share_log

Minaurum Accesses 600 M of Promontorio Mine at Alamos Silver Project; Sampling Returns 308 G/t Silver and 5.7 G/t Gold

Minaurum Accesses 600 M of Promontorio Mine at Alamos Silver Project; Sampling Returns 308 G/t Silver and 5.7 G/t Gold

米諾魯姆在阿拉莫斯銀項目訪問 600 米普羅蒙托里奧礦山; 採樣返回 308 克/噸銀和 5.7 克/噸黃金
newsfile ·  2023/03/02 08:46

Vancouver, British Columbia--(Newsfile Corp. - March 2, 2023) - Minaurum Gold Inc. (TSXV: MGG) (OTCQX: MMRGF) ("Minaurum") is pleased to provide an update on the underground rehabilitation work at the historical Promontorio mine, located in its flagship 100% owned Alamos silver project in Sonora, Mexico. Minaurum has successfully accessed the first 600 m of the main haulage level. Backfill material was removed and sampled returning grades ranging from anomalous to 308 g/t silver, 5.7 g/t gold, 1.57% copper, 3.91% lead and 8.19% zinc.

温哥華,不列顛哥倫比亞省-(Newsfile Corp.-2023年3月2日)-Minaurum Gold Inc.(多倫多證券交易所股票代碼:MGG)(場外交易市場代碼:MMRGF)(以下簡稱“Minaurum”)欣然提供歷史悠久的Promontorio礦地下修復工作的最新情況,該礦位於其位於墨西哥索諾拉的全資擁有的Alamos銀礦旗艦項目中。Minaurum已成功進入主運輸層的第一個600米。去除回填材料並取樣,返回的等級從異常到308克/噸銀,5.7克/噸金,1.57%銅,3.91%鉛鋅含量為8.19%。

"Our underground rehabilitation has now accessed 600 metres of an estimated 1.2 kilometres of workings," stated Darrell Rader, President and CEO. "Having full access to the workings will enable us to evaluate areas of known high-grade silver mineralization in addition to locating additional unmined areas of mineralization. Once our rehabilitation efforts are complete, we will commence detailed underground channel sampling leading to an underground drill program."

我們的地下修復工程現在已經進入了大約1.2公里工作面中的600米,達雷爾·雷德説,總裁兼首席執行官。“除了找到更多未開採的礦化區域外,我們還將能夠全面進入這些工作場所,評估已知的高品位銀礦化區域。一旦我們的修復工作完成,我們將開始詳細的地下渠道採樣,從而進行地下鑽探計劃。”

Promontorio Rehabilitation Progress

普羅蒙託裏奧康復進展

Access within the main haulage level has reached a short distance beyond the hoist room of the internal Balvanera shaft (Figure 1). The workings continue to be in good and stable condition. Backfill material continues to be removed and stockpiled outside the mine entrance for future processing (see Minaurum news release dated November 15, 2022). Several samples were taken returning high-grade silver, gold, and base metals (see Table 1 for sampling results). Ongoing efforts are focused on completing the following tasks:

主運輸層內的通道已到達內部巴爾瓦內拉豎井提升室之外的一小段距離(圖1)。工作面繼續保持良好穩定狀態。充填材料繼續被移走並儲存在礦山入口處外,以供未來加工(見Minaurum於2022年11月15日發佈的新聞稿)。從高品級銀、金和賤金屬中抽取了幾個樣本(抽樣結果見表1)。目前的工作重點是完成以下任務:

Promontorio Underground Work

普羅蒙託裏奧地下工程

Rehabilitation

復康

  1. Prepare shafts for rehabilitation
  2. Dewater internal shafts
  3. Mobilize crews to lower levels
  1. 為修復準備豎井
  2. 給內軸脱水
  3. 動員工作人員到更低的級別

Sampling

抽樣

  1. Channel sample vein, foot and hanging wall
  2. Input results into 3D geological model
  3. Generate underground drill targets
  1. 航道礦脈、足部和懸壁樣品
  2. 將結果輸入到3D地質模型中
  3. 生成地下鑽探目標

A considerable amount of mineralized backfill material lies in the El Tirito workings, in part blocking access to mine workings as well as to the 50-m deep internal El Tirito shaft. Once the loose material is completely removed and stockpiled, crews will begin dewatering the El Tirito shaft. Crews will then begin clearing and stabilizing the Balvanera area, including the dewatering of lower mine levels.

