share_log

Guanajuato Silver Completes Shares for Debt

Guanajuato Silver Completes Shares for Debt

Guanajuato白銀完成股份兌換債務
Accesswire ·  06/20 18:02

VANCOUVER, BC / ACCESSWIRE / June 20, 2024 / Guanajuato Silver Company Ltd. (the "Company" or "GSilver") (TSXV:GSVR)(OTCQX:GSVRF) confirms that, as previously announced on May 31, 2024, (See GSilver News Release dated May 31, 2024 - "Guanajuato Silver Announces Date of General Meeting of the Shareholders") the Company has settled $805,000 in outstanding liabilities of the Company by the issuance of 2,683,333 common shares in the capital of the Company at a deemed price of $0.30 per share (the "Debt Settlement"). The shares issued for the Debt Settlement are subject to a four-month hold period that expires on October 21, 2024.

Guanajuato銀公司確認,按照先前於2024年5月31日公佈的(請參見GSilver新聞稿,日期爲2024年5月31日 -“Guanajuato Silver Announces Date of General Meeting of the Shareholders”),公司通過發行公司股本中的2,683,333股普通股以0.30美元的認定價格結算了公司的805,000美元的未償債務(“債務結算”)。進行債務規避的股票將受到四個月的凍結期限,該期限於2024年10月21日到期。

Corporate Update
The Company also announces the upcoming event: June 27, 2pm Pacific - Mining Operations Update Presentation. Hernan Dorado Smith, Guanajuato Silver's Chief Strategy Officer, will provide an update and take questions about the Company's operations and plans for the remainder of 2024. The presentation will be held in Vancouver at the offices of Ventum Financial Corp, located at 733 Seymour Street, 25th Floor. Space will be limited; if you would like to attend, please respond to jjj@gsilver.com

公司更新。
公司還宣佈即將舉行的活動:6月27日下午2點太平洋時間-採礦業務更新演示。Guanajuato Silver的首席策略官Hernan Dorado Smith將提供更新,並就公司的運營和今年剩餘計劃回答問題。演示將在溫哥華Ventum Financial Corp辦公室舉行,該辦公室位於Seymour Street,25樓。場地名額有限,如果您想參加,請回復jjj@gsilver.com。th 今天天氣不錯 今天天氣不錯

About Guanajuato Silver
GSilver is a precious metals producer engaged in reactivating past producing silver and gold mines in central Mexico. The Company produces silver and gold concentrates from the El Cubo Mines Complex, Valenciana Mines Complex, and the San Ignacio mine; all three mines are located within the state of Guanajuato, which has an established 480-year mining history. Additionally, the Company produces silver, gold, lead, and zinc concentrates from the Topia mine in northwestern Durango. With four operating mines and three processing facilities, Guanajuato Silver is one of the fastest growing silver producers in Mexico.

Gsilver是一家寶貴金屬生產商,致力於重新激活墨西哥中部的銀和金礦。該公司從El Cubo Mines Complex、Valenciana Mines Complex和San Ignacio mine三個礦山生產銀和金精礦;這三個礦都位於有着480年採礦歷史的Guanajuato州內。此外,該公司還從Durango州西北部的Topia礦產生銀、金、鉛和鋅精礦。憑藉四個運營礦山和三個加工設施,Guanajuato Silver是墨西哥增長最快的銀生產商之一。
Guanajuato Silver是一家貴金屬生產商,致力於在墨西哥中部重新啓動曾經生產銀和金的礦山。該公司在Guanajuato州內擁有El Cubo Mines Complex、Valenciana Mines Complex和San Ignacio mine三個採礦場,這三個採礦場都有着480年的採礦歷史。此外,該公司還從Durango西北部的Topia礦山生產銀、金、鉛和鋅精礦。憑藉四個運營的礦山和三個處理設施,Guanajuato Silver是墨西哥增長最快的銀生產商之一。

ON BEHALF OF THE BOARD OF DIRECTORS
"James Anderson"
Chairman and CEO

董事會代表
"詹姆斯·安德森"
董事長兼首席執行官

For further information regarding Guanajuato Silver Company Ltd., please contact:

