share_log

Eos Energy Closes $303.5 Million Loan Guaranteed by the U.S. Department of Energy to Support Project AMAZE and American Made Manufacturing Expansion

Eos Energy Closes $303.5 Million Loan Guaranteed by the U.S. Department of Energy to Support Project AMAZE and American Made Manufacturing Expansion

eos energy通过美国能源部担保的30350万美元贷款,支持项目AMAZE和美国制造业-半导体扩张
Eos Energy ·  2024/12/03 13:00
PDF Version
PDF版本

Loan supports next phase of Company's growth, expected to bring annual production capacity to 8 GWh, meeting long duration battery energy storage systems' growing demand

贷款支持公司下一个增长阶段,预计将年产能提升至8 GWh,满足长周期电池能源储存系统不断增长的需求

First Title 17 Battery loan closed under the current administration after an application and approval process that began in January 2021

本届政府下第17电池贷款已经关闭,该贷款是在2021年1月开始的申请和批准过程中完成

Loan supports innovative technology development and closes 15 months after conditional loan commitment and detailed due diligence review

贷款支持创新技术开发,并在接受有条件贷款批准和详细尽职调查审查15个月后结束

Eos' technology combined with Cerberus Capital Management and DOE funding addresses critical needs essential to long-term United States energy security

Eos的技术与神犬资本管理以及美国能源部的资金结合,解决了长期美国能源安全所需的关键问题

TURTLE CREEK, Pa., Dec. 03, 2024 (GLOBE NEWSWIRE) -- Eos Energy Enterprises, Inc. (NASDAQ: EOSE) ("Eos" or the "Company"), a leading provider of safe, scalable, efficient, and sustainable zinc-based long duration energy storage systems, today announced the successful closing of a $303.5 million loan guaranteed by the U.S. Department of Energy's ("DOE") Loan Programs Office ("LPO") ("the DOE loan"), marking the first Title 17 battery loan closed under the current administration. The DOE loan is a key step in advancing Project American Made Zinc Energy (AMAZE) and is expected to fund the expansion of Eos' manufacturing capacity to 8 GWh by 2027 to meet the growing demand for longer duration battery energy storage systems.

宾夕法尼亚州TURTLE CREEk,2024年12月03日 (环球新闻) -- Eos Energy Enterprises,Inc. (纳斯达克: EOSE) ("柚子"或"公司"), 作为领先的提供安全、可扩展、高效、可持续的基于锌的长时能源存储系统的供应商,今天宣布成功完成由美国能源部(“DOE”)贷款项目办公室(“LPO”)担保的30350万美元贷款("DOE贷款"), 这标志着本届政府下第一笔以Title 17电池贷款关闭。DOE贷款是推动美国制造锌能源项目(AMAZE)的关键一步,预计将于2027年将Eos的制造能力扩展至8 GWh,以满足对更长持续时间电池能源存储系统不断增长的需求。

"Five years ago, we made the strategic decision to bring our manufacturing operations back to the U.S. from China – a move that has been transformative to our business and positioned Eos at the forefront of the American manufacturing renaissance," said Eos Chief Executive Officer Joe Mastrangelo. "Since then, we've made significant advancements in our battery technology, retooled our manufacturing facilities for greater efficiency, and established a U.S.- based supply chain with over 90% domestic content, all of which has brought us to this milestone today with the DOE. The DOE loan provides capital to scale our operations to meet the surging demand for reliable, long-duration energy storage solutions, all while supporting American manufacturing."

"五年前,我们做出了将我们的制造业务从中国迁回美国的战略决定 - 这一举措对我们的业务产生了转变,并使Eos处于美国制造复兴的前沿",Eos首席执行官Joe Mastrangelo表示。"从那时起,我们在电池技术方面取得了重大进展,重组了我们的制造设施以提高效率,并与美国建立了占超过90%的国内供应链,所有这些都使我们在今天与DOE达成这一里程碑。 DOE贷款提供了资金以扩大我们的运营以满足对可靠、长周期能源存储解决方案的激增需求,同时支持美国制造。"

According to Fortune Business Insights, the battery energy storage system market in the U.S. is projected to grow significantly, reaching an estimated value of USD $31.4 billion by 2032, driven by the increasing adoption of renewable energy and the need for enhanced grid stability. To meet this demand, the Company, backed by its September 30, 2024, $589 million order backlog and $14.2 billion commercial pipeline, plans to use the funding to build four fully automated, state-of-the-art manufacturing lines. With one line already in commercial operation and having achieved 10-second battery manufacturing cycle times, these lines are expected to enable the production of Eos' zinc-based batteries designed to offer a reliable, cost-effective, and safe alternative to incumbent technologies and support the transition to a more sustainable energy grid.

