share_log

Vital Battery Metals Inc. Commences Sting Copper Project Work Program

Vital Battery Metals Inc. Commences Sting Copper Project Work Program

Vital Battery Metals Inc. 啓動 Sting Copper 項目工作計劃
GlobeNewswire ·  2023/06/01 08:00

The Exploration Program encompasses 3 high priority zones over the Sting Project that will consist of prospecting, mapping and geochemical sampling

勘探方案包括Sting專案的3個高度優先區域,包括勘探、測繪和化探採樣

Figure 1

圖1

Vital Battery Metals Sting Copper Project 2023 Exploration Program Areas
重要的電池金屬Sting銅專案2023勘探計劃區

VANCOUVER, British Columbia, June 01, 2023 (GLOBE NEWSWIRE) -- Vital Battery Metals Inc. ("Vital" or the "Company") (CSE: VBAM | OTC: VBAMF | FRA: C0O) is pleased to announce, in partnership with Coast Mountain Geological Ltd. ("CMG"), that it has commenced its summer Exploration Program (the "Program") at its Sting Copper Project in northwestern Newfoundland.

溫哥華,不列顛哥倫比亞省,2023年6月1日(環球通訊社)--重要的電池金屬公司(“生死攸關“或”公司“)(CSE:VBAM場外交易:VBAMF法蘭克福機場:C0O)很高興地宣佈,與海岸山脈地質有限公司(“CMG“),它已經開始了它的夏季探索計劃(The計劃“)位於紐芬蘭西北部的Sting銅礦專案。

The Company has previously reported assay results of grab samples at its Sting Copper Project including 14.2% Cu, 11.6% Cu, 14.2% Cu, 13.9% Cu, with complimentary gold values ranging from 7 to 470 ppb. Vital is targeting high grade copper and precious metals in western Newfoundland on its Sting Copper Project. The mafic rocks that underlie the Jumbo Lode Prospect are part of the Bay of Islands Complex that is host to copper and copper/zinc deposits such as the York Harbour Mine, a former producer located 35 km to the south-southeast. Additionally, York Harbour Metals recently reported (news release dated April 21, 2023) final results of its Phase 4 drilling program which included a drill hole (YH22-73) that intersected 44.93 meters of 1.292% copper including 5.36 meters of 2.938% copper.

該公司此前曾報告其Sting銅礦專案的抓取樣本的化驗結果為14.2%銅、11.6%銅、14.2%銅、13.9%銅,贈送的金價為7至470 ppb。VITAL的Sting銅礦專案瞄準了紐芬蘭西部的高品位銅和貴金屬。Jumbo Lode Prospects下的鎂鐵質岩石是島灣綜合體的一部分,該綜合體擁有銅和銅/鋅礦床,例如位於東南偏南35公里處的前生產商約克港礦。此外,約克港金屬公司最近(日期為2023年4月21日的新聞稿)報告了其第四階段鑽井計劃的最終結果,其中包括一個鑽孔(YH22-73),該鑽孔與44.93米的1.292%銅包括5.36米2.938%的銅相交。

The current work Program is designed to follow-up from the previous encouraging results and to expand known mineralized zones. The Program also includes gridded prospecting, mapping and geochemical sampling to provide coverage over underlying favorable regional geology and geophysics. The three separate grids include the North Sting, Jumbo-Lode and South Sting grids. The North Sting grid covers 240 ha of ground and is draped over the NE-trending contact between mafic volcanic rocks and mafic intrusive rocks, a regionally important lineament for copper mineralization.

目前的工作計劃旨在跟進先前令人鼓舞的成果,並擴大已知的礦化帶。該計劃還包括網格勘探、測繪和地球化學採樣,以覆蓋潛在的有利區域地質和地球物理。這三個獨立的網格包括北斯汀、Jumbo-Lode和南斯汀網格。北斯汀格網覆蓋240公頃土地,覆蓋在鎂鐵質火山岩和鎂鐵質侵入岩之間的NE向接觸帶上,這是銅礦化的區域重要線形。

Adrian Lamoureux, Vital's Chief Executive Officer and President, comments, "Our initial exploration Program at the Sting Project yielded impressive results as high as 14.2% Cu and gold values ranging from 7 ppb to 470 ppb. Building on our previous program, we are looking forward to further exploration of high-priority targets, which we believe will continue to provide strong copper and gold values."

