SCOTTIE RESOURCES ANNOUNCES SHARE CONSOLIDATION AND UPCOMING 2025 TECHNICAL AND MARKETING PROGRAMS
SCOTTIE RESOURCES ANNOUNCES SHARE CONSOLIDATION AND UPCOMING 2025 TECHNICAL AND MARKETING PROGRAMS
VANCOUVER, BC, Nov. 20, 2024 /PRNewswire/ - Scottie Resources Corp. ("Scottie" or the "Company") (TSXV: SCOT) (OTCQB: SCTSF) (FSE:SR8) is pleased to announce that, in anticipation of pursuing a more aggressive marketing strategy to attract new shareholders, the Company will consolidate its common shares at a ratio of six pre-consolidation shares to one post-consolidation share (the "Consolidation"). The consolidation will also be coupled with the initiation of an extensive technical program focused on fast-tracking mining through engineering studies, economic modelling, and permit advancement. The release of the planned maiden Mineral Resource Estimate (expected late Q1 2025) will represent the first deliverable item in the pathway towards clearly demonstrating the economic viability and optionality of the deposit. Representing 16% ownership of the company, Scottie management and advisors are aligned with shareholders and believe that the consolidation is a beneficial step in creating value.
温哥华,BC,2024年11月20日 /PRNewswire/ - Scottie Resources corp. ("Scottie" 或 "公司") (tsxv: scot) (otcqb: sctsf) (fse:sr8) 很高兴地宣布,鉴于为吸引新股东而采取更积极的市场策略的预期,公司将以六股合并为一股的比例进行普通股合并("合并")。此次合并还将伴随启动一项广泛的技术方案,重点通过工程研究、经济模型和许可证推进,加快矿业进程。预计在2025年第一季度末发布的计划中的 maiden 涉矿概念估算,将标志着向清晰展示矿床经济可行性和选择权的第一项可交付成果。作为公司16%的所有权,Scottie管理层和顾问与股东保持一致,并认为这次合并是创造价值的有利步骤。
Upcoming Marketing and Technical Catalysts:
即将到来的市场和技术催化剂:
- Post 6:1 Share consolidation resulting in ~ 50 million outstanding shares
- Strong cash position ~ $7.5M CAD in hard dollars
- Release of the remaining 2024 Scottie Gold Mine Project drill results
- Completion of the maiden NI 43-101 Mineral Resource Estimate (MRE) for the Blueberry and Scottie Gold Mine Deposits
- Technical study to outline permitting requirements, viability and timeline for potential mining of the historic Scottie Mine tailing piles
- Initiate technical and market studies for the direct ship ore (DSO) sales and tolling through the Stewart export terminal for Asian markets
- Evaluate divesture options for the Georgia Project in order to capture value of the asset
- Initiation of a U.S. marketing campaign
- 合并后6:1的股份合并,导致~ 5000万流通股
- 强劲的现金位置 ~ $750万加元的硬通货
- 发布2024年Scottie黄金矿项目剩余的钻探结果
- 完成蓝莓和Scottie黄金矿区的maiden NI 43-101涉矿概念估算(MRE)
- 技术研究概述历史Scottie矿尾矿堆的许可要求、可行性和潜在采矿的时间表
- 启动直接船舶矿石(DSO)销售和通过斯图尔特出口终端用于亚洲市场的加工技术和市场研究
- 评估乔治亚项目的剥离选项,以便捕获资产的价值
- 启动美国市场营销活动
President and CEO, Brad Rourke commented: "After 5 years of aggressive exploration and land acquisition, and our discovery of the Blueberry Contact Zone, this share consolidation will allow us to improve our marketing initiatives to U.S. retail investors by reducing their incremental cost of share acquisition. We feel that the timing of the consolidation, prior to the release of our maiden Mineral Resource Estimate and commencement of the mining focused technical program, will allow us to capture the attention of new investors and build momentum. 2025 will be a transformational for the Company as we begin to explore an array of value enhancing opportunities over and above growing the mineral resources through our highly successful exploration programs. We welcome everyone to join our Webinar on November 25th to discuss in more detail."
