Toronto, Ontario--(Newsfile Corp. - December 11, 2024) - ATEX Resources Inc. (TSXV: ATX) ("ATEX" or the "Company") is pleased to announce the results of its second metallurgical program completed at the Valeriano Project. The program was conducted by Base Metallurgical Laboratories in Kamloops, British Columbia using mineralized sample material selected from drill core collected during the Phase III and IV drill campaigns at the Valeriano Project ("Valeriano" or the "Project") located in Atacama Region, Chile. The Company is also pleased to provide an exploration update on its Phase V drill program.
多伦多,安大略省--(资讯公司 - 2024年12月11日)- ATEX资源公司(TSXV:ATX)("ATEX"或"公司")很高兴地宣布其在Valeriano项目完成的第二个冶金计划的结果。该计划由位于不列颠哥伦比亚省卡姆鲁普斯的基础冶金实验室进行,使用的是从在Valeriano项目("Valeriano"或"项目")进行的第三和第四阶段钻探活动中采集的矿化样本材料,Valeriano项目位于智利阿塔卡马地区。公司还很高兴提供其第五阶段钻探计划的勘探更新。
ATEX's second metallurgical testwork program continues to demonstrate that the conceptual process flowsheet being developed for Valeriano is robust and comparable with other world class copper porphyry projects. Metallurgical performance exceeded expectations for all three domains tested including previously untested hole ATXD26 mineralization.
ATEX的第二个冶金测试计划继续证明针对Valeriano开发的概念性工艺流程图是稳健的,并且可与其他世界级的铜矿床项目相媲美。冶金性能超出了对所有三个测试领域的期望,包括之前未测试的ATXD26矿化孔。
HIGHLIGHTS:
亮点:
- ATTRACTIVE COPPER AND GOLD RECOVERIES - Robust total copper and gold recoveries ranging from 92% to 95% and 90% to 97% respectively, in line with the first metallurgical program testwork results; the results of the first metallurgical program were reported on October 18, 2023.
- COARSER GRINDING DOES NOT IMPACT RECOVERIES - Valeriano material is amenable to SAG and ball milling. Coarsening of the primary grind from 120 μm to 200 μm was achieved during the second metallurgical program with no negative impact on recoveries and to 165 μm on hole ATXD26 material, which will have a positive impact on projected processing costs.
- MARKETABLE CONCENTRATE GRADES - Concentrate grades of up to 33% Cu and up to 15 g/t Au present a very marketable product to copper smelters globally.
- NEGLIGIBLE DELETERIOUS ELEMENTS - Deleterious elements in concentrate are immaterial.
- POTENTIAL FOR SEPARATE MOLYBDENUM CONCENTRATE - Separation of copper and molybdenum could produce a saleable molybdenum concentrate, and there is significant molybdenum upside for the epithermal zone that warrants further investigation.
- 吸引人的铜和黄金回收率 - 总铜和黄金回收率分别在92%到95%和90%到97%之间,符合第一次冶金计划测试结果;第一次冶金计划的结果于2023年10月18日公布。
- 粗磨不会影响回收率 - Valeriano材料适合SAG和球磨。在第二个冶金计划中,主要磨矿从120微米粗磨到200微米,实现了没有对回收率造成负面影响的粗磨,以及在ATXD26材料上达到165微米,这将对预计的加工成本产生积极影响。
- 可销售浓缩矿品位 - 浓缩矿品位高达33% Cu和15克/吨Au,为全球铜冶炼厂提供了非常具市场价值的产品。
- 微不足道的有害元素 - 浓缩矿中的有害元素是微不足道的。
- 分离钼浓缩矿的潜力 - 铜和钼的分离可能会产生可销售的钼浓缩矿,并且对于需要进一步调查的热液带的钼潜力非常可观。
"We are very encouraged by these results, confirming again that Valeriano is a simple orebody with an uncomplicated circuit that can produce a high quality, clean concentrate utilizing conventional recovery methods," stated Ben Pullinger, President, and CEO of ATEX. "The copper and gold recovery results from this program have exceeded our expectations, and the high quality of the concentrate would be well received by global smelters. Coarsening of the grind size with no impact to recoveries will be very beneficial to future project economics with significant potential benefits to capital and operating costs. We also continue to make progress on our Phase V drill program with a fourth rig currently being mobilized and a fifth rig expected to be added in January."
