share_log

DLP Resources Intersects 138m of 0.68 % CuEq* Within an 881.95m Interval of 0.46% CuEq* on the Aurora Project in Southern Peru and Discovers New Copper Oxide Zone to the East of the Current Drilling

DLP Resources Intersects 138m of 0.68 % CuEq* Within an 881.95m Interval of 0.46% CuEq* on the Aurora Project in Southern Peru and Discovers New Copper Oxide Zone to the East of the Current Drilling

DLP Resources 在秘魯南部的 Aurora 項目上在 0.46% Cueq* 的 881.95 米間隔內相交 1.38 米,並在當前鑽探以東發現了新的氧化銅區
newsfile ·  2023/11/14 06:00

Cranbrook, British Columbia--(Newsfile Corp. - November 14, 2023) - DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) ("DLP" or the "Company") announces receipt of complete drill results for drillhole, A23-012 on the Aurora porphyry copper-molybdenum project in southern Peru (Figure 1).

不列顛哥倫比亞省克蘭布魯克--(Newsfile Corp.-2023 年 11 月 14 日)- DLP Resources Inc.(多倫多證券交易所股票代碼:DLP)(場外交易代碼:DLPRF) (”DLP“或者”公司“) 宣佈收到了秘魯南部奧羅拉斑岩銅鉬項目的 A23-012 鑽孔的完整鑽探結果(圖 1)。

Results for the first eleven drillholes, A22-001, A22-002, A22-003, A23-004, A23-005, A23-006, A23-007, A23-008, A23-009, A23-010 and A23-011 were last released on October 11, 2023. (see DLP Resources Inc., news release of October 11, 2023, for results for A23-001 to A23-011 and Table 3 below).

前 11 個鑽孔(A22-001、A22-002、A22-003、A23-004、A23-005、A23-006、A23-007、A23-008、A23-009、A23-010 和 A23-011)的結果最後一次公佈於 2023 年 10 月 11 日。(參見 DLP Resources Inc.,2023 年 10 月 11 日的新聞稿,了解 A23-001 至 A23-011 的業績和下面的表 3)。

Highlights

亮點

Drillhole A23-012 was drilled approximately 130m east of drillhole A23-011 and intersected significant copper and molybdenum mineralization throughout the hole to a depth of 887.60m. A23-012 ended in molybdenum mineralization and the most significant mineralized intervals included:

鑽孔 A23-012 在 A23-011 鑽孔以東大約 130 米處鑽探,並在整個孔中穿透了大量的銅和鉬礦化區,深度爲 887.60 米。A23-012 以鉬礦化結束,最重要的礦化間隔包括:

  • 0.46% CuEq* over 881.95m (0.18% Cu, 0.0514% Mo and 1.68g/t Ag) from 5.65m to 887.60m.
  • 0.80% CuEq* over 16.35m (0.49% Cu, 0.0499% Mo and 6.53g/t Ag) from 5.65m to 22.00m.
  • 0.50% CuEq* over 186.35m (0.15% Cu, 0.0643% Mo and 1.74g/t Ag) from 5.65m to 192.00m.
  • 0.68% CuEq* over 138.00m (0.45% Cu, 0.0390% Mo and 3.08g/t Ag) from 406.00m to 544.00m.
  • 0.62% CuEq* over 195.00m (0.06% Cu, 0.1083% Mo and 0.37g/t Ag) from 692.00m to 887.60m.
  • 0.72% CuEq* over 116.00m (0.07% Cu, 0.1253% Mo and 0.43g/t Ag) from 692.00m to 808.00m.
  • 0.46% CUEQ* 超過 8.8195 億 (0.18% 銅、0.0514% 鉬和 1.68g/t Ag)從 565 萬到 887.60 米。
  • 0.80% CUEq* 超過 1635 萬 (0.49% 銅、0.0499% 鉬和 6.53g/t Ag)從 565 萬到 2,200 萬。
  • 0.50% CUEq* 超過 1.8635 億 (0.15% 銅、0.0643% 鉬和 1.74g/t Ag)從 565 萬到 1.92 億。
  • 0.68% CUEq* 超過 1.380 億 (0.45% 銅、0.0390% 鉬和 3.08g/t Ag)從 406.00m 到 54.00m。
  • 0.62% CUEQ* 超過 1.95億 (0.06% 銅、0.1083% 鉬和 0.37g/t Ag)從 6.92 億到 887.60 米。
  • 0.72% CUEQ* 超過 1.1600 億 (0.07% 銅、0.1253% 鉬和 0.43g/t Ag)從 6.92 億到 808.00 米。

The complete set of results for A23-012 are summarized in Table 1 below.

A23-012 的完整結果彙總在下表 1 中。

Mr. Gendall, President and CEO commented: "A23-012 was drilled on a step-out of 130m to the east of A23-011. We continue to encounter copper-molybdenum mineralization on the SE side of the project. Mineralization is still open to depth and to the east and southeast. Drilling is ongoing and drillhole A23-013 is being drilled higher on the ridge to 1000m depth and is planned to intersect the zone of enriched copper mineralization in the upper elevations. We look forward to receiving results for A23-013 in later December. In addition, we are encouraged with the discovery of copper oxides approximately 500m east of the current drilling and will be completing a geochemical sampling program over this area in November and early December."

