Excelsior Mining Signs Letter of Intent With Cochise College for Local Workforce Development Partnership
Excelsior Mining Signs Letter of Intent With Cochise College for Local Workforce Development Partnership
Phoenix, Arizona--(Newsfile Corp. - October 10, 2024) - Excelsior Mining Corp. (TSX: MIN) (OTCQB: EXMGF) (FSE: 3XS) ("Excelsior" or the "Company") is pleased to announce that it has entered into a letter of intent (LOI) for a Workforce Development Agreement with Cochise College for a local workforce development partnership for its under-construction Johnson Camp Mine (JCM) and future development Gunnison Copper project in Cochise County, Arizona.
凤凰城,亚利桑那州-(新闻资料公司corp - 2024年10月10日) - 辉瑞矿业公司 (tsx: MIN) (OTCQB: EXMGF) (FSE: 3XS) ("辉瑞"或"公司")很高兴宣布,已与科奇斯学院就其正在建设的约翰逊营矿山(JCM)和未来发展的冈尼森铜项目在亚利桑那州科奇斯县进行本地劳动力发展合作伙伴关系所签署的意向书(LOI)。
"We believe this collaboration holds great promise and potential for both Excelsior and Cochise College to develop and foster highly skilled mining jobs in the area," states Craig Hallworth, SVP and Chief Financial Officer of Excelsior Mining. He continues, "Excelsior is rapidly constructing the Johnson Camp Mine which will be a crucial part of the clean energy supply chain and provide dozens of permanent mine jobs and temporary construction jobs to the area."
"我们相信这种合作对辉瑞和科奇斯学院都有巨大的潜力和希望,可以在该地区发展和培养高技能的采矿岗位,"辉瑞矿业首席财务官克雷格·霍尔沃斯表示。他继续说道:“辉瑞正在快速建设约翰逊营矿山,这将成为清洁能源供应链的关键部分,并为该地区提供数十个永久矿业工作岗位和临时施工工作岗位。"
"Cochise College is excited to explore workforce training opportunities with Excelsior Mining that will create jobs and strengthen the economic vitality of our County," comments Dr. James Perey, Executive Vice President for Academics at Cochise College.
"科奇斯学院很高兴与辉瑞矿业探索劳动力培训机会,这将创造工作岗位并增强我们县的经济活力,"科奇斯学院教务执行副校长詹姆斯·佩雷博士评论道。
Based on the LOI, Excelsior welcomes:
根据意向书,辉瑞欢迎:
- Engaging Cochise College to design, set up and administer Excelsior's apprenticeship program.
- Cochise College developing specialized course content, such as Mine Safety and Health Administration (MHSA) training or process plant instrumentation technician training, including the possibility of Excelsior providing for qualified course instructors.
- Excelsior participating in career days and in job boards to advertise available positions.
- 与科奇斯学院合作设计、建立和管理辉瑞的学徒培训计划。
- 科奇斯学院开发专门课程内容,如矿业安全与健康管理(MHSA)培训或过程装置仪表技术员培训,包括辉瑞提供合格课程讲师的可能性。
- 辉瑞参与职业日和在就业板上宣传可用职位。
Excelsior has been hiring a local workforce from the area for over a decade and has made community engagement a key priority. Excelsior participates in community support through its donations of money, people and materials to assist local organizations. Excelsior is a member of the Southeast Arizona Economic Development Group (SAEDG) which promotes economic development in the region.
辉瑞在过去十多年一直在当地招聘劳动力,并将社区参与作为关键重点。辉瑞通过捐赠金钱、人力和材料来协助当地组织而进行社区支持。辉瑞是东南亚利桑那经济发展集团(SAEDG)的成员,该组织促进该地区的经济发展。
ABOUT EXCELSIOR MINING
关于EXCELSIOR MINING
Excelsior "The Copper Solution Company" is a mineral exploration and production company that owns and operates the Gunnison Copper Project in Cochise County, Arizona. The project is a low cost, environmentally friendly in-situ recovery copper extraction project that is permitted to 125 million pounds per year of copper cathode production. Excelsior also owns the past producing Johnson Camp Mine, which with Nuton LLC, a Rio Tinto Venture is in Stage 2 of a process to restart the mine using Nuton technologies, with first copper expected to be produced in 2025. Excelsior additionally owns a portfolio of exploration projects, including the Peabody Sill and the Strong and Harris deposits.
Excelsior“铜解决方案公司”是一家矿产勘探和生产公司,拥有并经营位于亚利桑那州科奇斯县的甘尼森铜项目。该项目是一个低成本、环保的原位恢复铜提取项目,获准每年生产12500万磅铜阴极。Excelsior还拥有过去生产的约翰逊营地矿山,与力拓创业公司Nuton LLC合作,该项目正在使用Nuton技术进行第二阶段的重启工作,首批铜预计将于2025年生产出来。Excelsior此外还拥有一系列勘探项目,包括皮博迪岩柱和斯特朗与哈里斯矿床。
For more information on Excelsior, please visit our website at .
有关Excelsior的更多信息,请访问我们的网站。
For further information regarding this press release, please contact:
有关本新闻稿的更多信息,请联系:
Excelsior Mining Corp.
Concord Place, Suite 300, 2999 North 44th Street, Phoenix, AZ, 85018.
致富金融矿业公司
康科德广场,300号套房,北44街2999号,凤凰城,亚利桑那,85018。
Shawn Westcott
T: 604.365.6681
E: info@excelsiormining.com
肖恩·韦斯特科特
电话:604.365.6681
E: info@excelsiormining.com
Cautionary Note Regarding Forward-Looking Information
关于前瞻性信息的警示
This news release contains "forward-looking information" concerning anticipated developments and events that may occur in the future. Forward looking information contained in this news release includes, but is not limited to, statements with respect to the terms and benefits of the letter of intent with Cochise College, the rapid construction the Johnson Camp Mine, that the Johnson Camp Mine will be a crucial part of the clean energy supply chain, the number of permanent and temporary jobs provided, future production and production capacity from the Company's mineral projects.
