241,945 |
36,754 |
528,463 |
许可证和执照 |
33,073 |
9,308 |
- |
42,381 |
应收增值税 |
112,332 |
31,061 |
979 |
144,372 |
外币影响 |
(365,571) |
(78,127) |
(30,039) |
(473,737) |
余额,2024 年 6 月 30 日 |
88,977,334 美元 |
19,854,042 美元 |
4,934,555 美元 |
113,765,931 美元 |
SILVER SAND PROJECT
银沙项目
For the three months and year ended June 30, 2024, total expenditures of $1.02 million and $3.21 million, respectively (three months and year ended June 30, 2023 - $0.93 million and $6.74 million, respectively) were capitalized under the project.
在截至2024年6月30日的三个月和年度中,该项目的总支出分别为102万美元和321万美元(截至2023年6月30日的三个月和年度分别为93万美元和674万美元)。
CARANGAS PROJECT
卡兰加斯项目
For the three months and year ended June 30, 2024, total expenditures of $0.47 million and $1.79 million, respectively (three months and year ended June 30, 2023 - $1.75 million and $12.14 million, respectively) were capitalized under the project.
在截至2024年6月30日的三个月和年度中,该项目的总支出分别为47万美元和179万美元(截至2023年6月30日的三个月和年度分别为175万美元和1,214万美元)。
SILVERSTRIKE PROJECT
白银惊魂项目
For the three months and year ended June 30, 2024, total expenditures of $0.02 million and $0.10 million, respectively (three months and year ended June 30, 2023 - $0.22 million and $1.56 million, respectively) were capitalized under the project.
在截至2024年6月30日的三个月和年度中,该项目的总支出分别为2万美元和10万美元(截至2023年6月30日的三个月和年度分别为22万美元和156万美元)。
MANAGEMENT DISCUSSION AND ANALYSIS
管理层的讨论和分析
This news release should be read in conjunction with the Company's management discussion and analysis and the audited consolidated financial statements and notes thereto for the corresponding period, which have been filed with the Canadian Securities Administrators and are available under the Company's profile on SEDAR+ at ,on EDGAR at www.sec.gov and on the Company's website at .
本新闻稿应与公司的管理层讨论和分析以及相应时期的经审计的合并财务报表及其附注一起阅读,这些报表已向加拿大证券管理人提交,可在SEDAR+的公司简介下查阅,网址为EDGAR,网址为www.sec.gov和公司网站。
ABOUT NEW PACIFIC
关于新太平洋
New Pacific is a Canadian exploration and development company with three precious metal projects in Bolivia. The Company's flagship Silver Sand project has the potential to be developed into one of the world's largest silver mines. The Company is also rapidly advancing its Carangas project towards a Preliminary Economic Assessment. For the Silverstrike project, the Company completed a discovery drill program in 2022.
新太平洋是一家加拿大勘探和开发公司,在玻利维亚有三个贵金属项目。该公司的旗舰银沙项目有可能发展成为世界上最大的银矿之一。该公司还迅速将其Carangas项目推进到初步经济评估阶段。对于Silverstrike项目,该公司于2022年完成了一项发现演习计划。
For further information, please contact:
欲了解更多信息,请联系:
Andrew Williams, CEO
New Pacific Metals Corp. Phone: (604) 633-1368 Ext. 236
1750 – 1066 Hastings Street, Vancouver, BC V6E 3X1, Canada
U.S. & Canada toll-free: 1 (877) 631-0593
E-mail: [email protected]
For additional information and to receive the Company news by e-mail, please register using New Pacific's website at .
