share_log

Core Nickel Receives Second Tranche of $69,100 From the Manitoba Mineral Development Fund

Core Nickel Receives Second Tranche of $69,100 From the Manitoba Mineral Development Fund

Core Nickel從曼尼託巴礦業發展基金獲得第二筆總額爲69100美元的資金。
newsfile ·  06/24 07:30

Saskatoon, Saskatchewan--(Newsfile Corp. - June 24, 2024) - Core Nickel Corp. (CSE: CNCO) ("Core Nickel" or the "Company") is pleased to announce that it has received the second tranche of $69,100 as nonrepayable funding from the Manitoba Mineral Development Fund (the "MMDF") on June 19, 2024. As released February 26, 2024, the total grant awarded to the Company from the MMDF is $207,000. The Company has already received a total of $138,200 from the MMDF and anticipates receiving the final tranche of $69,100 upon the successful completion of its proposed summer exploration program on the Halfway Lake and Resting Lake properties.

薩斯卡通,薩斯喀徹溫省-(新聞稿 Corp. - 2024 年 6 月 24 日) -CSE爲CNCO的股票代碼("Core Nickel"或"公司很高興宣佈,該公司已於2024年6月19日收到來自馬尼托巴礦產開發基金(“MMDF”)的第二筆,金額爲6.91萬美元的不可償還基金劃撥款。根據2024年2月26日發佈的消息,該公司從 MMDF 獲得的總撥款爲 20.7 萬美元。該公司已經從 MMDF 獲得了總計 13.82 萬美元,並預計在其擬議的 Halfway Lake 和 Resting Lake 物業的夏季勘探計劃成功完成後,將收到最後一筆,即 6.91 萬美元的基金劃撥款。

The Company's 2024 winter program involved a diamond drilling program on the Halfway Lake property, with a total of 797.45 meters drilled into the Historical W62 zone, resulting in an intersecting 0.37% nickel over 91.05 meters. For further details on the results from the Company's Halfway Lake drilling campaign, access SEDAR+ or visit the Company's website here.

公司 2024 年的冬季工作涉及 Halfway Lake 物業的金剛石鑽井計劃,共鑽探了 797.45 米歷史 W62 帶,結果是在 91.05 米處穿越 0.37% 的鎳。如需了解公司 Halfway Lake 鑽探活動的詳細結果,請訪問 SEDAR+ 或訪問該公司的網站。

Looking ahead, the Company plans to conduct airborne VTEM surveys on Halfway Lake and Resting Lake in early July 2024.

展望未來,公司計劃於 2024 年 7 月初在 Halfway Lake 和 Resting Lake 進行空載 VTEM 調查。

MMDF is a $20M provincial fund administered by the Manitoba Chambers of Commerce that provides funding to strategic economic development projects in northern Manitoba.

MMDF 是一個由馬尼托巴商會管理的 2000 萬美元的省級基金,爲馬尼托巴北部的戰略經濟發展項目提供資金支持。

Misty Urbatsch, President and CEO of Core Nickel Corp. commented "Core Nickel sincerely appreciates the ongoing support from the MMDF and the Manitoba Chamber of Commerce. We have had a successful first six months operating as a company in Manitoba, in part due to the support from MMDF. The MMDF contributions have allowed us to increase employment of local talent from the Wabowden area and establish invaluable relationships within the community."

Core Nickel Corp. 的總裁兼首席執行官 Misty Urbatsch 評論道:“Core Nickel 真誠感謝 MMDF 和馬尼托巴商會的持續支持。在馬尼托巴州運營的前六個月,我們已經取得了很大成功,部分原因是得到了 MMDF 的支持。MMDF 的貢獻使我們能夠增加來自 Wabowden 地區的本地人才的就業機會,並在社區內建立了寶貴的關係。”社區."

About Core Nickel

關於Core Nickel

Core Nickel Corp. is a junior nickel exploration company that controls 100% of five properties in the prolific nickel district, the Thompson Nickel Belt (TNB) in Northern Manitoba, Canada. The five properties consist of approximately 27,000 hectares of land that is proximal to existing infrastructure, such as highways and operating mills.

Core Nickel Corp.是一家初創的鎳勘探公司,控制着位於加拿大曼尼托巴省北部生產力豐富的鎳區——湯普森鎳帶(TNB)內的5個財產,總面積約爲27,000公頃,靠近諸如高速公路和現有磨坊等現有基礎設施。

Map: Core Nickel's Thompson Nickel Belt Properties

地圖:Core Nickel的湯普森鎳帶財產

Core Nickel has a large contiguous land package in the northern part of the TNB, situated approximately 16-20 km from the City of Thompson. Core Nickel's northern TNB projects consist of three properties: Mel, Hunter, and Odei River. The Mel property encompasses the Mel deposit, which is characterized by a historical NI-43-101 resource estimate with an indicated resource of 4.3 million tonnes at 0.875% nickel, equating to 82.5 million lbs contained nickel, and a historical inferred resource estimate of 1.0 million tonnes at 0.839% nickel, equating to 18.7 million pounds of contained nickel1. The target stratigraphy (Pipe Formation) that hosts the Mel deposit, and other deposits in the Thompson Nickel Belt, extend onto the Hunter and Odei River properties and drillhole intersections into the target stratigraphy on the Hunter project have successfully intersected elevated nickel.