"我们对这些结果非常鼓舞,这再次确认了Valeriano是一个简单的矿体,并且其简单的工艺可以利用传统的回收方法生产高质量、洁净的精矿," ATEX的总裁兼首席执行官Ben Pullinger表示。"该项目的铜和黄金回收结果超出了我们的预期,精矿的高质量将受到全球冶炼厂的好评。磨矿粒度的粗化对回收没有影响,这将对未来项目经济带来很大好处,并对资本和运营成本产生显著影响。我们还在继续推进我们的第五阶段钻探计划,目前正在动用第四台钻机,预计将于一月增加第五台钻机。"
Overview
概述
In June 2024 a second phase metallurgical testwork program was designed and scoped by Libertas Metallurgy and ATEX. Metallurgical testwork was completed at Base Met Laboratories in Kamloops, B.C. from October 2024 through December 2024 on representative samples selected from recent metallurgical drilling, including material from the previously uncharacterized high grade, shallower depth epithermal zone. Please see May 15, 2024 press release for details on this new zone and hole ATXD26.
2024年6月,Libertas Metallurgy和ATEX设计并规划了第二阶段的冶金测试工作程序。冶金测试工作于2024年10月至2024年12月在位于Kamloops亿.C.的Base Met Laboratories完成,样品来自最新的冶金钻探,包括之前未表征的高品位、较浅深度的热液区的材料。有关该新区域及ATXD26钻孔的详细信息,请参见2024年5月15日的新闻稿。
A total of three representative samples were selected by Libertas Metallurgy and ATEX geologists in August of this year:
今年八月,由Libertas Metallurgy和ATEX地质学家选择了总共三个代表性样品:
- High Grade Early Porphyry (HGEP) Composite selected from half core within the High-Grade Central Porphyry Trend.
- Early Porphyry (EP) Composite selected from half core from within the porphyry surrounding the high-grade.
- ATXD26 HG Composite selected from half core from the high-grade epithermal zone of mineralization located above the main porphyry deposit.
- 高品位早期质岩(HGEP)复合材料,选自高品位中央质岩趋势的半原矿。
- 早期质岩(EP)复合材料,选自高品位周围质岩的半原矿。
- ATXD26 HG复合材料,选自位于主要质岩矿体上方的高品位热液矿化区域的半原矿。
Program Scope
项目范围
The second metallurgical program focused on the following key elements:
第二个冶金项目的重点是以下几个关键要素:
- Head characterization including chemical assays and quantitative mineralogy.
- Comminution testwork for SAG milling (SMC tests) and ball milling (Bond Ball Work Index tests).
- Comprehensive program of rougher and cleaner flotation tests culminating on successful locked cycle tests (LCTs) on each of the three composites.
- Leaching of flotation tails for additional gold recoveries.
- 头部特征描述,包括化学分析和定量矿物学。
- 用于SAG磨矿的破碎测试(SMC测试)和球磨测试(Bond球磨工作指数测试)。
- 全面的粗选和清选浮选测试程序,最终在三种复合材料上成功进行锁定循环测试(LCTs)。
- 浮选尾矿的浸出以获得额外的黄金回收。
Composite head grades ranged from 0.45% to 1.00% for copper and 0.36 g/t to 0.44 g/t for gold and were representative of the geometallurgical domains tested. Locked cycle test results are aligned with the first metallurgical program results with copper recoveries ranging from 92% to 95% at high quality copper concentrate grades ranging from 31% to 33%. Gold recoveries to copper concentrate ranged from 56% to 64% with concentrates grading 8 g/t to 15 g/t. Potential for an additional increase in gold recoveries of 25% to 38% was demonstrated via cyanide leaching of the copper cleaner 1 tails and rougher tails.
