Athena Gold Increases Excelsior Springs Project Size in Nevada
Athena Gold Increases Excelsior Springs Project Size in Nevada
VACAVILLE, CA / ACCESSWIRE / January 31, 2023 / Athena Gold Corporation (OTCQB:AHNR)(CSE:ATHA) ("Athena" or the "Company") is pleased to announce the addition of 1,000 acres (405 Hectares) to its property at Excelsior Springs by staking 51 new BLM claims bringing its total land package to 200 BLM lode claims covering over 4,000 acres (1,619 Hectares).
加利福尼亞州瓦卡維爾/ACCESSWIRE/2023年1月31日/雅典娜黃金公司(場外交易代碼:AHNR)(CSE:ATSA)(“雅典娜“或”公司“)很高興地宣佈其在怡東温泉的物業增加了1,000英畝(405公頃),在51個新的BLM債權上打上了賭注,使其總土地包達到200個BLM礦藏,覆蓋超過4,000英畝(1,619公頃)。
"We are excited to announce having secured an additional 1,000 acres (405 hectares) of key Lode Claims at Excelsior Springs. Our discovery at Western Slope, where we drilled three high-grade oxide gold holes near surface with multiple intercepts including 10.02 Au G/T over 10.7 meter opens the potential for continued mineralization to be found. We staked new claims to the south and east, including coverage of the Southwest IP Anomaly." commented John Power, President of Athena Gold Corp."
我們很高興地宣佈,我們已經在Excelsior Springs獲得了另外1,000英畝(405公頃)的關鍵礦脈主張。我們在西坡的發現,我們在地表附近鑽探了三個高品位氧化金礦洞,多次攔截,包括10.7米以上的10.02 Au G/T,開啟了繼續發現礦化的可能性。我們在南部和東部提出了新的主張,包括覆蓋西南激電異常。雅典娜黃金公司的總裁約翰·鮑爾評論道。
"Athena's recent exploration success in the Western Slope Zone proves the potential at the Excelsior Springs project. The new claims and exploration targets support our goal of developing a bulk mineable intrusive hosted gold deposit" Power added.
“雅典娜最近在西斜坡區的勘探成功證明瞭Excelsior Springs項目的潛力。新的主張和勘探目標支持我們開發大型可開採侵入型賦存金礦的目標。”Power補充道。
New Claim Block Details
新索賠塊詳細信息
- A shallow IP survey on the property shows a chargeability anomaly that extends beyond the boundary of the survey to the southwest with increased chargeability going under the South Ridge Thrust Fault ("SRTF") and is a target for a concentration of sulfides at depth and needs to be drill-tested. Of the new lode claims, 19 claims were located along our southern claim block border to provide protection over this important exploration target.
- 對該物業的淺層激電測量顯示,可充電性異常從測量邊界延伸到西南方向,並在南脊逆衝斷層(“SRTF”)下增加了可充電性,是深部硫化物集中的目標,需要進行鑽探測試。在新的礦脈索賠中,有19項索賠位於我國南部索賠區塊邊界,以保護這一重要的勘探目標。
- An additional 32 new lode claims (640+/- acres) were located east and southeast of our existing claim blocks in The Palmetto Mountain Trend which has been a key focus on a regional scale in this area of the Walker Lane Trend for over 150 years.
- 另外32個新的礦脈索賠(640+/-英畝)位於我們現有的棕櫚山趨勢索賠區塊的東部和東南部,該地區150多年來一直是Walker Lane Trend地區區域規模的關鍵焦點。
[1] "The Mines of the District for the most part lie within two parallel lines not much more than a half mile apart, commencing at the summit of the (Palmetto) Lida Bell Mountain thence diagonally down that mountain thence, diagonally down that mountain" was reported in the Inyo Independent newspaper in May 1873.
[1]1873年5月,《Inyo獨立報》報道稱,該地區的礦藏大部分位於兩條相距不超過半英里的平行線內,從(棕櫚樹)利達貝爾山的山頂開始,然後斜着從那座山下來,從那座山斜向下。
About Our Flagship Excelsior Springs Project
關於我們的旗艦項目Excelsior Springs
The Excelsior Springs Project (the "Project") lies within the prolific Walker Lane tectonic trend, a large region of northwest-trending, strike-slip fault zones that host a significant number of precious metal deposits having very strong structural control for mineralization. The Project contains numerous prospect pits, trenches, roads, surface sampling sites and 104 drill holes to date within a 300m X 3,000m wide (1,000 foot-wide and 10,000-foot-long east-west trending zone of shearing and alteration. Underground workings on the two patented claims within the Project had unverified, historical production of 597,187 grams of gold (19,200 troy ounces) from 18,000 tons averaging 37.3 grams/ton Au (1.2 oz/ton Au).
