share_log

Blue Star Gold's Ataani Discovery Returns 7.20 Metres of 1.145% CuEq Within 26.9 Metres of 0.576% CuEq Massive Sulphide Zone

Blue Star Gold's Ataani Discovery Returns 7.20 Metres of 1.145% CuEq Within 26.9 Metres of 0.576% CuEq Massive Sulphide Zone

蓝星黄金的阿塔尼发现在26.9米内返回1.145%的等铜相当物含量,其中包括7.20米的0.576%的等铜相当物浓硫化带
newsfile ·  09/24 20:00

Vancouver, British Columbia--(Newsfile Corp. - September 24, 2024) - Blue Star Gold Corp. (TSXV: BAU) (OTCQB: BAUFF) (FSE: 5WP0) ("Blue Star" or the "Company") provides an update on the critical mineral component of its 2024 exploration program on the Roma Project in the Kitikmeot region of Nunavut (Figure 1). This news release provides additional details from follow-up drilling on the Ataani discovery, with results from the second and third drill holes of a 1,365 metre program.

温哥华,不列颠哥伦比亚--(新闻稿公司 - 2024年9月24日) - 蓝星黄金公司(TSXV: BAU)(OTCQB: BAUFF)(FSE: 5WP0)("蓝星"或"公司")就努纳武特地域(图1)的Roma项目的2024年勘探计划的关键矿产部分提供更新。本新闻稿提供了来自对Ataani发现的跟进钻探的额外细节,涉及136,500.tre计划的第二和第三钻孔的结果。

Highlights

亮点

  • Second Ataani drill hole, DD24-HI01-002, returns 7.20 metres of 1.145% copper equivalent ("CuEq")
    • Or 7.20 metres of 0.906% Cu, 0.027% Zn, 0.002% Pb, 0.125 g/t Au and 20.066 g/t Ag
    • Within 26.9 metres of 0.413% Cu, 0.035% Zn, 0.004% Pb, 0.104 g/t Au and 10.929 g/t Ag in stringer to massive sulphide zone (or 0.576% CuEq over 26.9 metres)
  • DD24-HI01-003 intersected 1.7 metres of 0.880% CuEq
    • Or 1.7 metres of 0.676% Cu, 0.223% Zn, 0.107 g/t Au and 8.127 g/t Ag
  • 第二Ataani钻孔,DD24-HI01-002,返回了1.145%铜当量("CuEq")的7.20米
    • 或者0.906% Cu,0.027% Zn,0.002% Pb,0.125克/吨Au和20.066克/吨Ag的7.20米
    • 在0.413% Cu,0.035% Zn,0.004% Pb,0.104克/吨Au和10.929克/吨Ag的26.9米范围内,涉及脉状至块状硫化带(或26.9米内的0.576% CuEq)
  • DD24-HI01-003遇到了0.880% CuEq的1.7米
    • 或1.7米的0.676% Cu,0.223% Zn,0.107克/吨Au和8.127克/吨Ag

Grant Ewing, CEO of Blue Star, stated, "The wide section of stringer to massive sulphide mineralization intersected in the second Ataani hole downdip from the first hole is encouraging and suggests the potential for a large system in the area. These types of deposits tend to have multiple lenses and occur in clusters and only a small portion of the property has been assessed to date. Being proximal to the proposed Grays Bay Road (within ~6 km) and the High Lake VMS Deposit (~12 km) is another excellent attribute of the Ataani discovery."

蓝星首席执行官格兰特·尤因(Grant Ewing)表示,“从第一个孔向下倾斜的第二个Ataani孔中遇到的脉状至块状硫化物矿化的宽区间令人鼓舞,并表明该地区存在较大系统的潜力。这类矿床往往具有多个透镜,并且以群集形式出现,到目前为止,只有一小部分物业得到了评估。靠近拟议的Grays Bay公路(约6公里内)和High Lake VMS矿床(约12公里内)的Ataani发现是另一个优良特性。

Discussion of Results
An initial program of Fixed Loop Electromagnetic ("EM") surveying was completed in the northern portion of the HI01 claim (Figure 1) resulting in a 320 metre by 100 metre EM plate representing a zone of strong conductivity located 180 metres below surface (Figure 2). A drill program of five holes for 1,365 metres was undertaken with the first hole intersecting 17.1 metres of 0.973% copper equivalent from a zone of stringer to massive sulphides as previously released (Newsfile Corp. - September 5, 2024).