总裁兼首席执行官布拉德·鲁基评论道:“经过五年的积极勘探和土地收购,以及我们发现的蓝莓接触区,这次股份合并将使我们能够通过降低美国零售投资者的股份获取额外成本,来改善我们的市场营销活动。我们认为,在发布我们的首个涉矿概念估算和启动以矿业为重点的技术计划之前进行合并的时机,将使我们能够吸引新的投资者的注意并建立势头。2025年将是公司转型的一年,因为我们将开始探索一系列提升价值的机会,除了通过我们非常成功的勘探项目来增加矿产资源之外。我们欢迎大家参加我们将在11月25日举行的网络研讨会,以更详细地讨论。”
Consolidation Arrangement
合并安排
The Company currently has 299,819,618 common shares issued and outstanding. Upon completion of the Consolidation, the Company will have approximately 49,970,000 common shares issued and outstanding. Fractional shares of 0.5 or greater will be rounded up to the nearest whole number of common shares and fractional shares of less than 0.5 will be rounded down to the nearest whole number of Shares. Some slight variance is expected due to fractional rounding. As is customary, to reflect the Consolidation, all outstanding warrants and incentive stock options will be adjusted to increase their exercise price by a factor of six and to reduce the number of common shares issued upon exercise by dividing by six.
公司目前已发行并流通299,819,618普通股。在合并完成后,公司将拥有大约49,970,000普通股。0.5或更大比例的碎股将四舍五入到最接近的整股,少于0.5的碎股将向下四舍五入到最接近的整股。由于碎股的四舍五入,预计会有一些轻微的差异。根据惯例,为了反映合并,所有未到期的warrants和激励股票期权将进行调整,将其行权价格增加六倍,并将行使时发行的普通股数量减少为六分之一。
Subject to Scottie receiving all required approvals, including the approval of the TSX Venture Exchange (the "TSXV"), the Consolidation is expected to take effect on or about November 27, 2024.
在Scottie收到所有必要的批准,包括tsz交易所("tsxv")的批准后,合并预计将在2024年11月27日或之前生效。
Holders of shares of the Company who hold uncertificated shares (that is shares held in book-entry form and not represented by a physical share certificate), either as registered holders or beneficial owners, will have their existing book-entry account(s) electronically adjusted by the Company's transfer agent or, in the case of beneficial shareholders, by their brokerage firms, banks, trusts or other nominees that hold in street name for their benefit. Such holders generally do not need to take any additional actions to exchange their pre-consolidation shares for post-consolidation shares. If you hold your shares with such a bank, broker or other nominee, and if you have questions in this regard, you are encouraged to contact your nominee.
持有公司无证书股票的股东(即以账面形式持有而未由实物股票证书表示的股票),无论是登记持有人还是实际拥有者,都将由公司的过户代理人或在实际股东的情况下,由其券商、银行、信托或其他以街名持有其利益的提名人,电子调整其现有的账面账户。此类持有人通常无需采取任何额外措施来将其合并前的股票兑换为合并后的股票。如果您将股票持有在这样的银行、经纪人或其他提名人处,并且对此有疑问,建议您联系您的提名人。
Registered shareholders holding share certificates will be mailed a letter of transmittal advising of the Consolidation and instructing them to surrender the share certificates representing pre-consolidation shares for replacement certificates or a direct registration advice representing their post-consolidation shares. Until surrendered for exchange, each share certificate formerly representing pre-consolidation shares will be deemed to represent the number of whole post-consolidation shares to which the holder is entitled as a result of the Consolidation.