VITAL首席執行官禤浩焯·拉莫羅表示:“我們在斯汀專案的初步勘探專案取得了令人印象深刻的結果,銅含量高達14.2%,金礦價值從7 ppb到470 ppb不等。在之前專案的基礎上,我們期待著進一步勘探高優先級目標,我們相信這些勘探專案將繼續提供強勁的銅和黃金價值。”

The Jumbo-Lode area has historically compelling copper anomalies which surround and extend from the Jumbo, Red Love and Lode 9 mineral showings. The team will infill, expand upon, and verify the historical results, as well as test the eastern contact between mafic volcanic/intrusive rocks for copper anomalies. The South Sting grid provides coverage over the same lineament further south, where no record of exploration work exists.

Jumbo-Lode地區歷史上擁有引人注目的銅異常,這些異常圍繞著Jumbo、Red Love和Lode 9礦藏,並從這些礦藏延伸而來。該小組將補充、擴大和驗證歷史結果,並測試鎂鐵質火山/侵入岩之間的東部接觸是否有銅異常。南斯汀網格覆蓋了更南邊的同一條線,那裡沒有勘探工作的記錄。

Figure 1 - Vital Battery Metals Sting Copper Project 2023 Exploration Program Areas

圖1-重要電池金屬Sting銅專案2023勘探計劃區域

Qualified Person
The technical information in this presentation have been reviewed and approved by an Independent Qualified Person defined by National Instrument 43-101 Derrick Strickand P.Geo.

有資格的人
本演示文稿中的技術資訊已由National Instrument 43-101 Derrick Strickand P.Geo定義的獨立合格人員審核和批准。

The qualified person has not verified the information on the York Harbour Mine and the information disclosed is not necessarily indicative of mineralization on the Sting Copper Project.

該合資格人士並未核實有關約克港礦場的資料,而所披露的資料並不一定表示Sting銅礦專案的礦化情況。

About Vital Battery Metals Inc.
Vital Battery Metals Inc. (CSE: VBAM |OTC: VBAMF | FRA: C0O) is a mineral exploration company dedicated to the development of strategic projects comprised of battery, base and precious metals in stable jurisdictions. The Company is working to advance its Schofield Lithium, Dickson Lake Lithium, Sting Copper Project, and Vent Copper-Gold Projects.

關於重要的電池金屬公司
重要的電池金屬公司(CSE:VBAM|OTC:VBAMF|FRA:C0O)是一家礦產勘探公司,致力於在穩定的司法管轄區開發由電池、賤金屬和貴金屬組成的戰略專案。該公司正在努力推進其斯科菲爾德鋰、迪克森湖鋰、斯汀銅礦專案和文特銅金礦專案。

The Schofield Lithium Project covers 8,824 hectares and is adjacent to Brunswick Exploration's Hearst Lithium Project. The Schofield Lithium Project is located ~60 km south of Hearst, Ontario.

斯科菲爾德鋰專案佔地8824公頃,毗鄰布倫瑞克勘探公司的赫斯特鋰專案。斯科菲爾德鋰專案位於安大略省赫斯特以南約60公里處。

The Dickson Lake Lithium Project covers 464 single-cell mining claims and approximately 9,780 hectares and is near a Brunswick Exploration Lithium Project, Imagine Lithium's Jackpot Deposit and Rock Tech's Georgia Lake Deposit.

迪克森湖鋰專案涵蓋464個單單元採礦專案,佔地約9,780公頃,靠近Brunswick勘探鋰專案、Imagine Lithium的大獎礦藏和Rock Tech的喬治亞湖礦藏。

The Sting Copper Project covers approximately 12,700 hectares and hosts multiple historic Newfoundland and Labrador Government documented mineral occurrences and is located within a 50 km corridor known for significant volcanogenic massive sulfide (VMS), copper quartz vein lode and low sulphation epithermal gold showings. The Vent Copper-Gold project covers 1,562 hectares in British Columbia. Vital continues to evaluate value-add assets to bolster its project portfolio.

