share_log

Aldebaran Signs Option to Joint Venture Agreement With Nuton Holdings Ltd. (a Rio Tinto Venture) for the Altar Project in San Juan, Argentina

Aldebaran Signs Option to Joint Venture Agreement With Nuton Holdings Ltd. (a Rio Tinto Venture) for the Altar Project in San Juan, Argentina

Aldebaran签署了与Nuton Holdings Ltd.(力拓创业公司)关于阿根廷圣胡安Altar项目的合资协议的期权
GlobeNewswire ·  2024/11/07 20:00

VANCOUVER, British Columbia, Nov. 07, 2024 (GLOBE NEWSWIRE) -- Aldebaran Resources Inc. ("Aldebaran" or the "Company") (TSX-V: ALDE, OTCQX: ADBRF) is pleased to announce that it has entered into an option to joint venture agreement (the "Option Agreement") with Nuton Holdings Ltd. ("Nuton"), a Rio Tinto venture, whereby Nuton can acquire a 20% indirect interest in the Altar project by making staged payments totaling US$250 Million.

温哥华,英属哥伦比亚,2024年11月07日(环球社交媒体) - Aldebaran Resources Inc.("Aldebaran"或"公司")(tsx-v:ALDE,OTCQX:ADBRF)很高兴宣布,已与Nuton控股有限公司("Nuton")达成一项合资选择协议("选项协议"),其中Nuton可以通过分期付款总额达到25000万美元,在Altar项目中间接持有20%的股权。

Highlights

亮点

  • Non-dilutive financing with an upfront payment of US$10 M
  • US$20 M projected for Q4-2024 after the publication of an updated mineral resource estimate, if Nuton elects to proceed
  • US$30 M payment projected for Q2/Q3-2025 after the publication of a Preliminary Economic Assessment ("PEA") that includes a Nuton case, if Nuton elects to proceed
  • Final Payment of US$190 M would be made after the publication of a Pre-Feasibility Study ("PFS") that includes a Nuton case, expected in 2026, if Nuton elects to exercise the option
  • Aldebaran is collaborating with Nuton to evaluate a NutonTM Technologies sulphide leaching option in the upcoming PEA and PFS
  • Nuton's sulphide leaching technologies have the potential to materially improve the economics of the project
  • Aldebaran remains the operator of the Altar project
  • 通过一个前期支付为1000万美元的无稀释融资
  • 2024年第四季度后,预计将支付2000万美元,之后Nuton选择继续进行的话,将公布更新后的矿产资源估算
  • 2025年第二/三季度预计支付3000万美元,之后将公布包括Nuton方案在内的初步经济评估("PEA"),如果Nuton选择继续进行
  • 在2026年预计发布包括Nuton方案的可行性研究("PFS")后,将进行最终支付为19000万美元,如果Nuton选择行使该选项
  • Aldebaran正在与Nuton合作,以评估在即将进行的PEA和PFS中使用NutonTm Technologies硫化物浸出选项
  • Nuton的硫化物浸出技术有可能在项目的经济方面产生重大改善
  • Aldebaran仍然是Altar项目的运营商

John Black, Chief Executive Officer of Aldebaran, commented: "We're pleased to have entered into this agreement with Nuton. This deal has many benefits to Aldebaran shareholders in that it provides for non-dilutive capital injections to fund future work programs on the Altar project through to completion of a PFS, if Nuton proceeds through each milestone. As well, Nuton's proprietary sulphide leaching technologies could add significant value to the Altar project by reducing the costs and capital required for development. Our current plan for the PEA and PFS is to show both Nuton and non-Nuton cases."

Aldebaran的首席执行官John Black表示:“我们很高兴与Nuton达成这项协议。这笔交易对于Aldebaran股东有许多好处,因为它提供了非摊薄的资本注入,用于资助Altar项目的未来工作计划直至完工PFS,如果Nuton通过每个里程碑。此外,Nuton的专有硫化物浸出技术可能通过降低开发所需的成本和资本,为Altar项目增加巨大价值。我们对PEA和PFS的当前计划是展示Nuton和非Nuton案例。”

Adam Burley, Chief Executive Officer of Nuton, commented: "We're pleased to enter into this agreement with Aldebaran, which provides us with an option to acquire an interest in a very large copper project in Altar. Successful deployment of Nuton Technologies at Altar has the potential to materially enhance the economic and environmental performance of the project."

