share_log

Silver Elephant’s Paca North Discovery Drills 27 Meters of 159 g/t Silver from Near-Surface Oxides Including 1.5 Meters of 565 g/t Silver in Bolivia

Silver Elephant’s Paca North Discovery Drills 27 Meters of 159 g/t Silver from Near-Surface Oxides Including 1.5 Meters of 565 g/t Silver in Bolivia

Silver Elephant 的 Paca North Discovery 在玻利维亚从近地表氧化物中钻出 27 米 159 克/吨的银,包括 1.5 米 565 克/吨的银
Accesswire ·  2022/03/29 09:55

VANCOUVER, BC / ACCESSWIRE / March 29, 2022 / Silver Elephant Mining Corp. ("Silver Elephant" or "the Company") (TSX:ELEF)(OTCQX:SILEF)(Frankfurt:1P2N) announces diamond drilling results from the Paca deposit ("Paca") within its 100%-controlled Pulacayo silver project ("Pulacayo") in the Potosi department of Bolivia. A total of 8 holes were drilled at Paca, totaling 1,717 meters. PND 119, 120, 121 & 122 were drilled to test induced polarization ("IP") geophysical anomalies located to the east of the current Paca resource. PND 123, 124, 125 & 126 were drilled to test potential northern extension of the Paca resource.

不列颠哥伦比亚省温哥华/ACCESSWIRE /2022 年 3 月 29 日/Silver Elephant Mining Corp.(“银象” 或 “公司”)(多伦多证券交易所:ELEF)(OTCQX: SILEF)(法兰克福:1P2N) 公布了玻利维亚波托西省帕卡矿床(“Paca”)100%控制的普拉卡约白银项目(“Pulacayo”)的钻石钻探结果。在帕卡共钻了8个洞,总长1,717米。钻探了PND 119、120、121和122,以测试位于当前 Paca 资源以东的感应极化(“IP”)地球物理异常。对PND 123、124、125和126进行了钻探,以测试帕卡资源向北延伸的可能性。

The results are summarized in the following table:

结果汇总在下表中:

Paca East Discovery

Hole ID

From

To

Width (m)

Ag (g/t)

Pb %

Zn %

AgEq (g/t)

PND119

360.0

399.0

39.0

5

0.40

0.49

37

incl…

377.0

379.0

2.0

31

1.14

1.15

112

PND120

39.0

75.0

36.0

12

0.08

0.51

33

incl…

68.0

75.0

7.0

14

0.21

0.94

56

PND120

184.0

187.0

3.0

28

2.18

0.64

126

PND120

280.0

284.0

4.0

6

0.52

0.60

46

PND121

50.0

68.0

18.0

2

0.65

0.81

56

incl…

57.0

59.0

2.0

1

1.25

2.64

147

PND121

75.0

79.0

4.0

56

0.16

0.12

60

PND122

34.0

56.0

22.0

1

0.56

0.46

38

Paca North Oxide Discovery

Hole ID

From

To

Width (m)

Ag (g/t)

Pb %

Zn %

AgEq (g/t)

PND123

3.0

30.0

27.0

159

0.28

0.05

154

incl…

7.5

9.0

1.5

565

0.30

0.08

518

PND123

37.5

45.0

7.5

68

0.11

0.07

67

PND124

0.0

28.5

28.5

22

0.42

0.73

63

incl…

15.0

27.0

12.0

21

0.54

1.29

88

PND125

0.0

18.8

18.8

33

0.20

0.52

56

incl…

10.4

15.4

5.0

80

0.40

1.13

130

PND126

0.0

31.0

31.0

31

0.22

0.09

39

incl…

29.0

31.0

2.0

78

0.27

0.08

82

Paca East 探索之旅

Hole ID

来自

宽度 (m)

银 (g/t)

Pb%

锌%

ageQ (g/t)

PND119

360.0

399.0

39.0

5

0.40

0.49

37

包括...