复合头部品位为铜0.45%至1.00%,黄金为0.36克/吨至0.44克/吨,代表了测试的地质冶金区域。锁定循环测试结果与第一个冶金项目结果一致,铜的回收率在92%至95%之间,优质铜精矿品位在31%至33%之间。铜精矿的黄金回收率在56%至64%之间,精矿品位为8克/吨至15克/吨。通过对铜清选1尾矿和粗选尾矿进行氰化浸出,展示了黄金回收率可能额外提高25%至38%。
Additional comminution testwork confirmed that Valeriano material is amenable to SAG milling and that Bond Ball Work indices were of average to above average hardness. Coarsening of the primary grind target from 120 μm in Phase 1 to 165 to 200 μm in Phase 2 will result in significant energy savings over the life of mine, while having little to no impact on metal recovery. Geometallurgical (variability) testwork is ongoing, with QEMSCAN mineralogical analysis and flotation testwork on 25 discrete geometallurgy samples expected to be complete in early 2025.
额外的破碎测试确认Valeriano材料适合SAG磨矿,并且Bond球磨工作指数的硬度在平均到高于平均水平。将第一阶段的主要研磨目标从120微米粗化到第二阶段的165到200微米,在矿山生命周期内将显著节省能量,而对金属回收几乎没有影响。地质冶金(变异性)测试正在进行中,预计QEMSCAN矿物分析和25个离散地质冶金样品的浮选测试将在2025年初完成。
Sample Selection
样本选择
The metallurgical samples were selected as follows:
冶金样品的选择如下:
- Early Porphyry (EPMC) Composite: ~500 kg with selected intervals originating from multiple holes, and a copper equivalent grade of greater than 0.70%.
- High Grade Early Porphyry (HGEP) Composite: ~300 kg with selected intervals originating from multiple holes and a copper equivalent grade of almost 1.00%.
- Epithermal (EPT) Composite: ~90 kg with intervals originating from hole ATXD26 and a targeted copper equivalent grade of ~1.50%.
- 早期斑岩(EPMC)复合样品:约500公斤,选取自多个孔的特定区间,铜当量等级大于0.70%。
- 高品位早期斑岩(HGEP)复合样品:约300公斤,选取自多个孔的特定区间,铜当量等级接近1.00%。
- 热液(EPT)复合样品:约90公斤,选自孔ATXD26的区间,目标铜当量等级约为1.50%。
The figure below summarizes the location of the selected domain composites and variability samples:
下图总结了所选领域复合样品和变异样品的位置:
Figure 1 - Porphyry, Epithermal Domain Composite & Geometallurgical Variability Sample Selections (Facing Northeast)
图1 - 斑岩、热液域复合样品及地球冶金变异样品选择(面向东北)
The majority of samples originated from Phase III and Phase IV drilling in 2023 and 2024 respectively. Intervals were selected from multiple holes and from various locations down hole to provide the best possible spatial representivity, with the exception being the epithermal composite where only one drill hole intersected this zone. In addition to the three domain composites, 25 discrete geometallurgical samples were selected from the lower portion of the porphyry. These geometallurgical variability samples represented continuous intervals of approximately 10 m to 20 m in length and ranged from approximately 20 kg to 40 kg each. The samples originated from multiple holes within the bottom 500 meters of the porphyry and covered a range of copper and gold grades. Figure 1 above summarizes the location of the selected domain composites and variability samples.
