share_log

ST Engineering Bags $180m Metro Infrastructure Contracts in Bangkok

ST Engineering Bags $180m Metro Infrastructure Contracts in Bangkok

新科工程在曼谷获得价值18000万美元的地铁制造行业合同
Singapore Business Review ·  2024/12/18 17:44

The contracts were awarded to its Urban Solutions business.

这些合同授予了其城市解决方案业务。

ST Engineering's Urban Solutions business has secured contracts worth $180m for metro infrastructure projects in Bangkok, Thailand.

St Engineering的城市解决方案业务已获得价值1.8亿美元的泰国曼谷地铁基础设施项目合同。

The projects involve the deployment of a communications system, Supervisory Control and Data Acquisition (SCADA) system, and AGIL Platform Screen Door (PSD) solution for the 35.9-kilometre MRT Orange Line.

这些项目涉及为35.9公里的地铁橙线部署通信系统、监控和数据采集(SCADA)系统以及AGIL平台屏蔽门(PSD)解决方案。

The communications system will leverage advanced networking technologies to ensure timely data transmission, facilitating efficient operations and predictive maintenance. Meanwhile, the SCADA system will enable real-time monitoring and control of metro operations.

通信系统将利用先进的网络技术来确保及时的数据传输,促进高效运营和预测性维护。同时,SCADA系统将实现对地铁运营的实时监控和控制。

ST Engineering Urban Solutions will also provide over 500 sets of full-height PSDs and more than 160 sets of half-height PSDs for the 21 underground stations and seven elevated stations on the Orange Line.

St Engineering Urban Solutions还将为橙线上的21个地铁站和7个高架车站提供500多套全高PSD和160多套半高PSD。

The Orange Line, which connects eastern and western Bangkok, is expected to serve approximately 400,000 daily passengers when fully operational in 2030.

连接曼谷东部和西部的橙线在2030年全面运营后,预计每天将为约40万名乘客提供服务。

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发