Nuton的首席执行官Adam Burley表示:“我们很高兴与Aldebaran达成这项协议,这使我们有机会在Altar的一个非常大的铜项目中取得利益。在Altar成功部署Nuton Technologies具备重大潜力增强项目的经济和环境表现。”

Status of Earn-In Agreement with Sibanye-Stillwater

与Sibanye-Stillwater的赚取协议的进展情况

The Altar project is owned by Peregrine Metals Ltd. ("Peregrine"), a private Canadian incorporated company. Aldebaran currently owns a 60% interest in Peregrine. In August 2023, the Company informed Sibanye-Stillwater that it had met its commitments to complete the acquisition of an additional 20% interest in Peregrine from Sibanye-Stillwater (see Company news release dated August 14, 2023). The process of finalizing the additional acquisition is ongoing and an official announcement is expected in Q4 of this year. Upon finalizing the acquisition, Aldebaran will hold an 80% interest in Peregrine, with Sibanye-Stillwater holding the remaining 20%. Both Aldebaran and Sibanye-Stillwater will need to fund future work programs based on their equity interest in Peregrine.

Altar项目由Peregrine Metals Ltd.(“Peregrine”)拥有,这是一家加拿大私人公司。目前Aldebaran持有Peregrine 60%的股权。2023年8月,公司通知Sibanye-Stillwater,已完成从后者手中收购Peregrine另外20%股权的承诺(请参阅2023年8月14日的公司新闻发布)。最终收购的程序正在进行中,预计将在今年第4季度进行官方公告。一旦完成收购,Aldebaran将持有Peregrine 80%的股权,而Sibanye-Stillwater持有剩余的20%。根据其在Peregrine的股权,Aldebaran和Sibanye-Stillwater都将需要为未来的工作计划提供资金支持。

Transaction Details

交易详情

Aldebaran has entered into an Option to Joint Venture Agreement with Nuton, whereby Nuton has the exclusive right to acquire a 20% interest in Peregrine in exchange for the following payments:

Aldebaran已与Nuton签订了一项合资协议选择权协议,根据该协议,Nuton有独家权利以以下支付方式收购Peregrine 20%的股权:

  • US$10 Million upon signing ("Signing Payment")
  • US$20 Million upon delivery of an updated mineral resource estimate ("MRE Payment")
    • Mineral resource estimate expected to be completed in November 2024
  • US$30 Million upon delivery of a Preliminary Economic Assessment ("PEA Payment")
    • PEA expected to be completed in Q2-2025
  • US$190 Million upon delivery of a Pre-Feasibility Study ("PFS Payment")
    • PFS expected to be completed in 2026
  • 签署时支付1000万美元(“签约付款”)
  • 更新的矿产资源评估完成时支付2,000万美元("MRE支付")
    • 预计矿产资源评估将于2024年11月完成
  • 初步经济评估完成时支付3,000万美元("PEA支付")
    • 预计初步经济评估将于2025年第二季度完成
  • 可行性研究完成时支付1,9000万美元("PFS支付")
    • 预计可行性研究将于2026年完成

The payments by Nuton will be made as follows: 90% will be paid directly to Peregrine and 10% will be paid directly to Aldebaran, as directed by Peregrine. The payments made to Peregrine will be utilized to fund Aldebaran's portion of ongoing and future work programs at Altar.

Nuton的付款将按以下方式进行:90%将直接支付给Peregrine,而10%将根据Peregrine的指示直接支付给Aldebaran。支付给Peregrine的款项将用于资助Aldebaran在Altar进行的现有和未来工作计划的部分。

Upon completion of the PFS Payment, Nuton will acquire a 20% interest in Peregrine and have a 20% indirect interest in the Altar project. Altar would then be owned as follows: Aldebaran 60%, Sibanye-Stillwater 20%, and Nuton 20%, with Aldebaran operating the project.

完成PFS支付后,Nuton将收购Peregrine 20%的股权,并间接持有Altar项目20%的股权。届时Altar的所有权如下:Aldebaran 60%,Sibanye-Stillwater 20%,Nuton 20%,其中Aldebaran负责运营该项目。

If Nuton elects not to proceed after the issuance of the MRE, PEA or PFS, the Option Agreement will be terminated, Aldebaran will retain its 80% interest in the project, and Aldebaran and Peregrine will retain any cash payments made prior to the termination unless there is an uncured material breach of the agreement by Aldebaran or Peregrine.

