Murchison Minerals Commences Geophysical Surveys Targeting Prospective Copper Stockwork Zone at BMK Project
Murchison Minerals Commences Geophysical Surveys Targeting Prospective Copper Stockwork Zone at BMK Project
Highlights
亮點
- Commences ground geophysics program at the BMK Deposit consisting of Fixed Loop Transient Electromagnetic and Borehole Electromagnetic ("EM") surveys.
- Surveys are designed to assist in locating the copper-rich stockwork zone associated with zinc-rich massive sulphide zones like those found at the BMK Deposit.
- The objective of the surveys is to refine the CST target area in anticipation of a winter 2024 diamond drill program.
- The CST target is located only 400 metres south of the BMK Deposit and is of similar size and conductive strength, the target has not been previously drilled.
- 在BMK礦牀啓動地面地球物理學項目,包括固定迴路瞬態電磁和鑽孔電磁(“EM”)勘測。
- 調查旨在幫助定位與富鋅塊狀硫化物帶(例如在BMK礦牀發現的塊狀硫化物帶)相關的富銅儲量區。
- 調查的目的是完善CST的目標區域,爲2024年冬季的鑽石鑽探計劃做好準備。
- CST目標位於BMK礦牀以南僅400米處,具有相似的大小和導電強度,該目標以前從未鑽探過。
BURLINGTON, ON / ACCESSWIRE / November 8, 2023 / Murchison Minerals Ltd. ("Murchison" or the "Company") (TSXV:MUR)(OTCQB:MURMF) is pleased to announce commencement of Fixed Loop Transient Electromagnetic (FLTEM) and Borehole Electromagnetic (BHEM) surveys at its 100%-owned Cu-Zn-Ag-Pb-Au Volcanogenic Massive Sulphide (VMS) BMK Project in Saskatchewan. The focus of these surveys is to provide high-resolution geophysical data to aid in the potential discovery of a copper-rich stockwork zone and additional lenses of sulphide mineralization at the BMK Deposit. The surveys are being completed by Discovery International Geophysics of Saskatoon, SK, a wholly owned division of Dias Geophysical of Saskatoon, SK.
安大略省伯靈頓/ACCESSWIRE /2023 年 11 月 8 日/默奇森礦業有限公司(“默奇森” 或 “公司”)(多倫多證券交易所股票代碼:MURMF)(OTCQB: MURMF)欣然宣佈,在其全資擁有的銅鋅-銀鉛-金火山塊狀硫化物(VMS)上開始進行固定迴路瞬態電磁(FLTEM)和鑽孔電磁(BHEM)調查薩斯喀徹溫省的BMK項目。這些調查的重點是提供高分辨率的地球物理數據,以幫助可能在BMK礦牀發現富含銅的儲量區和其他硫化物礦化透鏡。這些調查由SK薩斯卡通DiasGeophysics旗下的Scovery International Geophysics旗下的Scovery International地球物理學公司完成。
Figure 1: Location map of BMK Deposit and CST target.
圖 1:BMK 存款和 CST 目標的位置圖。
Figure 2: Long-section View of BMK Deposit and CST target.
圖 2:BMK 存款和 CST 目標的長視圖。
BMK Geophysical Program:
BMK 地球物理項目:
The BMK VMS Project hosts the high-grade polymetallic massive sulphide Brabant-McKenzie Deposit with a current NI 43-101 resource estimate of 2.1 Mt indicated at 0.69% Cu, 7.08% Zn, 0.49% Pb, 39.6 g/t Ag, 0.23 g/t Au and 7.6 Mt of inferred at 0.57% Cu, 4.46% Zn, 0.19% Pb, 18.42 g/t Ag, and 0.1 g/t Au (See NI 43-101 dated September 4, 2018). The Deposit remains open along strike and at depth, and notably, is missing a copper stockwork zone which is typical of high-grade VMS deposits - locating this zone is the primary objective at the BMK Project. Reinterpretation of a 2017 Heli-SAM survey (hybrid ground/airborne electromagnetic survey) has highlighted a high conductance, deep EM target, 400 meters south of the BMK Deposit (Figure 1). The CST target is considered highly prospective and is top priority for Murchison to drill test. The large size and proximity of the anomaly to the BMK Deposit may indicate a copper stockwork zone or an additional lens of massive sulphide mineralization. The FLTEM survey will utilize an EMIT SMART Fluxgate sensor and is designed to further refine this target in advance of anticipated drilling in winter 2024.