總裁兼首席執行官根德爾先生評論說:“A23-012 是在 A23-011 以東 1.3 米處的臺階上鑽探的。我們在該項目的東南一側繼續遇到銅鉬礦化問題。礦化仍向深度以及向東和東南開放。鑽探正在進行中,A23-013 鑽孔正在山脊上鑽得更高,深度達到 1000 米,並計劃與海拔較高的富銅礦化區相交。我們期待在 12 月下旬收到 A23-013 的結果。此外,我們對在當前鑽探以東約500米處發現的氧化銅感到鼓舞,並將於11月和12月初完成該地區的地球化學採樣計劃。”

Aurora Cu-Mo Project - Summary of Drill Results for A23-012

Aurora 銅鉬項目-A23-012 鑽探結果摘要

  • Drillhole A23-012 (Figures 2,3,4 and 5) commenced on September 19 and was completed on October 17 at a depth of 887.60m. Coordinates are 8,565,427mN and 190,100mE at an elevation of 2728m. A23-012 was drilled at -70 degrees towards 020 degrees (NE).
    • This hole was drilled approximately 130m east of A23-011.
      • 0 to 5.65m: Overburden.
      • 5.56m to 22.00m: Breccia with moderate chalcopyrite and minor chalcocite in matrix.
      • 22m to 195.92m: Hornfels with moderate chalcopyrite-pyrite mineralization and moderate molybdenite.
      • 195.92m to 279.80m: Quartz-eye-feldspar-biotite porphyry (QEFBP - intermineral phase) with potassic alteration and overprint of weak chlorite and intermediate argillic alteration and pyrrhotite. Moderate veining with chalcopyrite disseminated and in microfractures with moderate molybdenite. Faulted contact.
      • 279.80m to 326,80m: QEFBP with predominantly intermediate argillic alteration on secondary biotite and weak chlorite alteration. Weak quartz veining and minor chalcopyrite and molybdenite mineralization. Faulted contact.
      • 326.80m to 631m: QEFBP (Intermineral phase) with moderate intermediate argillic alteration on quartz-sericite alteration. Weak chalcopyrite mineralization and moderate molybdenite.
      • 631m to 700m: QEFBP with moderate quartz-sericite alteration on K-feldspar alteration and moderate quartz veining. Weak chalcopyrite and molybdenite mineralization.
      • 700m to 815m: QEFBP (Early porphyry phase) with abundant quartz veining and moderate to strong molybdenite and minor chalcopyrite. Moderate quartz-sericite + green sericite alteration with magnetite.
      • 815m to 875.85m: QEFBP (Intermineral phase) with weak quartz veining and moderate chlorite overprint on potassic alteration (secondary biotite). Strong molybdenite mineralization.
      • 875.85m to 887.60m: FBP (Feldspar-biotite porphyry - Intermineral phase) with weak quartz veining and weak chalcopyrite and strong molybdenite mineralization.
  • 鑽孔 A23-012 (圖 2、3、4 和 5) 於9月19日開工,於10月17日完工,深度爲887.60米。座標爲 8,565,427m 和 190,100mE,海拔 2728 米。A23-012 在 -70 度朝向 020 度(東北)的溫度下鑽探。
    • 這個洞是在 A23-011 以東大約 130 米處鑽出的。
      • 0 到 5.65 米:覆蓋層。
      • 5.56m 至 22.00m:角礫岩,基質中含有中度黃銅礦和少量硫鋁石。
      • 22m 至 195.92m:黃銅礦-黃鐵礦礦化程度適中,輝鉬礦含量適中的霍恩費爾斯。
      • 195.92m 至 279.80m:Quartz-eye-Feldspar-Biotite 斑岩(QEFBP-礦物間相),含鉀蝕變,疊印有弱亞氯酸鹽和中間的丙烯酸蝕變和鐵礦。中度脈紋,黃銅礦彌散,微裂縫中有中等輝鉬礦。聯繫人故障。
      • 279.80m 至 326,80m:QEFBP 主要是次生黑雲母的中間泥質蝕變和微弱的亞氯酸鹽蝕變。微弱的石英脈絡和少量的黃銅礦和輝鉬礦礦化。聯繫人故障。
      • 326.80m 至 631m:QEFBP(礦物間相),石英絲巖蝕變上有中等的中間泥質蝕變。黃銅礦礦化程度低,輝鉬礦含量適中。
      • 631 米到 700 米:QEFBP 在 K-Feldspar 蝕變上有中度的石英-絹雲母蝕變,石英脈紋中等。弱黃銅礦和輝鉬礦礦化。
      • 700m 至 815m:QEFBP(早期斑岩期),具有豐富的石英脈和中到強的輝鉬礦和少量的黃銅礦。中度石英-絹雲母+綠色絹雲母與磁鐵礦的蝕變。
      • 815m 至 875.85 m:QEFBP(礦物間相),石英脈較弱,鉀蝕變(次生黑雲母)上有中度亞氯酸鹽疊印。強烈的輝鉬礦化作用。
      • 875.85m 至 887.60m:FBP(Feldspar-Biotite 斑岩——礦物間相),具有弱石英脈和弱黃銅礦和強輝鉬礦礦化作用。

Table 1. Summary of Drill Results for Diamond Drillhole A23-012. All grades are length-weighted averages of samples within the interval reported.