大多数样品源自2023年和2024年的第三阶段和第四阶段钻探。所选区间来自多个孔,并在孔的不同位置选取,以提供最佳的空间代表性,唯一的例外是热液复合样品,因为只有一个钻孔交叉了该区域。除了这三个领域复合样品外,还从斑岩的下部选取了25个独立的地球冶金样品。这些地球冶金变异样品表示持续区间,长度约为1000万到2000万,重量从约20公斤到40公斤不等。样品来自斑岩底部500米内的多个孔,并涵盖了多种铜和黄金等级。上述图1总结了所选领域复合样品和变异样品的位置。
A total of 194 half core intervals were selected from across the three domains to create the three domain master composites. The samples are summarised in Table 1 below:
共选择194个半岩心区间,从三个领域中创建三个领域主复合样品。样品汇总如下表1所示:
Table 1 - Selected Composite Calculated Grades
表1 - 选定的复合计算等级
Composite | Cu (%) | Au (g/t) | Ag (g/t) | Mo (ppm) | Fe (%) | CuEq (%)1 |
High Grade Early Porphyry | 0.67 | 0.36 | 2.3 | 41 | 3.03 | 0.94 |
Early Porphyry | 0.45 | 0.39 | 1.6 | 20 | 2.88 | 0.73 |
Epithermal | 1.00 | 0.44 | 2.3 | 405 | 3.73 | 1.48 |
| ||||||
|
复合 | 铜 (%) | 黄金(克/吨) | Ag (克/吨) | 钼 (ppm) | 铁 (%) | 铜当量 (%)1 |
高品位早期岩浆岩 | 0.67 | 0.36 | 2.3 | 41 | 3.03 | 0.94 |
早期岩浆岩 | 0.45 | 0.39 | 1.6 | 20 | 2.88 | 0.73 |
浅热液 | 1.00 | 0.44 | 2.3 | 405 | 3.73 | 1.48 |
| ||||||
|
Flotation, Leaching and Comminution Testwork
浮选、浸出和粉碎试验
A total of 22 rougher and cleaner batch flotation tests were conducted on 2 kg testwork charges from the three domain composites. The Phase I Valeriano process flowsheet was assessed on all composites and optimized as required:
对来自三个区域复合体的2公斤测试料进行了共22次后续和清洗批次浮选测试。对所有复合体评估了第一阶段Valeriano工艺流程图,并根据需要进行了优化:
- Initial, baseline primary grind to a P80 of 120 μm, which was subsequently coarsened to 165 μm for the epithermal composite and 200 μm for the porphyry composites. No negative impact to metals recovery was observed during grind vs. recovery sensitivity testwork.
- Copper rougher flotation with conventional copper and gold collectors.
- Small dosages of fuel oil collector added to the rougher and cleaner stages to promote molybdenum flotation.
- Regrinding of the copper rougher concentrates to 25 μm to 50 μm.
- Two stages of copper cleaner flotation to produce a concentrate grading +30% Cu.
- 初始的基线初级研磨至P80为120微米,随后将其粗化至165微米用于热液复合体,200微米用于斑岩复合体。在研磨与金属回收灵敏度测试中未观察到对金属回收的负面影响。
- 采用常规铜和黄金收集剂进行铜粗选浮选。
- 在粗选和清洗阶段添加少量燃油收集剂以促进钼的浮选。
- 将铜粗选浓缩物再磨至25微米至50微米。
- 进行两阶段的铜清选浮选,以产生含Cu超过30%的浓缩物。
Primary grind vs. recovery sensitivity testing on the three domain composites indicate that the primary grind can be coarsened up to 80% passing 200 μm for the high grade and early porphyry composites, and 165 μm for the epithermal composite. Based on preliminary mine scheduling, this could result in lower capital and operating costs for the Project. The epithermal composite is slightly softer than the porphyry composites and the finer primary grind size required for this material may be offset by the lower hardness indices.
对三个区域复合体的初级研磨与回收灵敏度测试表明,初级研磨可以粗化至高品位和早期斑岩复合体中80%通过200微米,而热液复合体为165微米。根据初步的矿山计划,这可能会导致项目的资本和运营成本降低。热液复合体的硬度略低于斑岩复合体,而所需的较细初级研磨粒度可能会因较低的硬度指数而得到补偿。
Second Metallurgical Program Summary and Conclusions
第二次冶金项目总结与结论
The second metallurgical program testwork continues to demonstrate that the process flowsheet being developed for Valeriano is robust. Metallurgical performance was excellent for all three composites tested and the previously untested epithermal zone appears to be responding well to the standard Valeriano metallurgical flowsheet.