BMK VMS項目擁有高品位多金屬塊狀硫化物布拉班特-麥肯齊礦牀,目前NI 43-101的資源估計爲210萬噸,銅含量爲0.69%,鋅含量爲7.08%,鉛含量爲0.49%,鉛含量爲0.49%,鉛含量爲0.42克/噸,銀含量爲18.42克/噸,以及 0.1 g/t Au(參見 2018 年 9 月 4 日的 NI 43-101)。該礦牀在走向和深度均處於開放狀態,值得注意的是,缺少銅庫區,這是高品位VMS礦牀的典型特徵——定位該區域是BMK項目的主要目標。對2017年Heli-SAM調查(地面/機載混合電磁勘測)的重新解釋突出顯示了位於BMK礦牀以南400米處的高電導深電磁目標(圖1)。CST目標被認爲極具前景,是默奇森鑽探測試的重中之重。該異常體面積大且與 BMK 礦牀的距離較近,可能表明存在銅儲量區或額外的塊狀硫化物礦化透鏡。FLTEM調查將使用EMIT SMART Fluxgate傳感器,旨在在預計於2024年冬季進行鑽探之前進一步完善這一目標。
In addition to FLTEM, a BHEM survey will be completed on the open drillhole BM21-001, located approximately 185 m southwest of the BMK Deposit, which intersected 0.35 m of VMS style mineralization at 1.13% Pb, 0.26% Zn, and 58.8 g/t Ag (see April 13, 2021 release). Murchison infers that this mineralization indicates additional VMS mineralization maybe proximal. The area remains highly prospective for expansion of the BMK Deposit, and results from the BHEM and FLTEM surveys will be used as vectors towards identifying additional lenses of sulphide mineralization. Past BHEM surveys have been successful in identifying VMS style mineralization at the BMK Project.
除FLTEM外,BHEM還將對位於BMK礦牀西南約185米處的露天鑽孔 BM21-001 完成調查,該鑽孔與0.35米的VMS式礦化區相交,含鉛量爲1.13%,鋅含量爲0.26%,銀含量爲58.8克/噸(見2021年4月13日發佈的版本)。默奇森推斷,這種礦化表明可能存在額外的VMS礦化作用。該地區仍極具擴建BMK礦牀的前景,BHEM和FLTEM調查的結果將用作識別其他硫化物礦化鏡頭的載體。過去的BHEM調查成功地在BMK項目中發現了VMS風格的礦化作用。
Murchison Minerals' CEO, President, & Director Troy Boisjoli comments:
默奇森礦業首席執行官、總裁兼董事特洛伊·博伊斯喬利評論說:
"Murchison is eagerly anticipating the results of the FLTEM survey at the CST target area. This area has been identified as being highly prospective to host the potential copper stockwork zone typical of high-grade VMS deposits. The survey results will be incorporated into Murchison's targeting model in anticipation of a winter 2024 drill program at BMK."
“默奇森熱切期待着FLTEM在CST目標區域的調查結果。該地區已被確定爲極有可能成爲高品位VMS礦牀典型的潛在銅庫區。調查結果將納入默奇森的目標模型中,因爲預計BMK將在2024年冬季進行鑽探計劃。”
Murchison Minerals' Vice-President of Exploration John Shmyr comments:
默奇森礦業勘探副總裁約翰·施邁爾評論說:
"The team is excited to collect additional data at the CST target to get it ready for drill testing. The fact that the geophysical anomaly appears to be of similar size and conductance to the BMK Deposit and is only 400 metres away is highly compelling. The discovery of the copper stockwork zone proximal to BMK Deposit has the potential to add a significant amount to the resource estimate and is our highest priority."
“團隊很高興能在CST目標處收集更多數據,爲鑽探測試做好準備。地球物理異常的大小和電導率似乎與BMK礦牀相似,而且只有400米遠,這一事實非常有說服力。發現靠近BMK礦牀的銅礦儲量區有可能大幅增加資源估計,這是我們的首要任務。”
Qualifying Statement
資格聲明
The foregoing scientific and technical disclosures on the BMK Project have been reviewed by John Shmyr, P.Geo., VP Exploration, a registered member of the Professional Engineers and Geoscientists of Saskatchewan. Mr. Shmyr is a Qualified Person as defined by National Instrument 43-101. The Qualified Person has verified the data disclosed in this release, including sampling, analytical and test data underlying the information contained in this release. Mr. Shmyr consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.