Core Nickel在TNB北部擁有一大片連續的土地,距離湯普森市約16-20公里。Core Nickel北部TNB項目由三個財產組成:Mel,Hunter和Odei River。Mel財產包括Mel礦牀,其具有歷史NI-43-101資源估計,指示資源爲4.3萬噸鎳含量0.875%,相當於8250萬磅含鎳量,以及歷史推斷資源估計,1.0萬噸鎳含量0.839%,相當於1870萬磅鎳含量。1Mel礦牀所處的目標地層(導管組),以及湯普森鎳帶中的其他礦牀,都延伸到亨特和奧迪河的礦權,並且在亨特項目上對目標地層進行的鑽孔交錯成功地穿過了富含鎳的區間。

1"Technical Report on the Mel Deposit, Northern Manitoba" prepared for Victory Nickel Inc, Shane Naccashian (P. Geo) of Wardrop Engineering Inc., March 9, 2007

1爲Victory Nickel Inc準備的“關於馬尼托巴省北部Mel礦牀的技術報告”,由Wardrop Engineering Inc.的Shane Naccashian(P.Geo)於2007年3月9日編寫。

The Company also holds two properties in the southern TNB near Wabowden: Halfway Lake and Resting Lake. Both properties host the target Pipe Formation associated with known elevated nickel mineralization and are proximal to existing nickel deposits, mills, and other infrastructure.

該公司還持有位於Wabowden附近的南部TNb的兩個產權:Halfway Lake和Resting Lake。這兩個產權都擁有目標導管組,與已知含鎳礦化相關,並且靠近現有的鎳礦牀、磨粉廠和其他製造行業。

The Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects for this news release is Caitlin Glew, P. Geo., Vice-President Exploration for Core Nickel Corp., who has reviewed and approved its contents.

本新聞稿的國家43-101礦產項目披露標準的有資格人員是Core Nickel Corp.的勘探副總裁Caitlin Glew,P.Geo.,已經審核並批准了其內容。

Technical Disclosure

技術公告

The historical results contained within this news release have been captured from Manitoba Integrated Mining and Quarrying System ("iMaQs") as available and may be incomplete or subject to minor location inaccuracies. Management cautions that historical results were collected and reported by past operators and have not been verified nor confirmed by a Qualified Person but form a basis for ongoing work on the subject properties.

本新聞稿中包含的歷史結果已從馬尼托巴省綜合採礦和採石系統(“iMaQs”)中搜集,可能不完整或存在輕微的位置不準確性。管理層警告歷史結果是由過去的運營商收集和報告的,並未經被確認或驗實,但是它們形成了有關該物業的持續工作的基礎。

On behalf of the Board of Directors
"Misty Urbatsch"
Misty Urbatsch
CEO, President and Director
Core Nickel Corp.

謹代表董事會
"Misty Urbatsch"
Misty Urbatsch
首席執行官,總裁和董事
Core Nickel Corp.

Contacts:
Misty Urbatsch, CEO and President
Tel: 306-668-6927
Email: murbatsch@corenickel.com

聯繫人:
Misty Urbatsch,首席執行官和總裁
電話:306-668-6927
電子郵件:murbatsch@corenickel.com

General Enquiry
Tel: 306-668-6927
Email: info@corenickel.com

一般查詢
電話:306-668-6927
郵箱:info@corenickel.com

Neither the Canadian Securities Exchange nor its regulations services accept responsibility for the adequacy or accuracy of this release.

加拿大證券交易所及其監管服務對本公告的完整性或準確性不負責任。

Forward-looking information

前瞻性信息

All statements included in this press release that address activities, events or developments that the Company expects, believes or anticipates will or may occur in the future are forward-looking statements. These forward-looking statements involve numerous assumptions made by the Company based on its experience, perception of historical trends, current conditions, expected future developments and other factors it believes are appropriate in the circumstances. In addition, these statements involve substantial known and unknown risks and uncertainties that contribute to the possibility that the predictions, forecasts, projections and other forward-looking statements will prove inaccurate, certain of which are beyond the Company's control. Readers should not place undue reliance on forward-looking statements. Except as required by law, the Company does not intend to revise or update these forward-looking statements after the date hereof or revise them to reflect the occurrence of future unanticipated events.

本新聞稿中包含的所有涉及公司預期、信任或預計會或可能發生的未來活動、事件或發展的聲明均屬前瞻性聲明。這些前瞻性聲明基於公司根據其經驗、歷史趨勢感知、當前條件、預期未來發展以及其認爲在情況下適當的其他因素所作的衆多假設,還涉及大量可知和不可知的風險和不確定性,這些風險和不確定因素有助於使預測、預報、投射和其他前瞻性聲明證明不準確,其中某些因素超出了公司的控制範圍。讀者不應過度依賴前瞻性聲明。除法律規定外,公司不打算在此後修改或更新這些前瞻性聲明或重新修訂它們以反映未來的偶發事件。

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論