有關Guanajuato Silver Company Ltd.的更多信息,請聯繫:

JJ Jennex, Gerente de Comunicaciones, T: 604 723 1433
E: jjj@GSilver.com
Gsilver.com

JJ Jennex,通信經理,電話:604 723 1433
電子郵件:jjj@GSilver.com
Gsilver.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX Venture Exchange及其監管服務提供者(如TSX Venture Exchange的政策所定義的那樣)對此發佈的充分性或準確性不承擔任何責任。

Forward-Looking Statements

前瞻性聲明

This news release contains certain forward-looking statements and information, which relate to future events or future performance including, but not limited to the Company's status as one of the fastest growing silver producers in Mexico.

此新聞發佈包含某些前瞻性聲明和信息,這些內容涉及未來事件或未來業績,包括但不限於該公司作爲墨西哥增長最快的銀礦生產商的地位。

Such forward-looking statements and information reflect management's current beliefs and expectations and are based on information currently available to and assumptions made by the Company; which assumptions, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include: our estimates of mineralized material at El Cubo and San Ignacio and the assumptions upon which they are based, including geotechnical and metallurgical characteristics of rock conforming to sampled results and metallurgical performance; available tonnage of mineralized material to be mined and processed; resource grades and recoveries; assumptions and discount rates being appropriately applied to production estimates; the ability of the Company to ramp up processing of mineralized material at Cata at the projected rates and source sufficient high grade mineralized material to fill such processing capacity; prices for silver, gold and other metals remaining as estimated; currency exchange rates remaining as estimated; availability of funds for the Company's projects and to satisfy current liabilities and obligations including debt repayments; capital cost estimates; decommissioning and reclamation estimates; prices for energy inputs, labour, materials, supplies and services (including transportation) and inflation rates remaining as estimated; no labour-related disruptions; no unplanned delays or interruptions in scheduled construction and production; all necessary permits, licenses and regulatory approvals are received in a timely manner; and the ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.

這些前瞻性聲明和信息反映了管理層當前的信仰和期望,並基於公司目前可用的信息和假設;雖然公司認爲這些假設是合理的,但它們內在上受到重大的運營、業務、經濟和監管的不確定性和意外情況的影響,這些假設包括:我們對El Cubo和San Ignacio的含礦物質的估計及其基礎的假設,包括岩石的地質技術和冶金性能符合取樣結果和材料性能的情況;可採礦物質的可用噸位進行開採和加工;資源品位和回收率;適當應用於生產估計的假設和折現率;公司能夠按預計速率升級Cata的礦石加工能力,並獲得足夠的高品位礦石以填補該加工能力的源;白銀、黃金和其他金屬的價格仍然如預計;匯率仍然與預計相同;爲公司的項目和滿足當前負債和義務(包括償還債務)提供資金;資本成本的估計;退役和復墾的估計;能源輸入、勞動、材料、用品和服務(包括運輸)的價格和通貨膨脹率仍然如預計;沒有與勞動有關的干擾;沒有計劃外的施工和生產延誤或中斷;所有必要的許可證、執照和監管批准及時獲得;並且能夠遵守環境、健康和安全法規。這些假設的清單並非詳盡無遺。

