Dakota Gold Announced Results From Fifteen Drill Holes From The Ongoing Infill And Step-out Drill Program To Expand The Maiden Resource At The Richmond Hill Gold Project, The Results From The Drill Program Will Be Incorporated Into An Updated S-K 1300...
Dakota Gold Announced Results From Fifteen Drill Holes From The Ongoing Infill And Step-out Drill Program To Expand The Maiden Resource At The Richmond Hill Gold Project, The Results From The Drill Program Will Be Incorporated Into An Updated S-K 1300...
Dakota Gold宣布了来自Richmond Hill黄金项目的首次资源扩展的连续填充和外扩钻孔结果,钻探方案的结果将纳入更新的S-k 1300中...
Dakota Gold Announced Results From Fifteen Drill Holes From The Ongoing Infill And Step-out Drill Program To Expand The Maiden Resource At The Richmond Hill Gold Project, The Results From The Drill Program Will Be Incorporated Into An Updated S-K 1300 Initial Assessment In Q1 2025
Dakota Gold宣布了来自Richmond Hill黄金项目的首次资源扩增钻探项目的十五个钻孔结果,这些钻探项目的结果将被纳入到2025年第一季度更新的S-k 1300初始评估中。
The maiden S-K 1300 resource, which was announced on April 30, 2024 outlined an Indicated Resource of 51.83 million tonnes (Mt) at 0.80 grams per tonne gold (g/t Au) for 1.33 million ounces and Inferred Resource of 58.06 million tonnes (Mt) at 0.61 grams per tonne gold (g/t Au) for 1.13 million ounces.
2024年4月30日发布的Maiden S-k 1300资源概述了5183万吨(Mt)指示资源,金品位为每吨0.80克(g/t Au),对应133万盎司,而推测资源为5806万吨(Mt),金品位为每吨0.61克(g/t Au),对应113万盎司。