share_log

Ruby Hill West 2023 Drill Results

Ruby Hill West 2023 Drill Results

Ruby Hill West 2023 鑽探
newsfile ·  02/12 20:40

HIGHLIGHTS

亮點

  • Results confirm that a significant LCT pegmatite system is present at the Ruby Hill West property. Highlights include:
    • 19.5m at 1.13% Li2O from surface (trench sample)
    • 11.1m at 0.56% Li2O from 29.8m
    • 10.7m at 0.67% Li2O from 102.3m
    • 5.5m at 0.76% Li2O from surface (trench sample)
    • 5.01 at 0.95% Li2O from surface (trench sample)
  • Multiple thick LCT pegmatite intersections showing highly fractioned/fertile indicators (K/Rb ratios <50, Mg/Li ratios <10, Nb/Ta ratios <8)
  • Pegmatites show evidence of internal zoning creating discrete spodumene rich zones
  • Very high-grade tantalum, rubidium and caesium association
  • 25km prospective lithium trend remains open for new discoveries
  • 結果證實,Ruby Hill West地產中存在重要的LCT偉晶岩系統。亮點包括:
    • 1,950 萬英鎊,利率爲 1.13%2O 從表面(溝槽樣本)
    • 1110 萬盧比 0.56%2O 從 298 萬美元起
    • 1,07m 在 0.67% Li2O 從 102.3 萬美元起
    • 在 0.76% Li 時爲 550 萬2O 從表面(溝槽樣本)
    • 在 0.95% Li 時爲 5.012O 從表面(溝槽樣本)
  • 多個厚的 LCT 偉晶岩交叉點顯示出高分餾/肥沃的指標(K/Rb 比
  • 偉晶岩顯示出內部分區形成了離散的富含鋰輝石區域的證據
  • 極高品位的鉭、釕和銫的結合
  • 25 千米的潛在鋰趨勢仍有待新發現

Toronto, Ontario--(Newsfile Corp. - February 12, 2024) - Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) (the Company or Benz) is pleased to provide an update on its lithium exploration activities. Drilling on the Ruby Hill West (RHW) and Mikisiw pegmatite targets concluded in early November 2023 and results have now been received and interpreted. The drill program consisted of 19 holes for 2,940.7m via a single helicopter supported diamond rig. An additional 58.95m of trench channel samples were also completed targeting visible pegmatite outcrops.

安大略省多倫多--(Newsfile Corp.-2024 年 2 月 12 日)- 奔馳礦業公司(多倫多證券交易所股票代碼:BZ)(澳大利亞證券交易所股票代碼:BNZ) (那個 公司 要麼 奔馳)很高興提供其鋰勘探活動的最新情況。在 Ruby Hill West 上鑽探 (哈哈)和 Mikisiw 偉晶岩目標於 2023 年 11 月初結束,現已收到並解釋了結果。鑽探計劃包括通過一臺直升機支持的鑽石鑽機鑽進19個鑽孔,鑽孔深度爲2940.7米。另外還完成了針對可見偉晶岩露頭的58.95米溝槽道樣本。

Figure 1: RHW Property

圖 1: RHW 地產

Benz Mining Chief Development Officer, Mark Lynch-Staunton, commented:

奔馳礦業首席開發官馬克·林奇-斯湯頓評論說:

"Results show we have a significant LCT pegmatite system at the RHW property with drilling uncovering multiple thick LCT pegmatite dykes. While the thicknesses and fertility indicators are highly encouraging, the individual pegmatite dykes exhibit internal zonation, moving from spodumene rich to spodumene poor zones over short distances. Importantly, all the ingredients for a major lithium discovery still exist on the Ruby Hill West property, with over 25km of mostly unexplored prospective lithium trend remaining to be tested. The geological setting still suggests that additional discoveries are likely, with further work needed on uncovering the spodumene rich parts of the system."

“結果表明,我們在RHW地產有一個重要的LCT偉晶岩系統,鑽探發現了多個厚的LCT偉晶岩岩脈。儘管厚度和肥力指標非常令人鼓舞,但個別偉晶岩岩脈呈內部分區,在短距離內從富含鋰輝石的區域向鋰輝石貧乏的區域移動。重要的是,一項重大鋰發現的所有成分仍然存在於Ruby Hill West物業中,還有超過25公里尚未開發的潛在鋰趨勢有待測試。地質環境仍然表明,可能會有更多發現,還需要進一步努力來發現該系統中富含鋰輝石的部分。”

Figure 2: Core Recovery RHW23-025 (100.5 to 113m). Assays: 0.67% Li2O over 10.7m from 102.3m to 113m.

