Sego Exploration Target Review of South Gold Zone "At and Near Surface" Potential Tonnage & Grade
Sego Exploration Target Review of South Gold Zone "At and Near Surface" Potential Tonnage & Grade
Vancouver, British Columbia--(Newsfile Corp. - September 24, 2024) - Sego Resources Inc. (TSXV: SGZ) ("Sego" or "the Company") is pleased to announce that it has received from SRK Consulting (Canada) Inc. ("SRK"), an Exploration Target Review on the South Gold Zone at its Miner Mountain Project including recommended additional infill drilling.
温哥华,不列颠哥伦比亚省--(新闻发布 - 2024年9月24日) - Sego Resources Inc. (tsxv: SGZ)("Sego"或"该公司")高兴地宣布,已收到SRk咨询(加拿大)公司(“SRK”)关于其Miner Mountain项目南黄金区的勘探靶向审查,包括推荐的额外填充钻探。
Figure 1: 3-D View of the Litho-structural and Mineralization Models of the South Gold Zone
Source: SRK, 2024
图1:南黄金区岩石结构和矿化模型的三维视图
来源:SRk,2024年
DISCLOSURE WARNINGS IN RESPECT TO AN EXPL0RATION TARGET REVIEW
关于勘探目标审核的披露警告
- An exploration target is not a NI 43-101 compliant resource or reserve.
- The South Gold Zone is confirmed only as a target for further exploration.
- Potential quantity and grades are conceptual in nature only.
- There has not been sufficient exploration to define any mineral resource.
- There is no certainty that further exploration will result in the target being delineated as a Mineral Resource.
- The assessment of the target for further exploration was completed by SRK Consulting ("SRK"), a consultant independent of the Company. The estimation of the potential quantity and grade of the exploration target was based on a drillhole database of 22 diamond core holes and 1,545 gold assay data. With the available drilling information, SRK developed conceptual gold mineralization volumes, constrained by interpreted lithological and structural models. The original core samples were composited, and the composited gold assays were capped after evaluating the statistical distributions on probability plots. The gold values were interpolated into a three-dimensional block model using Inverse Distance to a power of three. To estimate a tonnage, an average specific gravity of 2.7 was considered.
- 勘探目标不是符合NI 43-101标准的资源或储备。
- 南黄金区仅确认为进一步勘探的目标。
- 潜在数量和品位仅具有概念性质。
- 尚未进行足够的勘探以定义任何矿产资源。
- 无法确定进一步勘探是否会将目标界定为涉矿概念。
- 对进一步勘探的目标进行评估是由独立于公司的顾问SRk咨询公司(“SRK”)完成的。对勘探目标潜在数量和品位的估计基于22个金刚石岩心钻孔和1,545个黄金化验数据的钻孔数据库。根据可用的钻探信息,SRk开发了概念性的金矿化体积,受解释的岩性和构造模型的约束。原始岩心样品被合并,合并后的金化验经过概率图上的统计分布评估后进行上限处理。金值被插值到一个使用三次方反距离法的三维块模型中。为了估算吨位,考虑了平均比重为2.7。
HIGHLIGHTS
亮点
- An estimated total of 5,000,000 to 8,000,000 tonnes of mineralization of between 0.5 to 0.7 grams per tonne of gold in the South Gold Zone.
- 在南部金域,估计的矿化总量为5,000,000至8,000,000吨,金品位在0.5至0.7克/吨之间。
- The South Gold Zone may contain 100,000 to 150,000 ounces of gold.
- 南部金域可能含有100,000至150,000盎司的黄金。
- The SRK Study also proposed drill hole locations to firstly provide infill drilling, secondly test structural features and thirdly potentially increase the size of the exploration target.
- SRk研究还提议钻孔位置,首先提供填充钻探,其次测试构造特征,第三可能增加勘探目标的规模。
This study is an integrated litho-structural model of the South Gold Zone, which covers the conceptual target and a second conceptual target to the immediate north, with the aim of facilitating future targeting and drill hole planning.