表 1。鑽石鑽孔 A23-012 的鑽孔結果摘要。所有成績均爲報告間隔內樣本的長度加權平均值。

Hole From To Interval1 Description Cu (total) Mo Ag Cueq*
ID m m m
% % g/t %
A23-012 0.00 5.65 5.65 Overburden (not sampled) - - - -

5.65 887.60 881.95 Primary Mineralization/Hornfels + Porprhyry 0.18 0.0514 1.68 0.46
Includes 5.65 22.00 16.35 Primary Mineralization + Enriched/Breccia 0.49 0.0499 6.53 0.80
Includes 5.65 192.00 186.35 Primary Mineraliztion/Hornfels + Porphyry 0.15 0.0643 1.74 0.50
Includes 406.00 544.00 138.00 Primary Mineralization/Porphyry 0.45 0.0390 3.08 0.68
Includes 600.00 887.60 287.60 Primary Mineralizxation/Porphyry 0.07 0.0962 0.93 0.58
Includes 692.00 887.60 195.60 Primary Mineralization/Porphyry 0.06 0.1083 0.37 0.62
Includes 692.00 808.00 116.00 Primary Mineralization/Porphyry 0.07 0.1253 0.43 0.72
來自 間隔1 描述 銅(總計) Mo Ag Cueq*
身份證 m m m
% % g/t %
A23-012 0.00 5.65 5.65 過載(未抽樣) - - - -

5.65 887.60 881.95 初級礦化/Hornfels + Porpryryry 0.18 0.0514 1.68 0.46
包括 5.65 22.00 16.35 初級礦化 + 濃縮/角礫岩 0.49 0.0499 6.53 0.80
包括 5.65 192.00 186.35 初級礦化/霍恩費爾斯 + 斑岩 0.15 0.0643 1.74 0.50
包括 406.00 544.00 138.00 初級礦化/斑岩 0.45 0.0390 3.08 0.68
包括 600.00 887.60 287.60 初級礦化/斑岩 0.07 0.0962 0.93 0.58
包括 692.00 887.60 195.60 初級礦化/斑岩 0.06 0.1083 0.37 0.62
包括 692.00 808.00 116.00 初級礦化/斑岩 0.07 0.1253 0.43 0.72

Note: *Copper equivalent grades (CuEq) are for comparative purposes only. Mo, Cu and Ag values are uncut, and recovery is assumed to be 100% for the entire drilled length of A23-012. The project is at an early stage of exploration and conceptual recoveries of Cu 85%, Mo 82%, and Ag 75% are assigned to the CuEq calculations. Conversion of metals to an equivalent copper grade based on these metal prices is relative to the copper price per unit mass factored by conceptual recoveries for those metals normalized to the conceptualized copper recovery. The metal equivalencies for each metal are added to the copper grade. The formula for this is: CuEq % = Cu% + (Mo% * (Mo recovery / Cu recovery) * (Mo $ per lb / Cu $ per lb) + (Ag g/t * (Ag recovery / Cu recovery) * (Ag $ per oz/ 31.1034768) / (Cu $ per lb* 22.04623)).

注意:*銅當量等級 (CueQ) 僅用於比較目的。鉬值、銅值和銀值未切割,假設 A23-012 整個鑽孔長度的回收率爲 100%。該項目處於勘探初期,概念回收率爲 85%,鉬含量 82%,銀 75% 被分配給 CueQ 計算。根據這些金屬價格將金屬轉換爲同等銅品位是相對於單位質量銅價格的相關的,該價格是按概念化銅回收率標準化的金屬的概念回收率計算得出的。將每種金屬的金屬當量添加到銅等級中。計算公式爲:CueQ% = Cu% +(Mo% *(鉬回收率/銅回收率)*(每磅鉬美元/每磅銅美元)+(Ag g/t *(銀回收率/銅回收率)*(每盎司銀美元/ 31.1034768)/(每磅銅美元* 22.04623))。

*Copper equivalent calculations use metal prices of Cu - US$3.34/lb, Mo - US$18/lb and Ag - US$21.87/oz.

*銅當量計算使用銅——3.34美元/磅、鉬——18美元/磅和銀——21.87美元/盎司的金屬價格。

1 Intervals are downhole drilled core lengths. Drilling data to date is insufficient to determine true width of mineralization. Mo, Cu and Ag values are uncut.

1 間隔是指井下鑽孔的岩心長度。迄今爲止的鑽探數據不足以確定礦化的真實寬度。Mo、Cu 和 Ag 值未切割。

Table 2: A23-012 Diamond drillhole location, depth, orientation and inclination.