圖 2: 核心恢復 RHW23-025(100.5 到 113m)。化驗:0.67% 的鋰離子濃度超過1,070萬,從1.023億到1.13億。

Figure 3: Core Recovery RHW23-017 (4.29m to 50.02m). Assays: 0.56% Li2O over 11.11m from 29.8m to 40.95m

圖 3: 核心恢復 RHW23-017(4.29m 到 50.02m)。分析:0.56% 的 Li2O 超過 111 萬,從 2980 萬到 4,095 萬

RHW Pegmatite

RHW 偉晶岩

Drilling followed up on the previously announced intersection of 26.1m at 1% Li20 from hole RHW22-006[1]. Hole RHW23-025 targeted the down dip extension of RHW22-006, and intersected 10.7m at 0.67% Li2O, within a greater 21.3m LCT pegmatite (Figures 4 & 5). Trenching uncovered 19.5m at 1.13% in RHW23CH-004, which significantly increased the mineralised zone of the pegmatite. The RHW pegmatites form a series of subparallel pegmatite dykes that typically dip 50 to 60 dg to the NW, changing to sub-horizontal near surface. The pegmatite dykes appear to closely follow the contacts of a differentiated mafic-ultramafic sill. A complete list of drill and trenching mineralised intercepts is reported in Tables 1 and 2 in Appendix 1.

隨後在先前宣佈的交叉路口進行了鑽探 2610 萬英鎊時爲 1%20 從 RHW22-006 洞出發[1]。RHW23-025 孔瞄準了 RHW22-006 的向下延伸部分,然後相交 1,07m 在 0.67% Li2O, 在更大範圍內 21.3 米 LCT 偉晶岩(圖 4 和 5)。挖溝被發現 1,950 萬英鎊,漲幅爲 1.13% 在 RHW23CH-004 中,它顯著增加了偉晶岩的礦化區域。RHW 偉晶岩形成一系列亞平行偉晶岩岩脈,這些岩脈通常向西北傾斜 50 至 60 dg,然後在地表附近向水平方向移動。偉晶岩岩脈似乎密切關注差異化的鎂鐵質-超鎂鐵質基底的接觸。附錄1中的表 1 和表 2 中報告了鑽探和挖溝礦化截獲物的完整清單。

Figure 4: Interpreted section A-A view looking to the NW for RHW drill holes. Section thickness is 100m.

圖 4: 解讀 A-A 部分視圖,向西北看 RHW 鑽孔。截面厚度爲 100 米。

Figure 5: Geological map of RHW pegmatite trends with all Benz drill holes (2022 and 2023) and trench locations.

圖 5: RHW 偉晶岩趨勢的地質圖,包括所有奔馳鑽孔(2022年和2023年)和溝槽位置。

Mikisiw Pegmatites (M1 and M2)

Mikisiw 偉晶岩(M1 和 M2)

Drilling intersected a stacked sequence of LCT pegmatites at the M2 target (Figures 6 & 7). Similar to RHW, there is evidence of internal zonation. Drillhole RHW-017 hit 11.11 at 0.56% Li20 within a wider 32.62m pegmatite intersection. Several other thick pegmatite dykes were intersected showing encouraging lithium fertility indicators, however, did not intersect mineralised spodumene zones. Attention will now turn to vectoring into the spodumene rich zones within this stacked LCT pegmatite system. A complete list of drill and trenching mineralised intercepts is reported in Tables 1 and 2 in Appendix 1.

鑽探在 M2 目標處與堆疊的 LCT 偉晶岩序列相交(圖 6 和 7)。與 RHW 類似,也有內部分區的證據。鑽孔 RHW-017 命中 11.11 在 0.56% Li20 在更寬的範圍內 32.62 億 偉晶岩交點。其他幾條厚的偉晶岩岩脈相交,顯示出令人鼓舞的鋰肥力指標,但是,它們並未與礦化鋰輝石區相交。現在,注意力將轉向該堆疊式 LCT 偉晶岩系統中富含鋰輝石的區域。附錄1中的表 1 和表 2 中報告了鑽探和挖溝礦化截獲物的完整清單。

Figure 6: Interpreted sectionB-B looking looking to the NW for M2 drill holes. Section thickness is 150m.