Readers are cautioned that such forward-looking statements and information are neither promises nor guarantees, and are subject to risks and uncertainties that may cause future results, level of activity, production levels, performance or achievements of GSilver to differ materially from those expected including, but not limited to, market conditions, availability of financing, future prices of gold, silver and other metals, currency rate fluctuations, rising inflation and interest rates, actual results of production, exploration and development activities, actual resource grades and recoveries of silver, gold and other metals, availability of third party mineralized material for processing, unanticipated geological or structural formations and characteristics, geopolitical conflicts including wars, environmental risks, operating risks, accidents, labor issues, equipment or personnel delays, delays in obtaining governmental or regulatory approvals and permits, inadequate insurance, and other risks in the mining industry. There are no assurances that GSilver will be able to successfully discover and mine sufficient quantities of high grade mineralized material at El Cubo, VMC, San Ignacio and Topia for processing at its existing mills to increase production, tonnage milled and recoveries rates of gold, silver, and other metals in the amounts, grades, recoveries, costs and timetable anticipated. In addition, GSilver's decision to process mineralized material from El Cubo, VMC, San Ignacio, Topia and its other mines is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and therefore is subject to increased uncertainty and risk of failure, both economically and technically. Mineral resources and mineralized material that are not Mineral Reserves do not have demonstrated economic viability, are considered too speculative geologically to have the economic considerations applied to them, and may be materially affected by environmental, permitting, legal, title, socio-political, marketing, and other relevant issues. There are no assurances that the Company's projected production of silver, gold and other metals will be realized. In addition, there are no assurances that the Company will meet its production forecasts or generate the anticipated cash flows from operations to satisfy its scheduled debt payments or other liabilities when due or meet financial covenants to which the Company is subject or to fund its exploration programs and corporate initiatives as planned. There is also uncertainty about any resurgence of COVID-19, the ongoing war in Ukraine and conflict in Gaza and higher inflation and interest rates and the impact they will have on the Company's operations, supply chains, ability to access mining projects or procure equipment, supplies, contractors and other personnel on a timely basis or at all and economic activity in general. Accordingly, readers should not place undue reliance on forward-looking statements or information. All forward-looking statements and information made in this news release are qualified by these cautionary statements and those in our continuous disclosure filings available on SEDAR at including the Company's most recently filed annual information form . These forward-looking statements and information are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances save as required by law.

讀者應當注意,這些前瞻性聲明和信息既不是承諾也不是保證,並且可能受到風險和不確定性的影響,這些風險和不確定性可能會導致GSilver未來結果、活動水平、生產水平、績效或成就與預期有所不同,包括但不限於市場條件、融資可用性、金、銀和其他金屬的未來價格、貨幣匯率波動、通貨膨脹和利率上漲、實際生產、勘探和開發活動的實際結果、銀、金和其他金屬的實際資源品位和回收率、可供第三方處理的礦化物質的可獲得性、未預料到的地質或結構形成和特性、包括戰爭的地緣政治衝突、環境風險、經營風險、意外事故、勞工問題、設備或人員延遲、獲得政府或監管批准和許可證的延誤以及不充分的保險等礦業風險。不能保證GSilver將能夠成功發現和開採El Cubo、VMC、San Ignacio和Topia足夠數量的高品位礦化物質,以利用其現有的磨機增加生產、加工噸位和金、銀和其他金屬的恢復率。此外,GSilver決定處理來自El Cubo、VMC、San Ignacio、Topia和其它礦山的礦化物質不是基於證明其經濟和技術可行性的礦物儲存的可行性研究,因此增加了不確定性和失敗風險,無論是經濟上還是技術上。未經證明經濟可行性的礦產資源和礦化物質,要將他們的經濟問題應用於它們則被視爲過於牽強,且可能會受到環境、執照、法律、所有權、社會政治、營銷和其他相關問題的影響。不能保證公司預期的白銀、黃金和其他金屬的生產量能實現,另外,也不能保證公司將達到其生產預測或從經營活動中產生所預期的現金流以滿足應付債務還款或其他負債的能力,或滿足公司受約束的財務契約或按計劃資助其勘探項目和企業倡議。此外,COVID-19的任何復甦,烏克蘭持續的戰爭和加沙衝突以及更高的通貨膨脹率和利率,以及它們對公司的經營、供應鏈、訪問採礦項目或及時獲取或全部獲取設備、用品、承包商和其他人員或全部產生的影響,會對公司的經濟活動產生影響。因此,讀者不應該過度依賴前瞻性聲明或信息。本新聞稿中所有前瞻性聲明和信息均受到這些警告聲明和連續揭露文件中的相關聲明的限制,這些文件可在SEDAR上獲得,包括公司最近提交的年度信息表。這些前瞻性聲明和信息是截至本日的,公司不承擔任何更新或修訂它們以反映新事件或情況的責任,除非法律要求。

SOURCE: Guanajuato Silver Company Ltd.

來源:Guanajuato銀公司有限公司。


声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論