Excelsior Springs項目(“項目”)位於多產的Walker Lane構造趨勢中,這是一大片向西北方向的走滑斷裂帶,擁有大量貴金屬礦牀,對成礦具有非常強的構造控制。到目前為止,該項目在一個300米×3,000米寬(1,000英尺寬,10,000英尺長的東西向剪切和蝕變趨勢帶)內包含許多勘探坑、壕溝、道路、地表採樣點和104個鑽孔。該項目內兩項專利主張的地下開採未經核實,歷史產量為597,187克(19,200金衡盎司),產量為18,000噸,平均為37.3克/噸金(1.2盎司/噸金)。
The Walker Lane trend is experiencing a major resurgence of intense and successful exploration and development. The Walker Lane has had total production of 20+ million ounces ("Moz") of gold, including the following deposits at Goldfields (5 Moz), Bullfrog (2 Moz), Tonopah (2 Moz), Mineral Ridge (1.5 Moz) and Comstock (8 Moz Au, 200 Moz Ag). Readers are cautioned that the Company has no interest in or right to acquire any interest in any of the above-mentioned properties, other than the Excelsior Springs the "Project"), and that the mineral deposits, and the results of any exploration or mining thereof, on adjacent or similar properties are not indicative of potential mineral deposits Project or any potential exploitation thereof.
沃克巷趨勢正在經歷一場激烈而成功的勘探和開發的重大復興。Walker Lane的黃金總產量為2000多萬盎司(“Moz”),包括位於Goldfield(5 Moz)、BullFrog(2 Moz)、Tonopah(2 Moz)、Minory Ridge(1.5 Moz)和Comstock(8 Moz Au,200 Moz Ag)的下列礦牀。謹此提醒讀者,本公司並無於上述任何物業(Excelsior Springs及Excelsior Springs除外)擁有任何權益,亦無權利收購該等物業的任何權益(“項目”),而鄰近或類似物業的礦藏及其任何勘探或開採結果並不代表潛在的礦藏項目或其任何潛在開採。
Gold mineralization discovered at the Project to date occurs in quartz vein stock-works and silicified zones in hornfels and calc-silicate altered country rock and is generally close to porphyry dykes. The best (grades and thicknesses) discovered recently were found in oxidized and altered sediments immediately above porphyry dykes seemingly intruded along existing east- and east-northeast trending faults. The mineralized stock-work vein zones are shallow and have a relatively flat plunge, making them amenable to open pit mining methods.
到目前為止,該項目發現的金礦化賦存於角巖和鈣硅酸鹽蝕變圍巖中的石英脈礦化和硅化帶中,通常靠近斑巖巖脈。最近發現的最好的(等級和厚度)是在斑巖巖牆正上方的氧化和蝕變沉積物中發現的,似乎是沿着現有的東向和東北向斷裂侵入的。礦化的礦化礦脈帶較淺,傾角相對平坦,適合露天採礦方法。
Most historical exploration at the Excelsior Springs Project has focused on a 2.5 km (8,200 feet) long section in the central part of the Buster zone where mineralization is at or near the surface. Surface mapping and an Induced Polarization (IP) geophysical survey conducted by Zonge International Inc. identified multiple zones of silicification that correlate well with the known mineralization. Many of the silicified zones defined by the IP (resistivity highs) surveys have not been tested by drilling and constitute viable exploration targets.
Excelsior Springs項目的大多數歷史勘探都集中在Buster帶中部一段2.5公里(8200英尺)長的區域,那裏的礦化位於或接近地表。宗格國際公司進行的地表測繪和激發極化(IP)地球物理測量確定了與已知礦化密切相關的多個硅化帶。許多由IP(高電阻率)測量確定的硅化帶還沒有經過鑽井測試,構成了可行的勘探目標。
Based on the results of previous drilling programs, the Project is at an advanced stage of exploration with significant potential to host one or more shallow gold deposits amenable to open pit mining, along with deeper, higher grade feeder zones that may be found and could be mined by underground methods. In the opinion of management and its consultants, the Project is very promising and further exploration has the potential to expand the known mineralization and establish additional mineralized zones.
根據先前鑽探計劃的結果,該項目已進入勘探的後期階段,藴藏着一個或多個可供露天開採的淺層金礦牀,以及可能找到並可用地下方法開採的較深、品位較高的供給帶。管理層及其顧問認為,該項目前景看好,進一步勘探有可能擴大已知的礦化並建立更多礦化帶。
Qualified Person
有資格的人
Donald G. Strachan, Certified Professional Geologist (CPG #10376 AIPG), is a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and has reviewed the scientific and technical information that forms the basis of this press release and has approved the disclosure herein. Mr. Strachan is independent of the Company and was responsible for the site management and technical aspects of Athena's 2022 drill programs.