圖 6: 解讀了 B-B 部分,向西北看 M2 鑽孔。截面厚度爲 150 米。

Figure 7: Geological map of M2 pegmatite area with Benz drill holes and trench location.

圖 7: 帶有奔馳鑽孔和溝槽位置的 M2 偉晶岩區域的地質圖。

Exploration upside

探索的上行空間

LCT pegmatites on the RHW property are spatially associated with:

具有 RHW 特性的 LCT 偉晶岩在空間上與以下方面相關:

- mafic-ultramafic intrusions following D1 shearing; and

-D1 剪切後出現的 magic-Ultramafic 入侵;以及

- Late NE-SW and NW-SE structures.

-晚期的NE-SW和NW-SE結構。

The intersection of these 2 trends are a potential trap for the more prospective LCT pegmatites.

這兩種趨勢的交匯點是更具前景的LCT偉晶岩的潛在陷阱。

With this criteria, there are clear upside exploration targets at the RHW pegmatite. The prospective mafic-ultramafic sill combined with late structures is interpreted to extend for up to 2km either side of the known pegmatite intersections providing an immediate target for strike extension (Figure 8).

根據這個標準,RHW 偉晶岩有明確的上行勘探目標。預期的鎂鐵質-超鎂鐵質基底與晚期結構相結合,被解釋爲已知偉晶岩交叉點的兩側延伸長達 2 千米,爲走向延伸提供了直接目標(圖 8)。

Figure 8: Simplified geological map (modified from SIGEOM) showing extent of the mafic-ultramafic intrusion, D1 shear zones and late brittle faulting conisdered controling factors in the emplacement of the RHW LCT pegmatites.

圖 8: 簡化的地質圖(根據SIGEOM修改)顯示了鎂質-超鎂鐵質侵入的範圍、D1剪切帶和晚期脆性斷層被認爲是RHW LCT偉晶岩安置的控制因素。

Within the greater 25km prospective trend, several other areas exhibiting mafic-ultramafic intrusion associated with brittle faulting have been identified and are considered highly prospective.

在更大的25公里前景趨勢中,已經確定了其他幾個表現出與脆性斷層相關的鎂質-超鎂鐵質入侵的區域,這些區域被認爲具有很高的前景。

The area is heavily covered in glacial overburden and, in certain areas, thick forests, making outcrops difficult to find. However, the ground gravity survey conducted shows good correlation between low gravity and pegmatite dyke bodies, allowing it to be used as an additional targeting tool. Furthermore, an Orthophoto, Lidar and satellite imagery survey flown in late 2023 will further aid in vectoring into prospective areas.

該地區被嚴重的冰川覆蓋,在某些地區,還有茂密的森林,因此很難找到露頭。但是,進行的地面重力調查顯示,低重力巖和偉晶岩巖體之間存在良好的相關性,因此可以將其用作額外的瞄準工具。此外,2023年底進行的正射影像、激光雷達和衛星圖像調查將進一步幫助向前景區域進行矢量測量。

Next Steps

後續步驟

  • The Eastmain Gold Project remains a focus for the Company with a gold targeting review underway. The review is focusing on both the high-grade structural trends of the Eastmain Mine, and district-scale tier 1 opportunities within the tenement package. The Upper Eastmain belt remains underexplored and in the right geological setting for a new significant gold discovery.
  • LCT pegmatite geochemistry and structural review of the belt is currently being conducted to better understand and predict / vector into where spodumene rich pegmatites occur.
  • Eastmain黃金項目仍然是該公司的重點,黃金目標審查正在進行中。該審查的重點是伊斯特曼礦的高品位結構趨勢,以及物業權一攬子計劃中地區規模的一級機會。上伊斯特曼帶仍未得到充分開發,地質環境正確,可以發現新的重大金礦。
  • 目前正在對該帶進行LCT偉晶岩地球化學和結構審查,以更好地理解和預測/嚮導富含鋰輝石的偉晶岩的產地。

QA/QC

QA/QC

Drillholes were designed to intersect at depth several surface occurrences of pegmatites in the area. These outcrops are small and partly covered in overburden but were stripped and channel sampled during September 2023. All of the core samples (1/2 core) were sent for analysis at ALS Global in Val D'Or. Pegmatite core samples were analyzed with ME-MS89L where other rock types were analyzed by ME-MS61 (4 acid digestion).