结果讨论
在HI01权益(图1)的北部完成了固定环电磁("EM")调查的初始方案,从地表下180米处找到了一个320米乘以100米的EM板,代表一个强电导率区域。进行了一项包括五个孔,共计1,365米的钻探方案,第一个孔遇到了一个从细丝岩到大型硫化物的0.973%铜等效的17.1米岩带,正如之前发布的一样(Newsfile corp. - 2024年9月5日)。

The second and third holes into the Ataani Target were drilled from the same drill set up as the first hole, testing down dip from the initial massive sulphide discovery. Both holes intersected stringer to massive sulphides.

从与第一个孔相同的钻探设置中钻入了阿塔尼目标的第二个和第三个孔,从最初的大型硫化物发现处向下轨进行测试。两个孔都遇到了细丝岩到大型硫化物。

DD24-HII-002 targeted ~45 metres below the 17.1 metre sulphide intercept in the first hole. This drillhole completed to a depth of 279 metres encountered the overlaying Proterozoic diabase sill, a late Archean granitoid unit, and a package of sericite-altered felsic tuffs hosting a thirty-seven (37.25) metre zone of stringer to massive sulphide mineralisation. A 26.9 metre stringer to massive sulphide section returned 0.576% CuEq or 0.413% Cu, 0.035% Zn, 0.104 g/t Au and 10.929 g/t Ag. Sulphides encountered were predominantly pyrite and pyrrhotite, with a 7.2 metre zone grading 1.145% CuEq, or 0.906% Cu, 0.027% Zn, 0.25 g/t Au and 20.066 g/t Ag which includes 4.45 metres of 1.028% Cu, 0.033% Zn, 0.149 g/t Au and 22.240 g/t Ag.

DD24-HII-002在第一个孔中的17.1米硫化物截获带的下方约45米进行了针对性钻探。这口钻孔钻至279米深,遇到了覆盖的前寒武纪辉长岩床,后太古宙花岗岩单元,以及一个包含黏土矿变质玄武岩火山碎屑岩的套被,其中有一个37.25米的细丝岩到大型硫化物矿化带。26.9米的细丝岩到大型硫化物段返回0.576%CuEq或0.413%Cu,0.035%Zn,0.104g/t Au和10.929g/t Ag。遇到的硫化物主要是黄铁矿和辉铁矿,其中包括7.2米的1.145%CuEq矿化带,或0.906%Cu,0.027%Zn,0.25g/t Au和20.066g/t Ag,其中包括4.45米的1.028%Cu,0.033%Zn,0.149g/t Au和22.240g/t Ag。

DD24-HII-003 was drilled ~50 metres down dip of the 37.25 metre mineralized zone intersected in DD24-HII-002 to a depth of 303 metres. This drill hole encountered the same package of rocks as the previous drill hole including a thick 83 metre zone of sericite altered felsic volcanics. Sulphides encountered were predominantly pyrite and pyrrhotite, with a 1.7 metre mineralized zone grading 0.880% CuEq, or 0.676% Cu, 0.223% Zn, 0.107 g/t Au and 8.127 g/t Ag.

DD24-HII-003在DD24-HII-002中发现的37.25米矿化带的下倾约50米处钻至303米深。这口钻孔遇到了与之前钻孔相同的岩石套被,包括厚度为83米的黏土矿变质的浅色火山岩。遇到的硫化物主要是黄铁矿和辉铁矿,其中有一个1.7米矿化带,品位为0.880%CuEq或0.676%Cu,0.223%Zn,0.107g/t Au和8.127g/t Ag。

Two additional drill holes, totalling 492 metres, tested the ground along strike 110 metres to the south and 110 metres to the north of the reported drill holes. Both holes intersected the mineralized zone. Assay results for the remaining holes are pending.

另外两个共计492米的钻孔,在报告的钻孔向南110米和向北110米的走向上进行了测试。两个孔均遇到了矿化带。其余钻孔的化验结果正在等待中。

Exploration Program Progress and Next Steps
The field components of the program are complete, and camp demobilisation occurred on September 8th. Additional assay results are being reviewed and interpreted as received for timely disclosure.