表 2: A23-012 金剛石鑽孔的位置、深度、方向和傾角。

Hole Easting Northing Elevation Length Azimuth Inclination
ID m m m m Degrees Degrees
A23-012 190,100 8,565,427 2728 887.60 020 -70
向東 北方 海拔 長度 方位角 傾角
身份證 m m m m 學位 學位
A23-012 190,100 8,565,427 2728 887.60 020 -70

Co-ordinates are in WGS84 Zone 19S.

座標位於 WGS84 區域 19S 中。

Table 3. Summary of significant drill results for diamond drillholes A23-01 to A23-011. All grades are length-weighted averages of samples within the interval reported.

表 3。A23-01 至 A23-011 金剛石鑽孔的重要鑽探結果摘要。所有成績均爲報告間隔內樣本的長度加權平均值。

Hole From To Interval1 Description Cu (total) Mo Ag Cueq*
ID m m m
% % g/t %
A23-001 22.45 145.80 123.35 Oxidized/Mixed 0.49 0.0036 4.20 0.51
Includes 100.35 145.80 45.45 Enriched 0.64 0.0017 3.40 0.65

100.35 124.30 23.95 Enriched 0.87 0.0024 3.43 0.88

108.65 124.30 15.65 Enriched 1.09 0.0033 3.00 1.11
A23-002 208.00 422.40 214.40 Oxidized/Mixed/Primary 0.35 0.0114 3.95 0.41
Includes 244.00 296.00 52.00 Primary 0.52 0.0131 4.53 0.59
A23-003 38.00 702.30 664.30 Partially leached /Mixed/Enriched/Primary 0.33 0.0483 3.23 0.58
Includes 132.00 350.00 218.00 Mixed sulphides/Enrichment 0.69 0.0162 5.65 0.77

206.00 350.00 144.00 Enriched 0.75 0.0097 5.87 0.80

258.00 350.00 92.00 Enriched 0.83 0.0071 6.81 0.87

522.00 702.30 180.30 Primary (Moly rich) 0.07 0.1284 0.73 0.74
A23-004 0.00 700.90 700.90 Leached/Mixed/Enriched/Primary 0.18 0.142 2.47 0.92
Includes 110.90 333.00 222.10 Mixed/Enriched/Primary 0.46 0.056 5.88 0.75

110.90 264.00 153.10 Mixed/Enriched 0.53 0.058 7.07 0.83

333.00 421.00 88.00 Primary (Molybdenum rich) 0.05 0.149 0.78 0.83

421.00 502.00 81.00 Primary (Molybdenum rich) 0.12 0.152 0.84 0.91

502.00 700.90 198.90 Primary (Molybdenum rich) 0.02 0.273 0.17 1.44
A23-005 130.00 188.00 58.00 Mixed/Enriched 0.43 0.054 3.38 0.71

188.00 302.00 114.00 Primary 0.14 0.076 1.38 0.54

302.00 472.00 170.00 Primary (Molybdenum rich) 0.1 0.11 1.05 0.67

472.00 693.40 221.40 Primary (Molybdenum rich) 0.03 0.259 0.95 1.38
來自 間隔1 描述 銅(總計) Mo Ag Cueq*
身份證 m m m
% % g/t %
A23-001 22.45 145.80 123.35 氧化/混合 0.49 0.0036 4.20 0.51
包括 100.35 145.80 45.45 豐富 0.64 0.0017 3.40 0.65

100.35 124.30 23.95 豐富 0.87 0.0024 3.43 0.88

108.65 124.30 15.65 豐富 1.09 0.0033 3.00 1.11
A23-002 208.00 422.40 214.40 氧化/混合/初級 0.35 0.0114 3.95 0.41
包括 244.00 296.00 52.00 小學 0.52 0.0131 4.53 0.59
A23-003 38.00 702.30 664.30 部分浸出/混合/濃縮/初級 0.33 0.0483 3.23 0.58
包括 132.00 350.00 218.00 混合硫化物/富集 0.69 0.0162 5.65 0.77

206.00 350.00 144.00 豐富 0.75 0.0097 5.87 0.80

258.00 350.00 92.00 豐富 0.83 0.0071 6.81 0.87

522.00 702.30 180.30 初級(Moly rich) 0.07 0.1284 0.73 0.74
A23-004 0.00 700.90 700.90 已浸出/混合/濃縮/主要 0.18 0.142 2.47 0.92
包括 110.90 333.00 222.10 混合型/強化型/初級 0.46 0.056 5.88 0.75

110.90 264.00 153.10 混合/濃縮 0.53 0.058 7.07 0.83

333.00 421.00 88.00 初級(富含鉬) 0.05 0.149 0.78 0.83

421.00 502.00 81.00 初級(富含鉬) 0.12 0.152 0.84 0.91

502.00 700.90 198.90 初級(富含鉬) 0.02 0.273 0.17 1.44
A23-005 130.00 188.00 58.00 混合/濃縮 0.43 0.054 3.38 0.71

188.00 302.00 114.00 小學 0.14 0.076 1.38 0.54

302.00 472.00 170.00 初級(富含鉬) 0.1 0.11 1.05 0.67

472.00 693.40 221.40 初級(富含鉬) 0.03 0.259 0.95 1.38

Table 3 cont. Summary of significant drill results for diamond drillholes A23-01 to A23-011. All grades are length-weighted averages of samples within the interval reported.

