share_log

Dakota Gold Announced Results From Fifteen Drill Holes From The Ongoing Infill And Step-out Drill Program To Expand The Maiden Resource At The Richmond Hill Gold Project, The Results From The Drill Program Will Be Incorporated Into An Updated S-K 1300...

Dakota Gold Announced Results From Fifteen Drill Holes From The Ongoing Infill And Step-out Drill Program To Expand The Maiden Resource At The Richmond Hill Gold Project, The Results From The Drill Program Will Be Incorporated Into An Updated S-K 1300...

Dakota Gold宣布了来自Richmond Hill黄金项目的首次资源扩展的连续填充和外扩钻孔结果,钻探方案的结果将纳入更新的S-k 1300中...
Benzinga ·  2024/11/14 19:39

Dakota Gold Announced Results From Fifteen Drill Holes From The Ongoing Infill And Step-out Drill Program To Expand The Maiden Resource At The Richmond Hill Gold Project, The Results From The Drill Program Will Be Incorporated Into An Updated S-K 1300 Initial Assessment In Q1 2025

Dakota Gold宣布了来自Richmond Hill黄金项目的首次资源扩增钻探项目的十五个钻孔结果,这些钻探项目的结果将被纳入到2025年第一季度更新的S-k 1300初始评估中。

The maiden S-K 1300 resource, which was announced on April 30, 2024 outlined an Indicated Resource of 51.83 million tonnes (Mt) at 0.80 grams per tonne gold (g/t Au) for 1.33 million ounces and Inferred Resource of 58.06 million tonnes (Mt) at 0.61 grams per tonne gold (g/t Au) for 1.13 million ounces.

2024年4月30日发布的Maiden S-k 1300资源概述了5183万吨(Mt)指示资源,金品位为每吨0.80克(g/t Au),对应133万盎司,而推测资源为5806万吨(Mt),金品位为每吨0.61克(g/t Au),对应113万盎司。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发