2024年的勘探计划正在积极推进,利用地图制图、勘探、地质和地球物理勘测,以精炼和优先确定钻探准备就绪的目标。我们还正在推进更多的前景地块,以准备进行钻探。团队将在钻机下月调用前继续制图、勘测、岩石地化层序勘测、感应极化勘测、固定环电磁勘测("EM")和行走时域电磁勘测。
该项目的场地元件已全部完成,并于9月8日发生了营地撤离。额外的化验结果正在被审查和解释,以便及时披露。

After receipt of all assay data from the current program, deposit modeling will be conducted with the compiled field data and results to determine impacts to the resource base, pipeline target prioritisation and pre-planning for 2025. Incremental work this season is expected to lead to future discoveries to grow our resource base of both gold and base metals across the Ulu Project and Roma Project in the Kitikmeot Region of Nunavut.

接收当前项目的所有化验数据后,将利用编制的现场数据和结果进行存入资金建模,以确定对资源基础、管道目标优先级和2025年的前期规划的影响。本季度的增量工作有望导致未来在努纳武特地区的乌鲁项目和罗马项目的黄金和基本金属资源的发现。


Figure 1: Blue Star Projects and New Ataani Discovery.


图1:蓝星项目和新的Ataani发现。

Table 1: Drill Results for Ataani Target

表1:Ataani目标的钻探结果

Hole ID From (m) To (m) Length (m) Cu % Zn % Pb % Au g/t Ag g/t CuEq%
DD24-HII-001 214.65 239.80 25.15 0.335 1.048 0.031 0.130 8.025 0.784
includes 222.70 239.80 17.10 0.420 1.432 0.03 0.133 9.187 0.973
which includes 228.30 230.30 2.00 0.078 10.951 0.107 0.117 4.331 3.269
and 236.30 239.80 3.50 1.459 0.154 0.007 0.293 25.680 1.897
DD24-HII-002 234.70 261.60 26.90 0.413 0.035 0.004 0.104 10.929 0.576
includes 239.55 246.75 7.20 0.91 0.03 0.002 0.13 20.07 1.145
which includes 239.55 244.00 4.45 1.028 0.033 0.003 0.149 22.240 1.304
and includes 256.04 261.60 5.56 0.285 0.042 0.007 0.146 10.843 0.481
DD24-HII-003 288.65 290.35 1.7 0.68 0.22 0.05 0.11 8.13 0.880
孔ID 从(m) 到(m) 长度(米) Cu % Zn % 市净率% Au克/吨 Ag g / t 铜当量%
DD24-HII-001 214.65 239.80 25.15 0.335 1.048 0.031 0.130 8.025 0.784
includes 222.70 239.80 17.10 0.420 1.432 0.03 0.133 9.187 0.973
其中包括 228.30 230.30 2.00 0.078 10.951 0.107 0.117 4.331 3.269
和框架。有关详细信息,请参阅UBS集团报酬报告 236.30 239.80 3.50 1.459 0.154 0.007 0.293 25.680 1.897
DD24-HII-002 234.70 261.60 26.90 0.413 0.035 0.004 0.104 10.929 0.576
includes 239.55 246.75 7.20 0.91 0.03 0.002 0.13 20.07 1.145
其中包括 239.55 244.00 4.45 1.028 0.033 0.003 0.149 22.240 1.304
并包括 256.04 261.60 5.56 0.285 0.042 0.007 0.146 10.843 0.481
DD24-hii-003 288.65 290.35 1.7 0.68 0.22 0.05 0.11 8.13 0.880

Drill samples are one half from sawn NQ sized drill core delivered under chain of custody to ALS Geochemistry in Yellowknife, NT for sample preparation which are then forwarded to ALS Canada Inc. in North Vancouver, BC for final analysis. Samples are prepared using code PREP-31 (crushing and pulverising) and analysed using codes Au-AA26 (50-gram fire assay with atomic absorption finish) and ME-MS61 (48 element four acid digestion with ICP-MS finish). Over limits for non-gold elements are ore grade four acid digestion with ICP-AES finish. The QAQC program for drilling consists of regular insertion of certified reference materials (CRMs) resulting in a 20% insertion rate.

岩心钻孔样品的一半由钻孔岩心锯下后交由ALS Geochemistry在Nt的Yellowknife进行保护送样品制备,然后转交至ALS Canada Inc.在卑诗省North Vancouver进行最终分析。样品使用代码PREP-31(破碎和粉碎)进行制备,使用代码Au-AA26(50克火试金原子吸收法完成)和ME-MS61(48元素四酸消解ICP-MS法完成)进行分析。非金元素的超限值采用矿石级四酸消解ICP-AES法完成。钻探的QAQC方案包括定期插入认证参考物质(CRMs),插入率为20%。

Metal Equivalents:

金属当量:

Copper Equivalent (CuEq) and Gold Equivalent (AuEq) mentioned above for drill intersections are calculated on a basis of US$ 3.75/lb for Cu, US$ 1,900/oz for Au, US$ 20/oz for Ag, US$ 1/lb for Zn, and US$ 0.95/lb for Pb with metallurgical recoveries assumed for all metals based on the values in the MMG 2023 Mineral Resource and Ore Reserves Statement. The assays have not been capped. CuEq = Cu + 0.279 * Zn + 0.231 * Pb + 0.623 * Au + 0.007 * Ag; calculations reviewed with Equivalent Grade Calculator (aaronmcm.com).