薩斯喀徹溫省專業工程師和地球科學家協會註冊會員、勘探副總裁John Shmyr審查了上述有關BMK項目的科學和技術披露。根據國家儀器43-101的定義,Shmyr先生是合格人員。合格人員已經驗證了本新聞稿中披露的數據,包括作爲本新聞稿所含信息基礎的抽樣、分析和測試數據。施邁爾先生同意根據他提供的信息,按照公告的形式和背景將這些事項納入公告中。
Some data disclosed in this News Release relating to sampling and drilling results is historical in nature. Neither the Company nor a qualified person has yet verified this data and therefore investors should not place undue reliance on such data. In some cases, the data may be unverifiable due to lack of drill core. Mineralization hosted on adjacent and/or nearby and/or geologically similar properties is not necessarily indicative of mineralization hosted on the Company's properties.
本新聞稿中披露的與採樣和鑽探結果有關的一些數據本質上是歷史性的。公司和合格人員均未驗證這些數據,因此投資者不應過分依賴此類數據。在某些情況下,由於缺少鑽芯,數據可能無法驗證。位於鄰近和/或附近和/或地質相似物業上的礦化不一定表示公司物業中存在礦化。
About the BMK Project
關於 BMK 項目
The Brabant-McKenzie Project is located 175 kilometres northeast of La Ronge, Saskatchewan and approximately three kilometres from the community of Brabant Lake. The area is accessed year-round via provincial Highway 102 and is serviced by grid power. The project hosts the Brabant-McKenzie VMS Deposit, and the mineral claims total 664 square kilometres, that cover approximately 37 kilometres of strike length of the favourable BMK trend. The project contains multiple known mineralized showings such as the Main Lake and Betty Showings and with many identified geophysical conductors that have yet to be drill tested.
布拉班特-麥肯齊項目位於薩斯喀徹溫省拉龍日東北175公里處,距離布拉班特湖社區約三公里。該地區全年可通過102號省道進入,並由電網提供服務。該項目擁有Brabant-McKenzie VMS礦牀,礦產索賠總面積爲664平方千米,涵蓋了BMK有利趨勢的約37千米的走向長度。該項目包含多個已知的礦化景觀,例如美因湖和貝蒂展覽,還有許多已確定的地球物理導體尚未進行鑽探測試。
Figure 3: Location map of BMK Project.
圖 3:BMK 項目的位置圖。
Mineral Resource Summary for BMK VMS Deposit
BMK VMS 礦牀的礦產資源摘要
2018 BMK Deposit Resource | ||||||||||
Domain |
Tonnes |
Contained Grade |
Contained Metal |
|||||||
Cu (%) |
Zn (%) |
Ag (g/t) |
Pb (%) |
Au (g/t) |
Cu Eq. (%) |
Zn Eq. |
Cu |
Zn |
||
INDICATED MINERAL RESOURCE | ||||||||||
Lower Zone |
1,200,000 |
0.75 |
8.13 |
48.00 |
0.67 |
0.28 |
5.56 |
11.53 |
19,842 |
215,083 |
Upper Zone |
900,000 |
0.60 |
5.70 |
28.52 |
0.24 |
0.17 |
3.82 |
7.93 |
11,905 |
113,097 |
Total Indicated |
2,100,000 |
0.69 |
7.08 |
39.60 |
0.49 |
0.23 |
4.82 |
9.98 |
31,945 |
327,783 |
INFERRED MINERAL RESOURCE | ||||||||||
Lower Zone |
2,700,000 |
0.55 |
4.88 |
29.02 |
0.42 |
0.14 |
3.43 |
7.14 |
32,739 |
290,481 |
Upper Zone |
4,900,000 |
0.57 |
4.22 |
12.46 |
0.06 |
0.08 |
2.79 |
5.81 |
61,575 |
455,871 |
Total Inferred |
7,600,000 |
0.57 |
4.46 |
18.42 |
0.19 |
0.10 |
3.03 |
6.29 |
95,504 |
747,278 |
2018 年 BMK 存款資源 | ||||||||||
域 |
噸 |
包含等級 |
所含金屬 |
|||||||
銅 (%) |
鋅 (%) |
銀 (g/t) |
鉛 (%) |
金 (g/t) |
銅方程 (%) |
Zn Eq。 |
銅 |
鋅 |
||
指示的礦產資源 | ||||||||||
下部區域 |
1,200,000 |
0.75 |
8.13 |
48.00 |
0.67 |
0.28 |
5.56 |
11.53 |
19,842 |
