share_log

Signal Gold Announces Final Drill Results of Growth Exploration Program, Including 76.31 G/t Over 0.5 Metres and 12.88 G/t Over 0.6 Metres

Signal Gold Announces Final Drill Results of Growth Exploration Program, Including 76.31 G/t Over 0.5 Metres and 12.88 G/t Over 0.6 Metres

Signal Gold 公佈增長勘探計劃的最終鑽探結果,包括 0.5 米上方的 76.31 克/噸和超過 0.6 米的 12.88 克/噸
Accesswire ·  02/08 07:00

TORONTO, ON / ACCESSWIRE / February 8, 2024 / Signal Gold Inc. ("Signal Gold" or the "Company") (TSX:SGNL)(OTCQX:SGNLF) is pleased to announce the final diamond drill results from the Company's growth exploration program at the Goldboro Project in Nova Scotia ("Goldboro", or the "Project"). The remaining diamond drill results are from 3,813 metres of drilling in 19 diamond drill holes that targeted near surface gold mineralization west of the Goldboro Mineral Resource and immediately to the east of the past producing Dolliver Mountain Gold Mine* ("Dolliver Mountain") (Exhibit A). The results included thirteen (13) instances of visible gold and 74 separate intersections of gold mineralization (Exhibits B and C), all located within the same anticline which hosts the Goldboro Deposit. These drill results are part of the larger growth exploration program in 2023 which comprised 11,435 metres in 61 diamond drill holes, focused on the discovery of gold mineralization to the west and along strike of the Goldboro Mineral Resource.

安大略省多倫多/ACCESSWIRE/2024年2月8日/ Signal Gold Inc.(“Signal Gold” 或 “公司”)(多倫多證券交易所股票代碼:SGNL)(OTCQX: SGNLF)欣然宣佈公司在新斯科舍省戈德伯勒項目(“戈德伯勒” 或 “項目”)增長勘探計劃的最終金剛石鑽探結果。剩餘的金剛石鑽探結果來自19個鑽石鑽孔的3813米鑽探,這些鑽孔的目標是戈德伯勒礦產資源以西的近地表金礦化區,緊鄰過去生產多利佛山金礦*(“多利佛山”)(附錄A)。結果包括十三(13)個可見的金礦化實例和74個不同的金礦化交叉點(附錄B和C),全部位於託管戈德伯勒礦牀的同一個背斜線內。這些鑽探結果是2023年更大規模的增長勘探計劃的一部分,該計劃包括11,435米的61個金剛石鑽孔,重點是在戈德伯勒礦產資源的西部和走向沿線發現金礦化。

"We are excited to announce these final drill results which, together with those previously released, conclusively demonstrate continuous gold mineralization along a strike length of 1.1 kilometres between the western extent of the Goldboro Deposit and the past producing Dolliver Mountain Mine, bringing the total strike length of known mineralization to 3.4 kilometres. This provides further confidence in the scalability of the Goldboro Deposit as well as in our exploration model and approach to gold discovery, which can be applied to 51 kilometres of strike extent along the combined Goldboro and Lower Seal Harbour trends. Our expanded and prospective land package of 27,200 hectares provides the opportunity to make additional discoveries in the Goldboro Gold District and to leverage the planned mine and mill infrastructure at Goldboro."

“我們很高興地宣佈這些最終鑽探結果,這些結果以及先前公佈的結果最終表明,在戈德伯勒礦牀西部範圍和過去開採的多利佛山礦之間的走向長度爲1.1千米的走向長度上有持續的金礦化,使已知礦化的總走向長度達到3.4千米。這進一步增強了人們對戈德伯勒礦牀的可擴展性以及我們的勘探模型和金礦發現方法的信心,這些模式和方法可以應用於戈德伯勒和下海港綜合趨勢下51公里的走向範圍。我們擴建的具有前景的27,200公頃土地一攬子計劃爲在戈德伯勒金區進行更多發現以及利用戈德伯勒計劃中的礦山和磨坊基礎設施提供了機會。”

~ Kevin Bullock, President and CEO, Signal Gold Inc.

