share_log

Kraken Energy Commences Drilling at Harts Point Uranium Property, Utah

Kraken Energy Commences Drilling at Harts Point Uranium Property, Utah

Kraken Energy 開始在猶他州 Harts Point 鈾礦進行鑽探
newsfile ·  2023/07/18 08:00

Vancouver, British Columbia--(Newsfile Corp. - July 18, 2023) - Kraken Energy Corp. (CSE: UUSA) (OTCQB: UUSAF) (the "Company" or "Kraken") is pleased to announce that it has commenced drilling at the Harts Point Uranium Property ("Harts Point Property" or the "Property") in San Juan County, southeast Utah.

溫哥華,不列顛哥倫比亞省-(Newsfile Corp.-2023年7月18日)-克拉肯能源公司(CSE:UUSA)(場外交易代碼:USAF)(“公司“或”海怪“)高興地宣佈,已開始在Harts Point鈾礦進行鑽探(”哈茨點特性“或”屬性)位於猶他州東南部的聖胡安縣。

With 20 drill pad locations fully permitted, the Company will first and foremost drill three holes over a 5 km strike length targeting the favorable uranium bearing Chinle Formation host rock where three historical oil and gas wells returned "off-scale" radioactivity. Upon favourable results, the Company intends to continue the drill program to further evaluate the mineralized trend. With ~$5M cash on hand, the Company is fully funded for an extensive drill program on the Harts Point Property.

隨著20個鑽臺位置的完全許可,該公司將首先在5公里的走向長度上鑽三個孔,目標是有利的含鈾欽勒組主巖,那裡有三口歷史上的油氣井恢復了“不按比例”的放射性。在取得良好結果後,本公司擬繼續鑽探計劃,以進一步評估礦化趨勢。手頭有大約500萬美元的現金,該公司完全有資金在Harts Point地產上進行廣泛的鑽探計劃。

Matthew Schwab, CEO of Kraken states, "We believe that the historical off-scale radioactivity encountered from historic oil and gas wells significantly increases the potential for exploration success at the Harts Point Property, and we are extremely excited to be able to commence our inaugural drill program on this exciting project."

Kraken首席執行官Matthew Schwab表示:“我們相信,歷史上的油氣井所遇到的超標放射性極大地增加了Harts Point油田勘探成功的可能性,我們非常高興能夠開始我們在這個令人興奮的專案上的首次鑽探計劃。”

Harts Point Property Highlights:

Harts Point特性亮點:

  • World class uranium jurisdiction: located in the center of the Colorado Plateau, which has produced over 328 million ("M") pounds ("lbs") U3O8 at 0.2 to 0.4% U3O8 since the 1950s1.

  • Property consists of 324 lode mining claims on Bureau of Land Management ("BLM") ground that covers an area of 2,622 hectares ("ha") (6,480 acres).

  • Harts Point Anticline is Analogous to the Lisbon Valley Anticline: where the Lisbon Valley Uranium District hosted 17 large uranium mines which produced approximately 80M lbs U3O8 at 0.34% U3O8 from 1948 to 19882.

    • - The dimensions of these tabular sandstone-hosted uranium deposits range from 2 to 13 meters ("m") (7 to 43 feet) thick, 100 to 3,048 m (328 to 10,000 feet) long, and 31 to 427 m (100 to 1,400 feet) wide3.

  • Significant Historic Uranium Production:

    • - Several historic mines located 11 km (7 miles) west of the Harts Point Property produced approximately 280,000 lbs U3O8 at 0.3% U3O8 from the favorable Chinle Formation host rock4.

    • - The Lisbon Valley Anticline is located 31 km (19 miles) to the east of the Harts Point Property produced approximately 80M lbs U3O8 0.34% U3O82.

  • Historic Exploration: Three wide-spaced historic oil and gas wells on the Property (Figure 1) along the east flank of the Harts Point Anticline show 'off-scale' radioactivity within the favorable Chinle Formation host rock.

    • - Drilled between 1953 and 1980, historic drill holes 43-037-10438, 43-037-30109, and 43-037-30623 showed off-scale radioactivity readings between 2.1 to 3.7 m thickness (7 to 12 feet) from depths of 390 to 417 m (1,280 to 1,368 feet).

  • Permitted to Drill: The Harts Point Property is permitted for up to 20 exploration drill pads.

  • Excellent Infrastructure: located approximately 64 km (40 miles) north of the White Mesa uranium processing facility.

    • - There is excellent access throughout the Property, which is situated 45 km (28 miles) from the town of Monticello, Utah.

  • 世界級鈾礦管轄權:位於科羅拉多州高原的中心,它產生了超過3.28億磅(“磅”)U3.O8個在0.2%至0.4%U3.O8個自20世紀50年代以來1

  • 屬性由以下部分組成324個礦脈採礦索賠關於土地局(“博萊姆“)佔地面積的土地2622公頃(6480英畝)

  • Harts Point背斜類似於里斯本谷背斜:里斯本谷鈾區主辦的地方17個大型鈾礦,產量約8000萬磅鈾3.O8個在0.34%U3.O8個從1948年到1988年2.