鑽孔的設計是爲了在深度上與該地區幾處偉晶岩的表面位置相交。這些露頭很小,部分被覆蓋,但在 2023 年 9 月被剝離並進行了河道採樣。所有核心樣本(1/2核)均送往位於瓦爾德奧爾的ALS Global進行分析。使用 ME-MS89L 分析了偉晶岩巖芯樣品,其他類型的岩石則通過 ME-MS61(4 次酸性消化)進行了分析。

This release was prepared under supervision and approved by Dr. Danielle Giovenazzo, P. Geo, acting as Benz's qualified person under National Instrument 43-101 for the reporting of exploration and drilling results.

本新聞稿是在監督下編寫的,並得到了P. Geo的Danielle Giovenazzo博士的批准,他是美國國家儀器公司43-101規定的奔馳勘探和鑽探結果報告的合格人員。

This announcement has been authorised for release by the Board of Benz Mining Corp.

本公告已獲奔馳礦業公司董事會授權發佈

For more information please contact:

欲了解更多信息,請聯繫:

Mark Lynch-Staunton
Chief Development Officer
Benz Mining Corp.
mstaunton@benzmining.com
+61 8 6143 6702

馬克·林奇-斯湯頓
首席開發官
奔馳礦業公司
mstaunton@benzmining.com
+61 8 6143 6702

Dannika Warburton
Principal
Investability Partners
dannika@investability.com.au
+61 401 094 261

丹妮卡·沃伯頓
校長
可投資性合作伙伴
dannika@investability.com.au
+61 401 094 261

About Benz Mining Corp.

關於奔馳礦業公司

Benz Mining Corp. (TSXV:BZ, ASX:BNZ) brings together an experienced team of geoscientists and finance professionals with a focused strategy to unlock the immense mineral potential of the Upper Eastmain Greenstone Belt in Northern Quebec, which is prospective for gold, lithium, nickel, copper, and other high-value minerals. Benz is earning a 100% interest in the former producing high grade Eastmain gold mine, Ruby Hill West and Ruby Hill East projects in Quebec and owns 100% of the Windy Mountain project.

奔馳礦業公司(TSXV: BZ,ASX: BNZ)彙集了一支經驗豐富的地球科學家和金融專業人員團隊,其重點是釋放魁北克北部上東部綠石帶的巨大礦產潛力,該地帶具有金、鋰、鎳、銅和其他高價值礦產的前景。奔馳在魁北克生產高品位的伊斯特曼金礦、Ruby Hill West和Ruby Hill East項目中獲得了100%的權益,並擁有風山項目的100%股份。

At the Eastmain Gold Project, Benz has identified a combination of over 380 modelled in-hole and off-hole DHEM conductors over a strike length of 6km which is open in all directions (final interpretation of some of the conductors still pending).

在Eastmain Gold Project中,奔馳已經確定了380多根建模的孔內和井外DHEM導體的組合,其走向長度爲6千米,可以向各個方向開放(一些導體的最終解釋仍在等待中)。

In 2021, Benz confirmed the presence of visible spodumene in a pegmatite at the Ruby Hill West Project, indicating lithium mineralisation which Benz intends to further explore in 2022.

2021年,奔馳證實,Ruby Hill West Project的偉晶岩中存在可見的鋰輝石,這表明奔馳打算在2022年進一步勘探鋰礦化。

Benz tenure over Upper Eastmain Greenstone Belt on simplified geology.

奔馳在簡化的地質條件下對上伊斯特曼綠石帶的任期。

About Eastmain Gold Project

關於伊斯特曼黃金項目

The Eastmain Gold Project, situated on the Upper Eastmain Greenstone Belt in Quebec, Canada, currently hosts a NI 43-101 and JORC (2012) compliant resource of 1Moz at 6.1g/t gold (Indicated: 384koz at 9.0g/t gold, Inferred: 621koz at 5.1g/t gold). The existing gold mineralisation is associated with 15-20% semi-massive to massive pyrrhotite, pyrite and chalcopyrite in highly deformed and altered rocks making it amenable to detection using electromagnetic techniques. Multiple gold occurrences have been identified by previous explorers over a 12km long zone along strike from the Eastmain Mine with very limited but highly encouraging testing outside the existing resource area.

