TSX.V: TORC OTCQB: TORCF
VANCOUVER, BC, July 11, 2023 /CNW/ - TinOne Resources Inc. (TSXV: TORC) (OTCQB: TORCF) (Frankfurt: 57Z0) ("TinOne" or the "Company") is pleased to announce that it been granted a total of 243 km2 of new exploration tenure in northeast Tasmania. In addition, the Company has applied for another 133 km2, which has been recommended to be granted in the coming months. The road-accessible tenements, collectively called the Mount Maurice Project, are considered prospective for tin and lithium mineralization. While northeast Tasmania has historically been a tin and tungsten producing region, recent exploration by several companies surrounding TinOne's tenements have focussed efforts on lithium prospectivity.
Highlights
Dominant land position: The acquisition of the Mount Maurice project strengthens the Company's position in northeast Tasmania focused on tin and lithium exploration.
Prospective for tin and lithium mineralization: The Mount Maurice project is centered on a complex granite batholith containing greisen zones considered prospective for tin and lithium mineralization.
Road accessible project: A forestry road network provides access across the project.
"We believe northeast Tasmania is a prime jurisdiction for the discovery of tin and lithium deposits," commented Chris Donaldson, Executive Chairman. "Our recent exploration results, specifically the discovery of lithium mineralization at our Aberfoyle project, just 20 kilometres south of Mount Maurice, has led us to re-evaluate the lithium potential of many Devonian-aged tin-tungsten bearing granites across northeast Tasmania. This evaluation led us to stake the Mount Maurice project an area that has received little modern exploration but contains documented greisen alteration zones hosted in prospective Devonian aged granites. We look forward to getting boots on the ground and exploring this new project."
Mineral Exploration Licences
The southern edge of the Mount Maurice tenements are approximately 20 kilometres north of the company's Aberfoyle Sn-W-Li project (see March 15th, 2023 news release; Figure 1). The road accessible claims are underlain by the 35 by 15 kilometre polyphase Scottsdale granitic batholith considered to be prospective for tin and lithium mineralization. The area has seen very limited historic exploration besides a regional stream sediment geochemical surveys, focused geological mapping, and minor trenching. Trenching results from the Mount Maurice Sn-Cu showing, central to the project, returned grades of up to 0.78% Sn and 1.4% Cu from quartz veins cutting greisenised (coarse mica altered) granite (Ellis, 1984). These mineralized occurrences have yet to be drill tested and lithium analyses have never been performed on any of the rock or stream sediment samples. A phase 1 reconnaissance-style exploration program comprised of project-wide stream sediment surveys, prospecting and rock-chip sampling is currently being planned.
The project was acquired via staking and represents an accretive addition to the Company's exploration-stage project portfolio in northeast Tasmania. The northern tenement (EL36/2022) at Mount Maurice has been granted while the southern tenement (EL39/2022) is under application and is expected to be granted in the coming months.
References
Ellis, P.D., 1984, Relinquishment Report, Mt. Maurice, EL 43/82, Northeast Tasmania, Open File,
TSX.V: TORC OTCQB: TORCF
不列顛哥倫比亞省溫哥華,2023 年 7 月 11 日 /CNW/- TinOne 資源公司 (多倫多證券交易所股票代碼:TORC)(OTCQB:TORCF)(法蘭克福:57Z0)(”TinOne“或者”公司“)很高興地宣佈,它在塔斯馬尼亞州東北部獲得了總共243平方公里的勘探使用權。此外,該公司還申請了另外133平方公里的土地,建議在未來幾個月內予以批准。這些通往道路的物業單位統稱爲莫里斯山項目,被認爲具有錫和鋰礦化的前景。儘管塔斯馬尼亞州東北部歷來是錫和鎢產區,但最近幾家公司圍繞TinOne的物業單位進行的勘探都集中在了鋰的前景上。
亮點
土地佔據主導地位: 收購莫里斯山項目鞏固了公司在塔斯馬尼亞州東北部專注於錫和鋰勘探的地位。
錫和鋰礦化的前景: 莫里斯山項目以複雜的花崗岩基石爲中心,其中包含被認爲具有錫和鋰礦化前景的格雷森帶。
道路無障礙項目: 林業道路網絡爲整個項目提供了通道。
執行主席克里斯·唐納森評論說:“我們認爲,塔斯馬尼亞州東北部是發現錫和鋰礦牀的主要司法管轄區。”“我們最近的勘探結果,特別是在位於莫里斯山以南僅20公里的Aberfoyle項目中發現的鋰礦化,使我們重新評估了塔斯馬尼亞東北部許多泥盆時代含錫鎢花崗岩的鋰潛力。這項評估促使我們對莫里斯山項目進行了質押,該地區幾乎沒有得到現代勘探,但包含有記錄在案的格雷森改造區域,這些區域位於潛在的泥盆紀陳年花崗岩中。我們期待着在地面上大放異彩,探索這個新項目。”
礦產勘探許可證
莫里斯山物業單位的南部邊緣位於該公司Aberfoyle Sn-W-Li項目以北約20公里處(見2023年3月15日新聞稿;圖1)。道路通行主張的基礎是35乘15千米的多相斯科茨代爾花崗岩基石,該岩石被認爲有望進行錫和鋰礦化。除了區域溪流沉積物地球化學調查、重點地質測繪和小型挖溝外,該地區的歷史勘探非常有限。Mount Maurice Sn-Cu的挖溝結果顯示,該項目的核心,石英礦脈切割灰化(粗雲母變性)花崗岩的返回品位高達0.78%和1.4%的銅(Ellis,1984年)。這些礦化礦點尚未經過鑽探測試,也從未對任何岩石或溪流沉積物樣本進行過鋰分析。目前正在計劃一項第一階段的偵察式勘探計劃,包括項目範圍內的溪流沉積物調查、勘探和岩屑採樣。
該項目是通過質押方式收購的,是該公司在塔斯馬尼亞東北部的勘探階段項目組合的增值補充。位於莫里斯山的北部物業單位(EL36/2022)已獲得批准,而南部物業單位(EL39/2022)正在申請中,預計將在未來幾個月內獲得批准。
參考文獻
Ellis,P.D.,1984 年,《放棄報告》,Mt.Maurice,EL 43/82,塔斯馬尼亞東北部,Open File,