根据财富商业洞察,美国电池能源存储系统市场预计将显著增长,到2032年达到估值314亿美元,这将受到对可再生能源的日益采用和对增强电网稳定性的需求推动。为了满足这一需求,该公司计划利用资金建造四条全自动、先进的制造线,并得到其2024年9月30日的58900万美元订单备货和142亿美元商业管道的支持。已有一条生产线处于商业运营,并已实现10秒内的电池制造周期,这些生产线预计将支持Eos基于锌的电池的生产,这些电池旨在为目前的技术提供可靠、具有成本效益和安全的替代方案,并支持向更可持续的能源电网的过渡。

Project AMAZE is designed to position Eos at the forefront of the clean energy transition, with the Company's goal of achieving 8 GWh of capacity by 2027, driven by increasing customer demand. The final loan guarantee amount of $303.5 million is lower than the amount in the Company's August 2023 conditional commitment driven by Project AMAZE operational costs coming in lower than forecast and the addition of the strategic investment by Cerberus Capital Management announced in June 2024. With the DOE's backing and the Delayed Draw Term Loan from Cerberus, Eos believes it has the foundational capital necessary to drive long-term, profitable growth. Together, these partnerships are driving forward the Company's mission to accelerate the clean energy transition and address critical needs vital to the long-term energy security of the United States.

Project AMAZE 旨在将 Eos 定位于清洁能源转型的前沿,公司旨在通过满足日益增长的客户需求,在 2027 年实现 8 GWh 的产能目标。最终的贷款担保金额为 30350万美元,低于公司 2023 年 8 月条件承诺的金额,这是由于 Project AMAZE 的运营成本低于预测,并且 Cerberus Capital Management 在 2024 年 6 月宣布的战略投资的增加。Eos 相信,在 DOE 的支持和 Cerberus 的后期贷款的基础上,公司拥有驱动长期盈利增长所需的基础资本。这些合作伙伴共同推动公司加速清洁能源转型的使命,并解决对美国长期能源安全至关重要的关键需求。

Eos Chief Financial Officer Nathan Kroeker added, "We are thrilled to reach this important milestone, which we view as a strong endorsement of Eos' proprietary Z3 technology and our ability to manufacture in the U.S. Closing on the loan marks a key achievement in executing our multi-phase capital strategy. The DOE loan guarantee, alongside our strategic investment from Cerberus, is expected to provide the capital required to build a profitable manufacturing business and supports our progress as we execute the Project AMAZE roadmap."

Eos 首席财务官 Nathan Kroeker 补充说:“达成这一重要里程碑,让我们感到非常激动,我们认为这是对 Eos 独有的 Z3 技术以及我国制造能力的强力认可。成功获得贷款标志着我们多阶段资本战略的重要成就。DOE 的贷款担保,连同我们来自 Cerberus 的战略投资,预计将为建设一个盈利制造企业提供所需的资金,并支持我们在执行 Project AMAZE 路线图时的进展。”

Eos' manufacturing expansion under Project AMAZE is poised to meet growing customer demand while generating significant economic benefits in the Mon Valley, supporting long-term sustainable growth in the energy storage sector. From just two employees in 2019, the Company has transformed an empty building in the region into a world-class clean energy manufacturing hub, with an over 250-person full time employee workforce in Turtle Creek. The project is expected to maintain and create up to 1,000 temporary and permanent jobs, including numerous apprenticeship opportunities through Eos' Clean Energy Careers Program, in partnership with local high schools, trade schools, and workforce development programs.