相當數量的礦化充填材料存在於El Tirito巷道中,部分堵塞了通往礦井以及50米深的El Tirito內部豎井的通道。一旦鬆散的材料被完全移除和儲存,工作人員將開始對El Tirito豎井進行脱水。然後,工作人員將開始清理和穩定巴爾瓦內拉地區,包括對較低的礦井水位進行降水。


Figure 1. Plan view of Promontorio mine rehabilitation access points and staging area.
Click image to enlarge.


圖1.普羅蒙託裏奧礦山修復接入點和集結區的平面圖。
點擊圖片放大。

Backfill and Surface Sampling

回填和表面取樣

Thirty-seven samples were taken from backfill material and loose rock debris in the first 600 m of the Promontorio adit (Table 1). Assays for the samples returned significant values with 58% of the samples between 100 g/t to 308 g/t silver and 64% of the samples between 0.20 g/t to 5.74 g/t gold. As the workings are cleared, mineralized backfill will be stockpiled for future processing.

在普羅蒙託裏奧平坎的前600米處,從回填材料和鬆散的巖石碎屑中採集了37個樣本(表1)。對樣品的分析返回有意義的值58%的樣品在100克/噸至308克/噸銀之間64%的樣品在0.20克/噸至5.74克/噸黃金之間。隨着工作面的清理,礦化的回填將被儲存起來,以供未來的處理。

Table 1. Precious and base-metal assays for backfill sampling from first 600 m of the Promontorio adit.

表1.普羅蒙託裏奧平坦前600米回填取樣的貴金屬和賤金屬化驗。

Sample Au g/t Ag g/t Cu % Pb % Zn %
101201 0.195 150 0.61 2.24 5.24
101202 0.199 308 0.62 2.13 4.42
101203 0.116 185 0.61 0.47 1.92
101204 0.377 231 0.38 1.31 2.49
101205 0.346 104 0.37 1.03 2.41
101206 2.000 172 0.79 1.42 3.48
101207 0.274 262 0.59 0.65 1.47
101208 0.293 105 0.51 0.98 2.15
101209 0.106 43.2 0.14 0.29 0.60
101211 0.026 23.4 0.07 0.40 0.60
101212 0.102 39.2 0.03 3.91 3.98
101213 0.248 100 0.06 0.86 3.36
101214 0.048 34.8 0.02 0.37 1.59
101215 0.473 109 0.30 1.49 6.07
101216 0.812 282 0.26 1.58 8.19
101217 0.595 186 0.16 1.33 3.81
101218 0.004 0.91 0.01 0.03 0.10
101219 0.437 11.9 0.03 0.52 0.42
101220 0.003 27.9 0.00 0.09 0.07
101221 0.234 46.1 0.30 0.43 0.63
101222 1.130 139 0.30 0.67 1.63
101223 0.466 195 0.34 2.62 4.70
101224 0.275 223 0.26 2.32 3.59
101226 0.011 34.7 0.04 1.34 0.42
101227 0.022 44.1 0.03 0.52 0.61
101228 0.539 97.9 0.25 0.63 1.41
101229 0.195 85 0.17 1.26 2.75
101230 0.578 137 0.23 1.73 3.91
101231 0.011 37.6 0.01 0.12 0.09
101232 5.740 128 1.16 2.45 3.64
101233 3.450 109 0.71 1.20 2.49
101234 1.705 62.2 0.67 1.53 2.89
101235 1.490 164 0.87 1.60 2.18
101236 0.684 90.6 0.37 1.26 3.25
101237 0.101 3.7 0.01 0.10 0.36
101238 3.000 198 1.57 2.20 3.95
樣本 Au g/t AG g/t CU% PB% 鋅含量%
101201 0.195 150 0.61 2.24 5.24
101202 0.199 308 0.62 2.13 4.42
101203 0.116 185 0.61 0.47 1.92
101204 0.377 231 0.38 1.31 2.49
101205 0.346 104 0.37 1.03 2.41
101206 2.000 172 0.79 1.42 3.48
101207 0.274 262 0.59 0.65 1.47
101208 0.293 105 0.51 0.98 2.15
101209 0.106 43.2 0.14 0.29 0.60
101211 0.026 23.4 0.07 0.40 0.60
101212 0.102 39.2 0.03 3.91 3.98
101213 0.248 100 0.06 0.86 3.36
101214 0.048 34.8 0.02 0.37 1.59
101215 0.473 109 0.30 1.49 6.07
101216 0.812 282 0.26 1.58 8.19
101217 0.595 186 0.16 1.33 3.81
101218 0.004 0.91 0.01 0.03 0.10
101219 0.437 11.9 0.03 0.52 0.42
101220 0.003 27.9 0.00 0.09 0.07
101221 0.234 46.1 0.30 0.43 0.63
101222 1.130 139 0.30 0.67 1.63
101223 0.466 195 0.34 2.62 4.70
101224 0.275 223 0.26 2.32 3.59
101226 0.011 34.7 0.04 1.34 0.42
101227 0.022 44.1 0.03 0.52 0.61
101228 0.539 97.9 0.25 0.63 1.41
101229 0.195 85 0.17 1.26 2.75
101230 0.578 137 0.23 1.73 3.91
101231 0.011 37.6 0.01 0.12 0.09
101232 5.740 128 1.16 2.45 3.64
101233 3.450 109 0.71 1.20 2.49
101234 1.705 62.2 0.67 1.53 2.89
101235 1.490 164 0.87 1.60 2.18
101236 0.684 90.6 0.37 1.26 3.25
101237 0.101 3.7 0.01 0.10 0.36
101238 3.000 198 1.57 2.20 3.95