表 3 續。A23-01 至 A23-011 金剛石鑽孔的重要鑽探結果摘要。所有成績均爲報告間隔內樣本的長度加權平均值。

Hole From To Interval1 Description Cu (total) Mo Ag Cueq*
ID m m m
% % g/t %
A23-006 91.00 708.50 617.50 Mixed/Enriched/Primary 0.17 0.148 1.82 0.94
Includes 91.00 127.00 36.00 Mixed/Enriched 0.62 0.031 9.10 0.78

321.00 708.55 387.55 Primary (Molybdenum rich) 0.07 0.205 0.74 1.14
A23-007 0.00 708.25 708.25 Partially Leached/Primary/Hornfels 0.25 0.0137 3.07 0.32
Includes 206.00 406.00 200.00 Primary/Hornfels 0.37 0.003 3.83 0.39

206.00 254.00 48.00 Primary/Hornfels 0.57 0.002 5.33 0.58

272.00 306.00 34.00 Primary/Hornfels 0.48 0.003 6.33 0.50
A23-008 3.10 703.65 700.55 Primary/Hornfels+Porphyry 0.10 0.0852 1.18 0.54
Includes 402.00 703.65 301.65 Primary/Porphyry 0.03 0.1548 0.26 0.84
A23-009 0.40 790.55 790.15 Primary/Hornfels+Breccia+Porphyry 0.27 0.0095 2.39 0.32
Includes 303.00 617.00 314.00 Primary/Hornfels+Breccia+Porphyry 0.37 0.0144 2.86 0.45

561.00 617.00 56.00 Primary/Porphyry + Breccia 0.52 0.0144 3.46 0.60
A23-010 0 1002.55 1002.55 Leached/Mixed/Enriched/Primary 0.20 0.0838 2.19 0.66
Includes 190.00 218.00 28.00 Mixed/Enriched 0.86 0.0015 8.41 0.94

190.00 315.00 125.00 Mixed/Enriched/Primary 0.43 0.0082 4.65 0.51

543.00 625.00 82.00 Primary - Breccia zone 0.37 0.0618 3.51 0.72

543.00 1002.55 459.55 Primary 0.09 0.1754 0.9 1.01
A23-011 3.10 1081.70 1078.60 Leached+Mixed & Primary Mineralization/Hornfels+Porphyry 0.16 0.0606 1.69 0.49
Includes 111.00 1081.70 970.70 Mixed & Primary Mineralization/Hornfels+Porphyry 0.17 0.0667 1.81 0.53
Includes 111.00 524.00 413.00 Mixed & Primary Mineralization/Hornfels+Porphyry 0.28 0.0112 2.40 0.36

183.00 464.00 281.00 Mixed & Primary Mineralization/Hornfels+Porphyry 0.31 0.0043 2.40 0.35
Includes 183.00 215.00 32.00 Mixed & Primary Mineralization/Hornfels+Porphyry 0.44 0.0125 3.69 0.54

524.00 1081.70 557.70 Primary Mineralization/Porphyry 0.09 0.1078 1.38 0.66
Includes 716.00 1081.70 365.70 Primary Mineralization/Porphyry 0.07 0.1403 0.66 0.81
來自 間隔1 描述 銅(總計) Mo Ag Cueq*
身份證 m m m
% % g/t %
A23-006 91.00 708.50 617.50 混合型/強化型/初級 0.17 0.148 1.82 0.94
包括 91.00 127.00 36.00 混合/濃縮 0.62 0.031 9.10 0.78

321.00 708.55 387.55 初級(富含鉬) 0.07 0.205 0.74 1.14
A23-007 0.00 708.25 708.25 部分浸出/主要/Hornfels 0.25 0.0137 3.07 0.32
包括 206.00 406.00 200.00 小學/霍恩費爾斯 0.37 0.003 3.83 0.39

206.00 254.00 48.00 小學/霍恩費爾斯 0.57 0.002 5.33 0.58

272.00 306.00 34.00 小學/霍恩費爾斯 0.48 0.003 6.33 0.50
A23-008 3.10 703.65 700.55 初級/Hornfels+Porphyry 0.10 0.0852 1.18 0.54
包括 402.00 703.65 301.65 初級/斑岩 0.03 0.1548 0.26 0.84
A23-009 0.40 790.55 790.15 Primary/Hornfels+Breccia+Porphyry 0.27 0.0095 2.39 0.32
包括 303.00 617.00 314.00 Primary/Hornfels+Breccia+Porphyry 0.37 0.0144 2.86 0.45

561.00 617.00 56.00 Primary/Porphyry + 角礫岩 0.52 0.0144 3.46 0.60
A23-010 0 1002.55 1002.55 已浸出/混合/濃縮/主要 0.20 0.0838 2.19 0.66
包括 190.00 218.00 28.00 混合/濃縮 0.86 0.0015 8.41 0.94