377.0

379.0

2.0

31

1.14

1.15

112

PND120

39.0

75.0

36.0

12

0.08

0.51

33

包括...

68.0

75.0

7.0

14

0.21

0.94

56

PND120

184.0

187.0

3.0

28

2.18

0.64

126

PND120

280.0

284.0

4.0

6

0.52

0.60

46

PND121

50.0

68.0

18.0

2

0.65

0.81

56

包括...

57.0

59.0

2.0

1

1.25

2.64

147

PND121

75.0

79.0

4.0

56

0.16

0.12

60

PND122

34.0

56.0

22.0

1

0.56

0.46

38

Paca 北氧化物探索之旅

Hole ID

来自

宽度 (m)

银 (g/t)

Pb%

锌%

ageQ (g/t)

PND123

3.0

30.0

27.0

159

0.28

0.05

154

包括...

7.5

9.0

1.5

565

0.30

0.08

518

PND123

37.5

45.0

7.5

68

0.11

0.07

67

PND124

0.0

28.5

28.5

22

0.42

0.73

63

包括...

15.0

27.0

12.0

21

0.54

1.29

88

PND125

0.0

18.8

18.8

33

0.20

0.52

56

包括...

10.4

15.4

5.0

80

0.40

1.13

130

PND126

0.0

31.0

31.0

31

0.22

0.09

39

包括...

29.0

31.0

2.0

78

0.27

0.08

82

Note: Reported widths are intercepted core lengths and not true widths, as relationships with intercepted structures and contacts vary. Based on core-angle measurements, true widths range from 75% to 85% of the reported core length. Please see note on AgEq calculation in preceding paragraphs. Sulphide zone metal recoveries of 89.2% for Ag, 91.9% for Pb, and 82.9% for Zn were used in the Silver Equivalent (Recovered) equation and reflect metallurgical testing results disclosed previously for the Pulacayo Deposit. Silver equivalents are noted where "AgEq"=Silver Equivalent (Recovered) and is equal to (Ag g/t*89.2%)+((Pb%*(US$0.95/lb. Pb/14.583 Troy oz./lb./US$17 per Troy oz. Ag)*(10,000*91.9%))+((Zn%*(US$1.16/lb. Zn/14.583 Troy oz./lb./US$17 per Troy oz. Ag)*(10,000*82.9%)).

注意:报告的宽度是截取的核心长度,而不是实际宽度,因为与截获结构和接触的关系各不相同。根据核心角度测量,实际宽度范围为报告核心长度的75%至85%。请参阅前面段落中有关AgeQ计算的说明。银当量(回收)方程中使用的硫化物区金属回收率为银89.2%,铅为91.9%,锌为82.9%,这反映了先前披露的普拉卡约矿床的冶金测试结果。注明白银当量,其中 “ageq” =白银当量(已恢复)等于(银g/t* 89.2%)+(Pb%*(0.95 美元/磅 pb/14.583 Troy oz./Lb./每特洛伊盎司银17 美元)*(10,000* 91.9%))+(Zn%*(1.16美元/磅 Znn/14.583 Troy ./lb./每 Troy oz. Ag) 17 美元) * (10,000* 82.9%)。

Notable results include PND 123, collared at the northern edge of the Paca resource and drilled further to the north. The hole intercepted 27 meters of 159 g/t silver from near-surface, including 1.5 meters of 565 g/t silver. PND 123, 124, 125 & 126 are step-out holes and all intercepted silver mineralization demonstrate the northern extension of Paca oxide resource that is open to the north and to the northeast by at least 100 meters. The company plans to conduct further drilling to expand the Paca oxide resource in 2nd half of 2022.

