share_log

STRATTEC Plans To List Its Milwaukee Facility On The Market For Sale; Plans To Reduce Manufacturing From Three-shift Operation To Two-shifts In Q1 Of 2025 At Its Milwaukee Location

STRATTEC Plans To List Its Milwaukee Facility On The Market For Sale; Plans To Reduce Manufacturing From Three-shift Operation To Two-shifts In Q1 Of 2025 At Its Milwaukee Location

STRATTEC计划将其在密尔沃基的设施上市销售;计划在2025年第一季度将其密尔沃基地点的制造业-半导体从三班制减少到两班制。
Benzinga ·  12/11 06:13

The evaluation will include identifying the best operational space for manufacturing and also office accommodations for the corporate offices, both ideally in the Milwaukee area assuming economics allow.

评估将包括确定制造业-半导体的最佳运营空间以及公司办公室的办公室住宿,理想情况下都位于密尔沃基地区,前提是经济条件允许。

In addition, given improving productivity and operational performance, STRATTEC plans to reduce manufacturing to two-shifts in the first quarter of 2025 at its Milwaukee location. This will result in the elimination of approximately 20 direct labor roles. Changes will also include moving to a 10-hour, 4-day work week from the standard 8-hour, 5-day schedule. The manufacturing team was interested in this change which provides a more flexible work week for them.

此外,考虑到生产力和运营绩效的改善,STRATTEC计划在2025年第一季度将其密尔沃基地点的制造业-半导体减少为两个班次。这将导致大约20个直接劳动岗位的消除。变更还将包括从标准的8小时、5天工作制转变为10小时、4天的工作周。制造团队对此变更表示了兴趣,因为这为他们提供了更灵活的工作周。

The Company expects the facility evaluation process to take several months to complete.

公司预计设施评估过程需要几个月才能完成。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发