这项研究是南部金域的综合岩构造模型,涵盖了概念目标和紧邻北部的第二概念目标,旨在促进未来定位和钻孔规划。
Figure 2: 3D and Sectional (Inset) Views of the South Gold Zone Block Model
Source: SRK, 2024
图2:南部金域块模型的三维和截面(插图)视图
来源:SRk,2024年
NEXT STEPS
即将开展的工作。
- Complete the SRK recommended drilling.
- 完成SRk推荐的钻探。
- Further drilling to test a copper-gold porphyry spatially related target immediately north of the South Gold Zone.
- 进一步钻探,以测试铜-黄金斑岩空间相关目标,该目标位于南部黄金区域的北部。
Qualified Person
合格人士
The technical information in this news release, including the information that relates to geology, drilling and gold mineralization was prepared under the supervision of, or was reviewed by Souvik Banerjee, P.Geo, an independent Qualified Person as this term is defined in National Instrument 43-101.
这则新闻稿中的技术信息,包括与地质、钻探和金矿化有关的信息,是在Souvik Banerjee,P.Geo的监督下编制的,或经过了他的审查,他是根据《43-101号国家规定书》中定义的独立合格人员。
OTHER MATTERS
其他问题
The Board of Directors has granted directors, officers and consultants of the Company, 6,775,000 stock options exercisable at $0.08 until July 25, 2029. The options are subject to TSX Venture Exchange approval. The options will vest 25% on grant and 25% every 6 months thereafter.
董事会已授予公司的董事、高管和顾问6,775,000股票期权,行权价为0.08美元,有效期至2029年7月25日。这些期权需获得TSX Venture Exchange的批准。期权授予后,25%立即行使,之后每6个月行使25%。
ABOUT THE MINER MOUNTAIN PROJECT
关于Miner Mountain项目
Sego owns 100% of the Miner Mountain Project, an alkalic copper-gold porphyry exploration project located near Princeton, British Columbia. The property is 2,056 hectares in size and is 15 kilometres north of the Copper Mountain Mine operated by Hudbay Minerals Inc. Sego has a Memorandum of Understanding with the Upper Similkameen Indian Band on whose Traditional Territory the Miner Mountain Project is situated. Sego has received an Award of Excellence for its reclamation work at Miner Mountain.
Sego拥有Miner Mountain项目的100%,这是位于不列颠哥伦比亚省普林斯顿附近的一项含碱性铜金斑岩勘探项目。该物业占地2,056公顷,位于Hudbay Minerals Inc.经营的Copper Mountain铜矿北部15公里处。Sego与上西米尔卡明印第安部落达成谅解备忘录,Miner Mountain项目位于其传统领土上。Sego因在Miner Mountain项目的复垦工作获得卓越奖。
For further information please contact:
J. Paul Stevenson, CEO (604) 682-2933
要了解更多信息,请联系:
J. Paul Stevenson,首席执行官(604)682-2933
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No regulatory authority has approved or disapproved the information contained in this news release.
TSX创业公司交易所及其监管服务提供商(如其在TSX创业公司规则中所定义)对本公告的充分性或准确性不承担责任。任何监管机构都未批准或不批准本资讯稿中包含的信息。
This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statement of historical facts that address future production, reserve potential, exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, statements are not guarantees of future performance and actual results or developments may differ materially from the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continued availability of capital and financing, general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements.
本公告包含可能被视为“前瞻性声明”的某些声明。本公告中的所有声明,除了涉及未来生产、储量潜力、勘探钻探、开发活动、以及公司预期的事件或事态的历史事实陈述外,均属前瞻性声明。尽管公司认为这些前瞻性声明表述的期望是基于合理假设的,但这些声明不是对未来业绩的保证,实际结果或发展可能与前瞻性声明有实质性差异。导致实际结果与前瞻性声明存在实质性差异的因素包括市场价格、开采和勘探成功、资本和融资的持续可用性、一般经济、市场或商业状况。投资者应当注意,任何此类声明都不构成对未来业绩的保证,实际结果或发展可能与前瞻性声明中所预期的有实质性差异。