第二个冶金项目的测试工作继续表明,为Valeriano开发的工艺流程表是稳健的。所有三个测试的复合材料的冶金性能均表现出色,而此前未测试的热液矿区似乎对标准的Valeriano冶金流程反应良好。
- Robust copper and gold recovery projections to copper flotation concentrate of 92% to 95% and 56% to 64% respectively, in line with the first metallurgical program testwork results.
- Concentrate grades of greater than 31% Cu and higher than 8 g/t Au is marketable to global copper smelters.
- Full element characterization of the copper concentrates indicate that it is generally low in deleterious elements. Arsenic content in the copper flotation concentrates ranged from 0.09% As to 0.24% As.
- Potential for increasing gold recovery 25% to 38% via cyanide leaching of the flotation tails is an option that merits further investigation. Combined flotation and leaching gold recoveries could reach 90% to 97% if leaching of flotation tails is shown to be economically viable.
- Cu-Mo separation could produce a saleable molybdenum concentrate and there is significant molybdenum upside for the epithermal zone that warrants further investigation.
- Valeriano material is amenable to SAG and ball milling and is of average to above average hardness, in line with other copper porphyry deposits. Coarsening of the primary grind from 120 μm to 165-200 μm was achieved during the second metallurgical program and will have a positive impact on the project economics.
- Geometallurgical testwork is ongoing on 25 additional samples at Base Met Labs in addition to copper-molybdenum separation and dewatering testwork on products from flotation of a bulk composite.
- SAG mill amenability (SMC tests) and ball milling amenability (Bond Ball Work Index tests) were also completed on each composite. These suggest that Valeriano material is amenable to SAG mill grinding with Bond Ball Work Indices ranging from 12.7 kwh/t for the wall rock to 15 kwh/t - 16 kwh/t for the porphyry composites.
- 铜和黄金的回收率预测分别为92%到95%和56%到64%,与第一冶金项目的测试结果一致。
- 浓缩物的铜含量超过31%且黄金含量高于8克/吨,可以向全球铜冶炼厂销售。
- 铜浓缩物的完整元素特征分析表明,其有害元素普遍较低。铜浮选浓缩物中的砷含量范围为0.09% As到0.24% As。
- 通过对浮选尾矿进行氰化浸出,有可能将黄金回收率提高25%到38%,这一选项值得进一步研究。如果浮选尾矿的浸出被证明在经济上可行,则组合浮选和浸出的黄金回收率可能达到90%到97%。
- 铜-钼分离可以生产可销售的钼浓缩物,并且对于热液矿区的钼潜力显著,值得进一步调查。
- Valeriano材料适用于SAG和球磨,硬度处于平均水平或高于平均水平,与其他铜斑岩矿床一致。在第二个冶金项目中,初级磨矿的粒度从120微米粗化到165-200微米,预计将对项目经济产生积极影响。
- 除了对浮选大复合物产品进行铜-钼分离和脱水测试外,Base Met Labs还对25个额外样本进行地质冶金测试。
- SAG磨矿适应性(SMC测试)和球磨适应性(Bond球磨工作指数测试)也已在每个复合材料上完成。这表明Valeriano材料适合于SAG磨矿,Bond球磨工作指数范围从壁岩的12.7 kwh/t到岩浆复合体的15 kwh/t - 16 kwh/t。
Exploration Update
勘探更新
ATEX's Phase V exploration program is currently underway, with three rigs currently operational at site with the fourth being mobilized this week. Holes ATXD23A and ATXD16B are progressing well and on track for completion in late December/early January.