190.00 315.00 125.00 混合型/強化型/初級 0.43 0.0082 4.65 0.51

543.00 625.00 82.00 主要-角礫區域 0.37 0.0618 3.51 0.72

543.00 1002.55 459.55 小學 0.09 0.1754 0.9 1.01
A23-011 3.10 1081.70 1078.60 浸出+混合和初級礦化/Hornfels+Porphyry 0.16 0.0606 1.69 0.49
包括 111.00 1081.70 970.70 混合和初級礦化/Hornfels+Porphyry 0.17 0.0667 1.81 0.53
包括 111.00 524.00 413.00 混合和初級礦化/Hornfels+Porphyry 0.28 0.0112 2.40 0.36

183.00 464.00 281.00 混合和初級礦化/Hornfels+Porphyry 0.31 0.0043 2.40 0.35
包括 183.00 215.00 32.00 混合和初級礦化/Hornfels+Porphyry 0.44 0.0125 3.69 0.54

524.00 1081.70 557.70 初級礦化/斑岩 0.09 0.1078 1.38 0.66
包括 716.00 1081.70 365.70 初級礦化/斑岩 0.07 0.1403 0.66 0.81

Note: *Copper equivalent grades (CuEq) are for comparative purposes only. Mo, Cu and Ag values are uncut, and recovery is assumed to be 100% for the entire drilled lengths of A23-01 to A23-011. The project is at an early stage of exploration and conceptual recoveries of Cu 85%, Mo 82%, and Ag 75% are assigned to the CuEq calculations. Conversion of metals to an equivalent copper grade based on these metal prices is relative to the copper price per unit mass factored by conceptual recoveries for those metals normalized to the conceptualized copper recovery. The metal equivalencies for each metal are added to the copper grade. The formula for this is: CuEq % = Cu% + (Mo% * (Mo recovery / Cu recovery) * (Mo $ per lb / Cu $ per lb) + (Ag g/t * (Ag recovery / Cu recovery) * (Ag $ per oz/ 31.1034768) / (Cu $ per lb* 22.04623)).

注意:*銅當量等級 (CueQ) 僅用於比較目的。鉬值、銅值和銀值未切割,假設 A23-01 到 A23-011 的整個鑽孔長度的回收率爲 100%。該項目處於勘探初期,概念回收率爲 85%,鉬含量 82%,銀 75% 被分配給 CueQ 計算。根據這些金屬價格將金屬轉換爲同等銅品位是相對於單位質量銅價格的相關的,該價格是按概念化銅回收率標準化的金屬的概念回收率計算得出的。將每種金屬的金屬當量添加到銅等級中。計算公式爲:CueQ% = Cu% +(Mo% *(鉬回收率/銅回收率)*(每磅鉬美元/每磅銅美元)+(Ag g/t *(銀回收率/銅回收率)*(每盎司銀美元/ 31.1034768)/(每磅銅美元* 22.04623))。

*Copper equivalent calculations use metal prices of Cu - US$3.34/lb, Mo - US$18/lb and Ag - US$21.87/oz.

*銅當量計算使用銅——3.34美元/磅、鉬——18美元/磅和銀——21.87美元/盎司的金屬價格。

1 Intervals are downhole drilled core lengths. Drilling data to date is insufficient to determine true width of mineralization. Mo, Cu and Ag values are uncut.

1 間隔是指井下鑽孔的岩心長度。迄今爲止的鑽探數據不足以確定礦化的真實寬度。Mo、Cu 和 Ag 值未切割。

Quality Control and Quality Assurance

質量控制和質量保證

DLP Resources Peru S.A.C, a subsidiary of DLP Resources Inc., supervises drilling and carries out sampling of HTW and NTW core. Logging and sampling are completed at a secured Company facility situated on the project site. Sample intervals are nominally 1.5 to 2.7m in length. Drill core is cut in half using a rotary diamond blade saw and samples are sealed on site before transportation to the ALS Peru S.A.C. sample preparation facility in Arequipa by Company vehicles and staff. Prepared samples are sent to Lima by ALS Peru S.A.C. for analysis. ALS Peru S.A.C. is an independent laboratory. Samples are analyzed for 48 elements using a four-acid digestion and ICP-MS analysis (ME-MS61). In addition, sequential copper analyses are done where secondary copper mineralization is observed and reports, soluble copper using sulphuric acid leach, soluble copper in cyanide leach, residual copper and total copper. ALS meets all requirements of International Standards ISO/IEC 17025:2005 and ISO 9001:2015 for analytical procedures.

DLP Resources Peru S.A.C是DLP資源公司的子公司,負責監督鑽探並對HTW和NTW岩心進行採樣。記錄和採樣工作在位於項目現場的公司安全設施中完成。樣本間隔的長度通常爲 1.5 到 2.7 米。使用旋轉式金剛石刀片鋸將鑽芯切成兩半,樣品在現場密封,然後由公司的車輛和工作人員運送到位於阿雷基帕的ALS Peru S.A.C. 樣品製備設施。ALS Peru S.A.C. 將製備好的樣本送往利馬進行分析。ALS 秘魯 S.A.C. 是一家獨立實驗室。使用四酸消解和 ICP-MS 分析 (ME-MS61) 對樣品中有 48 種元素進行分析。此外,對銅進行連續分析,觀察並報告銅的二次礦化,使用硫酸浸出液進行可溶性銅,氰化物浸出液中的可溶性銅,殘留的銅和總銅。ALS 符合國際標準 ISO/IEC 17025:2005 和 ISO 9001:2015 對分析程序的所有要求。

DLP Resources independently monitors quality control and quality assurance ("QA/QC") through a program that includes the insertion of blind certified reference materials (standards), blanks and pulp duplicate samples. The company is not aware of any drilling, sampling, recovery or other factors that could materially affect the accuracy or reliability of the data reported from 5.65m to 887.60 in A23-012.