上述钻孔相交部分的铜当量(CuEq)和金当量(AuEq)是基于铜每磅3.75美元,金每盎司1,900美元,银每盎司20美元,锌每磅1美元,铅每磅0.95美元进行计算,所有金属的冶金回收率都基于五矿资源2023年涉矿概念和矿石储量报告中的数值。化验结果未设上限。CuEq = 铜 + 0.279 * 锌 + 0.231 * 铅 + 0.623 * 金 + 0.007 * 银;计算结果经过等级等价计算器(aaronmcm.com)审核。

Darren Lindsay, P. Geo. and Vice President Exploration for Blue Star, is a Qualified Person under National Instrument 43-101 ("NI 43-101") and has reviewed and approved the technical information contained in this news release.

Darren Lindsay,蓝星副总裁和勘探副总裁,是根据加拿大《证券法规43-101》("NI 43-101")的规定,并已审查和核准了本新闻稿中所包含的技术信息的合格人员。

About Blue Star Gold Corp.

关于蓝星黄金股份有限公司,蓝星是一个专注于加拿大努纳武特的矿产勘查和开发公司。蓝星拥有总计270平方公里的高度潜力和未经开发的矿产物业于High Lake Greenstone 折叠带。该公司拥有Ulu Gold Project,包括Ulu Mining Lease和Hood River Property,以及Roma Project。在Ulu Mining Lease地区的Flood Zone矿床上存在着大量高品位的金矿资源,公司的大片土地上还有众多具备相当高的潜力的勘探目标区域,公司的矿产资源增长空间极为巨大。在Grays Bay的未来深水港口建设现场到公司的物业距离为40-100公里,Grays Bay全天候道路的拟定通道也将在Roma和Ulu金矿项目地区进行修建。蓝星黄金在TSX创业板、OTCQB副交易市场和Frankfurt Exchange上市,股票代码分别为:BAU,BAUFF和5WP0。了解更多信息,请访问公司网站。

Blue Star is a mineral exploration and development company focused in Nunavut, Canada. Blue Star's landholdings total 270 square kilometres of highly prospective and underexplored mineral properties in the High Lake Greenstone Belt. The Company owns the Ulu Gold Project, comprised of the Ulu Mining Lease and Hood River Property, and the Roma Project. A significant high-grade gold resource exists at the Flood Zone deposit (Ulu Mining Lease), and numerous high-potential exploration targets (gold and critical minerals) occur throughout the Company's extensive landholdings, providing Blue Star with excellent resource growth potential. The site of the future deep-water port at Grays Bay is 40 - 100 km to the north of the properties, and the proposed route corridor for the all-weather Grays Bay Road passes close by the Roma and Ulu Gold Projects.

Blue Star是一家矿产勘探和开发公司,专注于加拿大努纳武特。 Blue Star的土地总面积为270平方公里,拥有高度潜力和未经开发的矿产物业,位于High Lake Greenstone Belt。公司拥有Ulu Gold项目,包括Ulu Mining Lease和Hood River Property以及Roma项目。在Flood Zone矿床(Ulu Mining Lease)存在重大高品位金资源,并且公司广泛的土地持有中存在许多高潜力的勘探目标(金和重要矿物),为蓝星提供了出色的资源增长潜力。 Grays Bay未来深水港口的场地距离物业北部40至100公里,全气候Grays Bay Road的拟议路线走过了Roma和Ulu Gold项目的附近。

Blue Star is listed on the TSX Venture Exchange under the symbol: BAU, the U.S. OTCQB Venture Market under the symbol: BAUFF, and on the Frankfurt Exchange under the symbol: 5WP0. For information on the Company and its projects, please visit our website: .