显著的结果包括PND 123,它位于帕卡资源的北部边缘,向北钻探。该洞从近地表截获了 27 米 159 克/吨的银,包括 1.5 米 565 克/吨的银。PND 123、124、125 和 126 是步进洞,所有截获的银矿化都表明 Paca 氧化物资源向北延伸至少 100 米,向北和向东北开放了至少 100 米。该公司计划进行进一步的钻探,以扩大2年的Paca氧化物资源 2022 年的一半。

Paca north's shallow oxide expression and flat-tabular morphology may be well suited for a potential open-pit operation, which the company will announce the commissioning of a prefeasibility study shortly and provide an update on its environmental permitting efforts enabling an open-pit mining, leach processing operation at Paca.

Paca north的浅层氧化物表达和平板形态可能非常适合潜在的露天作业,该公司将很快宣布委托进行一项预可行性研究,并提供其环境许可工作的最新情况,使Paca能够进行露天采矿、渗滤处理作业。

John Lee, the Company's Chairman, states: "Silver Elephant's 2022 priority is all about Paca: expanding oxide resource, completing environmental permitting and a prefeasibility study. Our goal is to accelerate Paca development to reach a mine construction decision in early 2023."

该公司董事长约翰·李表示:“Silver Elephant在2022年的优先事项完全与Paca有关:扩大氧化物资源,完成环境许可和预可行性研究。我们的目标是加快 Paca 的开发,以便在 2023 年初做出矿山建设决定。”

PND 119, 120, 121 & 122 are exploration holes that tested IP anomalies located east and southeast from the Paca resource. All 4 holes encountered metal-bearing sulphide mineralization and the results confirm Paca hydrothermal mineralizing systems continue eastward beyond what was previously known. The Company is incorporating all available drill data, mapping, sampling, and geophysical data to better understand the geological and resource models to generate new drill targets.

PND 119、120、121 和 122 是用于测试位于 Paca 资源东部和东南部的知识产权异常的勘探洞。所有 4 个孔洞都遇到了含金属的硫化物矿化,结果证实 Paca 热液矿化系统继续向东延伸,超出了先前已知的范围。该公司正在整合所有可用的钻探数据、测绘、采样和地球物理数据,以更好地了解地质和资源模型,从而生成新的钻探目标。

The Paca resource was prepared by Mercator Geological Services Limited with an effective date of October 13, 2020 with details provided in the Company's news release dated October 13, 2020.

Paca资源由墨卡托地质服务有限公司编制,生效日期为2020年10月13日,公司于2020年10月13日发布的新闻稿中提供了详细信息。

Paca Deposit Pit-Constrained Mineral Resource Estimate - Effective Date October 13, 2020**

Paca 矿床矿坑受限矿产资源估算——生效日期 2020 年 10 月 13 日**

Cut -off
Grade

Zone

Category

Rounded
Tonnes

Ag g/t

Zn %

Pb %

Ag
Moz

Zn
Mlbs

Pb
Mlbs

*AgEq
Moz

*AgEq
g/t

50 Ag g/t

Oxide
In-Pit

Indicated

1,095,000

185

6.5

Inferred

345,000

131

1.5

30 *AgEq
g/t

Sulfide
In-Pit

Indicated

20,595,000

46

1.07

0.67

30.5

485.8

304.2

70.2

106

Inferred

3,050,000

46

0.76

0.65

4.5

51.1

43.7

9.2

94

Total:

Indicated

21,690,000

37

485.8

304.2

70.2

Inferred

3,395,000

6

51.1

43.7

9.2

切断
等级

区域

类别

已舍入

Ag g/t

锌%

Pb%

Ag
Moz


美国职棒大联盟

Pb
美国职棒大联盟

*AgeQ
Moz

*AgeQ
g/t

50 Ag g/t

氧化物
矿井内

已指明

1,095,000

185

6.5

推断

345,000

131

1.5

30 *AgeQ
g/t

硫化物
矿井内

已指明

20,595,000

46

1.07

0.67

30.5

485.8

304.2

70.2

106

推断

3,050,000

46

0.76

0.65

4.5

51.1

43.7

9.2

94

总计:

已指明

21,690,000

37

485.8

304.2

70.2

推断

3,395,000

6

51.1

43.7

9.2

Paca Deposit Pit-Constrained Cut-Off Grade Sensitivity Report for Oxide Zone

Paca 沉积层受限氧化区截止等级灵敏度报告

Cut -off Grade

Category

Rounded
Tonnes

Ag g/t

Ag
Moz

30 Ag g/t

Indicated

1,805,000

128

7.4

Inferred

500,000

102

1.6

45 Ag g/t

Indicated

1,225,000

170

6.7

Inferred

375,000

124

1.5

90 Ag g/t

Indicated

800,000

231

5.9

Inferred

235,000

159

1.2

200 Ag g/t

Indicated

420,000

311

4.2

Inferred

55,000

285

0.5

400 Ag g/t

Indicated

80,000

493

1.3

Inferred

5,000

459

0.1

Note: Cut-off grade for pit-constrained oxide Mineral Resources is 50 g/t Ag.

截止等级

类别

已舍入

Ag g/t

Ag
Moz

30 Ag g/t

已指明

1,805,000

128

7.4

推断

50 万

102

1.6

45 Ag g/t

已指明

1225,000

170

6.7

推断

375,000

124

1.5

90 Ag g/t

已指明

800,000

231

5.9

推断

235,000

159

1.2

200 Ag g/t

已指明

420,000

311

4.2

推断

55,000

285

0.5

400 Ag g/t

已指明

8000

493

1.3

推断

5,0

459

0.1

注:矿坑受限氧化物矿物资源的临界等级为 50 g/t Ag。

Summaries of each hole and their target rationale are provided in the discussion below.

下文讨论中提供了每个漏洞及其目标理由的摘要。

Paca East Discovery

Paca East 探索之旅

PND119 was the first hole to test a large semi-circular IP anomaly approximately 160 meters southeast of the known Paca resource. The hole was planned to intercept the anomaly and also drill under a historic artisanal mining trench. The anomaly was targeted between 325-350 meters downhole. The hole encountered 2 meters of 31 g/t Ag, 1.14% Pb, 1.15% Zn, 112 g/t AgEq within a larger interval 39 meters of 5 g/t Ag, 0.40% Pb, 0.49%, 37 g/t Ag.

PND119 是测试已知 Paca 资源东南约 160 米处的大型半圆形 IP 异常的第一个洞。这个洞原本是为了拦截异常现象,也是在历史悠久的手工采矿沟下钻探的。该异常目标位于井下 325-350 米之间。该洞在较大的间隔 39 米内遇到 2 米 31 g/t Ag、1.14% Pb、1.15% Zn、112 g/t AgeQ,即 5 g/t Ag、0.40% Pb、0.49%、37 g/t AgeQ。

PND120 was designed to test a potential down-dip extension of the 39 meters of mineralization encountered in PND119 and to ascertain any potential increase in concentration of this mineralization. A 36 meter interval was intercepted from 39-75 meters of 12 g/t Ag, 0.21% Pb, 0.08%, 0.51% Zn, 33 g/t AgEq including 7 meters of 14 g/t Ag, 0.21% Pb and 0.94% Zn, 56 g/t AgEq and encountered sulphides from 184-187 meters at 28 g/t Ag, 2.18% Pb, 0.64% Zn, 126 g/t AgEq. Both these intercepts precede the expected down dip portion of PND119. An intercept in the target area at 280-284 meters returned 6 g/t Ag, 0.52% Pb, 0.60% Zn, 46 g/t AgEq.