如果Nuton在MRE、PEA或PFS公布后选择不继续,期权协议将终止,Aldebaran将保留项目中80%的权益,并且Aldebaran和Peregrine 在终止前保留任何现金支付,除非Aldebaran或Peregrine存在未经修正的重大违约行为。

Nuton and Aldebaran have agreed to a work program for the 2024/2025 field season to ensure that Nuton's proprietary sulphide leaching technology can be evaluated in both the PEA and PFS. This work program involves drilling several new "twin-holes1" of existing drill holes to acquire large-diameter PQ-sized drill core to be utilized in Nuton's Phase 2 testing program (see below for details). The cost of this drill program will be paid from Nuton's US$10 Million Signing Payment. If the drill program exceeds US$5 Million, as mutually agreed, Nuton will advance those costs from the PEA Payment. All costs associated with the actual testing of the Altar drill core with the Nuton technologies will be borne by Nuton. The Phase 1 program is ongoing (see below for details).

Nuton和Aldebaran已经就2024/2025年野外季的工作计划达成一致,以确保Nuton的专有硫化物浸出技术能够在PEA和PFS中得到评估。该工作计划涉及钻取若干新的“双孔1”,以获取大口径PQ级钻芯,将用于Nuton的第2阶段测试计划(详情见下文)。此钻探计划的费用将从Nuton的1000万美元签约支付中支付。如果钻探计划超过500万美元,经双方同意,Nuton将从PEA支付中预支这些费用。与使用Nuton技术对Altar钻芯进行实际测试相关的所有费用将由Nuton承担。第1阶段计划正在进行中(详情见下文)。

Aldebaran will also conduct additional work programs at Altar during the 2024-25 field season to advance the PEA and PFS and potentially explore other areas of interest on the Altar property.

Aldebaran还将在2024-25年野外季在Altar进行其他工作计划,以推进PEA和PFS,并有可能在Altar物业的其他感兴趣区域进行探索。

As part of the agreement, Nuton will have exclusivity over any novel, trade secret or patented copper heap-leach related technology to be tested or deployed at the Altar project for a period of two years.

根据协议,Nuton将在为期两年的期限内对Altar项目中测试或部署的任何新颖、商业秘密或已申请专利的铜堆浸相关技术拥有独家权。

Phase 1 Nuton Program

第1阶段Nuton计划

Ten (10) samples, totaling approximately 2,100 kg, were shipped to Nuton earlier in 2024. All samples were taken from previously drilled, well preserved, PQ-sized whole core stored in the Company's San Juan warehouse. The samples were shipped to SGS laboratories in Santiago, Chile for further sample preparation according to Nuton specifications and protocols. The prepared materials were then shipped from Chile to Denver, Colorado, and placed into several columns with a height of 1 m, with each column under different controlled Nuton operational conditions. Results from Phase 1 are expected in Q2-2025 and will be utilized in the PEA.

在2024年初,共发送了十(10)份样本,总重量约为2,100公斤,至Nuton。所有样本均取自公司圣胡安仓库中事先钻取、保存完好的PQ规格整芯。这些样本按照Nuton的规格和协议被送往智利圣地亚哥的SGS实验室进行进一步样本制备。制备好的材料随后从智利运往科罗拉多州丹佛市,并放置在若干高度为100万的柱子内,每根柱子都处于不同的受控Nuton操作条件下。第1阶段的结果预计将于2025年第二季度出炉,并将用于PEA中。

Phase 2 Nuton Program

第2阶段Nuton计划

Aldebaran will complete large diameter PQ-sized drilling this coming field season to provide Nuton with material to be placed into full-height, 10 m columns. The 10 m height columns are designed to simulate a typical 10 metre "lift" height in an operational heap-leach pad. The scale-up from 1 m to 10 m height columns will provide valuable data that will be utilized in the Nuton case in the Altar PFS. It is anticipated that the final results will be ready approximately two years after the delivery of the rock material. Nuton has informed Aldebaran that interim results, which will be available in 2026, should be representative and can be utilized in the PFS.

Aldebaran将在即将到来的野外季节完成大口径PQ尺寸的钻探,为Nuton提供材料,用于放入完整高度的1000万柱中。1000万高度的柱设计用于模拟操作性堆浸坞的典型10米“抬升”高度。从100万到1000万高度柱的扩大规模将提供宝贵的数据,将在Altar PFS的Nuton案例中使用。预计最终结果将在岩石材料交付后约两年后准备就绪。Nuton已通知Aldebaran,2026年将提供中期结果,这些结果应代表性,并可在PFS中使用。

The Altar Project

阿尔塔项目

The Altar copper-gold project hosts a cluster of porphyry deposits in San Juan, Argentina, which Aldebaran is expanding through exploration to deliver to the rising copper market. The 2021 pit-constrained resource estimate showed 11.4B lb Cu and 3.4Moz Au in the Measured and Indicated categories, plus 1.7B lb Cu and 0.4Moz Au Inferred. Since the last resource update, the Company has completed more than 63,000 m of drilling and discovered an additional porphyry centre called Altar United. The Company is completing an updated resource estimate, which will be completed in November of 2024. The Company has engaged SRK Consulting as Lead to complete a PEA in Q2-2025 and a PFS in 2026, with Knight Piesold as a sub-contractor.