ATEX的第五阶段勘探计划目前正在进行中,现场目前有三台钻机在运行,第四台本周正在调派。钻孔ATXD23A和ATXD160亿进展顺利,预计在12月底/1月初完成。
- Hole ATXD23A is being drilled to follow up on the overprinting high-grade breccia mineralization intersected above known porphyry units which was discovered in Phase IV drill hole ATXD26 (including 68.0 metres of 2.02% CuEq; 1.39% Cu, 0.60 g/t Au, 3.81 g/t Ag and 473 g/t Mo).
- Hole ATXD16B is being drilled to further define high-grade mineralisation hosted within porphyry units by targeting extensions to the southeast of Phase IV drill hole ATXD16A (112m of 1.42% CuEq; 1.01% Cu, 0.57 g/t Au, 2.06 g/t Ag and 46 g/t Mo; please see February 22, 2024 press release for details).
- Hole ATXD27, paused during the Phase IV program will be completed by the third drill rig. It is designed to test the northeastern extensions to mineralised porphyry and will also drill below ATXD26 and ATXD23A, potentially adding volume to high-grade breccias intersected in Phase IV hole ATXD26.
- The fourth drill rig will complete hole ATXD25A which was paused at the end of Phase IV at the contact between the wall rock and the porphyry.
- The Company is planning to have a fifth rig mobilized in early January.
- 钻孔ATXD23A正在钻探,以跟进在已知岩浆单元上方交叉的高品位角砾岩矿化,该矿化是在第四阶段钻孔ATXD26中发现的(包括68.0米的2.02% CuEq; 1.39% Cu, 0.60 g/t Au, 3.81 g/t Ag和473 g/t Mo)。
- 钻孔ATXD160亿正在钻探,以进一步定义在岩浆单元内的高品位矿化,目标是对第四阶段钻孔ATXD16A东南部的延伸(11200万的1.42% CuEq; 1.01% Cu, 0.57 g/t Au, 2.06 g/t Ag和46 g/t Mo;请参见2024年2月22日的新闻稿以获取详细信息)。
- 钻孔ATXD27在第四阶段项目期间暂停,将由第三台钻机完成。该孔旨在测试矿化岩浆的东北延伸,也将在ATXD26和ATXD23A下方钻探,可能增加在第四阶段钻孔ATXD26中交叉的高品位角砾岩的体积。
- 第四台钻机将完成在第四阶段结束时暂停的钻孔ATXD25A,该孔位于壁岩和岩浆之间的接触面。
- 公司计划在1月初调派第五台钻机。
Adelaide Capital Markets
阿德莱德资本市场
ATEX is also pleased to announce it has extended its agreement with Adelaide Capital Markets ("Adelaide") of Toronto, Ontario, by one year until November 30, 2025, at a rate of $8,000 per month, and their engagement may continue on a month-to-month basis thereafter on the same terms as the agreement unless otherwise terminated by either party. Adelaide will continue to provide investor relations services to ATEX including advising on the Company's investor relations strategy, updating and creating corporate content, assisting with public reporting and filings, and hosting virtual webinars and shareholder engagement. Adelaide is independent of ATEX and is a full-service investor relations firm specializing in providing services to small and mid-cap companies throughout North America.
ATEX还高兴地宣布,它已与位于安大略省多伦多的阿德莱德资本市场("阿德莱德")延长协议为期一年,直到2025年11月30日,费用为每月8000美元,并且在此后,双方可以按照原协议的相同条款月度续约,除非有一方终止。阿德莱德将继续为ATEX提供投资者关系服务,包括对公司的投资者关系策略进行咨询,更新和创建公司内容,协助公共报告和备案,以及举办虚拟网络研讨会和股东活动。阿德莱德与ATEX是独立的,是一家专注于为整个北美的小型和中型公司的全方位投资者关系服务公司。
Qualified Person
合格人士
Dr. Owen Hatton, PhD, MAusIMM, registered with the Australasian Institute of Mining and Metallurgy (AusIMM), is the Qualified Person, as defined by Canadian Securities National Instrument 43-101 Standards for Disclosure for Mineral Projects ("NI 43-101"), for the Valeriano Copper-Gold Porphyry Project. Dr Hatton is Director of Exploration of ATEX and is therefore not independent of ATEX for the purposes of NI 43-101. He has reviewed and approved the disclosure of the scientific and technical information contained in this press release.