    • -這些以砂岩為主的板狀鈾礦床的尺寸從厚2至13米(7至43英尺),長100至3,048米(328至10,000英尺),寬31至427米(100至1,400英尺)3.

  • 歷史上重要的鈾產量:

    • -位於Harts Point地產以西11公里(7英里)處的幾個歷史悠久的礦山大約產生了28萬磅U3.O8個在0.3%U3.O8個有利的欽勒組賦存巖4.

    • -里斯本谷背斜位於Harts Point地產以東31公里(19英里)處,大約8000萬磅U3.O8個0.34%U3.O8個2.

  • 歷史探索: 該物業內有三口大間距的歷史油氣井(圖1)沿哈茨角背斜東側在有利的欽樂組主巖中顯示了“非標度”的放射性。

    • -在1953年至1980年期間鑽探,歷史鑽孔43-037-10438、43-037-30109和43-037-30623顯示,從390米至417米(1,280至1,368英尺)的深度,放射性讀數在2.1m至3.7m(7至12英尺)之間。

  • 允許鑽探:Harts Point屬性為最多可容納20個勘探鑽頭。

  • 卓越的基礎設施:位於大約位於懷特梅薩鈾加工設施以北64公里(40英里)。

    • -整個酒店交通便利,距離猶他州蒙蒂塞洛鎮45公里(28英里)。

References:

參考資料:

1 Holger Albrethsen, Jr. and Frank E. McGinley (1982). Summary History of Domestic Procurement Under U.S. Atomic Energy Commission Contracts, September 1982.

1小霍爾格·阿爾佈雷森和Frank E.McGinley(1982)。《美國原子能委員會合同下的國內採購簡史》,1982年9月。

2 Chenoweth, W.L. (1990). Lisbon Valley, Utah's Premier Uranium Area, a Summary of Exploration and Ore Production. Utah Geological Survey Open File Report 188, July 1990.

2.陳諾威,W.L.(1990)。里斯本山谷,猶他州的主要鈾區,勘探和礦石生產摘要。猶他州地質調查開放檔案報告188,1990年7月。

3 Gordon W. Weir and Willard P. Puffett (1981). Incomplete manuscript on stratigraphy and structural geology and uranium-vanadium and copper deposits of the Lisbon Valley area, Utah-Colorado. Open-File Report 81-39. Pages 153 to 163. United States Department of the Interior Geological Survey.

3.戈登·W·韋爾和威拉德·P·帕菲特(1981)。猶他州-科羅拉多州里斯本山谷地區的地層學和構造地質學以及鈾-釩和銅礦床的不完整手稿。開放--檔案報告81-39。第153至163頁。美國內政部地質調查局。

4 Chenoweth, W.L. (1993): The geology and Production History of the Uranium deposits in the White Canyon Mining District, San Juan County, Utah, Utah Geological Survey Miscellaneous Publication 93-3.

4.陳諾威(1993):猶他州聖胡安縣白色峽谷礦區鈾礦的地質和生產歷史。地質調查雜刊93-3。

Technical Information:

技術資訊:

All scientific and technical information in this news release has been prepared by or reviewed and approved by Matthew Schwab, P.Geo., President and CEO of the Company, and Garrett Ainsworth, P.Geo., Chairman of the Company. Each of Mr. Schwab and Mr. Ainsworth is a Qualified Person for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

本新聞稿中的所有科學技術資訊均由公司首席執行官兼首席執行官馬修·施瓦布和公司董事長加勒特·安斯沃思準備或審閱和批准。施瓦布先生和安斯沃思先生均符合《國家文書43-101-礦產專案披露標準》的要求。

The data disclosed in this news release is related to historical drilling results. Kraken has not undertaken any independent investigation of the sampling, nor has it independently analyzed the results of the historical exploration work in order to verify the results. Kraken considers these historical drill results relevant as the Company is using this data as a guide to plan exploration programs. The Company's current and future exploration work includes verification of the historical data through drilling.

本新聞稿披露的數據與歷史鑽探結果有關。Kraken沒有對抽樣進行任何獨立調查,也沒有為了核實結果而對歷史勘探工作的結果進行獨立分析。Kraken認為這些歷史鑽探結果是相關的,因為公司正在使用這些數據作為計劃勘探計劃的指南。公司目前和未來的勘探工作包括通過鑽井核實歷史數據。

About the Harts Point Property:

關於Harts Point特性:

Harts Point is located in the center of the Colorado Plateau, referred to by some as "the Athabasca Basin of the US" and is 64 kilometers ("km") (40 miles) north of the White Mesa Uranium Mill, the only fully licensed and operating conventional uranium mill in the United States. The Property consists of 324 lode mining claims on Bureau of Land Management ("BLM") ground and drill permits are in place for up to 20 exploration drill holes.