阿尔塔铜金项目位于阿根廷圣胡安,拥有一组斑岩矿床,阿德巴兰通过勘探扩展以供应不断增长的铜市场。2021年的限定采矿资源估算显示,已测量和指示类别中有114亿磅铜和3.4百万盎司金,另外推测类别中有17亿磅铜和0.4百万盎司金。自最新资源更新以来,公司已完成超过6300000万尺的钻探,并发现了一个名为Altar United的额外斑岩中心。公司正在进行更新的资源评估,将于2024年11月完成。公司已聘请SRK咨询公司作为首席进行于2025年第二季度完成PEA,并于2026年完成PFS,骑士派索尔德公司是其分包商。

Webinar

网络研讨会

For more context, please join the Company in a live event on Friday, November 8th, at 11:00 am EDT / 8:00 am PDT. Q&A will follow the presentation. Click here to register: .

更多详情,请于11月8日星期五上午11:00 EDT / 8:00 PDT参加公司的现场活动。演示结束后将进行问答环节。点击这里注册: .

Qualified Person

合格人士

The scientific and technical data contained in this news release has been reviewed and approved by Dr. Kevin B. Heather, B.Sc. (Hons), M.Sc, Ph.D, FAusIMM, FGS, Chief Geological Officer and director of Aldebaran, who serves as the qualified person (QP) under the definitions of National Instrument 43-101.

本新闻发布中包含的科学技术数据经过Aldebaran公司主要地质师和董事Dr. Kevin b. Heather亿批准并审查,他是符合国家43-101仪器定义的合格人(QP)。

ON BEHALF OF THE ALDEBARAN BOARD
(signed) "John Black"
John Black
Chief Executive Officer and Director
Tel: +1 (604) 685-6800
Email: info@aldebaranresources.com

代表Aldebaran董事会
(签名) “约翰·布莱克”
John Black
首席执行官和董事
电话:+1(604)685-6800
电子邮件:info@aldebaranresources.com

Please click here and subscribe to receive future news releases:

请单击此处订阅接收未来的新闻发布:

For further information, please consult our website at or contact:

如需进一步了解信息,请参阅我们的网站或联系:

Ben Cherrington
Manager, Investor Relations
Phone: +1 347 394-2728 or +44 7538 244 208
Email: ben.cherrington@aldebaranresources.com

Ben Cherrington
投资者关系经理
电话:+1 347 394-2728或+44 7538 244 208
电子邮件:ben.cherrington@aldebaranresources.com

About Aldebaran Resources Inc.

Certain statements regarding Aldebaran, including management's assessment of future-plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve known and unknown risks and uncertainties, most of which are beyond Aldebaran's control. Often, but not always, forward-looking statements or information can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate" or "believes" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

Aldebaran is a mineral exploration company that was spun out of Regulus Resources Inc. in 2018 and has the same core management team. Aldebaran holds a 60% interest in the Altar copper-gold project in San Juan Province, Argentina and can earn an additional 20% interest in the project by completing a further $25 million in expenditures at Altar over the next three years. The Altar project hosts multiple porphyry copper-gold deposits with potential for additional discoveries. Altar forms part of a cluster of world-class porphyry copper deposits which includes Los Pelambres (Antofagasta Minerals), El Pachón (Glencore), and Los Azules (McEwen Copper). In March 2021 the Company announced an updated mineral resource estimate for Altar, prepared by Independent Mining Consultants Inc. and based on the drilling completed up to and including 2020 (independent technical report prepared by Independent Mining Consultants Inc., Tucson, Arizona, titled "Technical Report, Estimated Mineral Resources, Altar Project, San Juan Province, Argentina", dated March 22, 2021 - see news release dated March 22, 2021).