DLP Resources 通過一項計劃獨立監控質量控制和質量保證(“QA/QC”),該計劃包括插入盲目認證參考材料(標準)、空白樣本和紙漿副本。該公司不知道有任何鑽探、取樣、回收或其他因素可能會對 A23-012 中從565米到887.60報告的數據的準確性或可靠性產生重大影響。

New Breccia Zone and Copper Oxide Showings - East of Current Drilling

新的角礫岩區域和氧化銅展覽-當前鑽探以東

During the past two months, while preparing an access road to the NE and SE side of the project for further drilling, a zone of approximately 500m x 500m was discovered with breccia's in the hornfels and copper-oxides on road cut surfaces. This is extremely encouraging for the extension of copper-molybdenum mineralization for at least another 500m further to the southeast and northeast of the current planned drilling. This area also overlies a similar magnetic anomaly that underlies the main porphyry area (Figure 6).

在過去的兩個月中,在準備通往該項目東北和東南側的道路以進行進一步鑽探時,發現了一個大約 500 米 x 500 米的區域,角質中有角礫岩,路面上有氧化銅。這對於將銅鉬礦化區向當前計劃鑽探的東南和東北方向再延伸至少500米是極其令人鼓舞的。該區域還覆蓋了主斑岩區域下方的類似磁異常(圖 6)。

Currently a rock sample program is underway to define additional copper-molybdenum targets for drilling. Sample results are expected later in December.

目前,岩石樣本計劃正在進行中,以確定額外的銅鉬鑽探目標。樣本結果預計將在12月下旬公佈。

Metallurgical Study Underway

冶金研究正在進行中

Plenge laboratory in Lima, Peru have been contracted to do a metallurgical study on three composite samples from the Aurora project. Results from this study are expected in February-March 2024.

秘魯利馬的Plenge實驗室已簽訂合同,對來自Aurora項目的三個複合樣品進行冶金學研究。這項研究的結果預計將在2024年2月至3月公佈。

Aurora Project

奧羅拉項目

Aurora Project is an advanced stage porphyry copper-molybdenum exploration project in the Province of Calca, SE Peru (Figure 1). The Aurora Project was previously permitted for drilling in 2015 but was never executed. Thirteen historical drillholes, drilled in 2001 and 2005 totaling 3,900m were drilled over an area of approximately 1000m by 800m, cut significant intervals of copper and molybdenum mineralization. From logging of the only three remaining holes DDA-01, DDA-3A and DDA-3 and data now available, it appears that only three of the thirteen holes tested the enriched copper zone and only one hole drilled deep enough to test the primary copper and molybdenum zone (see DLP Resources Inc. news release of May 18, 2021).

Aurora 項目是秘魯東南部卡爾卡省的後期斑岩銅鉬勘探項目(圖 1)。Aurora項目此前曾在2015年獲准鑽探,但從未執行。在 2001 年和 2005 年鑽探了 13 個歷史鑽孔,總計 3,900 米,在大約 1000 米 x 800 米的區域內鑽探了大量的銅和鉬礦化。從僅存的三個孔 DDA-01、DDA-3A 和 DDA-3 的記錄以及現在可用的數據來看,十三個孔中似乎只有三個測試了富集銅區,只有一個鑽得足夠深以測試初級銅和鉬區(見DLP Resources Inc. 2021年5月18日發佈的新聞稿)。

Salient historic drillhole data of the Aurora Project are:

Aurora項目的重要歷史鑽孔數據是:

  • 190m @ 0.57% Cu, 0.008% Mo in DDA-1 with a high-grade intercept of 20m @ 1.01% Cu related to a supergene enrichment zone of secondary chalcocite;
  • 142m @ 0.5% Cu, 0.004% Mo in DDA-3;
  • 71.7m @ 0.7% Cu, 0.007% Mo in DDA-3A (see historical Focus Ventures Ltd. news release July 11, 2012); and
  • One of the historical holes ABC-6 drilled on the edge of the system intersected 78m @ 0.45% Cu and 0.107% Mo (Figure 2).
  • DDA-1 中的 190m @ 0.57% Cu,0.008% Mo,高級截距爲 20m @ 1.01% Cu,與次生方解石的超基因富集區有關;
  • DDA-3 中的 142m @ 0.5% Cu,0.004% Mo;
  • DDA-3A 中的 7170 萬 @ 0.7% Cu,0.007% Mo(見 Focus Ventures Ltd. 2012 年 7 月 11 日發佈的歷史新聞稿);以及
  • ABC-6 在系統邊緣鑽出的一個歷史洞與 78 米 @ 0.45% 銅和 0.107% 鉬相交(圖 2)。

A review of the historical drilling indicates that the majority of the thirteen holes were drilled in the leached and partially leached zones of the porphyry system. Ten of the thirteen holes never fully tested the oxide and secondary enrichment zone and/or the primary copper zone at depth encountered in DDA-01. Copper-molybdenum mineralization is hosted by quartz-feldspar porphyries intruded into slates-hornfels and pelitic sandstones belonging to the Ordovician (439 - 463 ma) Sandia Formation.