持有股票证书的注册股东将收到一封寄送信件,告知合并事宜,并指示他们交回代表合并前股票的股票证书,以换取新的股票证书或直接注册代表他们的合并后股票。直到兑换为止,每一份原先代表合并前股票的股票证书将被视为代表因合并而应得的合并后股票的数量。
Technical Program
技术方案
In the coming months the Company plans to initiate a number of engineering and economic studies to support the development of a Preliminary Economic Assessment (PEA) built on the upcoming maiden MRE and allow the evaluation of multiple mining scenarios. Studies will address metallurgy, viability of ore-sorting, as well as underground and open-pit mine design.
在未来几个月,公司计划启动多项工程和经济研究,以支持基于即将进行的首次矿产资源评估(PEA)的开发,并评估多种采矿方案。研究将涉及冶金、矿石分拣的可行性,以及地下和露天矿的设计。
Georgia Project Divesture
乔治亚项目剥离
The Georgia Project is a 100% owned high-grade gold deposit located on the Portland Canal tidewater, 16 kilometres south of the town of Stewart, BC, in the prolific Golden Triangle. It was acquired through the merger with AUX Resources in 2021 and boasts numerous high-grade gold intercepts from a quartz vein system. The most recent documented, unclassified historical resource estimate for the SW Vein of the Georgia River Mine was completed in 1990 (BC Assessment Report 1983) and estimated 276,403 tonnes of 27.6 g/t gold and 20.9 g/t silver. The estimate was based on 50 drill holes and considers a minimum mining width of 1.22 metres. The SW Vein historical estimate does not comply with CIM Definition Standards on Mineral Resources and Mineral Reserves as required by NI 43-101 and has no comparable resource classification. The reliability of the historical estimate is considered reasonable, but a qualified person has not done sufficient work to classify the historical estimate as a current mineral resource and the Company is not treating the historical resource as a current resource.
乔治亚项目是一个100%拥有的高品位黄金矿床,位于温哥华港运河潮水区域,距离BC省斯图尔特镇南部16公里,位于富饶的黄金三角区。它通过与AUX资源的合并于2021年获得,拥有来自石英脉系统的多处高品位黄金拦截。最近一次的、未分类的SW脉的历史资源估算是在1990年完成的(BC评估报告1983),估算为276,403吨,含金量27.6克/吨,白银20.9克/吨。该估算基于50个钻孔,并考虑了1.22米的最小采矿宽度。SW脉历史估算不符合CIM对矿产资源和矿藏的定义标准,按照NI 43-101的要求,没有可比的资源分类。尽管历史估算的可靠性被认为合理,但合格人员尚未进行足够的工作以将历史估算分类为当前的矿产资源,因此公司不将历史资源视为当前资源。
Due to the focus on the recent discovery of the Blueberry Zone and the overall advancement of the Scottie Gold Mine Project, the 18,000 ha Georgia River Project has been overshadowed and underexplored in recent years. The Company will be evaluating multiple options relating to its divesture, including spinning out a new exploration company, taking a joint venture partner, and sale of the property.
由于近期对蓝莓区的发现以及斯科蒂金矿项目的整体进展,18,000公顷的乔治亚河项目在近年来被忽视和探索不足。公司将评估与其剥离相关的多种选项,包括剥离出一家新的探索公司、寻找合作伙伴进行合资,以及出售该物业。
Webinar
网络研讨会
Scottie management will be hosting a live Webinar on November 25, 1:30 PM (PST) to discuss and answer questions – link to the webinar can be found here:
斯科蒂管理层将于11月25日下午1:30(太平洋标准时间)举行现场直播网络研讨会,以讨论并回答问题 – 网络研讨会的链接可以在这里找到:
Quality Assurance and Control
质量保证和控制
Results from samples taken during the 2024 field season were analyzed at SGS Minerals in Burnaby, BC. The sampling program was undertaken under the direction of Dr. Thomas Mumford. A secure chain of custody is maintained in transporting and storing of all samples. Gold was assayed using a fire assay with atomic absorption spectrometry and gravimetric finish when required (+9 g/t gold). Analysis by four acid digestion with multi-element ICP-AES analysis was conducted on all samples with silver and base metal over-limits being re-analyzed by emission spectrometry.