Aldebaran是一家从Regulus Resources Inc.中分拆出来的矿业勘探公司,拥有相同的核心管理团队。 Aldebaran持有阿根廷圣胡安省的Altar铜金项目60%的权益,并可在未来三年内在Altar再完成2500万美元的开支后获得该项目的额外20%权益。 Altar项目拥有多个斑岩铜金矿床,具有发现其他矿体的潜力。 Altar是一个世界一流的斑岩铜矿床群的一部分,其中包括Los Pelambres(Antofagasta Minerals),El Pachón(Glencore)和Los Azules(McEwen Copper)。2021年3月,该公司公布了Altar的最新矿产资源估计报告,该报告由独立矿业顾问公司Independent Mining Consultants Inc.编制,基于截至2020年完成的钻探孔(独立技术报告的标题为“洛杉矶省Altar项目,阿根廷州估计矿产资源的技术报告”,日期为2021年3月22日-请参阅2021年3月22日发布的新闻稿)。

About Nuton

About Nuton

Nuton is an innovative venture that aims to help grow Rio Tinto's copper business. At the core of Nuton is a portfolio of proprietary copper leaching related technologies and capability – a product of almost 30 years of research and development. Nuton offers the potential to economically unlock copper from primary sulfide resources through leaching, achieving market-leading recovery rates and contributing to an increase in copper production at new and ongoing operations-. One of the key differentiators of Nuton is the ambition to produce the world's lowest footprint copper while having at least one Positive Impact at each of our deployment sites, across our five pillars: water, energy, land, materials and society.

Nuton是一个创新的创业公司,旨在帮助助力力拓的铜业务增长。Nuton的核心是一组专有的铜浸出相关技术和能力- 这是近30年研发成果的产物。Nuton提供了经济上从主要硫化物资源中通过浸出解锁铜的潜力,实现市场领先的回收率,并促进新的和持续运营地点的铜产量增加。Nuton的一个关键区别点是雄心勃勃地生产世界上环保母基铜,同时在我们的五大支柱:水、能源、土地、材料和社会的每个部署地点至少产生积极影响。

Sampling and Analytical Procedures

取样和分析程序

Altar follows systematic and rigorous sampling and analytical protocols which meet and exceed industry standards. These protocols are summarized below and are available on the Aldebaran website at . All drill holes are diamond core holes with PQ, HQ or NQ core diameters. Drill core is collected at the drill site where recovery and RQD (Rock Quality Designation) measurements are taken before the core is boxed and transported to the Altar camp facilities, a short distance away, where the whole core is photographed under more optimum lighting conditions and geological quick log is produced. The whole-core is then marked and sampled into geological defined, systematic 1- to 2-metre sample intervals, unless the geologist determines the presence of an important geological contact, which should not be crossed. The whole-core is then cut-in-half with a diamond saw blade, with half the sample retained in the core box for future reference and the other half placed into a pre-labelled plastic bag, sealed with a two plastic security zip ties, and labeled with a unique sample number. The bagged samples are then placed into larger plastic sacks and those sacks are sealed with another plastic security zip tie and labelled for shipment. The sacks are then placed onto wooden pallets and wrapped in plastic shrink-wrap and stored in a secure area pending shipment to a certified ALS laboratory sample preparation facility located in Mendoza, Argentina, where the samples are dried, crushed, and pulverized. The resulting sample pulps are sent by batch to the ALS laboratory in Lima for geochemical assay analysis, including a 30g fire assay with an atomic absorption (AA) finish analysis for gold and a full multi-acid digestion (4-acid) with ICP-AES analysis for other elements. Samples with results that exceed maximum detection values for gold are re-analyzed by fire assay with a gravimetric finish and other elements of interest are re-analyzed using precise ore-grade ICP analytical techniques. Aldebaran independently inserts certified control standards (Super Certified Reference Materials (SCRM's), coarse field blanks, and duplicates into the sample stream to monitor data quality. These control samples represent 10-12% of the total samples submitted and are inserted "blindly" to the laboratory in the sample sequence prior to departure from the Aldebaran facilities.