位於加拿大魁北克省上游伊斯特曼綠巖帶的伊斯特曼金礦項目目前擁有符合NI 43-101和JORC(2012)標準的1Moz資源,黃金含量爲6.1克/噸(指示:384koz,9.0g/t黃金,推斷:621koz爲5.1g/t黃金)。現有的金礦化與高度變形和變化的岩石中15-20%的半塊狀至塊狀黃鐵礦、黃鐵礦和黃銅礦有關,因此可以使用電磁技術對其進行探測。以前的勘探者已經在Eastmain礦走向的12公里長的區域內發現了多處金礦,在現有資源區之外進行了非常有限但非常令人鼓舞的測試。

About Ruby Hill West Lithium Project

關於 Ruby Hill West 鋰業項目

The Ruby Hill West Lithium project is a surface occurrence of spodumene bearing pegmatite within the Ruby Hill West project, located 50km due west of the Eastmain exploration camp. The occurrence was first sampled in 2016 by Eastmain Resources and then by Quebec government geologists in 2018. Only limited sampling was conducted by both groups.

Ruby Hill West Lithium項目是位於伊斯特曼勘探營地以西50公里處的Ruby Hill West項目中含鋰輝石的偉晶岩的地表出現。該事件於2016年由Eastmain Resources首次採樣,然後由魁北克政府地質學家於2018年進行採樣。兩組只進行了有限的抽樣。

In March 2022 Benz conducted a drilling program at the Ruby Hill West lithium pegmatite prospect and reported a 31.2m at 0.9% Li2O interval of visible spodumene rich pegmatite in the drilling (ASX & TSX-V releases dated 29 April 2022 "Multiple spodumene pegmatites intersected at Ruby Hill West").

2022 年 3 月,奔馳在 Ruby Hill West鋰偉晶岩勘探區進行了一項鑽探計劃,並報告了 3120 萬英鎊,Li 0.9%2O 鑽探中可見富含鋰輝石的偉晶岩間隔(澳大利亞證券交易所和多倫多證券交易所於2022年4月29日發佈的 “多塊鋰輝石偉晶岩在紅寶石山西部相交”)。

Competent Person's Statement: The information in this announcement that relates to current exploration results is based on and fairly represents information and supporting information compiled by Dr Danielle Giovenazzo who is a P. Geo. of the Ordre des Geologues du Québec, a Recognised Professional Organisation under the JORC Code. Dr Giovenazzo is a consultant for the Company and has sufficient experience in the style of mineralisation and type of deposits under consideration and qualifies as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Dr Giovenazzo holds securities in Benz Mining Corp and consents to the inclusion of all technical statements based on his information in the form and context in which they appear.

合資格人士聲明: 本公告中與當前勘探結果有關的信息基於並公平地代表了由 Danielle Giovenazzo 博士彙編的信息和支持信息,她是 JORC 守則認可的專業組織 “魁北克地質學會” 的P.Geo.Giovenazzo博士是該公司的顧問,在礦化類型和所考慮的礦牀類型方面擁有足夠的經驗,並且有資格成爲2012年版《澳大利亞勘探結果、礦產資源和礦石儲量報告守則》中定義的合格人士。Giovenazzo博士持有奔馳礦業公司的證券,並同意將所有基於其信息的技術聲明以其出現的形式和背景納入其中。

The information in this announcement that relates to historical exploration results was first reported to the ASX in accordance with ASX Listing Rule 5.7. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements.

本公告中與歷史勘探結果相關的信息是根據澳大利亞證券交易所上市規則5.7首次向澳大利亞證券交易所報告的。公司確認,它不知道有任何新的信息或數據會對原始市場公告中包含的信息產生重大影響。

The mineral resource estimate in this announcement was reported by the Company in accordance with Listing Rule 5.8 on 24 May 2023. The Company confirms it is not aware of any new information or data that materially affects the information included in the previous announcement and that all material assumptions and technical parameters underpinning the estimates in the previous announcement continue to apply and have not materially changed.

本公告中的礦產資源估算由該公司按照《上市規則》第5.8條於2023年5月24日公佈。公司證實,它不知道有任何新信息或數據對先前公告中包含的信息產生重大影響,並且支持先前公告中估計的所有重大假設和技術參數繼續適用,沒有發生重大變化。

Forward-Looking Information: Certain statements contained in this news release may constitute "forward-looking information" as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations, and estimates of management at the date the information is provided and is subject to certain factors and assumptions, including, that the Company's financial condition and development plans do not change because of unforeseen events and that the Company obtains regulatory approval. Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information. Factors that could cause the forward-looking information in this news release to change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those referred to above are realized and result in delays, or cessation in planned work, that the Company's financial condition and development plans change, and delays in regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in the Company's continuous disclosure filings filed under the Company's profile at and . The Company undertakes no obligation to update these forward-looking statements, other than as required by applicable law.