在2024年现场季节期间采集的样品在加拿大不列颠哥伦比亚省本拿比市的SGS矿业实验室进行了分析。该采样计划是在托马斯·芒福德博士的指导下进行的。在样品的运输和存储过程中保持了安全的保管链。黄金是通过火法鉴定与原子吸收光谱法及需要时的重力法进行分析(+9克/吨黄金)。对所有样品进行了四酸消化和多元素ICP-AES分析,银和基本金属超限的样品通过发射光谱法重新分析。
Dr. Thomas Mumford, P.Geo., a qualified person under National Instrument 43-101, has reviewed the technical information contained in this news release on behalf of the Company.
Thomas Mumford博士是根据43-101国家规定的合格人员,代表公司审查了本新闻发布中包含的技术信息。
ABOUT SCOTTIE RESOURCES CORP.
关于Scottie Resources股份有限公司
Scottie owns a 100% interest in the Scottie Gold Mine Property which includes the Blueberry Contact Zone and the high-grade, past-producing Scottie Gold Mine. Scottie also owns 100% interest in the Georgia Project which contains the high-grade past-producing Georgia River Mine, as well as the Cambria Project properties and the Sulu and Tide North properties. Altogether Scottie Resources holds approximately 58,500 hectares of mineral claims in the Stewart Mining Camp in the Golden Triangle.
Scottie拥有Scottie黄金矿权(包括蓝莓接触带和高品位生产过的Scottie金矿)的100%权益。Scottie还拥有Georgia项目的100%权益,其中包含高品位生产过的Georgia River金矿,以及Cambria项目、Sulu和Tide North地块。总体而言,Scottie Resources在Golden Triangle的Stewart Mining Camp拥有约58,500公顷的矿权。
The Company's focus is on expanding the known mineralization around the past-producing mines while advancing near mine high-grade gold targets, with the purpose of delivering a potential resource.
公司的焦点是在生产过的矿山周围扩展已知矿化体,并推进靠近矿体的高品位黄金目标,以实现有潜力的资源储量。
All of the Company's properties are located in the area known as the Golden Triangle of British Columbia which is among the world's most prolific mineralized districts.
公司的所有地块位于英属哥伦比亚的Golden Triangle区域,这是世界上最富有矿产的区域之一。
Forward Looking Statements
前瞻性声明
This news release may contain forward‐looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward‐looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward‐looking statements are based on the beliefs, estimates and opinions of the Company's management on the date such statements were made. The Company expressly disclaims any intention or obligation to update or revise any forward‐looking statements whether as a result of new information, future events or otherwise.
本新闻发布可能包含前瞻性陈述。前瞻性陈述是指那些不是历史事实的陈述,通常但不总是用“预期”、“计划”、“预料”、“相信”、“打算”、“估计”、“项目”、“潜在”和类似表达来识别,或者说事件或情况“将”、“会”、“可能”、“可以”或“应该”发生。尽管公司相信在此类前瞻性陈述中表达的期望是基于合理假设的,但这些陈述并不能保证未来的表现,实际结果可能与前瞻性陈述中的内容有实质性差异。前瞻性陈述是基于公司管理层在作出该等陈述时的信念、估计和意见。公司明确拒绝任何意图或义务对任何前瞻性陈述进行更新或修订,无论是由于新信息、未来事件还是其他原因。
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of TSX Venture Exchange) accepts responsibility for the adequacy of accuracy of this release.
TSX Venture Exchange及其规管服务供应商(正如TSX Venture Exchange的政策所定义的那样)对于本公告的充分性和准确性不负责任。
SOURCE Scottie Resources Corp.
来源:Scottie Resources Corp.