PND120 旨在测试在 PND119 中遇到的 39 米矿化层的潜在向下延伸部分,并确定这种矿化浓度是否可能增加。在 39-75 米处截获了 36 米间隔 12 g/t Ag、0.21% Pb、0.08%、0.51% Zn、33 g/t AgeQ,包括 7 米 14 g/t AgeQ、0.21% Pb 和 0.94% Zn、56 g/t AgeQ,在 184-187 米处遇到硫化物,速度为 28 g/t AgeQ,2.18% Pb,0.64% Zn,126 g/t ageQ。这两次拦截都早于 PND119 的预期向下跌部分。在目标区域 280-284 米处的拦截返回了 6 g/t Ag、0.52% Pb、0.60% Zn、46 g/t AgeQ。

PND121 was planned to test strong IP anomaly 280 meters south of the Paca resource and cross cut faulted structures indicated from surface mapping. A 2 meter interval of sulphide mineralization was encountered at 57-59 meters grading 1 g/t Ag, 1.25% Pb, 2.64% Zn, 147 g/t AgEq nested within a wider interval of 18 meters (50-68 meters) of 2 g/t Ag, 0.65% Pb, 0.81% Zn, 56 g/t AgEq. Another 4 meter interval shortly downhole of this interval from 75-79 meters grades 56 g/t Ag, 0.16% Pb, 0.12% Zn, 60 g/t AgEq.

PND121 计划测试Paca资源以南280米处的强IP异常和地表测绘出的横切断层结构。在 57-59 米处发现了 2 米间隔的硫化物矿化,品位为 1 g/t Ag、1.25% Pb、2.64% Zn、147 g/t AgeQ,嵌套在 18 米(50-68 米)的更宽间隔内,有 2 g/t AgeQ、0.65% Pb、0.81% Zn、56 g/t AgeQ。在这一区间不久的井下再有 4 米间隔,即 75-79 米,等级为 56 g/t Ag、0.16% Pb、0.12% Zn、60 g/t ageQ。

PND122 was designed to test an IP anomaly 240 meters southeast of the Paca resource. Disseminated sulphides were encountered from 34-56 meters (22 meters) grading 1 g/t Ag, 0.56% Pb, 0.46% Zn, 38 g/t AgEq, and a silver-bearing interval from 66-69 meters (3 meters) grading 76 g/t Ag, 0.03% Pb, 0.09% Zn, 72 g/t AgEq. Lightly mineralized sulfide bearing sediments were encountered at a depth ~200m redefining the shape of previously interpreted andesite dome and significantly extending the area of exploration interest.

PND122 旨在测试位于 Paca 资源东南 240 米处的 IP 异常。在34-56米(22米)处遇到了分级为1 g/t Ag、0.56% Pb、0.46% Zn、38 g/t ageQ,含银间隔为 66-69 米(3 米),分级为 76 g/t AgeQ,0.03% Pb,0.09% Zn,72 g/t ageQ。在深度约200米处遇到了轻度矿化的含硫化物沉积物,这重新定义了先前解释的安山岩穹顶的形状,极大地扩大了勘探兴趣的区域。

Paca North Oxide Discovery

Paca 北氧化物探索之旅

PND123 was drilled immediately outside of the resource limits to the north and encountered 27 meters of 159 g/t Ag, 0.28% Pb, 0.05% Zn, 154 g/t AgEq starting at 3.0 meters depth, including 1.5 meters of 565 g/t Ag, 0.30% Pb, 0.08% Zn, 518 g/t AgEq. A second 7.5 meter interval at 37.5-45.0 meters with 68 g/t Ag, 0.11% Pb, 0.07% Zn, 67 g/t AgEq was encountered.

PND123 在资源极限之外钻探到北方,在 3.0 米深处钻探到了 27 米 159 g/t AgeQ、0.28% Pb、0.05% Zn、154 g/t AgeQ,包括 1.5 米 565 g/t AgeQ、0.30% Pb、0.08% Zn、518 g/t AgeQ。在 37.5-45.0 米处遇到了第二个 7.5 米间隔,其中 68 g/t Ag、0.11% Pb、0.07% Zn、67 g/t AgeQ。

PND124 was drilled 80 meters north of the resource and hit mineralization starting at surface encountering 28.5 meters of 22 g/t Ag, 0.42% Pb, 0.74% Zn, 63 g/t AgEq.

