share_log

BCM Resources Corp Announces Phase 3 Exploration Plans, TK Cu-Au Porphyry Project, Utah, USA

BCM Resources Corp Announces Phase 3 Exploration Plans, TK Cu-Au Porphyry Project, Utah, USA

BCM Resources Corp宣佈美國猶他州TK銅-金斑巖項目第三階段勘探計劃
Accesswire ·  2022/09/08 17:30

VANCOUVER, BC / ACCESSWIRE / September 8, 2022 / BCM Resources Corp ("B" or the "Company") would like to inform shareholders on the details of its Phase 3 exploration drilling planned at its Thompson Knolls (TK) greenfield Cu-Au-Ag-Mo project in the southwestern Utah, USA. It is expected that Phase 3 drilling at TK will begin in October.

温哥華,卑詩省/ACCESSWIRE/2022年9月8日/BCM Resources Corp(“B”或“本公司”)謹告知股東有關其位於美國猶他州西南部的Thompson Knolls(TK)綠地銅-金-銀-鉬項目第三期勘探鑽探計劃的詳情。預計TK的第三階段鑽探將於10月份開始。

President Dr. Sergei Diakov stated, "We are looking forward to this newly permitted phase of drilling at the TK Cu-Au-Ag-Mo porphyry system. Phase 3 drilling will help us with the search for the copper core of the porphyry system. Our focus will be directed both on the central and eastern part of the porphyry system."

總裁博士謝爾蓋·迪亞科夫表示,我們期待着在TK銅-金-銀-鉬斑巖系統進行這一新允許的鑽探階段。三期鑽探將幫助我們尋找斑巖系統的銅芯。我們的重點將放在斑巖系統的中部和東部."

The company has received permits from the BLM to drill additional 7 diamond drill holes for 24,200 feet (~7.4 km) with the proposed drill hole locations in Fig 1.

該公司已經獲得了BLM的許可,可以在24,200英尺(~7.4公里)的範圍內再鑽7個鑽石鑽孔,鑽孔位置如圖1所示。

Figure 1. TK project plan view with the location of drill holes completed by BCM (Phase 1 & 2 drill programs) in grey-blue and planned drill holes (Phase 3 drill program) in green.

圖1.TK項目平面圖,由BCM(第一階段和第二階段鑽探計劃)完成的鑽孔位置以灰藍色顯示,計劃鑽孔(第三階段鑽探計劃)以綠色顯示。

TK Phase 3 Program Design

TK第三階段程序設計

Phase 3 drilling program will be directed at vectoring in towards a potential Cu-rich core and testing several targets from the western to the eastern flank of the project as follows:

第三階段鑽探計劃將導向潛在的富銅巖心,並測試從項目西側到東側的幾個目標,具體如下:

  • TK8 will be drilled to a depth of 4000 ft (~1220 m ) and is designed to reach the mineralized intrusion beneath the mineralized skarn previously intercepted in TK5. It will be an 800 ft (~245 m) step out to the west from TK3A.
  • TK7 will be directed at testing the most intensively magnetic part of the TK porphyry intrusion and will have a projected length of 3000 ft (~915 m). TK7 is a 1457 ft (~444 m) step-out south-southeast from TK3A.
  • Holes TK9, TK10 & TK11 are positioned along the northern edge of the porphyry intrusion to test the potential for intensely mineralized skarns along the northern contract of the intrusion with the host carbonate rocks. TK9 will be drilled to 4000 ft (~1220 m) whereas TK10 and TK11 will be drilled to 3600 ft (~1100 m).
  • TK12 and TK13 will test the eastern flank of the TK porphyry intrusion and each hole will be drilled down to 3000 ft (~915 m).
  • TK8將鑽至4000英尺(約1220米)的深度,旨在到達先前在TK5截獲的礦化矽卡巖下的礦化侵入體。從TK3A向西將是800英尺(~245米)的臺階。
  • TK7將用於測試TK斑巖侵入體最強烈的磁性部分,預計長度為3000英尺(~915米)。TK7是一個1457英尺(約444米)的臺階,位於TK3A東南偏南方向。
  • TK9、TK10及TK11沿着斑巖侵入體的北緣定位,以測試沿侵入體北部收縮與寄主碳酸鹽巖的強烈礦化夕卡巖的可能性。TK9將被鑽至4000英尺(約1220米),而TK10和TK11將被鑽至3600英尺(約1100米)。
  • TK12和TK13將測試TK斑巖侵入體的東側,每個洞將被鑽至3000英尺(~915米)。

The greenfield TK Cu-Au-Ag-Mo porphyry project is located approximately 210 km southwest of Rio Tinto's giant Bingham Canyon porphyry copper-molybdenum-gold mine and smelter complex near Salt Lake City, Utah. It is accessed by a highway and then by a network of gravel roads.

