share_log

Uranium Energy | 8-K: Current report

Uranium Energy | 8-K: Current report

Uranium Energy | 8-K:重大事件
美股SEC公告 ·  2024/09/13 04:35

Moomoo AI 已提取核心訊息

Uranium Energy Corp announced significant drilling results from its Roughrider Project in Saskatchewan's Athabasca Basin. Drill hole RR-961, located 850 meters northeast of the main deposit, intersected 11.4% eU3O8 over 2.4 meters, including a high-grade interval of 24.9% eU3O8 over 1.0 meters. This follows the previously reported RR-940 intersection of 12.7% eU3O8 over 7.2 meters.The Roughrider North discovery has extended uranium mineralization along approximately 200 meters of strike length, with a high-grade core measuring about 55 meters. The mineralization remains open to the east and west, entirely within basement rocks about 250 meters below surface. The ongoing drill program has 20 holes remaining and may be extended into fall.The project is situated 13 kilometers west of Orano's McClean Lake Mill in the eastern Athabasca Basin, one of the world's premier uranium mining jurisdictions. Samples from all holes have been collected for assay analysis at SRC's Geoanalytical Laboratory in Saskatoon, with results expected in the coming weeks.
Uranium Energy Corp announced significant drilling results from its Roughrider Project in Saskatchewan's Athabasca Basin. Drill hole RR-961, located 850 meters northeast of the main deposit, intersected 11.4% eU3O8 over 2.4 meters, including a high-grade interval of 24.9% eU3O8 over 1.0 meters. This follows the previously reported RR-940 intersection of 12.7% eU3O8 over 7.2 meters.The Roughrider North discovery has extended uranium mineralization along approximately 200 meters of strike length, with a high-grade core measuring about 55 meters. The mineralization remains open to the east and west, entirely within basement rocks about 250 meters below surface. The ongoing drill program has 20 holes remaining and may be extended into fall.The project is situated 13 kilometers west of Orano's McClean Lake Mill in the eastern Athabasca Basin, one of the world's premier uranium mining jurisdictions. Samples from all holes have been collected for assay analysis at SRC's Geoanalytical Laboratory in Saskatoon, with results expected in the coming weeks.
鈾能公司宣佈了在薩斯喀徹溫省阿薩巴斯卡盆地的Roughrider項目中的重要鑽探結果。鑽孔RR-961位於主要礦牀東北850米處,切割到11.4%的富鈾礦石(eU3O8),長度爲2.4米,其中一個高品位區間爲24.9%的富鈾礦石,長度爲1.0米。這是繼之前報告的RR-940切割到12.7%的富鈾礦石,長度爲7.2米之後的結果。Roughrider North的發現將鈾礦化延伸了大約200米的走向,核心高品位區域約爲55米。礦化仍然向東和向西開放,完全位於離地表約250米的基岩中。當前的鑽探計劃剩餘20個孔,可能會延續到秋季。該項目位於阿薩巴斯卡盆地東部,距離Orano的McClean Lake礦區13公里,這裏是全球頂級的鈾礦開採區域之一。所有孔的樣本已被收集並進行化驗分析,送往薩斯卡通的SRC地質分析實驗室,結果預計將在接下來的幾周內公佈。
鈾能公司宣佈了在薩斯喀徹溫省阿薩巴斯卡盆地的Roughrider項目中的重要鑽探結果。鑽孔RR-961位於主要礦牀東北850米處,切割到11.4%的富鈾礦石(eU3O8),長度爲2.4米,其中一個高品位區間爲24.9%的富鈾礦石,長度爲1.0米。這是繼之前報告的RR-940切割到12.7%的富鈾礦石,長度爲7.2米之後的結果。Roughrider North的發現將鈾礦化延伸了大約200米的走向,核心高品位區域約爲55米。礦化仍然向東和向西開放,完全位於離地表約250米的基岩中。當前的鑽探計劃剩餘20個孔,可能會延續到秋季。該項目位於阿薩巴斯卡盆地東部,距離Orano的McClean Lake礦區13公里,這裏是全球頂級的鈾礦開採區域之一。所有孔的樣本已被收集並進行化驗分析,送往薩斯卡通的SRC地質分析實驗室,結果預計將在接下來的幾周內公佈。
声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息