PND124 在资源以北 80 米处钻探,从地表开始发现矿化,遇到 28.5 米的 22 g/t Ag、0.42% Pb、0.74% 的锌、63 g/t 的 AgeQ。

PND125 was drilled 25 meters east of the resource and also encountered mineralization starting at surface to 18.8 meters of 33 g/t Ag, 0.2% Pb, 0.52% Zn, 56 g/t AgEq including 5.0 meters of 80 g/t Ag, 0.40% Pb, 1.13% Zn, 130 g/t AgEq from 10.4-15.4 meters.

PND125 在资源以东 25 米处钻探,还遇到了从地表 18.8 米开始的 33 g/t Age、0.2% Pb、0.52% Zn、56 g/t AgeQ,包括 5.0 米 80 g/t AgeQ、0.40% Pb、1.13% Zn、130 g/t AgeQ 的矿化,位于 10.4-15.4 米处。

PND126 was collared just outside the resource drilling west into the resource and encountered mineralization from surface to 31.0 meters of 31 g/t Ag, 0.22% Pb, 0.09% Zn, 39 g/t AgEq, including 78 g/t Ag, 0.27% Pb, 0.08% Zn, 82 g/t AgEq.

PND126 被封锁在资源外向西钻探资源,从地表到31.0米的31g/t Ag、0.22% Pb、0.09% Zn、39 g/t ageQ,包括 78 g/t Ag、0.27% Pb、0.08% Zn、82 g/t AgeQ。

Please visit to see maps pertaining to this release.

请访问以查看与此版本有关的地图。

Qualified Person

合格人员

The technical contents of this news release have been prepared under the supervision of Danniel Oosterman, VP Exploration. Mr. Oosterman is not independent of the Company in that he is employed by it. Mr. Oosterman is a qualified person as defined by the guidelines in NI 43-101.

本新闻稿的技术内容是在探索副总裁丹尼尔·奥斯特曼的监督下编写的。奥斯特曼先生并非独立于公司,因为他受雇于公司。根据NI 43-101中的指导方针的定义,奥斯特曼先生是合格人士。

Quality Assurance and Quality Control

质量保证和质量控制

Silver Elephant adopts industry-recognized best practices in its implementation of QA/QC methods. A geochemical standard control sample and a blank sample are inserted into the sample stream at every 20th sample. Duplicates are taken at every 40th sample. Standards and duplicates, including lab duplicates and standards, are analyzed using scatterplots. Samples are shipped to ALS Global Laboratories in Ururo, Bolivia for preparation. They are then shipped for analysis to ALS Global laboratories in Lima, Peru. Samples are analyzed using Intermediate Level Four Acid Digestion. Silver overlimits ("ore grade") are analyzed using fire assay with a gravimetric finish. ALS Laboratories sample management system meets all the requirements of the International Standards ISO/IEC 17025:2017 and ISO 9001:2015. All ALS geochemical hub laboratories are accredited to ISO/IEC 17025:2017 for specific analytical procedures.

Silver Elephant 在实施质量保证/质量控制方法时采用了行业公认的最佳实践。每隔 20 个样本将一个地球化学标准对照样本和一个空白样品插入样本流中。每第 40 个样本采集一次重复样本。使用散点图对标准和重复项(包括实验室副本和标准)进行分析。样本被运往玻利维亚乌鲁罗的ALS全球实验室进行准备。然后,它们被运往秘鲁利马的ALS Global实验室进行分析。使用中级四酸消解对样品进行分析。银超限值(“矿石等级”)使用火焰分析法进行分析,表面采用重量法测定。ALS 实验室样本管理系统符合国际标准 ISO/IEC 17025:2017 和 ISO 9001:2015 的所有要求。所有 ALS 地球化学中心实验室均获得 ISO/IEC 17025:2017 的特定分析程序认证。

All samples are taken from HQ-diameter core were split in half by a diamond-blade masonry saw. One half of the core is submitted for laboratory analysis and the other half is preserved for reference at the Company's secured core facility. All the core is geotechnically analyzed and photographed and then logged by geologists prior to sampling.