215,083 |
上部區域 |
900,000 |
0.60 |
5.70 |
28.52 |
0.24 |
0.17 |
3.82 |
7.93 |
11,905 |
113,097 |
顯示的總數 |
2100,000 |
0.69 |
7.08 |
39.60 |
0.49 |
0.23 |
4.82 |
9.98 |
31,945 |
327,783 |
推斷的礦產資源 | ||||||||||
下部區域 |
2700,000 |
0.55 |
4.88 |
29.02 |
0.42 |
0.14 |
3.43 |
7.14 |
32,739 |
290,481 |
上部區域 |
4,900,000 |
0.57 |
4.22 |
12.46 |
0.06 |
0.08 |
2.79 |
5.81 |
61,575 |
455,871 |
推斷總數 |
7,600,000 |
0.57 |
4.46 |
18.42 |
0.19 |
0.10 |
3.03 |
6.29 |
95,504 |
747,278 |
The above mineral resource estimate for the Brabant-McKenzie VMS Deposit was prepared by an independent qualified person ("QP") Finley Bakker, P. Geo., and has an effective date of September 4, 2018. The NI 43-101 Technical Report named Technical Report on the Resource Estimate Update for the Brabant-McKenzie Property, Brabant Lake, Saskatchewan is available on the Company's website and on SEDAR. The Mineral Resource of the Brabant-McKenzie VMS Deposit was estimated based on metal prices of USD $1.20/lb Zn, $2.50/lb Cu, $1.00/lb Pb, $16.00/Oz. Ag, and $1,200/Oz. Au, and a USD exchange rate of $1.25. A Net Smelter Return (NSR) cut-off of $90/tonne and a 3.5% zinc equivalent based on above metal prices and an average recovery of 75% for all metals.
上述Brabant-McKenzie VMS礦牀的礦產資源估算由獨立合格人士(“QP”)P.Geo. 的芬利·巴克編制,生效日期爲2018年9月4日。名爲薩斯喀徹溫省布拉班特湖布拉班特-麥肯齊地產資源估算更新技術報告的NI 43-101技術報告可在公司網站和SEDAR上查閱。Brabant-McKenzie VMS礦牀的礦產資源是根據每磅鋅1.20美元、2.50美元/磅銅、1.00美元/磅鉛、16.00美元/盎司銀和1200美元/盎司金的金屬價格以及1.25美元的美元匯率估算的。根據上述金屬價格,冶煉廠淨回報率(NSR)截止值爲每噸90美元,鋅當量爲3.5%,所有金屬的平均回收率爲75%。
About Murchison Minerals Ltd. (TSXV:MUR)(OTCQB:MURMF)
關於默奇森礦業有限公司(TSXV: MUR)(OTCQB: MURMF)
Murchison is a Canadian‐based exploration Company focused on nickel-copper-cobalt exploration at the 100% - owned HPM Project in Quebec and the exploration and development of the 100% - owned Brabant Lake zinc‐copper‐silver project in north‐central Saskatchewan. Murchison currently has 218.2 million shares issued and outstanding.
默奇森是一家總部位於加拿大的勘探公司,專注於魁北克全資HPM項目的鎳銅鈷勘探,以及薩斯喀徹溫省中北部100%擁有的布拉班特湖鋅銅銀項目的勘探和開發。默奇森目前已發行和流通股票2.182億股。
Additional information about Murchison and its exploration projects can be found on the Company's website at . For further information, please contact:
有關默奇森及其勘探項目的更多信息,請訪問該公司的網站,網址爲。欲了解更多信息,請聯繫:
Troy Boisjoli, President and CEO,
Erik H Martin, CFO, or
Justin LaFosse, Director Corporate Development
Tel: (416) 350‐3776
info@murchisonminerals.com
特洛伊·博伊斯喬利,總裁兼首席執行官,
首席財務官埃裏克·馬丁或
賈斯汀·拉福斯,企業發展總監
電話:(416) 350‐3776
info@murchisonminerals.com
Forward‐Looking Information
前瞻性信息
The content and grades of any mineral deposits at the Company's properties are conceptual in nature. There has been insufficient exploration to define a mineral resource on the property and it is uncertain if further exploration will result in any target being delineated as a mineral resource.