Minaurum Gold Inc. (TSXV: MGG) (OTCQX: MMRGF) (FSE: 78M) is a Mexico-focused explorer concentrating on the high-grade Alamos silver project in southern Sonora. With a property portfolio encompassing multiple additional district-scale projects, Minaurum is managed by one of the strongest technical and finance teams in Mexico. Minaurum's goal is to continue its founders' legacy of creating shareholder value by making district-scale mineral discoveries and executing accretive mining transactions. For more information, please visit our website at and follow us on YouTube, Twitter and LinkedIn.

Minaurum Gold Inc.(多倫多證券交易所股票代碼:MGG)(OTCQX:MMRGF)(證券交易所代碼:78M)是一家專注於墨西哥的勘探者,專注於南部索諾拉的高品位阿拉莫斯白銀項目。Minaurum的物業組合包括多個額外的區級項目,由墨西哥最強大的技術和財務團隊之一管理。Minaurum的目標是通過地區規模的礦產發現和執行增值採礦交易,繼續其創始人創造股東價值的遺產。欲瞭解更多信息,請訪問我們的網站,並在YouTube、Twitter和LinkedIn。

ON BEHALF OF THE BOARD

我代表董事會

"Darrell A. Rader"

"達雷爾·A·雷德"

Darrell A. Rader
President and CEO

達雷爾·A·雷德
總裁與首席執行官

For more information, please contact:
Sunny Pannu - Investor Relations and Corporate Development Manager
(778) 330 0994 or via email at pannu@minaurum.com

如需更多信息,請聯繫:
Sunny Pannu-投資者關係和企業發展經理
(778)330 0994或發送電子郵件至pannu@minaurum.com

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this news release.

多倫多證券交易所創業板不對本新聞稿的充分性或準確性承擔任何責任。

___________________________________________________________________________

___________________________________________________________________________

2710 - 200 Granville Street
Vancouver, BC V6C 1S4

加連威老街2710-200號
温哥華,BC V6C 1S4

Telephone 778 330-0994
info@minaurum.com

電話:778 330-0994
郵箱:Info@minaurum.com

Stephen R. Maynard, Vice President of Exploration of Minaurum and a Qualified Person as defined by National Instrument 43-101, reviewed and verified the assay data, and has approved the disclosure in this News Release. Historical data reported in this news release has not been verified.

史蒂芬·R·梅納德,礦產勘探局副總裁,國家儀器43-101定義的合格人員,審查和驗證了化驗數據,並在本新聞稿中批准了披露。本新聞稿中報道的歷史數據尚未得到核實。

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release constitute forward-looking information. In making the forward-looking statements in this release, Minaurum has applied certain factors and assumptions that are based on Minaurum' s current beliefs as well as assumptions made by and information currently available to Minaurum. Although Minaurum considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect, and the forward-looking statements in this release are subject to numerous risks, uncertainties and other factors that may cause future results to differ materially from those expressed or implied in such forward-looking statements. Readers are cautioned not to place undue reliance on forward-looking statements. Minaurum does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law.