所有样本均取自 HQ-Diametare 岩芯,由一把金刚石刀片的石工锯切成两半。一半的核心已提交实验室分析,另一半保存在公司的安全核心设施中以供参考。所有岩心都经过地质技术分析和拍照,然后由地质学家在采样之前进行记录。

About Silver Elephant

关于《银象》

Silver Elephant Mining Corp. is a premier silver mining and exploration company which also owns 39% of Battery Metals Royalties Corp.

Silver Elephant Mining Corp. 是一家首屈一指的白银开采和勘探公司,还拥有Battery Metals Royal

Further information on Silver Elephant can be found at .

有关 Silver Elephant 的更多信息,请访问。

SILVER ELEPHANT MINING CORP.
ON BEHALF OF THE BOARD

银象矿业公司
代表董事会

"John Lee"
Executive Chairman

“约翰·李”
执行主席

For more information about Silver Elephant, please contact:
+1.604.569.3661 ext. 101
info@silverelef.com

有关 Silver Elephant 的更多信息,请联系:
+1.604.569.3661 分机 101
info@silverelef.com

Neither the Toronto Stock Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Toronto Stock Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Cautionary Note Regarding Forward-Looking Statements

关于前瞻性陈述的警示说明

Certain statements contained in this news release, including statements which may contain words such as "expects", "anticipates", "intends", "plans", "believes", "estimates", or similar expressions, and statements related to matters which are not historical facts are forward-looking information within the meaning of applicable securities laws. Such forward-looking statements, which reflect management's expectations regarding Company's future growth, results of operations, performance, and business prospects and opportunities, are based on certain factors and assumptions and involve known and unknown risks and uncertainties which may cause the actual results, performance, or achievements to be materially different from future results, performance, or achievements expressed or implied by such forward-looking statements.

本新闻稿中包含的某些陈述,包括可能包含 “期望”、“预期”、“打算”、“计划”、“相信”、“估计” 或类似表达等词语的陈述,以及与非历史事实的事项相关的陈述,是适用证券法所指的前瞻性信息。此类前瞻性陈述反映了管理层对公司未来增长、经营业绩、业绩以及业务前景和机遇的预期,基于某些因素和假设,涉及已知和未知的风险和不确定性,这些风险和不确定性可能导致实际业绩、业绩或成就与此类前瞻性陈述所表达或暗示的未来业绩、业绩或成就存在重大差异。

These factors should be considered carefully, and readers should not place undue reliance on the Company's forward-looking statements. The Company believes that the expectations reflected in the forward-looking statements contained in this news release and the documents incorporated by reference herein are reasonable, but no assurance can be given that these expectations will prove to be correct. In addition, although the Company has attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events, or results not to be as anticipated, estimated, or intended. The Company undertakes no obligation to publicly release any future revisions to forward-looking statements to reflect events or circumstances after the date of this news or to reflect the occurrence of unanticipated events, except as expressly required by law.

应仔细考虑这些因素,读者不应过分依赖公司的前瞻性陈述。公司认为,本新闻稿中包含的前瞻性陈述以及此处以引用方式纳入的文件中反映的预期是合理的,但无法保证这些预期会被证明是正确的。此外,尽管公司试图确定可能导致实际行动、事件或结果与前瞻性陈述中描述的存在重大差异的重要因素,但可能还有其他因素导致行动、事件或结果与预期、估计或预期不符。除非法律明确要求,否则公司没有义务公开发布未来对前瞻性陈述的任何修订,以反映本新闻发布之日之后的事件或情况或反映意外事件的发生。

SOURCE: Silver Elephant Mining Corp.

来源: 银象矿业公司


View source version on accesswire.com:
在 accesswire.com 上查看源代码版本:

声明:本内容仅用作提供资讯及教育之目的,不构成对任何特定投资或投资策略的推荐或认可。 更多信息
    抢沙发