公司物業中任何礦牀的含量和等級本質上都是概念性的。勘探不足,無法確定該物業的礦產資源,目前尚不確定進一步的勘探是否會將任何目標劃定爲礦產資源。
Certain information set forth in this news release may contain forward-looking information that involves substantial known and unknown risks and uncertainties. This forward-looking information is subject to numerous risks and uncertainties, certain of which are beyond the control of the Company, including, but not limited to, the impact of general economic conditions, industry conditions, and dependence upon regulatory approvals. FLI herein includes, but is not limited to: future drill results; stakeholder engagement and relationships; parameters and methods used with respect to the assay results; the prospects, if any, of the deposits; future prospects at the deposits; and the significance of exploration activities and results. FLI is designed to help you understand management's current views of its near- and longer-term prospects, and it may not be appropriate for other purposes. FLI by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such FLI. Although the FLI contained in this press release is based upon what management believes, or believed at the time, to be reasonable assumptions, the Company cannot assure shareholders and prospective purchasers of securities of the Company that actual results will be consistent with such FLI, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness of any such FLI. Except as required by law, the Company does not undertake, and assumes no obligation, to update or revise any such FLI contained herein to reflect new events or circumstances, except as may be required by law. Unless otherwise noted, this press release has been prepared based on information available as of the date of this press release. Accordingly, you should not place undue reliance on the FLI or information contained herein. Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in FLI. Assumptions upon which FLI is based, without limitation, include: the ability of exploration activities to accurately predict mineralization; the accuracy of geological modelling; the ability of the Company to complete further exploration activities; the legitimacy of title and property interests in the deposits; the accuracy of key assumptions, parameters or methods used to obtain the assay results; the ability of the Company to obtain required approvals; the results of exploration activities; the evolution of the global economic climate; metal prices; environmental expectations; community and nongovernmental actions; and any impacts of COVID-19 on the deposits, the Company's financial position, the Company's ability to secure required funding, or operations. Risks and uncertainties about the Company's business are more fully discussed in the disclosure materials filed with the securities regulatory authorities in Canada, which are available at . Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
本新聞稿中列出的某些信息可能包含涉及大量已知和未知風險和不確定性的前瞻性信息。這些前瞻性信息面臨許多風險和不確定性,其中某些風險和不確定性是公司無法控制的,包括但不限於總體經濟狀況、行業狀況以及對監管部門批准的依賴的影響。此處的FLI包括但不限於:未來的鑽探結果;利益相關者的參與和關係;與分析結果有關的參數和方法;礦牀的前景(如果有);礦牀的未來前景;以及勘探活動和結果的重要性。FLI 旨在幫助您了解管理層目前對其短期和長期前景的看法,它可能不適合用於其他目的。就其性質而言,FLI基於假設,涉及已知和未知的風險、不確定性和其他因素,這些因素可能導致公司的實際業績、業績或成就與該FLI所表達或暗示的任何未來業績、業績或成就存在重大差異。儘管本新聞稿中包含的FLI基於管理層當時認爲或認爲的合理假設,但公司無法向股東和公司證券的潛在購買者保證實際業績將與此類FLI一致,因爲可能還有其他因素導致業績與預期、估計或預期不符,公司和任何其他人均不對任何此類FLI的準確性和完整性承擔責任。除非法律要求,否則除非法律要求,否則公司不承諾也不承擔任何義務更新或修改此處包含的任何此類FLI,以反映新的事件或情況。除非另有說明,否則本新聞稿是根據截至本新聞稿發佈之日可用的信息編寫的。因此,您不應過分依賴FLI或此處包含的信息。此外,如果一個或多個風險、不確定性或其他因素得以實現,或者如果基本假設被證明不正確,則實際結果可能與FLI中描述的結果存在重大差異。FLI所依據的假設包括但不限於:勘探活動準確預測礦化的能力;地質建模的準確性;公司完成進一步勘探活動的能力;礦牀所有權和財產權益的合法性;用於獲得化驗結果的關鍵假設、參數或方法的準確性;公司獲得所需批准的能力;勘探活動的結果;全球經濟環境的演變;金屬價格;環境預期;社區和非政府行動;以及 COVID-19 對存款、公司財務狀況、公司獲得所需資金的能力或運營的任何影響。向加拿大證券監管機構提交的披露材料中更全面地討論了公司業務的風險和不確定性,該披露材料可在以下網址查閱。多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所風險交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任e。
SOURCE: Murchison Minerals Ltd.
來源:默奇森礦業有限公司