對歷史鑽探的回顧表明,十三個孔中的大多數是在斑岩系統的滲濾區和部分滲濾區鑽探的。十三個孔中有十個從未全面測試過 DDA-01 中遇到的深度氧化物和二次富集區和/或初級銅區。銅鉬礦化是由侵入奧陶紀(439-463 ma)桑迪亞組的石板角巖和泥質砂岩中的石英長石斑岩主導。

Qualified Person

合格人員

David L. Pighin, consulting geologist and co-founder of DLP Resources, is the qualified person of the Company as defined by National Instrument 43-101. Mr. Pighin has reviewed and approved the technical contents of this news release.

根據National Instrument 43-101的定義,諮詢地質學家兼DLP Resources的聯合創始人大衛·皮金是公司的合格人士。Pighin 先生已審查並批准了本新聞稿的技術內容

About DLP Resources Inc.

關於 DLP Resources Inc.

DLP Resources Inc. is a mineral exploration company operating in Southeastern British Columbia and Peru, exploring for Base Metals and Cobalt. DLP is listed on the TSX-V, trading symbol DLP and on the OTCQB, trading symbol DLPRF. Please refer to our web site for additional information.

DLP Resources Inc. 是一家礦產勘探公司,在不列顛哥倫比亞省東南部和秘魯開展業務,勘探基本金屬和鈷。DLP在TSX-V上市,交易代碼爲DLP,在OTCQB上市,交易代碼爲DLPRF。請參閱我們的網站以獲取更多信息。

FOR FURTHER INFORMATION PLEASE CONTACT:

欲了解更多信息,請聯繫:

DLP RESOURCES INC.
Ian Gendall, CEO & President
Jim Stypula, Executive Chairman
Robin Sudo, Chief Financial Officer and Corporate Secretary
Maxwell Reinhart, Investor Relations
Telephone: 250-426-7808
Email: iangendall@dlpresourcesinc.com

Email: jimstypula@dlpresourcesinc.com
Email: robinsudo@dlpresourcesinc.com
Email: maxreinhart@dlpresourcesinc.com

DLP 資源公司
伊恩·根德爾,首席執行官兼總裁
吉姆·斯蒂普拉,執行主席
Robin Sudo,首席財務官兼公司秘書
麥克斯韋爾·萊因哈特,投資者關係
電話:250-426-7808
電子郵件:iangendall@dlpresourcesinc.com

電子郵件:jimstypula@dlpresourcesinc.com
電子郵件: robinsudo@dlpresourcesinc.com
電子郵件:maxreinhart@dlpresourcesinc.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險投資交易所及其監管服務提供商(該術語在多倫多證券交易所風險投資交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Cautionary Note Regarding Forward-Looking Information

關於前瞻性信息的警示說明

This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". This information and these statements, referred to herein as "forward‐looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management's expectations and intentions with respect to drilling on the Aurora Project in Peru.

本新聞稿包含某些陳述和信息,這些陳述和信息可能構成適用的加拿大證券法所指的前瞻性信息。前瞻性陳述與未來事件或未來業績有關,反映了公司管理層對未來事件的期望或信念。通常,前瞻性陳述和信息可以通過使用前瞻性術語來識別,例如 “打算” 或 “預期”,或者某些行動、事件或結果 “可能”、“應該”、“將” 或 “發生” 的詞語和短語或陳述的變體。這些信息和這些陳述(此處稱爲 “前瞻性陳述”)不是歷史事實,是截至本新聞稿發佈之日作出的,包括但不限於有關未來計劃、估計和預測討論的聲明,以及管理層對秘魯奧羅拉項目鑽探的預期和意圖的陳述。

These forward‐looking statements involve numerous risks and uncertainties and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things drill results expected from the Aurora Project in Peru.

這些前瞻性陳述涉及許多風險和不確定性,實際結果可能與任何前瞻性陳述中建議的結果存在重大差異。除其他外,這些風險和不確定性包括秘魯奧羅拉項目預期的鑽探結果。

Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.

儘管公司管理層試圖確定可能導致實際業績與前瞻性陳述或前瞻性信息中包含的業績存在重大差異的重要因素,但可能還有其他因素導致業績與預期、估計或預期不符。無法保證此類陳述會被證明是準確的,因爲實際結果和未來事件可能與此類陳述中的預期存在重大差異。因此,讀者不應過分依賴前瞻性陳述和前瞻性信息。提醒讀者,依賴此類信息可能不適合用於其他目的。除非根據適用的證券法,否則公司不承諾更新此處以引用方式納入的任何前瞻性陳述、前瞻性信息或財務展望。我們尋求安全港。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論