Altar遵循系统化和严格的取样和分析协议,符合并超过行业标准。这些协议概述如下,并可在Aldebaran网站查阅。所有钻孔均为PQ、HQ或NQ直径的金刚石岩心钻孔。在钻孔现场收集岩心,进行回收和RQD(岩石品质指标)测量,之后将岩心装入箱中,运送至离钻孔现场不远的Altar营地设施,在更理想的光照条件下为整个岩心拍照,并制作地质快速日志。然后,整块岩心被标记并按照地质定义的系统间隔进行取样(1到2米为一间隔),除非地质学家确定存在重要的地质界线,不应越界。接着,整块岩心用金刚石锯片切成两半,一半样品保留在岩心箱中以备将来参考,另一半放入预标记的塑料袋中,用两个塑料安全拉链密封,并贴有唯一的样品编号。袋装样品随后被放入更大的塑料袋中,这些袋子用另一个塑料安全拉链密封,并贴有标签用于运输。这些袋子随后被放置在木制托盘上,用塑料收缩膜包裹,并存放在安全区域,等待运往位于阿根廷门多萨的认证ALS实验室样品制备设施进行干燥、粉碎和研磨。得到的样品浆块被分批发送至利马的ALS实验室进行地球化学分析,其中包括30克的火试金及原子吸收(AA)完成分析用于黄金,以及全面的多酸消解(4酸)和ICP-AES分析用于其他元素。对于结果超过黄金最大检测值的样品,将重新进行火试金和重力法完成分析,其他感兴趣的元素则使用精密的矿石级ICP分析技术进行再分析。Aldebaran独立插入认证控制标准(超级认证参考材料(SCRM)、粗大地空白和重复样品)到样品流中,以监控数据质量。这些控制样品代表所提交总样品的10-12%并被"盲目"插入标本序列中,在从Aldebaran设施出发前送往实验室。

Forward-Looking Statements

前瞻性声明

Certain statements regarding Aldebaran, including management's assessment of future-plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve known and unknown risks and uncertainties, most of which are beyond Aldebaran's control. Often, but not always, forward-looking statements or information can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate" or "believes" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

Aldebaran公司关于计划和运营的某些声明可能构成适用证券法下的前瞻性声明,必然涉及已知和未知的风险和不确定性,其中大部分超出了Aldebaran的控制范围。通常,但并非总是,前瞻性陈述或信息可以通过使用“计划”、“期望”或“不期望”、“预计”、“预算”、“按计划”、“估计”、“预测”、“打算”、“预计”、“相信”“或此类词语和短语或说明某些行动、事件或结果的陈述,可能被采取、发生或实现,或者可能被采取、实现或实现,也可能被认为可能采取、发生或实现。

Specifically, and without limitation, all statements included in this press release that address activities, events or developments that Aldebaran expects or anticipates will or may occur in the future, including the proposed exploration and development of the Altar project described herein, and management's assessment of future plans and operations and statements with respect to the completion of the anticipated exploration and development programs, may constitute forward-looking statements under applicable securities laws and necessarily involve known and unknown risks and uncertainties, most of which are beyond Aldebaran's control. These risks may cause actual financial and operating results, performance, levels of activity and achievements to differ materially from those expressed in, or implied by, such forward-looking statements. Although Aldebaran believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that such expectations will prove to be correct. The forward-looking statements contained in this press release are made as of the date hereof and Aldebaran does not undertake any obligation to publicly update or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities law.

具体而有限制地,本新闻稿中包括的所有叙述,涉及或预计将来Aldebaran期待或预期会发生的活动、事件或发展,包括本报告所述的Altar项目的拟议勘探和开发,以及管理层对未来计划和业务的评估以及就预期的勘探和开发计划完成提出的声明,均可能构成根据适用证券法的前瞻性声明,并且必然涉及已知和未知的风险和不确定性,其中大部分超出了Aldebaran的控制范围。这些风险可能导致实际财务和运营结果、绩效、活动水平和成就与这些前瞻性声明中表达或暗示的有实质差异。尽管Aldebaran相信这些前瞻性声明中体现的期望是合理的,但不能保证这些期望会被证明是正确的。本新闻稿中包含的前瞻性声明截至本日,并且Aldebaran不承担任何公开更新或修订任何前瞻性声明或信息的义务,除非适用证券法要求如此。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX Venture Exchange及其监管服务提供者(如该术语在TSX Venture Exchange规定中所定义的)不对本新闻稿的充分性或准确性承担责任。

1 A twin-hole is designed to replicate an existing drill hole and is typically drilled directly beside an existing hole which acts as a geological control hole. Twin-holes, drilled with PQ-sized core, allow for the collection of a large volume of rock material that can be used in metallurgical test work, such as large 10 m height columns for Nuton, and for other geotechnical or environmental characterization work.

双孔设计旨在复制现有钻孔,通常直接钻在旁边的现有孔旁,作为地质控制孔。 使用PQ尺寸的核心钻孔,允许收集大量岩石样本,可用于冶金试验工作,例如Nuton的大型1000万高柱,以及其他岩土工程或环保特性工作。


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发