Eos 在 Project AMAZE 的制造扩张中正准备满足不断增长的客户需求,同时在 Mon Valley 创造重大经济效益,支持能源存储板块的长期可持续增长。公司从 2019 年的仅两名员工开始,在该地区的一栋空置建筑物内打造了一个世界级的清洁能源制造中心,Turtle Creek 现有 250 多名全职员工。该项目预计将维持并创造多达 1,000 个临时和永久工作岗位,其中包括大量见习机会,涉及 Eos 的清洁能源职业计划,与当地高中、职业学校和劳动力发展计划合作。

LOAN DETAILS
The key terms and conditions of the DOE loan are summarized below:

LOAN DETAILS
美国能源部贷款的关键条款和条件如下总结:

Amount
  • $303.5 million
    • Lower than previously announced conditional commitment driven by operating costs coming in below forecast and the addition of the strategic investment by Cerberus Capital Management announced in June 2024
    • Structured as a four-Tranche loan facility with multiple disbursements to cover 80% of "Eligible Costs" in accordance with LPO regulations, with each Tranche structured to address the construction, startup and shakedown of a separate automated production line
    • The initial funding under the DOE loan, which is expected within 45 days, will reimburse the Company for 80% of "Eligible Costs" paid by the Company in connection with the automated line installed earlier this Summer (Line 1)
Interest Rate
  • U.S. Treasury rate based
Maturity Date
  • June 15, 2034
Other Items
  • Customary covenants and events of defaults for a project finance loan facility
  • Customary conditions precedent to each advance for a project finance loan facility
金额
  • 30350万美元
    • 由于运营成本低于预测并且Cerberus Capital Management于2024年6月宣布了战略投资,因此较之前宣布的条件性承诺更低
    • 结构化为四笔贷款设施,分多次拨款以覆盖按照LPO法规可支付成本的80%,每笔贷款组织为解决独立的自动生产线的建设、启动和调试
    • 预计在45天内获得DOE贷款的初始资金,将对公司由于今年夏季早些时候安装的自动生产线(Line 1)支付的80%“符合条件成本”进行偿还
利率
  • 基于美国财政部利率
到期日期
  • 2034年6月15日
其他项目
  • 项目融资贷款设施的习惯契约和违约事件
  • 项目融资贷款设施每次提前预付款的惯例先决条件

Haynes Boone, LLP served as Eos' legal advisor.

Haynes Boone, LLP担任Eos的法律顾问。

About Eos Energy Enterprises

关于eos energy公司

Eos Energy Enterprises, Inc. is accelerating the shift to clean energy with positively ingenious solutions that transform how the world stores power. Our breakthrough Znyth aqueous zinc battery was designed to overcome the limitations of conventional lithium-ion technology. It is safe, scalable, efficient, sustainable, manufactured in the U.S., and the core of our innovative systems that today provides utility, industrial, and commercial customers with a proven, reliable energy storage alternative for 3 to 12-hour applications. Eos was founded in 2008 and is headquartered in Edison, New Jersey. For more information about Eos (NASDAQ: EOSE), visit eose.com.

eos energy企业正在加速向清洁能源的转变,提供极具创意的解决方案,改变世界存储能源的方式。我们突破性的Znyth水性锌电池旨在克服传统锂离子技术的局限性。它安全、可扩展、高效、可持续,在美国制造,并成为我们创新系统的核心,为公用事业、工业和商业客户提供经过验证的可靠能源储存替代方案,适用于3至12小时的应用。Eos成立于2008年,总部位于新泽西州伊迪森。有关Eos(纳斯达克代码:EOSE)的更多信息,请访问 eose.com.

Eos Contacts

Eos Contacts

Investors: ir@eose.com
Media: media@eose.com
投资者: ir@eose.com
媒体: media@eose.com

Forward Looking Statements

前瞻性声明

Except for the historical information contained herein, the matters set forth in this press release are forward-looking statements within the meaning of the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995. Forward-looking statements include, but are not limited to, statements regarding our expected revenue, contribution margins, orders backlog and opportunity pipeline for the fiscal year ended December 31, 2024, our path to profitability and strategic outlook, the tax credits available to our customers or to Eos pursuant to the Inflation Reduction Act of 2022, the delayed draw term loan with Cerberus, milestones thereunder and the anticipated use of proceeds therefrom, the DOE loan and statements regarding the receipt of funds under the DOE loan and the anticipated use of proceeds therefrom, obtaining the requisite approvals from the DOE to receive guarantees under the loan guarantee agreement, our ability to meet the applicable conditions precedent under the loan guarantee agreement, statements that refer to outlook, projections, forecasts or other characterizations of future events or circumstances, including any underlying assumptions. The words "anticipate," "believe," "continue," "could," "estimate," "expect," "intends," "may," "might," "plan," "possible," "potential," "predict," "project," "should," "would" and similar expressions may identify forward-looking statements, but the absence of these words does not mean that a statement is not forward-looking. Forward-looking statements are based on our management's beliefs, as well as assumptions made by, and information currently available to, them. Because such statements are based on expectations as to future financial and operating results and are not statements of fact, actual results may differ materially from those projected.