前瞻性信息: 本新聞稿中包含的某些陳述可能構成 “前瞻性信息”,因爲適用的加拿大證券法中使用了該術語。前瞻性信息基於管理層在提供信息之日的計劃、預期和估計,並受某些因素和假設的約束,包括公司的財務狀況和發展計劃不會因不可預見的事件而發生變化,以及公司獲得監管部門的批准。前瞻性信息受各種風險和不確定性以及其他因素的影響,這些因素可能導致計劃、估計和實際結果與此類前瞻性信息中的預測存在重大差異。可能導致本新聞稿中的前瞻性信息發生變化或不準確的因素包括但不限於所提及的任何假設被證明無效或不可靠的風險、上述情況發生並導致計劃工作的延遲或停止、公司的財務狀況和發展計劃發生變化、監管機構批准延遲的風險,以及適用於公司的其他風險和不確定性在本公司的持續披露中列出在公司簡介下提交的文件,地址爲.除非適用法律要求,否則公司沒有義務更新這些前瞻性陳述。

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ACCURACY OR ADEQUACY OF THIS RELEASE.

多倫多證券交易所風險投資交易所及其監管服務提供商(該術語在多倫多證券交易所風險投資交易所的政策中定義)均不對本新聞稿的準確性或充分性承擔責任。

Appendix 1: 2023 Drilling at Ruby Hill West

附錄 1:2023 年 Ruby Hill West 的鑽探

Table 1: Mineralised intersections from Diamond Drilling (>0.5% Li2O and 0.5m) OR (>500ppm Ta)

表 1:鑽石鑽探產生的礦化交叉點(鋰含量大於 0.5%2O 和 0.5m) 或 (>500ppm Ta)

Borehole Li2O % Ta2O5 _ppm Nb ppm Be ppm Cs ppm Rb ppm From To Total Length Mg/Li Nb/Ta K/Rb
RHW











RHW23-025 1.02 186.00
57.50 463.00 1475.00 74.93 75.79 0.86 0.6 0.25 12.61
RHW23-025 0.67 240.00
132.90 1550.00 2113.00 102.30 113.00 10.70 1.42 0.46 8.37
includes 0.78 222.00
135.00 1412.00 1799.00 102.30 106.00 3.70 0.87 0.41 8.8
includes 0.86 215.00
252.00 1497.00 2440.00 111.00 113.00 2.00 1.2 0.5 7.6
RHW23-008 0.03 741.00 241.00 18.26 8.88 65.21 54.12 55.74 1.62 116 0.9 55.21
RHW23-009 0.15 1200.24 70.80 5.70 14.30 6.10 36.1 36.94 0.84 119 0.07 196
RHW23-011 0.40 102.60
188.90 1120.00 773.00 146.75 155.26 8.51 1.89 0.51 9.77
includes 0.70 82.70 34.50 45.80 621.00 476.00 148.75 149.63 0.88 0.5 0.51 9.03
M-2











RHW23-017 0.65 36.51 64.10 202.00 12.40 813.00 24.00 25.00 1.00 0.3 2.14 30.26

0.56 81.85 105.85 196.00 22.76 1252.74 29.84 40.95 11.11 1.78 1.74 21.46
includes 0.83 44.93 108.00 222.00 19.20 813.00 29.84 30.84 1.00 0.2 2.93 23.5
includes 1.30 64.71 120.50 164.00 20.80 1460.00 33.66 34.33 0.67 0.1 2.27 20.82
鑽孔 Li2O% Ta2O5 _ppm nb ppm be ppm Cs ppm rb ppm 來自 總長度 Mg/Li Nb/Ta K/Rb
哈哈











