share_log

Guanajuato Silver Extinguishes 1st Ocean Partners Debt Facility

Guanajuato Silver Extinguishes 1st Ocean Partners Debt Facility

瓜納華託白銀取消了第一筆海洋夥伴債務融資
Accesswire ·  05/21 06:30

VANCOUVER, BC / ACCESSWIRE / May 21, 2024 / Guanajuato Silver Company Ltd. (the "Company" or "GSilver") (TSXV:GSVR)(OTCQX:GSVRF), a significant producer of silver and gold in Mexico, is pleased to announce the complete repayment of the US$5,000,000 concentrate pre-payment facility (the "OP Facility") owed to Ocean Partners UK Limited ("Ocean Partners"), a metal off-take and trading firm (see GSilver news release dated August 30, 2022 - "Guanajuato Silver Draws US$5,000,000 Credit Facility").

Guanajuato Silver公司(以下簡稱“GSilver”)(TSXV:GSVR)(OTCQX:GSVRF)是墨西哥銀和黃金的重要生產商,已全額償還了欠Ocean Partners Uk Limited(以下簡稱“Ocean Partners”)的500萬美元濃縮物預付款(以下簡稱“OP Facility”),Ocean Partners 是一家金屬貿易公司(請參見2022年8月30日的GSilver新聞稿“Guanajuato Silver Draws US$5,000,000 Credit Facility ”)。

James Anderson, Chairman and CEO, said, "The repayment in full of this credit facility reflects the rapidly improving financial position of Guanajuato Silver. The elimination of this loan will have an immediate positive impact on our monthly economic performance, in parallel with the continued ramp-up at our four producing silver mines - with improved tonnage throughput, and at lower operating costs."

主席兼首席執行官詹姆斯·安德森(James Anderson)表示:“全額償還這筆信貸是Guanajuato Silver財務狀況快速改善的反映。消除這筆貸款將立即對我們的月度經濟表現產生積極影響,並且與我們的四個生產銀礦的持續推進相平行-隨着通過改進噸位處理量和降低運營成本而改善。]

Guanajuato Silver now has two loans outstanding. The first loan is a US$5,000,000 silver and gold pre-payment facility (the "Facility") with Swiss-based precious metals trading firm OCIM Metals & Mining S.A. ("OCIM") (see GSilver news release dated March 16, 2023 - "Guanajuato Silver Arranges New US$5,000,000 Facility with OCIM"); the remaining balance of approximately US$3.2M is scheduled to be repaid in full by September, 2024.

Guanajuato Silver現在有兩筆未還貸款。第一筆是由瑞士貴金屬交易公司OCIm Metals & Mining S.A.(以下簡稱OCIM)提供的500萬美元的白銀和黃金預付款設施(“Facility”)(見GSilver 2023年3月16日發佈的新聞稿-“Guanajuato Silver與OCIM安排新的500萬美元的Facility”);約320萬美元的餘額計劃於2024年9月全部償還。

Mr. Anderson added, "The elimination of the OCIM pre-payment facility approximately five months from now will further enhance economic performance and flexibility and improve our working capital position. None of Guanajuato Silver's currently producing mines are encumbered by royalties; ultimately our goal is to become a debt-free producer of silver and gold."

“如能持續實現預期,當深部開採的生產頂板壓力得到控制並改善回篩的效率之後,我們預計銀產量將繼續增加,”安德森笑着說,“當然,這只是我們的目標,不是保證。”

Guanajuato Silver's second outstanding loan is the recently announced gold loan credit facility (the "Expanded Facility") with Ocean Partners (see GSilver news release dated February 29,2024 - "Guanajuato Silver Increases Size of Gold Loan Credit Facility to US$13.3M"); the Expanded Facility has a term of 30 months with payments commencing in June 2024.

Guanajuato Silver公司的第二筆未償還貸款是最近宣佈的金貸款信貸設施(以下簡稱“Expanded Facility”),與Ocean Partners(請參見2024年2月29日的GSilver新聞稿“Guanajuato Silver Increases Size of Gold Loan Credit Facility to US $13.3M”)。Expanded Facility的期限爲30個月,付款將於2024年6月開始。

About Guanajuato Silver

Gsilver是一家寶貴金屬生產商,致力於重新激活墨西哥中部的銀和金礦。該公司從El Cubo Mines Complex、Valenciana Mines Complex和San Ignacio mine三個礦山生產銀和金精礦;這三個礦都位於有着480年採礦歷史的Guanajuato州內。此外,該公司還從Durango州西北部的Topia礦產生銀、金、鉛和鋅精礦。憑藉四個運營礦山和三個加工設施,Guanajuato Silver是墨西哥增長最快的銀生產商之一。

GSilver is a precious metals producer engaged in reactivating past producing silver and gold mines in central Mexico. The Company produces silver and gold concentrates from the El Cubo Mine, Valenciana Mines Complex, and the San Ignacio mine; all three mines are located within the state of Guanajuato, which has an established 480-year mining history. Additionally, the Company produces silver, gold, lead, and zinc concentrates from the Topia mine in northwestern Durango. With four operating mines and three processing facilities, Guanajuato Silver is one of the fastest growing silver producers in Mexico.