~ 凱文·布洛克,Signal Gold Inc. 總裁兼首席執行官

Selected composited highlights (core length) from the current drill holes include:

當前鑽孔中精選的複合亮點(巖芯長度)包括:

  • 76.31 g/t gold over 0.5 metres (111.0 to 111.5 metres) in hole BR-23-436;
  • 12.88 g/t gold over 0.6 metres (157.4 to 158 metes) in hole BR-23-439;
  • 7.73 g/t gold over 1.0 metres (17.6 to 18.6 metres) in hole BR-23-438;
  • 2.10 g/t gold over 3.8 metres (140.1 to 143.9 metres) in hole BR-23-437, including 4.67 g/t gold over 1.0 metres; and
  • 1.33 g/t gold over 3.0 metres (177.0 to 180.0 metres) in hole BR-23-433 including 2.75 g/t gold over 0.6 metres
  • BR-23-436 洞中超過 0.5 米(111.0 至 111.5 米)的金含量爲 76.31 g/t;
  • BR-23-439 洞中超過 0.6 米(157.4 至 158 米)的 12.88 克/噸黃金;
  • BR-23-438 洞中超過 1.0 米(17.6 至 18.6 米)的金含量爲 7.73 g/t;
  • BR-23-437 孔中超過 3.8 米(140.1 至 143.9 米)的 2.10 克/噸黃金,包括 1.0 米以上的 4.67 克/噸黃金;以及
  • BR-23-433 孔中超過 3.0 米(177.0 至 180.0 米)的 1.33 g/t 金含量超過 0.6 米的 2.75 g/t 黃金

The drill results from these 19 diamond drill holes (BR-23-415, 418, 420, 422 to 426, 429 to 439) further demonstrate that the geological environment at Dolliver Mountain is similar to the Goldboro Deposit, with gold mineralization associated with multiple stacked argillite and quartz vein zones typically containing pyrite and arsenopyrite. This system is folded into the upright Upper Seal Harbour Anticline and plunges gently to the east (approximately 200). It is the occurrence of pyrite and arsenopyrite associated with the alteration assemblage and gold mineralization that produces the Induced Polarization chargeability anomalies that were targeted during the growth exploration program.

這19個金剛石鑽孔(BR-23-415、418、420、422至426、429至439)的鑽探結果進一步表明,多利佛山的地質環境與戈德伯勒礦牀相似,金礦化與多層堆疊的粘土巖和石英脈帶有關,通常含有黃鐵礦和亞硫鐵礦。該系統摺疊到直立的 Upper Seal Harbour Anticline 中,然後向東緩墜落(大約 20 英寸)0)。正是黃鐵礦和亞硫鐵礦的出現與蝕變組合和金礦化有關,才產生了生長勘探計劃中針對的誘導極化可充電性異常。

Drilling tested the host anticline to a vertical depth of 230 metres, and mineralization continues to be open to the west and at depth. Importantly, the intersection of gold mineralization at Dolliver Mountain also highlights the potential for further discovery of gold down-plunge and beneath the currently defined Goldboro Deposit below 550 vertical metres, presently the deepest drilling to date. (Exhibit D).

鑽探測試宿主背斜的垂直深度爲230米,礦化作用繼續向西和深度開放。重要的是,Dolliver Mountain金礦化的交匯點也凸顯了進一步發現黃金向下暴跌和目前定義的垂直550米以下的戈德伯勒礦牀下方的潛力,這是迄今爲止最深的鑽探。(附錄 D)。

*Operations began at the Dolliver Mountain Gold Mine in 1901 and the operation ceased in 1904.

*多利佛山金礦於 1901 年開始運營,1904 年停止運營。

Exhibit A. A map showing the location of the conceptual West and East pits of the Goldboro Project and the location of the past producing Dolliver Mountain Gold Mine to the west. Also shown is the trend of the host structure to the Goldboro Deposit and its demonstrated westerly extension as shown by a recently completed Induced Polarization ("IP") Geophysical survey.