有關前瞻性陳述的注意事項:本新聞稿中的某些披露屬於前瞻性信息。在本新聞稿中作出前瞻性陳述時,Minaurum應用了某些因素和假設,這些因素和假設是基於Minaurum當前的信念以及Minaurum所做的假設和目前可用的信息。儘管Minaurum認為根據目前掌握的信息,這些假設是合理的,但它們可能被證明是不正確的,本新聞稿中的前瞻性陳述會受到許多風險、不確定因素和其他因素的影響,這些風險、不確定因素和其他因素可能會導致未來的結果與此類前瞻性陳述中明示或暗示的結果大不相同。告誡讀者不要過度依賴前瞻性陳述。除法律要求外,Minaurum不打算、也明確不承擔任何因新信息、未來事件或其他原因而更新或修改任何前瞻性陳述的意圖或義務。

Quality Assurance/Quality Control: Preparation and assaying of drilling samples from Minaurum's Alamos project are done with strict adherence to a Quality Assurance/Quality Control (QA/QC) protocol. Core samples are sawed in half and then bagged in a secure facility near the site, and then shipped by a licensed courier to ALS Minerals' preparation facility in Hermosillo, Sonora, Mexico. ALS prepares the samples, crushing them to 70% less than 2mm, splitting off 250g, and pulverizing the split to more than 85% passing 75 microns. The resulting sample pulps are prepared in Hermosillo, and then shipped to Vancouver for chemical analysis by ALS Minerals. In Vancouver, the pulps are analyzed for gold by fire assay and ICP/AES on a 50-gram charge. In addition, analyses are done for a 48- element suite using 4-acid digestion and ICP analysis. Samples with silver values greater than 100 g/t; and copper, lead, or zinc values greater than 10,000 ppm (1%) are re-analyzed using 4-acid digestion and atomic absorption spectrometry (AAS).

質量保證/質量控制:Minaurum Alamos項目鑽井樣品的製備和分析嚴格遵守質量保證/質量控制(QA/QC)協議。巖心樣品被鋸成兩半,然後裝在現場附近的安全設施中,然後由一名有執照的信使運往ALS Minerals位於墨西哥索諾拉Hermosillo的準備設施。ALS準備樣品,將它們粉碎到70%小於2 mm,劈開250克,然後粉碎到85%以上,超過75微米。產生的樣品紙漿在Hermosillo準備好,然後運往温哥華,由ALS Minerals進行化學分析。在温哥華,用火分析和50克裝藥的電感耦合等離子體發射光譜儀分析紙漿中的金。此外,還用4酸消解和電感耦合等離子體發射光譜分析對48組分進行了分析。銀值大於100 g/t的樣品以及銅、鉛或鋅值大於10,000 ppm(1%)的樣品將使用4酸消化和原子吸收光譜(AAS)重新分析。

Quality-control (QC) samples are inserted in the sample stream every 20 samples, and thus represent 5% of the total samples. QC samples include standards, blanks, and duplicate samples. Standards are pulps that have been prepared by a third-party laboratory; they have gold, silver, and base-metal values that are established by an extensive analytical process in which several commercial labs (including ALS Minerals) participate. Standards test the calibration of the analytical equipment. Blanks are rock material known from prior sampling to contain less than 0.005 ppm gold; they test the sample preparation procedure for cross-sample contamination. In the case of duplicates, the sample interval is cut in half, and then quartered. The first quarter is the original sample, the second becomes the duplicate. Duplicate samples provide a test of the reproducibility of assays in the same drilled interval. When final assays are received, QC sample results are inspected for deviation from accepted values. To date, QC sample analytical results have fallen in acceptable ranges on the Alamos project.

質量控制(QC)樣本每20個樣本插入樣本流,因此佔總樣本的5%。質控樣品包括標準樣品、空白樣品和複製樣品。標準是由第三方實驗室準備的紙漿;它們具有金、銀和賤金屬的價值,這些價值是由幾個商業實驗室(包括ALS Minerals)參與的廣泛分析過程確定的。標準測試分析設備的校準。空白樣品是已知的巖石材料,其含金量低於0.005 ppm;它們測試樣品製備過程中的交叉樣品污染。在重複的情況下,採樣間隔被減半,然後被平分。第一個季度是原始樣本,第二個季度成為複製品。重複樣品提供了對同一鑽井間隔內分析的重複性的測試。收到最終化驗結果後,檢查質控樣品結果是否偏離可接受的值。到目前為止,阿拉莫斯項目的QC樣品分析結果已落在可接受的範圍內。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論