首席执行官安德鲁·威廉姆斯
新太平洋金属公司电话:(604) 633-1368 分机 236
1750 — 加拿大不列颠哥伦比亚省温哥华市黑斯廷斯街 1066 号 V6E 3X1
美国和加拿大免费电话:1 (877) 631-0593
电子邮件:[电子邮件保护]
如需了解更多信息并通过电子邮件接收公司新闻,请使用新太平洋的网站进行注册,网址为。
CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION
关于前瞻性信息的警示性说明
Certain of the statements and information in this news release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "is expected", "anticipates", "believes", "plans", "projects", "estimates", "assumes", "intends", "strategies", "targets", "goals", "forecasts", "objectives", "budgets", "schedules", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information. Such statements include, but are not limited to, statements regarding: the Company's financial results; anticipated exploration, drilling, development, construction, and other activities or achievements of the Company; inferred, indicated or measured mineral resources or mineral reserves on the Company's projects, including, but not limited to, the Silver Sand PFS Technical Report; the anticipation that the Company will file a Preliminary Economic Assessment in respect of its Carangas project; the timing of receipt of permits and regulatory approvals; and estimates of the Company's revenues and capital expenditures.
本新闻稿中的某些陈述和信息构成1995年《美国私人证券诉讼改革法》所指的 “前瞻性陈述” 和适用的加拿大省级证券法所指的 “前瞻性信息”。任何表达或涉及有关预测、期望、信念、计划、预测、目标、假设或未来事件或绩效的讨论的陈述或信息(通常,但并非总是如此)使用诸如 “期望”、“预期”、“预期”、“相信”、“计划”、“项目”、“估计”、“假设”、“打算”、“策略”、“目标”、“目标”、“目标”、“目标”、“目标”、“目标”、“目标”、“目标”、“””、“目标”、“预算”、“时间表”、“潜在” 或其变动,或声明某些行动、事件或结果 “可能”、“可能”、“将”、“可能” 或 “将”被接受、发生或被实现,或这些术语中的任何否定词和类似表述)都不是历史事实的陈述,可能是前瞻性陈述或信息。此类声明包括但不限于以下方面的声明:公司的财务业绩;公司的预期勘探、钻探、开发、施工和其他活动或成就;公司项目推断、表明或测得的矿产资源或矿产储量,包括但不限于银沙PFS技术报告;预计公司将就其卡兰加斯项目提交初步经济评估;收到时间许可证和监管部门的批准;以及对公司收入和资本支出的估计。
Forward-looking statements or information are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements or information, including, without limitation, risks relating to: fluctuating equity prices, bond prices, commodity prices; calculation of resources, reserves and mineralization, general economic conditions, foreign exchange risks, interest rate risk, foreign investment risk; loss of key personnel; conflicts of interest; dependence on management, uncertainties relating to the availability and costs of financing needed in the future, environmental risks, operations and political conditions, the regulatory environment in Bolivia and Canada, risks associated with community relations and corporate social responsibility, and other factors described under the heading "Risk Factors" in the Company's annual information form for the year ended June 30, 2023 and its other public filings. This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements or information.
前瞻性陈述或信息受各种已知和未知的风险、不确定性和其他因素的影响,这些因素可能导致实际事件或结果与前瞻性陈述或信息中反映的有所不同,包括但不限于以下方面的风险:股价、债券价格、大宗商品价格波动;资源、储量和矿化量的计算;总体经济状况、外汇风险、利率风险、外国投资风险;关键人员流失;利益冲突;依赖管理、与未来所需融资的可用性和成本相关的不确定性、环境风险、运营和政治状况、玻利维亚和加拿大的监管环境、与社区关系和企业社会责任相关的风险,以及公司截至2023年6月30日的年度信息表和其他公开文件中 “风险因素” 标题下描述的其他因素。本清单并未详尽列出可能影响公司任何前瞻性陈述或信息的因素。
The forward-looking statements are necessarily based on a number of estimates, assumptions, beliefs, expectations and opinions of management as of the date of this news release that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. These estimates, assumptions, beliefs, expectations and options include, but are not limited to, those related to the Company's ability to carry on current and future operations, including: development and exploration activities; the timing, extent, duration and economic viability of such operations; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; the Company's ability to meet or achieve estimates, projections and forecasts; the stabilization of the political climate in Bolivia; the Company's ability to obtain and maintain social license at its mineral properties; the availability and cost of inputs; the price and market for outputs; foreign exchange rates; taxation levels; the timely receipt of necessary approvals or permits, including the ratification and approval of the Mining Production Contract with the Corporacion Minera de Bolivia by the Plurinational Legislative Assembly of Bolivia; the ability of the Company's Bolivian partner to convert the exploration licenses at its Carangas project to administrative mining contracts; the ability to meet current and future obligations; the ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political conditions; and other assumptions and factors generally associated with the mining industry. Although the forward-looking statements contained in this news release are based upon what management believes are reasonable assumptions, there can be no assurance that actual results will be consistent with these forward-looking statements. All forward-looking statements in this news release are qualified by these cautionary statements. Accordingly, readers should not place undue reliance on such statements. Other than specifically required by applicable laws, the Company is under no obligation and expressly disclaims any such obligation to update or alter the forward-looking statements whether as a result of new information, future events or otherwise except as may be required by law. These forward-looking statements are made as of the date of this news release.