綠地TK銅-金-銀-鉬斑巖項目位於力拓巨大的賓漢峽谷斑巖銅鉬金礦和冶煉綜合體西南約210公里處,靠近猶他州鹽湖城。它可以通過駭維金屬加工訪問,然後通過砂礫公路網訪問。

Qualified Person

有資格的人

The Company's Director, Mr. Richard R. Redfern, M.Sc., and Certified Professional Geologist, a "qualified person" for the purposes of National Instrument 43-101, has verified and approved the information contained in this news release.

公司董事理查德·R·雷德費恩先生和註冊專業地質學家已核實並批准了本新聞稿中包含的信息。雷德費恩先生是美國國家儀器43-101的“合格人士”。

About BCM Resources Corporation

關於BCM Resources Corporation

BCM Resources Corporation is a diversified Canadian mineral exploration company focused on the continued exploration of the Thompson Knolls Porphyry Cu-Au-Mo project. BCM also controls prospective Copper, Gold, and Molybdenum exploration projects in British Columbia. BCM Resources is managed by experienced and successful board members and advisors. For further information, including area maps, sections, and photos, please visit our website at or contact us by e-mail at info@bcmresources.com.

BCM Resources Corporation是一家多元化的加拿大礦產勘探公司,專注於湯普森諾爾斯斑巖銅金鉬項目的持續勘探。BCM還控制着不列顛哥倫比亞省未來的銅、金和鉬勘探項目。BCM Resources由經驗豐富且成功的董事會成員和顧問管理。欲瞭解更多信息,包括區域地圖、橫斷面和照片,請訪問我們的網站或通過電子郵件與我們聯繫:info@bcmresource ces.com。

ON BEHALF OF BCM RESOURCES CORP.
Dr. Sergei Diakov
President & Director

代表BCM Resources Corp.
謝爾蓋·迪亞科夫博士
總裁與董事

For further information, please contact:

如需更多信息,請聯繫:

Investor relations 604-646-0144 ext. 222
info@bcmresources.com

投資者關係部604-646-0144轉222
郵箱:Info@bcmresource ces.com

Caution Concerning Forward-Looking Statements:

有關前瞻性陳述的注意事項:

This news release and related texts and images on BCM Resource Corporation's website contain certain "forward-looking statements" including, but not limited to, statements relating to interpretation of mineralization potential, drilling and assay results, future exploration work, and the anticipated results of this work. Forward-looking statements are statements that are not historical facts and are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metals prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical, governmental, social, or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the company's projects; uncertainties involved in the interpretation of sampling and drilling results and other tests; the possibility that required permits and access agreements may not be obtained in a timely manner; risk of accidents, equipment breakdowns or other unanticipated difficulties or interruptions, and; the possibility of cost overruns or unanticipated expenses in these exploration programs.

本新聞稿以及BCM資源公司網站上的相關文本和圖片包含某些“前瞻性陳述”,包括但不限於與成礦潛力解釋、鑽探和化驗結果、未來勘探工作以及這項工作的預期結果有關的陳述。前瞻性表述為非歷史事實的表述,受各種風險和不確定因素的影響,這些風險和不確定性可能導致實際事件或結果與前瞻性表述中反映的情況大不相同,包括但不限於:與金屬價格波動有關的風險;與及時以可接受的條件籌集足夠資金為計劃工作提供資金有關的不確定性;天氣、後勤、技術、政府、社會或其他因素導致計劃工作的變化;工作結果不能實現預期並實現公司項目的預期潛力的可能性;對採樣和鑽探結果及其他測試的解釋涉及的不確定性;可能無法及時獲得所需的許可和准入協議;發生事故、設備故障或其他意想不到的困難或中斷的風險;以及這些勘探計劃中可能出現的成本超支或意外費用。

SOURCE: BCM Resources Corporation

資料來源:BCM資源公司


View source version on accesswire.com:
在accesswire.com上查看源代碼版本:

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論