Harts Point位於科羅拉多高原的中心,被一些人稱為“美國的阿薩巴斯卡盆地”,位於懷特梅薩鈾廠以北64公里(“公里”)(40英里),懷特梅薩鈾廠是美國唯一一家獲得完全許可並正在運營的常規鈾廠。該資產包括土地管理局(“BLM”)地面上的324個礦脈採礦權,鑽探許可證適用於多達20個勘探鑽孔。

About Kraken Energy Corp.:

關於克拉肯能源公司:

Kraken Energy Corp. is a new energy company advancing its portfolio of high-grade uranium properties in the Unites States. The Company is advancing its 100%-owned Apex Uranium Property, located 280 km (174 miles) east from Reno, Nevada which is recognized as Nevada's largest past-producing uranium mine. The Company has additionally entered into an option agreement to earn 100% of the Garfield Hills Uranium Property. The past-producing Garfield Hills Uranium Property covers 1,238 ha (3,060 acres) and is located 19 km (12 miles) east of Hawthorne in Mineral County, Nevada. Kraken Energy has also recently staked the Huber Hills Uranium Property, located 136 km (85 miles) north of Elko, Nevada which covers 1,044 ha (2,580 acres) and encompasses the historic Race Track open pit mine. The Company has recently entered into an option agreement to earn 75% of the Harts Point Uranium Property. The Harts Point Uranium Property covers 2,622 ha (6,480 acres) and is located 49 km (30 miles) northwest of Monticello in San Juan County, Utah.

Kraken Energy Corp.是一家新能源公司,正在推進其在美國的高品位鈾礦資產組合。該公司正在推進其100%擁有的Apex鈾礦,該鈾礦位於內華達州里諾以東280公里(174英里),被公認為內華達州最大的過去生產的鈾礦。此外,該公司還簽訂了一項期權協定,以獲得加菲爾德山鈾礦的100%權益。過去生產的加菲爾德山鈾礦佔地1238公頃(3060英畝),位於內華達州礦產縣霍桑以東19公里(12英里)處。Kraken Energy最近還收購了胡伯山鈾礦,該鈾礦位於內華達州埃爾科以北136公里(85英里)處,佔地1,044公頃(2,580英畝),包括歷史悠久的Race Track露天礦。該公司最近簽訂了一項期權協定,將獲得Harts Point鈾礦75%的權益。Harts Point鈾礦佔地2622公頃(6480英畝),位於猶他州聖胡安縣蒙蒂塞洛西北49公里(30英里)處。

For more information about the Company, please visit; .

欲瞭解更多有關該公司的資料,請瀏覽;。

On Behalf of the Board of Kraken Energy Corp.:
Matthew Schwab
President & Chief Executive Officer

我代表克拉肯能源公司董事會:
馬修·施瓦布
總裁&首席執行官

Corporate Office:
Suite 907 - 1030 West Georgia Street
Vancouver, British Columbia
V6E 2Y3
T: (604) 628-2669

公司辦公室:
西喬治亞街907-1030號套房
溫哥華,不列顛哥倫比亞省
V6E 2Y3
電話:(604)628-2669

For investor relations inquiries, contact:
Kin Communications Inc.
T: (604) 684-6730
E: uusa@kincommunications.com

如需投資者關係諮詢,請聯繫:
KIN通信公司
電話:(604)684-6730
電子郵箱:uusa@kiniciations.com

This news release contains forward-looking information which is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ from those projected in the forward-looking statements. Forward-looking statements in this press release include our plans for exploration at the properties. These forward-looking statements are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Risks that could change or prevent these statements from coming to fruition include changing costs for mining and processing; increased capital costs; the timing and content of upcoming work programs; geological interpretations based on drilling that may change with more detailed information; potential process methods and mineral recoveries assumption based on limited test work and by comparison to what are considered analogous deposits that with further test work may not be comparable; the availability of labour, equipment and markets for the products produced; and despite the current expected viability of the project, conditions changing such that the minerals on our property cannot be economically mined, or that the required permits to build and operate the envisaged mine can be obtained. The forward-looking information contained herein is given as of the date hereof and the Company assumes no responsibility to update or revise such information to reflect new events or circumstances, except as required by law.

本新聞稿包含前瞻性資訊,這些資訊受到各種風險、不確定因素和其他因素的影響,這些因素可能導致實際事件或結果與前瞻性陳述中預測的不同。本新聞稿中的前瞻性陳述包括我們在這些物業的勘探計劃。這些前瞻性陳述會受到各種風險、不確定因素和其他因素的影響,這些因素可能會導致實際事件或結果與前瞻性資訊中預測的大不相同。可能改變或阻止這些陳述取得成果的風險包括:採礦和加工成本的變化;資本成本增加;即將出臺的工作計劃的時間和內容;基於鑽探的地質解釋可能隨更詳細的資訊而變化;潛在的加工方法和礦物回收率假設;基於有限的測試工作以及與被視為類似礦藏的假設相比,這些礦藏在進一步的測試工作中可能無法進行比較;生產的產品可獲得勞動力、設備和市場;儘管目前預計該專案具有可行性,但條件發生了變化,使得我們財產上的礦物不能進行經濟開採,或者獲得建造和運營設想中的礦場所需的許可證。本文中包含的前瞻性資訊是截至本文發佈之日的前瞻性資訊,公司不承擔更新或修改此類資訊以反映新事件或新情況的責任,除非法律另有要求。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論