RHW23-025 1.02 186.00
57.50 463.00 1475.00 74.93 75.79 0.86 0.6 0.25 12.61
RHW23-025 0.67 240.00
132.90 1550.00 2113.00 102.30 113.00 10.70 1.42 0.46 8.37
包括 0.78 222.00
135.00 1412.00 1799.00 102.30 106.00 3.70 0.87 0.41 8.8
包括 0.86 215.00
252.00 1497.00 2440.00 111.00 113.00 2.00 1.2 0.5 7.6
RHW23-008 0.03 741.00 241.00 18.26 8.88 65.21 54.12 55.74 1.62 116 0.9 55.21
RHW23-009 0.15 1200.24 70.80 5.70 14.30 6.10 36.1 36.94 0.84 119 0.07 196
RHW23-011 0.40 102.60
188.90 1120.00 773.00 146.75 155.26 8.51 1.89 0.51 9.77
包括 0.70 82.70 34.50 45.80 621.00 476.00 148.75 149.63 0.88 0.5 0.51 9.03
M-2











RHW23-017 0.65 36.51 64.10 202.00 12.40 813.00 24.00 25.00 1.00 0.3 2.14 30.26

0.56 81.85 105.85 196.00 22.76 1252.74 29.84 40.95 11.11 1.78 1.74 21.46
包括 0.83 44.93 108.00 222.00 19.20 813.00 29.84 30.84 1.00 0.2 2.93 23.5
包括 1.30 64.71 120.50 164.00 20.80 1460.00 33.66 34.33 0.67 0.1 2.27 20.82

Table 2: Mineralised intersections from Trench Channel Sampling (>0.5% Li2O and 0.5m)

表 2:來自溝槽通道採樣的礦化交叉點(> 0.5% Li2O 和 0.5m)

Trench ID
From To length Li2O% Ta2O5_ppm Rb Cs Be Mg/Li Nb/Ta K/Rb
trench 23CH-001
1.36 6.37 5.01 0.95 198 1599.1 2601 206 0.65 0.43 8.8


4.85 5.85 1 1.48 199 1432 4857 341 0.62 0.345 6.9
trench 23CH-002
0 5.5 5.5 0.76 374.7 4143 5952 142 0.61 0.24 6.87


2.5 3.5 1 1.06 314 4108 8223 147 0.24 0.18 8.27
trench 23CH-004
1.84 21.3 19.5 1.13 641.0 2342 965 191 0.74 0.21 9.35


11.9 17.4 5.47 1.76 443 2221 784 178 0.22 0.21 8.72
M-1 outcrop











trench 23CH-003
10.39 13.7 3.33 0.82 52 2696 172 23 0.34 0.47 13.5













M-2 outcrop











trench 23CH-05
0 2.51 2.51 1.113 41 883 22 165 0.1 2.32 23.83


0 1.51 1.51 1.588 37.25 1033 26.26 131 0.055 2.42 21.5
戰壕標識
來自 長度 Li2O% ta2o5_ppm Rb Cs 成爲 Mg/Li Nb/Ta K/Rb
戰壕 23CH-001
1.36 6.37 5.01 0.95 198 1599.1 2601 206 0.65 0.43 8.8


4.85 5.85 1 1.48 199 1432 4857 341 0.62 0.345 6.9
戰壕 23CH-002
0 5.5 5.5 0.76 374.7 4143 5952 142 0.61 0.24 6.87


2.5 3.5 1 1.06 314 4108 8223 147 0.24 0.18 8.27
戰壕 23CH-004
1.84 21.3 19.5 1.13 641.0 2342 965 191 0.74 0.21 9.35


11.9 17.4 5.47 1.76 443 2221 784 178 0.22 0.21 8.72
M-1 露頭











戰壕 23CH-003
10.39 13.7 3.33 0.82 52 2696 172 23 0.34 0.47 13.5













M-2 露頭











戰壕 23CH-05
0 2.51 2.51 1.113 41 883 22 165 0.1 2.32 23.83


0 1.51 1.51 1.588 37.25 1033 26.26 131 0.055 2.42 21.5

Table 3: Collar data from Diamond Drilling at RHW (UTM NAD83 Zone 18N)

表 3:來自 RHW 鑽石鑽探公司的項圈數據 (UTM NAD83 區域 (18N)