Owen Hatton博士,博士,MAusIMm,注册于澳大利亚矿业与冶金协会(AusIMM),是《加拿大证券国家仪器43-101矿产项目披露标准》("NI 43-101")所定义的合格人士,负责Valeriano铜金瓷矿项目。Hatton博士是ATEX的勘探董事,因此在NI 43-101的目的上不独立于ATEX。他已审核并批准了本新闻稿中包含的科学和技术信息的披露。
About ATEX
关于ATEX
ATEX is exploring the Valeriano Copper-Gold Project which is located within the emerging copper gold porphyry mineral belt linking the prolific El Indio High-Sulphidation Belt to the south with the Maricunga Gold Porphyry Belt to the north, located in the Atacama Region, Chile. This emerging belt, informally referred to as the Link Belt, hosts several copper gold porphyry deposits at various stages of development including, Filo del Sol (Filo Mining), Josemaria (Lundin Mining), Los Helados (NGEX Minerals/JX Nippon), La Fortuna (Teck Resources/Newmont) and El Encierro (Antofagasta/Barrick Gold). The Valeriano Project hosts a large copper gold porphyry mineral resource: 1.41 billion tonnes at 0.67% CuEq (0.50% Cu, 0.20 g/t Au, 0.96 g/t Ag and 63.80 g/t Mo), which includes a higher-grade core totaling 200 million tonnes at 0.84% CuEq (0.62% Cu, 0.29 g/t Au 1.25 g/t Ag and 55.7 g/t Mo), as reported by ATEX on September 12, 20231.
ATEX正在探索Valeriano铜金项目,该项目位于新的铜金瓷矿带内,该矿带将南部富裕的El Indio高硫带与北面的Maricunga金瓷矿带连接,位于智利的阿塔卡马地区。这个新兴的矿带被非正式称为“连接带”,其中拥有多个处于不同开发阶段的铜金瓷矿存矿,包括Filo del Sol(Filo Mining)、Josemaria(Lundin Mining)、Los Helados(NGEX Minerals/JX Nippon)、La Fortuna(泰克资源有限公司/纽曼矿业)和El Encierro(安托法加斯塔/巴里克黄金)。Valeriano项目拥有大量铜金瓷矿资源:14.1亿吨,品位为0.67% CuEq(0.50% Cu,0.20 g/t Au,0.96 g/t Ag和63.80 g/t Mo),其中包括一个高级核心,总计20000万吨,品位为0.84% CuEq(0.62% Cu,0.29 g/t Au,1.25 g/t Ag和55.7 g/t Mo),如ATEX在2023年9月12日所报告。
For further information, please contact:
如需更多信息,请联系:
Ben Pullinger,
President and CEO
Email: bpullinger@atexresources.com
本·普林杰,
总裁兼首席执行官
电子邮件:bpullinger@atexresources.com
Aman Atwal,
Vice President, Business Development and Investor Relations
Email: aatwal@atexresources.com
阿曼·阿特瓦尔,
业务发展和投资者关系副总裁
电子邮件:aatwal@atexresources.com
1-647-398-9405
or visit ATEX's website at .
1-647-398-9405
或者访问ATEX的网站。
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:
关于前瞻性声明的警告说明:
This news release contains forward-looking statements, including predictions, projections, and forecasts. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "planning", "expects" or "does not expect", "continues", "scheduled", "estimates", "forecasts", "intends", "potential", "anticipates", "does not anticipate", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements.