GSilver是一家從事重新啓動墨西哥中部曾經產出的銀和金礦山的貴金屬生產商。該公司從El Cubo礦、Valenciana Mines Complex和San Ignacio礦生產白銀和黃金濃縮物;這三個礦山都位於有着480年採礦歷史的瓜納華託州境內。此外,該公司還從德蘭戈州西北部的Topia礦生產銀、金、鉛和鋅濃縮物。憑藉四個營運礦山和三個加工設施,Guanajuato Silver是墨西哥增長最快的銀生產商之一。

ON BEHALF OF THE BOARD OF DIRECTORS
"James Anderson"
Chairman and CEO

董事會代表
"詹姆斯·安德森"
董事長兼首席執行官

For further information regarding Guanajuato Silver Company Ltd., please contact:

有關Guanajuato Silver Company Ltd.的更多信息,請聯繫:

JJ Jennex, Gerente de Comunicaciones, T: 604 723 1433
E: jjj@GSilver.com
GSilver.com

JJ Jennex,通信經理,電話:604 723 1433
電子郵件:jjj@GSilver.com
Gsilver.com

Guanajuato Silver Bullion Store

Guanajuato Silver金條商店

Please visit our Bullion Store, where Guanajuato Silver coins and bars can be purchased.

請訪問我們的金條商店,可購買Guanajuato Silver硬幣和金條。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX Venture Exchange及其監管服務提供者(如TSX Venture Exchange的政策所定義的那樣)對此發佈的充分性或準確性不承擔任何責任。

Forward-Looking Statements

前瞻性聲明

This news release contains certain forward-looking statements and information, which relate to future events or future performance including, but not limited to, the rapidly improving financial and working capital position of Guanajuato Silver, the immediate positive impact on the Company's monthly economic performance, the ramp-up of the Company's four producing silver mines, improved tonnage throughput and at lower operating cost, the repayment of the OCIM pre-payment facility, the goal to be a debt free producer of silver and gold, and GSilver's status as one of the fasting growing silver mining company in Mexico.

本新聞稿包含某些前瞻性聲明和信息,涉及未來事件或未來表現,包括但不限於Guanajuato Silver迅速改善的財務和營運資本狀況,對公司月度經濟表現的立竿見影的積極影響,公司四個營運銀礦的推進,改善礦石吞吐量,降低營運成本,償還OCIm預付款設施,旨在成爲無債務的銀和金生產商,以及GSilver作爲墨西哥增長最快的銀礦業公司的地位。

Such forward-looking statements and information reflect management's current beliefs and are based on information currently available to and assumptions made by the Company; which assumptions, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include: the potential quantity, grade and metal content of the mineralized material at El Cubo, San Ignacio, VMC and Topia, the geotechnical and metallurgical characteristics of such material conforming to sampled results and metallurgical performance; available tonnage of mineralized material to be mined and processed; resource grades and recoveries; assumptions and discount rates being appropriately applied to production estimates; prices for silver, gold and other metals remaining as estimated; currency exchange rates remaining as estimated; availability of funds for the Company's projects and to satisfy current liabilities and obligations including debt repayments; capital, decommissioning and reclamation estimates; prices for energy inputs, labour, materials, supplies and services (including transportation) and inflation rates remaining as estimated; no labour-related disruptions; no unplanned delays or interruptions in scheduled construction and production; all necessary permits, licenses and regulatory approvals are received in a timely manner; and the ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.

這些前瞻性聲明和信息體現了管理層的當前信念,基於公司當前掌握的信息和假設;雖然公司認爲這些假設是合理的,但它們本質上面臨着重要的運營、商業、經濟和法規不確定性和可能性。這些假設包括:El Cubo、San Ignacio、VMC和Topia礦區的礦化材料的潛在數量、品位和金屬含量,這些材料的岩土工程和冶金特性符合採樣結果和冶金表現;可採礦化材料的可用噸位進行開採和加工;資源品位和回收率;對生產估計合理地應用的假設和折現率;白銀、黃金和其他金屬的價格保持預計水平;貨幣匯率保持預計水平;公司的項目和滿足當前負債項和債務償還的資金可得到合理的保障;資金、停產和復墾預算;能源輸入、勞動力、材料、用品和服務(包括運輸)的價格和通脹率保持預計水平;沒有勞資糾紛;沒有按計劃施工和生產的計劃外延遲或中斷;所有必要的許可證、執照和監管批准能夠及時獲得;以及能夠遵守環境、健康和安全法規。這些假設的列表並非詳盡無遺。