除了本文中包含的历史信息之外,本新闻稿中提出的事项属于1995年《私人证券诉讼改革法》"安全港"规定下的前瞻性声明。前瞻性声明包括但不限于关于我们预期的营业收入、贡献利润率、订单积压和2024年12月31日结束的财政年度的机会管道,以及我们走向盈利和战略前景的声明,根据2022年通货膨胀减少法案,适用于我们的客户或Eos能源的税收优惠,与Cerberus的延迟支取贷款,其中的里程碑及预计的资金用途,DOE贷款以及关于从该贷款下收取资金以及预计的资金用途的声明,获得DOE必要批准以在贷款担保协议下获得担保,我们能否满足贷款担保协议下的相关前提条件,涉及展望、预测、预测或对未来事件或情况的其他表述,包括任何基本假设。"预计","相信","继续","可能","估计","期望","打算","可以","潜在","预测","规划","可能","潜在","计划","应该","将"等类似表达可能会识别出前瞻性声明,但没有这些词并不意味着该声明不是前瞻性的。前瞻性声明基于公司管理层的信念以及他们所作的假设和目前可获得的信息。由于这些声明是基于对未来财务和运营结果的期望,而不是事实陈述,实际结果可能会与预期有重大不同。

Factors which may cause actual results to differ materially from current expectations include, but are not limited to: changes adversely affecting the business in which we are engaged; our ability to forecast trends accurately; our ability to generate cash, service indebtedness and incur additional indebtedness; our ability to achieve the operational milestones on the delayed draw term loan; our ability to raise financing in the future, including the discretionary revolving facility from Cerberus; risks associated with the credit agreement with Cerberus, including risks of default, dilution of outstanding Common Stock, consequences for failure to meet milestones and contractual lockup of shares; our customers' ability to secure project financing; the amount of final tax credits available to our customers or to Eos pursuant to the Inflation Reduction Act; uncertainties around our ability to meet the applicable conditions precedent to any funding under the DOE loan; our ability to continue to develop efficient manufacturing processes to scale and to forecast related costs and efficiencies accurately; fluctuations in our revenue and operating results; competition from existing or new competitors; our ability to convert firm order backlog and pipeline to revenue; risks associated with security breaches in our information technology systems; risks related to legal proceedings or claims; risks associated with evolving energy policies in the United States and other countries and the potential costs of regulatory compliance; risks associated with changes to the U.S. trade environment; risks resulting from the impact of global pandemics, including the novel coronavirus, Covid-19; our ability to maintain the listing of our shares of common stock on NASDAQ; our ability to grow our business and manage growth profitably, maintain relationships with customers and suppliers and retain our management and key employees; risks related to the adverse changes in general economic conditions, including inflationary pressures and increased interest rates; risk from supply chain disruptions and other impacts of geopolitical conflict; changes in applicable laws or regulations; the possibility that Eos may be adversely affected by other economic, business, and/or competitive factors; other factors beyond our control; risks related to adverse changes in general economic conditions; and other risks and uncertainties.