附錄 A. 一張地圖,顯示了戈德伯勒項目概念性西礦和東礦坑的位置,以及過去生產多利佛山金礦的西部位置。還顯示了戈德伯勒礦牀宿主結構的趨勢及其向西延伸,最近完成的誘導極化(“IP”)地球物理調查顯示了這一點。

Exhibit B. A plan map showing the location of drill holes BR-23-415, 418, 420, 422-426, 429-439, over a 450 metres strike east of the past-producing Dolliver Mountain Mine.

附錄 B. 一張平面圖,顯示了 BR-23-415、418、420、422-426、429-439 鑽孔的位置,該鑽孔位於過去生產的多利佛山礦以東 450 米處。

Exhibit C. A vertical longitudinal section through the west end of the Goldboro Deposit and including the area of the recent drill program. The drill program demonstrates that the structure that hosts the Goldboro Deposit and the same style of alteration and mineralization exist west of previous drill sections showing that the Deposit has the potential to be expanded westward. Potential mineralized belts are shown as currently interpreted.

附錄 C. 穿過戈德伯勒礦牀西端的垂直縱向剖面,包括最近的鑽探計劃區域。鑽探計劃表明,Goldboro礦牀所在的結構以及以前的鑽探區段以西存在相同類型的蝕變和礦化,這表明該礦牀有可能向西擴張。潛在的礦化帶如目前的解釋所示。

Exhibit D. A schematic vertical longitudinal section, looking north, showing the 3.4-kilometre strike of known gold mineralization between and inclusive of Dolliver Mountain and the Goldboro Deposit. The drill results from Dolliver Mountain are significant in that they demonstrate potential for discovery of additional gold mineralization down-plunge to the east beneath the current defined Goldboro Deposit.

附錄D. 向北看的垂直縱向剖面示意圖,顯示了多利佛山和戈德伯勒礦牀之間及包括在內的已知金礦化區3.4千米的走向。Dolliver Mountain的鑽探結果意義重大,因爲它們表明有可能在當前定義的戈德伯勒礦牀下方向東下探出更多的金礦化物。

A table of selected composited assay results from the drill program

鑽探計劃的選定綜合化驗結果表

Drillhole From (m) To (m) Interval (m) Gold (g/t) Visible Gold
BR-23-415

154.9

155.6

0.7

0.60

and

171.0

171.5

0.5

1.16

and

178.6

179.1

0.5

2.85

and

189.7

190.7

1.0

3.36

VG

and

212.0

214.1

2.1

0.92

VG

incl.