本新闻稿包含前瞻性陈述,包括预测、推测和预测。通常,但并不总是,前瞻性陈述可以通过使用诸如“计划”、“筹划”、“期望”或“没有期望”、“持续”、“计划中”、“估计”、“预测”、“意图”、“潜在”、“预期”、“不预期”或描述“目标”的词语来识别,或者这种词语和短语的变体,或者声明某些行为、事件或结果“可能”、“可以”、“将会”、“可能”或“将”被采取、发生或实现。前瞻性陈述涉及已知和未知的风险、未来事件、条件、不确定性以及其他因素,这些因素可能导致实际结果、表现或成就与任何前瞻性陈述中表达或暗示的未来结果、预测、推测、表现或成就存在重大差异。
Such forward-looking statements include, among others: future results of on-going or additional metallurgical testing and programs; the marketability of copper concentrate that may be produced at the Project; the impact of coarser grinding on recoveries; potential for production of a saleable molybdenum concentrate; the length and terms of the engagement of Adelaide; the success and robustness of the process flowsheet being developed for Valeriano; plans for the evaluation of exploration properties including the Project; the success of evaluation plans; the success of exploration activities at the Project, including those related to copper, gold and molybdenum; mine development prospects; potential for future metals production; changes in economic parameters and assumptions; all aspects related to the timing and extent of exploration activities including the Phase V exploration program contemplated in this press release; timing of receipt of exploration results; the interpretation and actual results of current exploration activities, including drilling and metallurgical programs, and mineralization; changes in project parameters as plans continue to be refined; the results of regulatory and permitting processes; future metals price; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; labour disputes and other risks of the mining industry; the results of economic and technical studies; delays in obtaining governmental and local approvals or financing or in the completion of exploration; timing of assay results; as well as those factors disclosed in ATEX's publicly filed documents.
此类前瞻性陈述包括但不限于:持续或额外冶金测试和项目的未来结果;可能在项目中生产的铜精矿的市售性;粗磨对回收率的影响;生产可销售的钼精矿的潜力;阿德莱德的参与期限和条款;为Valeriano开发的流程图的成功和稳健性;对包括该项目在内的勘探属性进行评估的计划;评估计划的成功;在项目中,包括与铜、黄金和钼相关的勘探活动的成功;矿山开发前景;未来金属生产的潜力;经济参数和假设的变化;与本新闻稿中考虑的第五阶段勘探计划的勘探活动的时间和程度相关的所有方面;勘探结果的接收时间;当前勘探活动的解释和实际结果,包括钻探和冶金项目以及矿化;随着计划的不断完善,项目参数的变化;监管和许可过程的结果;未来金属价格;品位或回收率的可能变化;设备或流程未能按预期运行;劳工争议和其他采矿行业风险;经济和技术研究的结果;获得政府和地方批准或融资或完成勘探的延误;化验结果的时间;以及在ATEX公开提交的文件中披露的那些因素。
Although ATEX has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.
虽然ATEX已经尝试识别可能导致实际行动、事件或结果与前瞻性声明中描述的情况有重大差异的重要因素,但可能还有其他因素导致行动、事件或结果未能如预期、估计或打算的那样发生。无法保证前瞻性声明将被证明是准确的,因为实际结果和未来事件可能与这些声明中预计的情况有重大差异。因此,读者不应对前瞻性声明给予过度的信赖。
Neither the TSX Venture Exchange nor its regulation services provider has reviewed or accepts
responsibility for the adequacy or accuracy of the content of this news release.
无论是TSX创业公司交易所还是其监管服务提供商都未审查或接受
本资讯稿内容的充分性或准确性不承担任何责任。
1 Please see NI 43-101 technical report titled "Independent Technical Report for the Valeriano Copper-Gold Project, Atacama Region, Chile" by Joled Nur, CCCRRM-Chile, and David Hopper, CGeol, with an effective date of September 1, 2023, filed at on October 25, 2023, for additional details on the 2023 Mineral Resource Estimate for the Valeriano project.
请查看Joled Nur、CCCRRm-Chile和David Hopper等撰写的《瓦莱里亚诺铜金项目,智利阿塔卡马地区独立技术报告》(NI 43-101技术报告),报告截止日期为2023年9月1日,并于2023年10月25日提交,了解有关2023年瓦莱里亚诺项目矿产资源评估的详细信息。