Readers are cautioned that such forward-looking statements and information are neither promises nor guarantees, and are subject to risks and uncertainties that may cause future results, level of activity, production levels, performance or achievements of GSilver to differ materially from those expected including, but not limited to, market conditions, availability of financing, currency rate fluctuations, high inflation and interest rates, geopolitical conflicts including wars, actual results of exploration, development and production activities, actual resource grades and recoveries of silver, gold and other metals from the Company's existing mines including El Cubo, San Ignacio, VMC and Topia, availability of third party mineralized material for processing, unanticipated geological or structural formations and characteristics, environmental risks, future prices of gold, silver and other metals, operating risks, accidents, labor issues, equipment or personnel delays, delays in obtaining governmental or regulatory approvals and permits, inadequate insurance, and other risks in the mining industry. There are no assurances that GSilver will be able to continue to increase production, tonnage milled and recoveries rates, improve grades and reduce costs at El Cubo, San Ignacio, VMC and/or Topia to process mineralized materials to produce silver, gold and other concentrates in the amounts, grades, recoveries, costs and timetable anticipated. In addition, GSilver's decision to process mineralized material from El Cubo, San Ignacio, VMC and Topia is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and therefore is subject to increased uncertainty and risk of failure, both economically and technically. Mineral resources and mineralized material that are not Mineral Reserves do not have demonstrated economic viability, are considered too speculative geologically to have the economic considerations applied to them, and may be materially affected by environmental, permitting, legal, title, socio-political, marketing, and other relevant issues. There are no assurances that the Company's projected grades of gold and silver at El Cubo, San Ignacio, VMC and Topia and the anticipated level of production therefrom will be realized. In addition, there are no assurances that the Company will meet its production forecasts or generate the anticipated cash flows from operations to satisfy its scheduled debt payments or other liabilities when due or meet financial covenants to which the Company is subject or to fund its exploration programs and corporate initiatives as planned. There is also uncertainty about impact of any resurgence ofCOVID-19, the ongoing war in Ukraine and conflict in Gaza, elevated inflation and interest rates and the impact they will have on the Company's operations, supply chains, ability to access mining projects or procure equipment, contractors and other personnel on a timely basis or at all and economic activity in general. Accordingly, readers should not place undue reliance on forward-looking statements or information. All forward-looking statements and information made in this news release are qualified by these cautionary statements and those in our continuous disclosure filings available on SEDAR+ at including the Company's most recently filed annual information form . These forward-looking statements and information are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances save as required by law.

讀者應注意,此類前瞻性聲明和信息既非承諾也非保證,可能面臨導致GSilver未來結果、活動水平、生產水平、表現或成就與預期不符的風險和不確定性,包括但不限於市場條件、融資可用性、貨幣匯率波動、高通脹和利率、地緣政治衝突、實際勘探、開發和生產活動結果、從公司現有礦山,包括El Cubo、San Ignacio、VMC和Topia,以及對第三方礦化材料進行加工獲得銀、金和其他金屬的實際資源品位和回收率、未預料到的地質或結構形態和特徵、環境風險、金、銀和其他金屬的未來價格、營運風險、意外事故、勞資問題、設備或人員延遲、政府或監管機構批准和許可證的延遲、不充分的保險以及礦業行業的其他風險。無法保證GSilver能夠繼續增加銀、金的產量,磨礦吞吐量和回收率,改善El Cubo、San Ignacio、VMC和/或Topia的品位並降低成本以處理礦化材料以產生預計的銀、金和其他濃縮物。此外,GSilver決定加工來自El Cubo、San Ignacio、VMC和Topia的礦化材料並不是基於證明其經濟和技術可行性的礦牀可採儲量可行性研究,因此存在更高的不確定性和失敗風險,無論是從經濟上還是從技術上來看。未被證實經濟可行性的礦產資源和礦化材料不適用於採用經濟考慮的地質學特徵,並可能受到環境、批准、法律、所有權、社會政治、市場營銷和其他相關問題的重大影響。無法保證公司在El Cubo、San Ignacio、VMC和Topia的金和銀預計品位及預期生產水平得以實現。此外,不存在公司將實現生產預測或從營運產生預期的現金流以滿足其到期的債務支付或其他負債,或達到公司受制於的財務契約或按計劃爲其勘探項目和公司計劃的主動權提供資金的希望保證。此外,任何COVID-19的捲土重來對公司的經營、供應鏈、獲得挖掘項目或獲得設備、承包商和其他人員的能力,以及經濟活動的影響都存在不確定性。因此,讀者不應過於依賴前瞻性聲明或信息。本新聞稿中所作的所有前瞻性聲明和信息均受這些警示性聲明和我們在SEDAR+上連續披露文件中的聲明的限制(包括公司最近提交的年度信息表)的限制。這些前瞻性聲明和信息是截至此日期爲止所做的,並且公司不承擔任何更新或修訂它們以反映新事件或情況的義務,除非法律要求。

SOURCE: Guanajuato Silver Company Ltd.

來源:Guanajuato銀公司有限公司。


声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論