唐納德·G·斯特拉坎,註冊專業地質學家(CPG#10376 AIPG),是國家儀器43-10376定義的合格人員-《礦產項目信息披露標準》(“NI 43-101”),並已審查了構成本新聞稿基礎的科學和技術信息,並已批准在此披露。Strachan先生獨立於公司,負責雅典娜2022年鑽井項目的現場管理和技術方面。
About Athena Gold Corporation
關於雅典娜黃金公司
Athena is engaged in the business of mineral exploration and the acquisition of mineral property assets. Its objective is to locate and develop economic precious and base metal properties of merit and to conduct additional exploration drilling and studies on the Project.
雅典娜從事礦產勘探和收購礦產資產的業務。其目標是尋找和開發有價值的經濟、貴金屬和賤金屬資產,並對該項目進行額外的勘探、鑽探和研究。
For further information about Athena Gold Corporation and our Excelsior Springs Gold project, please visit .
有關雅典娜黃金公司和我們的Excelsior Springs黃金項目的更多信息,請訪問。
On Behalf of the Board of Directors
我謹代表董事會
John Power
Chief Executive Officer and President
約翰·鮑爾
首席執行官兼總裁
Contact:
聯繫方式:
Phone: John Power, 707-291-6198
Email: info@athenagoldcorp.com
電話:約翰·鮑爾,707-291-6198
電子郵件:info@athenagoldcorp.com
Jason Libenson,
President
Castlewood Capital Corporation
Phone: (647)-534-9884
Email: jason@castlewoodcapital.ca
傑森·利本森
總裁
卡斯特爾伍德資本公司
電話:(647)-534-9884
電子郵件:jason@Castlewood capal.ca
Cautionary Statement to U.S. Investors
對美國投資者的警示聲明
This press release references NI 43-101, which differs from the requirements of U.S. securities laws. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects.
本新聞稿編號為NI 43-101,與美國證券法的要求不同。NI 43-101是加拿大證券管理人制定的一項規則,為發行人對有關礦產項目的科學和技術信息進行的所有公開披露建立了標準。
The United States Securities and Exchange Commission ("SEC") permits mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can legally extract or produce. Pursuant to SEC Industry Guide 7 under the United States Securities Act of 1933, as amended, a "final" or "bankable" feasibility study is required to report reserves. Currently Athena has not delineated "reserves" on any of its properties. Athena cannot be certain that any deposits at its properties will ever be confirmed or converted into SEC Industry Guide 7 or any successor rule or regulation compliant "reserves". Investors are cautioned not to assume that any part or all of the historic Buster Mine gold zone will ever be confirmed or converted into reserves or that it can be economically or legally extracted.
美國證券交易委員會(“美國證券交易委員會”)允許礦業公司在提交給美國證券交易委員會的文件中只披露公司可以合法開採或生產的礦藏。根據修訂後的1933年《美國證券法》下的《美國證券交易委員會行業指南7》,需要進行一份“最終”或“可銀行”的可行性研究報告,以報告儲備情況。目前,雅典娜還沒有在其任何一處房產上劃定“保護區”。雅典娜無法確定其物業內的任何存款是否會被確認或轉換為“美國證券交易委員會”行業指南7或任何後續規則或法規所遵循的“儲備”。告誡投資者,不要以為歷史悠久的巴斯特金礦區的任何部分或全部都會得到確認或轉換為儲量,或者可以經濟或合法地開採出來。
The SEC has adopted amendments to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are registered with the SEC under the United States Securities Exchange Act of 1934, as amended. These amendments became effective February 25, 2019, with compliance required for the first fiscal year beginning on or after January 1, 2021, and historical property disclosure requirements for mining registrants that were included in SEC Industry Guide 7, which was rescinded from and after such date and replaced with disclosure requirements known as S-K 1300.
美國證券交易委員會已經通過了對其披露規則的修正案,以使其證券根據修訂後的1934年美國證券交易法在美國證券交易委員會登記的發行人的礦業權披露要求現代化。這些修正案於2019年2月25日生效,要求從2021年1月1日或之後開始的第一個財年遵守《美國證券交易委員會行業指南7》中針對礦業註冊人的歷史財產披露要求,該指南在該日期及之後被撤銷,取而代之的是名為S-K1300的披露要求。
Forward Looking Statements
前瞻性陳述
This press release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and U.S. securities laws. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding future exploration plans and the completion of a phase 2 drill program at the Project, future results from exploration, and the anticipated business plans and timing of future activities of the Company, are forward-looking statements. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: "believes", "will", "expects", "anticipates", "intends", "estimates", "plans", "may", "should", "potential", "scheduled", or variations of such words and phrases and similar expressions, which, by their nature, refer to future events or results that may, could, would, might or will occur or be taken or achieved. In making the forward-looking statements in this press release, the Company has applied several material assumptions, including without limitation, that there will be investor interest in future financings, market fundamentals will result in sustained precious metals demand and prices, the receipt of any necessary permits, licenses and regulatory approvals in connection with the future exploration and development of the Company's projects in a timely manner, QAQC procedures at the Project were followed, the availability of financing on suitable terms for the exploration and development of the Company's projects and the Company's ability to comply with environmental, health and safety laws.
