Gamuda Wins RM1.8 Billion River Solar Project In Australia
Gamuda Wins RM1.8 Billion River Solar Project In Australia
$GAMUDA (5398.MY)$ through its wholly-owned subsidiary in Australia, DT Infrastructure, has announced that it has been awarded the AUD625 million (approximately RM1.8 billion) contract by Lightsource bp Renewable Energy Investments Limited (Lightsource bp) to deliver Goulburn River Solar Farm project in the Upper Hunter region of New South Wales (NSW), Australia.
$GAMUDA (5398.MY)$ 通过其全资子公司在澳洲的Dt Infrastructure宣布,它已被Lightsource bp可再生能源投资有限公司(Lightsource bp)授予价值AUD62500万(约合RM18亿)的合同,以执行位于新南威尔士州(NSW)上亨特(Upper Hunter)地区的戈尔本河太阳能农场项目。
Goulburn River's 585 MWp capacity is the first solar farm project to be delivered by Gamuda under the DT Infrastructure brand in Australia. The scope of works for this engineering, procurement and construction project includes civil, structural and electrical infrastructure required for the solar farm.
Goulburn River的585 MWp容量是Gamuda在澳洲以Dt Infrastructure品牌交付的第一个太阳能农场项目。该工程的采购和施工项目的工作范围包括太阳能农场所需的土木、结构和电力基础设施。
In a statement today, the group said: "The Goulburn River project is a fantastic example of New South Wales continuing its significant investment in renewable energy, aligning with the Australian Government's target of achieving 82 percent renewable energy in the nation's electricity grids by 2030. We are delighted to be partnering with Lightsource bp on the Goulburn River solar farm. We look forward to contributing our expertise to delivering best-in-class renewable energy solutions and driving
positive outcomes for the local community, the energy sector, and Australia's carbon reduction targets."
今天,该集团在一份声明中表示:“Goulburn River项目是新南威尔士州持续大规模投资可再生能源的绝佳例子,符合澳大利亚政府到2030年实现国家电力网中82%可再生能源的目标。我们很高兴能与Lightsource bp在Goulburn River太阳能农场合作。我们期待为提供一流的可再生能源解决方案和推动
积极成果,为当地社区、能源板块和澳洲的碳减排目标贡献力量。”
Once operational, the solar farm will generate enough renewable energy to power approximately 225,000 homes. It is expected to reduce carbon emissions by 910,000 tonnes each year, significantly supporting Australia's sustainability goals.
一旦投入运营,该太阳能农场将产生足够的可再生能源,为大约225,000户家庭供电。预计每年将减少910,000吨的碳排放,对澳洲的可持续发展目标提供显著支持。
Site access date for Goulburn River Solar Farm project is expected to commence by January 2025. Gamuda has been making strong strides in Australia's renewable energy market. In September 2024, the group was awarded the RM702 million (AUD243 million) Boulder Creek Wind Farm project in Queensland under DT Infrastructure. While its Gamuda Engineering Australia arm, in a joint venture with Ferrovial Construction signed an Early Contractor Involvement (ECI) agreement in November 2024 with Alinta Energy for the multi-billion-dollar Oven Mountain Pumped Hydro Storage project in NSW.
Goulburn River太阳能农场项目的现场访问日期预计将于2025年1月开始。Gamuda在澳洲可再生能源市场上正在取得重大进展。2024年9月,该集团获得了在昆士兰州的RM70200万(AUD24300万)Boulder Creek风电场项目,采用Dt Infrastructure进行承接。同时,其Gamuda工程澳洲分公司与Ferrovial Construction建立了合资企业,并于2024年11月与Alinta Energy签署了多亿美元的Oven Mountain抽水蓄能项目的早期承包商参与(ECI)协议。