Yinson JV In Vietnam Secures RM1.8 Billion Contract From Murphy Oil
Yinson JV In Vietnam Secures RM1.8 Billion Contract From Murphy Oil
PTSC Asia Pacific a joint venture between Yinson Production (49%) and PetroVietnam Technical Services Corporation ("PTSC"; 51%), has executed a contract for the charter of floating storage and offloading ("FSO") vessel for the Lac Da Vang project with Murphy Cuu Long Bac Oil Co. Ltd., a wholly owned subsidiary of Murphy Oil Corporation. The contract has a firm period of 10 years with the option to extend up to 5 years, and a total value of up to approximately USD 416 million.
PTSC亚太是英生生产(49%)与越南石油技术服务公司("PTSC"; 51%)合资的一家公司,已与墨菲开多大陆石油有限公司签订了浮式储油和离岸生产("FSO")船舶租赁合同,用于Lac Da Vang项目。该合同固定期为10年,可选择延长至5年,总价值高达约41600万美元。
The group said the FSO will be a newbuild double-hull vessel with storage capacity around 500,000 barrels and advanced dual-fuel systems for optimised efficiency. The design of the FSO emphasises safety, operational excellence, and low-carbon emissions, aligning with Yinson Production's sustainability goals. Following a construction period of approximately two years, the FSO is expected to start operations in the Lac Da Vang field located in Block 15-1/05 offshore Vietnam in the fourth quarter of 2026.
该集团表示,FSO将是一艘新建的双壳船舶,储油能力约为50万桶,采用先进的双燃料系统进行优化效率。FSO的设计侧重于安全、运营卓越和低碳排放,与英生生产的可持续发展目标一致。经过约两年的施工周期,预计FSO将于2026年第四季度开始在越南近海15-1/05区块的Lac Da Vang油田进行作业。
Commenting on the contract, Flemming Grønnegaard, Chief Executive Officer of Yinson Production, said, "This new project underscores Yinson Production's commitment to delivering energy solutions that meet the evolving needs of our clients and the industry. The Lac Da Vang FSO project is a testimony to the strength of our partnership with PTSC and our shared vision for operational excellence. We are proud to play a pivotal role in supporting Vietnam's energy security."
在谈到合同时,英生生产首席执行官弗莱明·格罗内加德表示:"这个新项目彰显了英生生产致力于提供符合客户和行业不断发展需求的能源解决方案的承诺。Lac Da Vang FSO项目证明了我们与PTSC的合作伙伴关系的实力,以及我们对运营卓越的共同愿景。我们为能够在支持越南的能源安全方面发挥关键作用感到自豪。"