TotalEnergies Suspends Financial Ties With Adani Group Amid US Investigation
TotalEnergies Suspends Financial Ties With Adani Group Amid US Investigation
TotalEnergies SE (NYSE:TTE) shares are trading lower on Monday. The company stated that it has learned of U.S. authorities indicting certain executives of Adani Group's Indian renewable energy segment.
道达尔能源公司(纽交所:TTE)股票在周一交易中下跌。该公司表示,它已获悉美国当局对阿达尼集团印度可再生能源部门的某些高管提起了指控。
The indictment does not target Adani Green Energy Ltd. (AGEL) or its related entities. TotalEnergies is not implicated in the allegations, either.
该指控并未针对阿达尼绿色能源有限公司(AGEL)或其相关实体。道达尔能源也未卷入这些指控。
TotalEnergies owns a 19.75% stake in AGEL and is a 50% joint-venture partner in AGEL projects established between 2020 and 2024.
道达尔能源拥有AGEL 19.75%的股份,并在2020年至2024年间建立的AGEL项目中是50%的合资合作伙伴。
Pending clarification of the accusations and their implications, TotalEnergies will halt new financial contributions to Adani group investments.
在对指控及其影响进行澄清之前,道达尔能源将暂停对阿达尼集团投资的新财政贡献。
TotalEnergies states its investments in AGEL, made in compliance with laws and due diligence processes, were based on representations from the sellers, with no prior knowledge of any investigations.
道达尔能源表示,其在AGEL的投资是根据法律和尽职调查程序进行的,基于卖方的陈述,事先并不知情于任何调查。
Apart from this, TotalEnergies is partnering with Air Liquide to produce renewable hydrogen at its La Mède biorefinery in southeast France, supporting its 2030 goal to decarbonize hydrogen use in European refineries.
此外,道达尔能源正在与空气液化公司合作,在其位于法国东南部的La Mède生物精炼厂生产可再生氢气,以支持其到2030年在欧洲炼油厂实现氢气使用脱碳的目标。
This initiative complements the Masshylia green hydrogen project, developed with ENGIE. Together, these projects aim to cut La Mède's annual CO2 emissions by 130,000 tons.
这一举措补充了与ENGIE共同开发的Masshylia绿色氢气项目。两个项目的目标是将La Mède每年的二氧化碳排放量减少13万吨。
Apart from this, TotalEnergies and ENGIE are advancing the Masshylia project to produce 10,000 tons of green hydrogen annually through water electrolysis.
此外,道达尔能源和ENGIE正在推进Masshylia项目,通过水电解每年生产1万吨的绿色氢气。
This will help decarbonize the La Mède biorefinery and serve local customers in the Fos-Berre industrial-port zone. The first 20 MW electrolyzer is targeted for startup in 2029, pending European and French subsidies and public authorizations.
这将有助于减少La Mède生物炼油厂的碳排放,并为Fos-Berre工业港区的当地客户提供服务。目标是在2029年启动第一台20 MW电解槽,具体取决于欧洲和法国的补贴及公共授权。
Last week, the company inked a Cooperation Agreement with Oil India Limited (OIL) to use TotalEnergies' AUSEA technology for methane emissions detection and measurement at OIL sites in India.
上周,该公司与印度石油有限公司(OIL)签署了一项合作协议,使用TotalEnergies的AUSEA技术在OIL位于印度的场地进行甲烷排放检测和测量。
Investors can gain exposure to the stock via First Trust Exchange-Traded Fund IV FT Energy Income Partners Strategy ETF (NYSE:EIPX) and Octane All-Cap Value Energy ETF (NASDAQ:OCTA).
投资者可以通过First Trust Exchange-Traded Fund IV Ft Energy Income Partners Strategy ETF(纽交所:EIPX)和Octane全权益能源etf(纳斯达克:OCTA)获得该股票的曝光。
Price Action: TotalEnergies shares are down 1.42% at $58.81 at the last check Monday.
价格动态:在周一最后一次检查时,TotalEnergies的股票下跌了1.42%,报58.81美元。
- EQT Secures $3.5 Billion Boost: Blackstone JV To Power Midstream Expansion
- EQT获得35亿美元支持:黑石合资企业将推动中游-脑机扩张