213.1

216.6

0.5

2.82

BR-23-418

31.5

32.0

0.5

2.71

and

150.1

151.1

1.0

0.57

BR-23-420

78.0

78.5

0.5

0.97

and

83.0

84.0

1.0

0.90

and

90.9

91.9

1.0

1.77

and

113.2

114.2

1.0

0.84

and

119.4

120.0

0.6

0.80

and

114.1

144.6

0.5

3.49

and

173.5

174.0

0.5

0.80

and

214.1

216.4

2.3

1.07

BR-23-422

71.0

72.0

1.0

0.67

VG

and

82.2

82.7

0.5

2.65

VG

and

126.8

127.8

1.0

0.96

and

211.9

212.4

0.5

0.69

BR-23-423

46.2

46.7

0.5

0.85

BR-23-424

114.0

115.0

1.0

3.49

VG
BR-23-425

47.8

48.8

1.0

3.06

and

71.1

72.8

1.7

1.13

and

94.0

94.5

0.5

0.66

and

136.3

136.8

0.5

2.35

and

139.9

140.9

1.0

4.13

VG

and

147.5

148.5

1.0

0.52

and

216.0

216.9

0.9

1.39

BR-23-426

44.4

44.9

0.5

0.59

BR-23-429

93.0

93.5

0.5

1.36

and

97.4

98.4

1.0

0.60

and

134.0

135.0

1.0

0.87

VG

and

136.9

137.5

0.6

0.72

and

173.0

173.5

0.5

2.45

BR-23-430

61.3

61.8

0.5

1.53

VG

and

103.6

104.6

1.0

0.51

BR-23-431

36.2

37.2

1.0

2.25

and

156.9

157.9

0.7

0.52

and

178.0

178.5

0.5

0.73

BR-23-432

44.9

45.4

0.5

1.93

and

144.4

145.4

1.0

1.46

and

190.0

190.5

0.5

0.97

and

194.7

195.3

0.6

0.60

BR-23-433

47.4

48.0

0.6

0.99

and

93.0

94.0

1.0

0.91

and

177.0

180.0

3.0

1.33

VG

incl.

179.4

180.0

0.6

2.75

BR-23-434

102.4

103.5

1.1

1.60

and

131.6

132.4

0.8

2.13

VG

and

200.9

201.5

0.6

1.78

BR-23-435

62.0

62.5

0.5

5.49

and

123.1

124.6

1.5

1.53

incl.

123.1

123.6

0.5

3.03

and

154.7

155.2

0.5

6.53

BR-23-436

35.3

35.8

0.5

0.69

and

36.8

37.4

0.6

0.51

and

41.5

42.0

0.5

1.03

and

96.6

97.2

0.6

1.76

and

111.0

111.5

0.5

76.31

VG

and

129.0

129.5

0.5

0.57

and

135.6

136.2

0.6

6.97

VG
BR-23-437

84.1

84.6

0.5

2.09

and

89.1

89.6

0.5

9.46

and

95.1

95.6

0.5

0.54

and

96.1

96.8

0.7

0.62

and

140.1

143.9

3.8

2.10

incl.