Sting銅礦專案佔地約12,700公頃,擁有多個歷史悠久的紐芬蘭和拉布拉多政府記錄的礦藏,位於一條50公里長的走廊內,以重要的火山成因塊狀硫化物(VMS)、銅石英脈脈和低硫酸鹽淺成熱液金礦而聞名。文特銅金專案位於不列顛哥倫比亞省,佔地1,562公頃。VITAL繼續評估增值資產,以支持其專案組合。

For more information, visit

如需更多資訊,請訪問

On Behalf of the Board of Directors

我謹代表董事會

Adrian Lamoureux
Chief Executive Officer, Director
+1 (604) 229-9772
info@vitalbatterymetals.com

禤浩焯·拉穆魯
董事首席執行官
+1(604)229-9772
郵箱:info@vitalbatterymetals.com

Disclaimer for Forward-Looking Information

對前瞻性資訊的免責聲明

This news release contains certain forward-looking statements within the meaning of applicable securities laws. All statements that are not historical facts, including without limitation, statements regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions, expectations or beliefs of future performance, including statements regarding the Project acquisition bringing a low-risk opportunity, the Company building a strong battery metals portfolio with low-risk opportunities that positively impact the Company and its shareholders and the Company providing an initial work plan are "forward-looking statements." Forward-looking statements in this news release include, but are not limited to, statements with respect to the Sting Copper Project and its mineralization potential; the Company's objectives, goals or future plans with respect to the Sting Copper Project; the commencement of drilling or exploration programs in the future; the completion and anticipated results of the Program. These forward-looking statements reflect the expectations or beliefs of management of the Company based on information currently available to it. Forward-looking statements are subject to a number of risks and uncertainties, including those detailed from time to time in filings made by the Company with securities regulatory authorities, which may cause actual outcomes to differ materially from those discussed in the forward-looking statements. These factors should be considered carefully and readers are cautioned not to place undue reliance on such forward-looking statements. The forward-looking statements and information contained in this news release are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

本新聞稿包含適用證券法所指的某些前瞻性陳述。所有非歷史事實的陳述,包括但不限於關於未來估計、計劃、計劃、預測、預測、目標、假設、預期或對未來業績的信念的陳述,包括有關專案收購帶來低風險機會、公司建立具有對公司及其股東積極影響的強大電池金屬組合以及公司提供初步工作計劃的陳述,均屬“前瞻性陳述”。本新聞稿中的前瞻性陳述包括但不限於有關Sting銅礦專案及其礦化潛力的陳述;公司有關Sting銅礦專案的目標、目標或未來計劃;未來鑽探或勘探計劃的開始;該計劃的完成情況和預期結果。這些前瞻性陳述反映了根據公司目前掌握的資訊對公司管理層的期望或信念。前瞻性陳述會受到許多風險和不確定因素的影響,包括公司不時向證券監管機構提交的檔案中詳細說明的風險和不確定因素,這些風險和不確定性可能會導致實際結果與前瞻性陳述中討論的大不相同。應仔細考慮這些因素,並告誡讀者不要過度依賴此類前瞻性陳述。本新聞稿中包含的前瞻性陳述和資訊是截至本新聞稿發佈之日作出的,公司沒有義務公開更新或修改任何前瞻性陳述或資訊,除非適用的證券法要求公開更新或修改任何前瞻性陳述或資訊,無論是由於新資訊、未來事件還是其他原因。

The Canadian Securities Exchange (CSE) does not accept responsibility for the adequacy or accuracy of this release.

加拿大證券交易所(CSE)不對本新聞稿的充分性或準確性承擔責任。

A photo accompanying this announcement is available at

這一公告附帶的照片可在以下網址查閱


声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論