前瞻性陈述必然基于管理层截至本新闻稿发布之日的许多估计、假设、信念、预期和观点,尽管管理层认为这些估计、假设、信念、预期和观点是合理的,但本质上会受到重大的业务、经济和竞争不确定性和突发事件的影响。这些估计、假设、信念、预期和选择包括但不限于与公司开展当前和未来业务的能力相关的估计、假设、信念、预期和选择,包括:开发和勘探活动;此类业务的时间、范围、持续时间和经济可行性;估计、预测、研究和评估的准确性和可靠性;公司实现或实现估计、预测和预测的能力;玻利维亚政治气候的稳定;公司的能力获取和维持其矿产的社会许可;投入的供应和成本;产出的价格和市场;外汇汇率;税收水平;及时获得必要的批准或许可,包括玻利维亚多民族立法会议批准和批准与玻利维亚矿业公司签订的采矿生产合同;该公司的玻利维亚合作伙伴将其卡兰加斯项目的勘探许可证转换为行政采矿合同的能力;能力迎接现在和未来债务;必要时以合理条件及时获得融资的能力;当前和未来的社会、经济和政治状况;以及通常与采矿业相关的其他假设和因素。尽管本新闻稿中包含的前瞻性陈述基于管理层认为的合理假设,但无法保证实际业绩会与这些前瞻性陈述一致。本新闻稿中的所有前瞻性陈述均受这些警示性陈述的限制。因此,读者不应过分依赖此类陈述。除适用法律的特别要求外,除非法律要求,否则公司没有义务并明确表示不承担任何更新或修改前瞻性陈述的义务,无论是由于新信息、未来事件还是其他原因。这些前瞻性陈述是截至本新闻发布之日作出的。
CAUTIONARY NOTE TO UNITED STATES INVESTORS
致美国投资者的警示说明
This news release has been prepared in accordance with the requirements of the securities laws in effect in Canada which differ from the requirements of United States securities laws. All mining terms used herein but not otherwise defined have the meanings set forth in National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101"). Unless otherwise indicated, the technical and scientific disclosure herein has been prepared in accordance with NI 43-101, which differs significantly from the requirements adopted by the United States Securities and Exchange Commission.
本新闻稿是根据加拿大现行证券法的要求编写的,这些要求不同于美国证券法的要求。此处使用但未另行定义的所有采矿术语均具有国家仪器43-101——矿业项目披露标准(“NI 43-101”)中规定的含义。除非另有说明,否则此处的技术和科学披露是根据NI 43-101编制的,这与美国证券交易委员会通过的要求有很大不同。
Accordingly, information contained in this news release containing descriptions of the Company's mineral deposits may not be comparable to similar information made public by United States companies subject to the reporting and disclosure requirements of United States federal securities laws and the rules and regulations thereunder.
因此,本新闻稿中包含的包含公司矿床描述的信息可能无法与美国公司根据美国联邦证券法及其相关规则和条例的报告和披露要求公开的类似信息进行比较。
Additional information relating to the Company, including the Company's annual information form, can be obtained under the Company's profile on SEDAR+ at , on EDGAR at www.sec.gov, and on the Company's website at .
与公司有关的更多信息,包括公司的年度信息表,可以在SEDAR+上的公司简介、EDGAR的www.sec.gov和公司的网站上获得。
SOURCE New Pacific Metals Corp.
SOURCE 新太平洋金属公司