140.1

141.4

1.0

4.67

and

193.9

194.9

1.0

0.77

VG
BR-23-438

17.6

18.6

1.0

7.73

and

21.2

22.2

1.0

1.13

and

54.5

55.5

1.0

3.00

and

57.4

58.4

1.0

0.86

BR-23-439

157.4

158.0

0.6

12.88

Drillhole 從 (m) 到 (m) 間隔 (m) 黃金 (g/t) 可見的黃金
BR-23-415

154.9

155.6

0.7

0.60

171.0

171.5

0.5

1.16

178.6

179.1

0.5

2.85

189.7

190.7

1.0

3.36

VG

212.0

214.1

2.1

0.92

VG

包括。

213.1

216.6

0.5

2.82

BR-23-418

31.5

32.0

0.5

2.71

150.1

151.1

1.0

0.57

BR-23-420

78.0

78.5

0.5

0.97

83.0

84.0

1.0

0.90

90.9

91.9

1.0

1.77

113.2

114.2

1.0

0.84

119.4

120.0

0.6

0.80

114.1

144.6

0.5

3.49

173.5

174.0

0.5

0.80

214.1

216.4

2.3

1.07

BR-23-422

71.0

72.0

1.0

0.67

VG

82.2

82.7

0.5

2.65

VG

126.8

127.8

1.0

0.96

211.9

212.4

0.5

0.69

BR-23-423

46.2

46.7

0.5

0.85

BR-23-424

114.0

115.0

1.0

3.49

VG
BR-23-425

47.8

48.8

1.0

3.06

71.1

72.8

1.7

1.13

94.0

94.5

0.5

0.66

136.3

136.8

0.5

2.35

139.9

140.9

1.0

4.13

VG

147.5

148.5

1.0

0.52

216.0

216.9

0.9

1.39

BR-23-426

44.4

44.9

0.5

0.59

BR-23-429

93.0

93.5

0.5

1.36

97.4

98.4

1.0

0.60

134.0

135.0

1.0

0.87

VG

136.9

137.5

0.6

0.72

173.0

173.5

0.5

2.45

BR-23-430

61.3

61.8

0.5

1.53

VG

103.6

104.6

1.0

0.51

BR-23-431

36.2

37.2

1.0

2.25

156.9

157.9

0.7

0.52

178.0

178.5

0.5

0.73

BR-23-432

44.9

45.4

0.5

1.93

144.4

145.4

1.0

1.46

190.0

190.5

0.5

0.97

194.7

195.3

0.6

0.60

BR-23-433

47.4

48.0

0.6

0.99

93.0

94.0

1.0

0.91

177.0

180.0

3.0

1.33

VG

包括。

179.4

180.0

0.6

2.75

BR-23-434

102.4

103.5

1.1

1.60

131.6

132.4

0.8

2.13

VG

200.9

201.5

0.6

1.78

BR-23-435

62.0

62.5

0.5

5.49

123.1

124.6

1.5

1.53

包括。

123.1

123.6

0.5

3.03

154.7

155.2

0.5

6.53

BR-23-436

35.3

35.8

0.5

0.69

36.8

37.4

0.6

0.51

41.5

42.0

0.5

1.03

96.6

97.2

0.6

1.76

111.0

111.5

0.5

76.31

VG

129.0

129.5

0.5

0.57

135.6

136.2

0.6

6.97

VG
BR-23-437

84.1

84.6

0.5

2.09

89.1

89.6

0.5

9.46

95.1

95.6

0.5

0.54

96.1

96.8

0.7

0.62

140.1

143.9

3.8

2.10

包括。

140.1

141.4

1.0

4.67

193.9

194.9

1.0

0.77

VG
BR-23-438

17.6

18.6

1.0

7.73

21.2

22.2

1.0

1.13

54.5

55.5

1.0

3.00

57.4

58.4

1.0

0.86

BR-23-439

157.4

158.0

0.6

12.88

Footnotes:

腳註:

  • Intervals are reported as core length only. True widths are estimated to be between 70% and 100% of the core length.
  • All drill hole results are reported using fire assay only. See notes on QAQC procedures at the bottom of this press release.
  • Drill holes were oriented along a north-south trend with holes on the north limb of the hosting anticlinal structure drilled southward and holes located south of the anticlinal structure drilled northward. The dip of holes is dependent upon the location relative to the anticline with the goal of intersecting mineralized zones orthogonally.
  • 間隔僅報告爲核心長度。實際寬度估計在覈心長度的70%至100%之間。
  • 所有鑽孔結果僅使用火災分析報告。請參閱本新聞稿底部的 QAQC 程序說明。
  • 鑽孔沿南北方向定向,在主斜結構的北緣向南鑽孔,在斜向結構以南向北鑽孔。鑽孔的傾角取決於相對於背斜的位置,目標是正交地與礦化區相交。

All samples and the resultant composites referred to in this release are collected using QA/QC protocols including the regular insertion of standards and blanks within the sample batch for analysis and check assays of select samples. All samples quoted in this release were analyzed at Eastern Analytical Ltd. in Springdale, NL, for Au by fire assay (30 g) with an AA finish.

本新聞稿中提及的所有樣本和合成複合物均使用質量保證/質量控制協議進行收集,包括定期在樣品批次中插入標準品和空白,以便對選定樣本進行分析和檢查分析。本新聞稿中引用的所有樣品均在位於荷蘭斯普林代爾的東方分析有限公司進行了金分析(30 g),並進行了AA表面處理。

All assays in this press release are reported as fire assays only. For samples analyzing greater than 0.5 g/t Au via 30 g fire assay, these samples will be re-analyzed at Eastern Analytical Ltd. via total pulp metallics. For the total pulp metallics analysis, the entire sample is crushed to -10mesh and pulverized to 95% -150mesh. The total sample is then weighed and screened to 150mesh. The +150mesh fraction is fire assayed for Au, and a 30 g subsample of the -150mesh fraction analyzed via fire assay. A weighted average gold grade is calculated for the final reportable gold grade. Total pulp metallics assays for drill holes sited within this press release may be updated in a future news release.