导致实际结果与当前预期存在差异的因素包括但不限于:不利影响我们所从事业务的变化;我们准确预测趋势的能力;我们产生现金、偿还债务和承担额外债务的能力;我们能否实现延迟绘制期贷款上的运营里程碑;我们将来筹集资金的能力,包括来自Cerberus的自主循环设施;与Cerberus的信贷协议相关的风险,包括违约风险、稀释未行使普通股、未达里程碑的后果和合约锁定股份的后果;我们客户获得项目融资的能力;最终适用于我们客户或Eos根据通货膨胀减免法享有的最终税收抵免金额;关于我们能否满足任何根据DOE贷款的资金的适用前提条件的不确定性;我们继续开发高效制造工艺以扩大规模并准确预测相关成本和效率的能力;我们营业收入和运营结果的波动;现有或新竞争对手的竞争;我们将确认已订购的积压订单和管道以实现营收的能力;我们信息技术系统安全漏洞风险;与法律诉讼或索赔相关的风险;美国和其他国家能源政策演变以及符合监管合规的潜在成本风险;与美国贸易环境变化相关的风险;由全球大流行(包括新冠病毒Covid-19)带来的风险;我们能否维持股票在纳斯达克的上市;我们扩大业务、有效管理增长、保持与客户和供应商关系和留住管理层和关键员工的能力;与一般经济状况不利变化、包括通胀压力和利率上升增加相关的风险;供应链中断风险和地缘政治冲突影响等其他影响的风险;适用法律或法规的变化;Eos可能会受到其他经济、商业和/或竞争因素不利影响的可能性;我们无法控制的其他因素;与一般经济状况不利变化相关的风险;以及其他风险和不确定性。

The forward-looking statements contained in this press release are also subject to additional risks, uncertainties, and factors, including those more fully described in the Company's most recent filings with the Securities and Exchange Commission, including the Company's most recent Annual Report on Form 10-K and subsequent reports on Forms 10-Q and 8-K. Further information on potential risks that could affect actual results will be included in the subsequent periodic and current reports and other filings that the Company makes with the Securities and Exchange Commission from time to time. Moreover, the Company operates in a very competitive and rapidly changing environment, and new risks and uncertainties may emerge that could have an impact on the forward-looking statements contained in this press release.

本新闻稿中的前瞻性声明还面临其他风险、不确定性和因素,包括公司最近在证券交易委员会提交的最新申报文件中更全面的描述,包括该公司最近的年度报告(10-K表格)和随后提交的10-Q表格和8-K表格。关于有可能影响实际结果的潜在风险的进一步信息,将在公司随后定期和当前的报告以及向美国证券交易委员会不时提交的其他文件中予以说明。此外,该公司在一个非常竞争激烈和快速变化的环境中运营,可能会出现新的风险和不确定性,这些风险和不确定性可能会对本新闻稿中所含前瞻性声明产生影响。

Forward-looking statements speak only as of the date they are made. Readers are cautioned not to put undue reliance on forward-looking statements, and, except as required by law, the Company assumes no obligation and does not intend to update or revise these forward-looking statements, whether as a result of new information, future events, or otherwise.

前瞻性声明仅适用于其发表之日。读者应当谨慎对待前瞻性声明,并且除非法律要求,公司不承担任何义务并无意更新或修订这些前瞻性声明,不另作通知。

Key Metrics

关键指标

Backlog. Our backlog represents the amount of revenue that we expect to realize from existing agreements with our customers for the sale of our battery energy storage systems and performance of services. The backlog is calculated by adding new orders in the current fiscal period to the backlog as of the end of the prior fiscal period and then subtracting the shipments in the current fiscal period. If the amount of an order is modified or cancelled, we adjust orders in the current period and our backlog accordingly, but do not retroactively adjust previously published backlogs. There is no comparable US-GAAP financial measure for backlog. We believe that the backlog is a useful indicator regarding the future revenue of our Company.

积压订单。我们的积压订单表示我们预计从现有协议中与客户销售我们的电池能源储存系统和提供服务所实现的营业收入金额。积压订单是通过将本财政期间的新订单与上一个财政期末的积压订单相加,然后减去本财政期间的出货量来计算的。如果订单金额被修改或取消,我们将相应调整本期订单和积压订单,但不会对先前发布的积压订单进行追溯调整。积压订单没有可比的美国通用会计准则财务指标。我们认为积压订单是关于我们公司未来营业收入的有用指标。

Pipeline. Our pipeline represents projects for which we have submitted technical proposals or non-binding quotes plus letters of intent ("LOI") or firm commitments from customers. Pipeline does not include lead generation projects.

管道。我们的管道代表我们已提交技术提案或非约束性报价以及客户的意向书("LOI")或确定的承诺的项目。 管道不包括铅生成项目。

Booked Orders. Booked orders are orders where we have legally binding agreements with a Purchase Order ("PO"), or Master Supply Agreement ("MSA") executed by both parties.

已预定订单。已预定订单是我们与客户有法律约束力协议的订单(附有采购订单("PO")或双方签署的主供应协议("MSA")。


声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发