蓝星在tsxv交易所上市,股票代码为BAU,在美国OTCQb创业公司市场上市,股票代码为BAUFF,也在法兰克福交易所上市,股票代码为5WP0。欲了解有关公司及其项目的信息,请访问我们的网站:。

For further information, please contact:

如需更多信息,请联系:

Grant Ewing, P. Geo., CEO
Telephone: +1 778-379-1433
Email: info@bluestargold.ca

Grant Ewing,P. Geo.,首席执行官
电话:+1 778-379-1433
电子邮件:info@bluestargold.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the Policies of the TSX-Venture Exchange) accepts responsibility for the adequacy or accuracy of this Release.

TSX Venture Exchange及其监管服务提供商(根据TSX Venture Exchange的规章)不承担本信息披露的充分性或准确性的责任。

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS AND INFORMATION

关于前瞻性声明和信息的注意事项

This press release contains "forward-looking statements" within the meaning of applicable securities laws. Forward-looking statements can be identified by words such as: "anticipate," "intend," "plan," "goal," "seek," "believe," "project," "estimate," "expect," "strategy," "future," "likely," "may," "should," "will" and similar references to future periods. Examples of forward-looking statements include, among others, statements we make regarding prospective income and revenues, anticipated levels of capital expenditures for the fiscal year, expectations of the effect on our financial condition of claims, litigation, environmental costs, contingent liabilities, and governmental and regulatory investigations and proceedings, and estimates of mineral resources and reserves on our properties.

本新闻稿包含"前瞻性声明",根据适用的证券法规,前瞻性声明可通过以下词语识别:"预计"、"期望"、"计划"、"目标"、"寻求"、"相信"、"项目"、"估计"、"期望"、"策略"、"未来"、"可能"、"应"、"将"及类似期间的参照。前瞻性声明的例子包括我们关于预期收入和收益水平、本财年资本支出水平的陈述,以及对我们的财务状况产生影响的索赔、诉讼、环保成本、附加负债和政府和监管机构调查和程序的预期、我们矿产资源和财产上的储量估计。

Forward-looking statements are neither historical facts nor assurances of future performance. Instead, they are based only on our current beliefs, expectations, and assumptions regarding the future of our business, plans and strategies, projections, anticipated events and trends, the economy, and other future conditions. Because forward-looking statements relate to the future, they are subject to inherent uncertainties, risks, and changes in circumstances that are difficult to predict and many of which are outside of our control. Our actual results and financial condition may differ materially from those indicated in the forward-looking statements. Therefore, you should not rely on any of these forward-looking statements. Important factors that could cause our actual results and financial condition to differ materially from those indicated in the forward-looking statements include, among others, the following: economic and financial conditions, including volatility in interest and exchange rates, commodity and equity prices and the value of financial assets, strategic actions, including acquisitions and dispositions and our success in integrating acquired businesses into our operations, developments and changes in laws and regulations, including increased regulation of the mining industry through legislative action and revised rules and standards applied by the regulatory bodies in Nunavut, changes in the price of fuel and other key materials and disruptions in supply chains for these materials, closures or slowdowns and changes in labour costs and labour difficulties, including stoppages affecting either our operations or our suppliers' abilities to deliver goods and services to us, as well as natural events such as severe weather, fires, floods and earthquakes or man-made or other disruptions of our equipment, and inaccuracies in estimates of mineral resources and/or reserves on our mineral properties.

前瞻性声明既不是历史事实也不保证未来表现。相反,它们仅基于我们对于未来业务,计划和策略,预测,预期事件和趋势,经济状况和其他未来条件的目前信念,期望和假设。由于前瞻性声明涉及未来,因此它们受到固有的不确定性,风险和情况变化的影响,这些情况很难预测,其中许多情况超出了我们的控制范围。我们实际的结果和财务状况可能与前瞻性声明中所示有所不同。因此,您不应依赖任何这些前瞻性声明。影响我们实际结果和财务状况的重要因素包括但不限于以下因素:经济和金融状况,包括利率和汇率波动,商品和股票价格以及财务资产的价值,战略作用,包括收购和处置以及我们成功将收购的业务整合到我们的运营中,法律法规的变化和发展,包括通过立法行动和努纳武特监管机构施行的修订规则和标准等方式对采矿行业的增加监管,燃料和其他关键材料价格的变化以及这些材料的供应链中断,关闭或放缓以及劳工成本和劳动力困难的变化,包括影响我们的运营或我们供应商向我们提供货物和服务的能力的停工,以及严重天气,火灾,洪水和地震等自然事件或人为或其他对我们设备的干扰以及我们矿产物业上的矿产资源和/或储量估计不准确。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发