本新聞稿包含適用於加拿大和美國證券法的前瞻性陳述和前瞻性信息(統稱為“前瞻性陳述”)。除有關歷史事實的陳述外,本文中包含的所有陳述,包括但不限於有關未來勘探計劃和項目第二階段鑽探計劃的完成、勘探的未來結果以及公司未來活動的預期業務計劃和時間的陳述,均為前瞻性陳述。儘管該公司相信這樣的陳述是合理的,但它不能保證這種預期將被證明是正確的。前瞻性表述通常用“相信”、“將”、“預期”、“預期”、“打算”、“估計”、“計劃”、“可能”、“應該”、“潛在”、“預定”或這些詞語和短語的變體以及類似的表述來識別,這些詞語的性質是指可能、可能、將、可能或將發生或將發生或將採取或實現的未來事件或結果。在本新聞稿中做出前瞻性陳述時,公司應用了幾個重大假設,包括但不限於,投資者對未來融資的興趣、市場基本面將導致貴金屬需求和價格持續增長、與公司未來項目勘探和開發相關的任何必要許可證、許可證和監管批准的及時收到、項目的QAQC程序得到遵守、公司項目勘探和開發以合適條款獲得融資,以及公司遵守環境、健康和安全法律的能力。
The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward-looking statements as a result of various factors, including, operating and technical difficulties in connection with mineral exploration and development activities, actual results of exploration activities, the estimation or realization of mineral reserves and mineral resources, the inability of the Company to obtain the necessary financing required to conduct its business and affairs, as currently contemplated, the timing and amount of estimated future production, the costs of production, capital expenditures, the costs and timing of the development of new deposits, requirements for additional capital, future prices of precious metals, changes in general economic conditions, changes in the financial markets and in the demand and market price for commodities, lack of investor interest in future financings, accidents, labor disputes and other risks of the mining industry, delays in obtaining governmental approvals, permits or financing or in the completion of development or construction activities, risks relating to epidemics or pandemics such as COVID-19, including the impact of COVID-19 on the Company's business, financial condition and results of operations, changes in laws, regulations and policies affecting mining operations, title disputes, the inability of the Company to obtain any necessary permits, consents, approvals or authorizations, including of the Canadian Securities Exchange, the timing and possible outcome of any pending litigation, environmental issues and liabilities, and other factors and risks that are discussed in the Company's periodic filings with the SEC and disclosed in the final long form prospectus of the Company dated August 31, 2021.
公司提醒投資者,公司的任何前瞻性陳述都不是對未來結果或業績的保證,實際結果可能由於各種因素而與前瞻性陳述中的結果大不相同,這些因素包括與礦產勘探和開發活動有關的經營和技術困難、勘探活動的實際結果、對礦產儲量和礦產資源的估計或變現、公司無法獲得開展目前預期的業務和事務所需的必要融資、估計未來產量的時間和數量、生產成本、資本支出、開發新礦藏的成本和時機、額外資本的要求、這些風險包括:貴金屬的未來價格;總體經濟狀況的變化;金融市場以及大宗商品的需求和市場價格的變化;投資者對未來融資缺乏興趣;事故、勞資糾紛和採礦業的其他風險;在獲得政府批准、許可或融資或完成開發或建設活動方面的延誤;與流行病或流行病有關的風險,如新冠肺炎對公司業務的影響;財務狀況和經營業績;影響採礦業務的法律、法規和政策的變化;所有權糾紛;公司無法獲得任何必要的許可、同意、批准或授權。這些風險包括加拿大證券交易所的風險、任何未決訴訟的時間和可能的結果、環境問題和責任,以及公司在提交給美國證券交易委員會的定期報告中討論的其他因素和風險,這些因素和風險在公司日期為2021年8月31日的最終詳細招股説明書中有所披露。
Readers are cautioned not to place undue reliance on forward-looking statements. The Company undertakes no obligation to update any of the forward-looking statements in this press release or incorporated by reference herein, except as otherwise required by law.
告誡讀者不要過度依賴前瞻性陳述。除非法律另有要求,否則公司不承擔更新本新聞稿中的任何前瞻性陳述或通過引用將其併入本新聞稿的義務。
SOURCE: Athena Gold Corporation
資料來源:雅典娜黃金公司