Hole_ID Area Easting Northing Elevation Azimuth Dip End Depth
RHW23-007 RHW2 658585 5796255 542.5 155 -50 179.0
RHW23-008 RHW2 658540 5796240 543.5 155 -50 104.0
RHW23-009 RHW2 658450 5796195 545 155 -50 104.0
RHW23-010 RHW2 658360 5796160 547.9 155 -50 89.0
RHW23-011 RHW2 658366 5796155 547.9 335 -45 245.0
RHW23-012 RHW2 658722 5796330 540 155 -45 224.0
RHW23-013 RHW2 658720 5796354 539.6 335 -45 125.2
RHW23-014 RHW2 658775 5796235 553.3 155 -45 218.0
RHW23-015 M2 678234 5804025 500 340 -50 188.0
RHW23-016 M2 678620 5804110 496 150 -45 230.2
RHW23-017 M2 678666 5804034 495 330 -45 125.1
RHW23-018 M2 678676 5804117 487.8 150 -45 194.1
RHW23-019 M2 678669 5804030 495 150 -75 130.6
RHW23-020 M2 678619 5803996 490 330 -45 237.3
RHW23-021 M1 680169 5805445 483 230 -45 87.2
RHW23-022 M1 680116 5805454 476.7 140 -45 56.0
RHW23-023 M1 680069 5805533 480 140 -45 155.1
RHW23-024 RHW2 658250 5796260 553 160 -45 124.9
RHW23-025 RHW2 658677 5796184 551 335 -45 124.0
hole_ID 區域 向東 北方 海拔 方位角 末端深度
RHW23-007 RHW2 658585 5796255 542.5 155 -50 179.0
RHW23-008 RHW2 658540 5796240 543.5 155 -50 104.0
RHW23-009 RHW2 658450 5796195 545 155 -50 104.0
RHW23-010 RHW2 658360 5796160 547.9 155 -50 89.0
RHW23-011 RHW2 658366 5796155 547.9 335 -45 245.0
RHW23-012 RHW2 658722 5796330 540 155 -45 224.0
RHW23-013 RHW2 658720 5796354 539.6 335 -45 125.2
RHW23-014 RHW2 658775 5796235 553.3 155 -45 218.0
RHW23-015 M2 678234 5804025 500 340 -50 188.0
RHW23-016 M2 678620 5804110 496 150 -45 230.2
RHW23-017 M2 678666 5804034 495 330 -45 125.1
RHW23-018 M2 678676 5804117 487.8 150 -45 194.1
RHW23-019 M2 678669 5804030 495 150 -75 130.6
RHW23-020 M2 678619 5803996 490 330 -45 237.3
RHW23-021 M1 680169 5805445 483 230 -45 87.2
RHW23-022 M1 680116 5805454 476.7 140 -45 56.0
RHW23-023 M1 680069 5805533 480 140 -45 155.1
RHW23-024 RHW2 658250 5796260 553 160 -45 124.9
RHW23-025 RHW2 658677 5796184 551 335 -45 124.0

Table 4: Collar data from Trench channel samples (UTM NAD83 Zone 18N)

表 4:來自溝槽通道樣本的項圈數據 (UTM NAD83 區域 (18N)

Hole_ID Area Easting Northing Elevation Azimuth End Depth
RHW23CH-001 RHW 658532 5796296 538.7607 1546.87
RHW23CH-002 RHW 658519 5796314 539.281 1526.49
RHW23CH-003 M1 680132 5805413 480.7346 5913.72
RHW23CH-004 RHW 658599 5796224 545.5384 14722.42
RHW23CH-005 M2 678646 5804073 492.0908 1964.95
RHW23CH-006 RHW 659257 5796566 509.8909 1581.38
RHW23CH-007 RHW 659259 5796568 509.1184 1661.28
RHW23CH-008 RHW 659260 5796570 508.4919 1491.84
hole_ID 區域 向東 北方 海拔 方位角 末端深度
RHW23CH-001 哈哈 658532 5796296 538.7607 1546.87
RHW23CH-002 哈哈 658519 5796314 539.281 1526.49
RHW23CH-003 M1 680132 5805413 480.7346 5913.72
RHW23CH-004 哈哈 658599 5796224 545.5384 14722.42
RHW23CH-005 M2 678646 5804073 492.0908 1964.95
RHW23CH-006 哈哈 659257 5796566 509.8909 1581.38
RHW23CH-007 哈哈 659259 5796568 509.1184 1661.28
RHW23CH-008 哈哈 659260 5796570 508.4919 1491.84

1 29 April 2022: Multiple Spodumene Pegmatites Intersected in Maiden Drill Program at Ruby Hill West

1 2022年4月29日:在 Ruby Hill West 的首次鑽探計劃中,多塊鋰輝石偉晶岩相交

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論