这则新闻资讯包含了有关未来可能发生的预期发展和事件的"前瞻性信息"。此新闻资讯中包含的前瞻性信息包括但不限于关于与 Cochise College 建立的意向书条款和益处、对 Johnson Camp 矿山快速施工、Johnson Camp 矿山将成为清洁能源供应链中至关重要的一部分、提供的永久和临时工作岗位数量、公司矿产项目的未来生产和生产能力等方面的声明。
In certain cases, forward-looking information can be identified by the use of words such as "plans", "expects" or "does not expect", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might", "occur" or "be achieved" suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future events or performance. Forward-looking information contained in this news release is based on certain factors and assumptions regarding, among other things, the availability of financing to implement the Company's operational plans, the execution of a definitive agreement for the letter of intent with Cochise College, the estimation of mineral resources and mineral reserves, the realization of resource and reserve estimates, copper and other metal prices, the timing and amount of future development expenditures, the estimation of initial and sustaining capital requirements, the estimation of labour and operating costs (including the price of acid), the availability of labour, material and acid supply, receipt of and compliance with necessary regulatory approvals and permits, the estimation of insurance coverage, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While the Company considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.
在某些情况下,前瞻性信息可通过使用"计划"、"预期"或"不预期"、"预算"、"安排"、"估算"、"预测"、"打算"、"预期"、"相信"或诸如此类的词语或短语可识别,或者陈述某些行动、事件或结果"可能"、"可能"、"可能"、"可能"、"可能"、"可能"、"可能"、"可能" 表示未来结果,或其他期望、信念、计划、目标、假设、意图或关于未来事件或绩效的声明。本新闻资讯中包含的前瞻性信息基于对某些因素和假设的考虑,其中包括融资的可用性以实施公司的运营计划、与 Cochise College 意向书的最终协议的执行、矿产资源和储量的估算、资源和储量估计的实现、铜和其他金属价格、未来开发支出的时间和金额、初期和持续资本需求的估算、劳动力和运营成本的估算(包括酸价)、劳动力、材料和酸供应的可用性、收到并遵守必要的监管批准和许可、保险覆盖范围的估算,以及关于货币波动、环境风险、所有权争端或索赔等类似事项的假设。虽然公司认为这些假设基于目前对其可获得的信息是合理的,但它们可能被证明是不正确的。
Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the construction and operation of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined including the possibility that mining operations may not be sustained at the Gunnison Copper Project or JCM, the risk that a definitive agreement with Cochise College is not executed, risks relating to variations in mineral resources and reserves, grade or recovery rates, risks relating to the ability to access infrastructure, risks relating to changes in copper and other commodity prices and the worldwide demand for and supply of copper and related products, risks related to increased competition in the market for copper and related products, risks related to current global financial conditions, risks related to current global financial conditions, uncertainties inherent in the estimation of mineral resources, access and supply risks, risks related to the ability to access acid supply on commercially reasonable terms, reliance on key personnel, operational risks inherent in the conduct of mining activities, including the risk of accidents, labour disputes, increases in capital and operating costs and the risk of delays or increased costs that might be encountered during the construction or mining process, regulatory risks including the risk that permits may not be obtained in a timely fashion or at all, financing, capitalization and liquidity risks, risks related to disputes concerning property titles and interests, environmental risks and the additional risks identified in the "Risk Factors" section of the Company's reports and filings with applicable Canadian securities regulators.
前瞻性信息涉及已知和未知的风险、不确定性和其他因素,这些因素可能导致公司的实际结果、表现或成就与前瞻性信息所暗示或表达的任何未来结果、表现或成就存在实质区别。这些因素包括在矿床建设和控件中固有的风险,包括与项目参数变化相关的风险,随着计划继续重新定义,可能导致金斯顿铜项目或JCm的采矿操作无法持续的风险,与 Cochise College 没有签订最终协议的风险,与矿产资源和储量的变化,品位或回收率相关的风险,与能够获取基础设施的能力相关的风险,与铜价以及全球对铜及相关产品的需求和供应变化相关的风险,与市场上对铜及相关产品竞争的增加相关的风险,与目前全球金融状况相关的风险,与目前全球金融状况相关的不确定性,内在于估算矿产资源的不确定性,访问和供应风险,与以商业合理条件获取酸供应的能力相关的风险,对关键人员的依赖,内在于开展采矿活动的控件风险,包括事故风险、劳资纠纷、资本与运营成本增加的风险以及在建设或采矿过程中可能遇到的延迟或成本增加的风险,监管风险,包括可能无法及时或根本未获得许可证的风险,融资、资本金和流动性风险,与关于产权和权益的争端相关的风险,环境风险以及公司的报告和提交给适用的加拿大证券监管机构的文件"风险因素"部分中确定的其他风险。
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. The forward-looking information is made as of the date of this news release. Except as required by applicable securities laws, the Company does not undertake any obligation to publicly update or revise any forward-looking information.
尽管该公司已经尝试确定可能导致实际行动、事件或结果与前瞻性信息描述的不同的重要因素,但可能存在其他因素导致行动、事件或结果不如预期、估计或意图。因此,读者不应过度依赖前瞻性信息。前瞻性信息是根据本新闻发布日期制作的。除适用证券法规要求外,该公司不承担任何公开更新或修订任何前瞻性信息的义务。