本新聞稿中的所有化驗均僅作爲火災化驗報告。對於通過30 g火法分析的金含量超過0.5 g/t的樣品,東方分析有限公司將通過全紙漿金屬化合物對這些樣品進行重新分析。對於總紙漿金屬化合物分析,將整個樣品粉碎至-10目,然後粉碎至95%-150目。然後對總樣本進行稱重並篩選至 150 目。對+150mesh分數進行火法測定金含量,通過火試分析對-150mesh分數的30g子樣本進行分析。加權平均黃金等級是根據最終應報告的黃金等級計算得出的。本新聞稿中鑽孔的總紙漿金屬化合物分析結果可能會在未來的新聞稿中更新。

This news release has been reviewed and approved by Paul McNeill, P.Geo., VP Exploration with Signal Gold Inc., a "Qualified Person", under National Instrument 43-101 Standard for Disclosure for Mineral Projects.

根據國家儀器43-101礦產項目披露標準,本新聞稿已由Signal Gold Inc.勘探副總裁Paul McNeill,P.Geo進行了審查和批准,他是 “合格人士”。

ABOUT SIGNAL GOLD

關於信號金

Signal Gold is advancing the Goldboro Gold Project in Nova Scotia, a significant growth project subject to a positive Feasibility Study which demonstrates an approximately 11-year open pit life of mine ("LOM") with average gold production of 100,000 ounces per annum and an average diluted grade of 2.26 grams per tonne gold. (Please see the 'NI 43-101 Technical Report and Feasibility Study for the Goldboro Gold Project, Eastern Goldfields District, Nova Scotia' on January 11, 2022, for further details). On August 3, 2022, the Goldboro Project received its environmental assessment approval from the Nova Scotia Minister of Environment and Climate Change, a significant regulatory milestone, and the Company has now submitted all key permits including the Industrial Approval, Fisheries Act Authorization and Schedule II Amendment, and the Mining and Crown Land Leases. The Goldboro Project has significant potential for further Mineral Resource expansion, particularly towards the west along strike and at depth, and the Company has consolidated 27,200 hectares (~272 km2) of prospective exploration land in the Goldboro Gold District.

Signal Gold正在推進位於新斯科舍省的戈德伯勒黃金項目,這是一個有待積極的可行性研究的重大增長項目,該項目表明,礦山(“LOM”)的露天礦壽命約爲11年,平均黃金產量爲100,000盎司,平均稀釋後的每噸黃金品位爲2.26克。(更多詳情請參閱2022年1月11日發佈的 “新斯科舍省東金礦區戈德伯勒黃金項目的NI 43-101技術報告和可行性研究”)。2022年8月3日,戈德伯勒項目獲得了新斯科舍省環境和氣候變化部長的環境評估批准,這是一個重要的監管里程碑,該公司現已提交所有關鍵許可證,包括工業批准、漁業法授權和附表二修正案以及採礦和公有土地租賃。戈德伯勒項目具有進一步擴張礦產資源的巨大潛力,尤其是沿着走向西和深度擴張,該公司已在戈德伯勒金區整合了27,200公頃(約272平方公里)的潛在勘探用地。

FOR ADDITIONAL INFORMATION CONTACT:

如需更多信息,請聯繫:

Signal Gold Inc.
Kevin Bullock
President and CEO
(647) 388-1842
kbullock@signalgold.com
Reseau ProMarket Inc.
Dany Cenac Robert
Investor Relations
(514) 722-2276 x456
Dany.Cenac-Robert@ReseauProMarket.com
Signal Gold 公司
凱文布洛克
總裁兼首席執行官
(647) 388-1842
kbullock@signalgold.com
Resau ProMarket Inc
丹尼·塞納克·羅伯特
投資者關係
(514) 722-2276 x456
Dany.Cenac-Robert@ReseauProMarket.com

SOURCE: Signal Gold Inc.

來源:Signal Gold Inc.


声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論