share_log

First Helium Summarizes High Impact Exploration Targets and Corporate Actions for H2 2024

First Helium Summarizes High Impact Exploration Targets and Corporate Actions for H2 2024

First Helium總結了2024年下半年的高影響力勘探目標和公司行動。
GlobeNewswire ·  07/10 07:30

CALGARY, Alberta, July 10, 2024 (GLOBE NEWSWIRE) -- First Helium Inc. ("First Helium" or the "Company") (TSXV: HELI) (OTCQB: FHELF) (FRA: 2MC) today announced plans to test key exploration targets at the Company's 100% owned Worsley property in Northern Alberta, along with key corporate activities, in the second half of 2024.

加拿大阿爾伯塔省卡爾加里,2024年7月10日(環球新聞社)——First Helium Inc.(“First Helium”或“公司”)(TSXV:HELI)(OTCQB:FHELF)(FRA:2MC)今天宣佈,計劃在2024年下半年,在該公司在北阿爾伯塔省的100%擁有的沃斯利物業測試關鍵勘探目標以及關鍵企業活動。

Highlights:
The Company plans to test multiple high impact exploration targets over the next 6 months, including:

亮點:
該公司計劃在未來6個月內測試多個高影響勘探目標,其中包括:

  • A substantial structure in the Leduc Formation, identified on recently interpreted proprietary 3D seismic (Press Release dated July 3, 2024); and
  • Numerous planned horizontal, helium-enriched natural gas targets on a regional play on the western part of the Worsley property.
  • Leduc構造中的一個重要結構,在最近解釋的專有三維地震數據中確定(2024年7月3日新聞稿);以及
  • Worsley產區西部計劃有多個層面的富氦天然氣井目標。

All targets to be tested in the anticipated program:

預計計劃中的所有目標:

  • Have the potential to encounter multiple productive horizons (pay zones) which can include natural gas with associated helium, and light oil;
  • Are located on trend and adjacent to past producing helium-enriched natural gas pools and light oil wells (See Figure 1);
  • Can garner premium pricing, with netbacks ranging from 3 - 4 times the netbacks of conventional natural gas, when enriched with helium; and
  • have an offtake agreement in place with one of the largest global helium gas distributors.
  • 具有遇到多產層(產油帶)的潛力,其中包括帶有天然氣、富含氦和輕質原油的自然氣;
  • 位於趨勢和過去出產氦富集的天然氣池和原油井相鄰(見圖1);
  • 富有吸引力的定價,淨退稅額爲傳統天然氣的3-4倍,富含氦氣;以及
  • 與全球最大的氦氣分銷商之一簽訂了提貨協議。

Figure 1:

圖1:

Worsley Project

沃斯利項目

"Over the past several months, our team has been working to complete the evaluation of proprietary 3D seismic data over our 100% owned Worsley property. We recently reported that we have identified a large structure in the Leduc Formation that is on trend and substantially greater in areal extent than our 1-30 Leduc oil pool discovery, which together with our 4-29 Leduc well, have produced 113,000 barrels of light oil and generated $13 million in revenue to date," said Ed Bereznicki, President & CEO of First Helium. "In the coming months we plan to test that large Leduc structure as well as complete a horizontal well previously drilled in the Blueridge Formation on the western part of the property. Successful completion and testing of that horizontal well could help establish a regional, repeatable natural gas play with scalability and tremendous potential for growth as well as enriched netback economics resulting from the helium content of those wells," added Mr. Bereznicki.

“過去幾個月,我們的團隊一直在完成對我們100%擁有的Worsley產區專有3D地震數據的評估。我們最近報道說,在Leduc地層中識別出了一個比我們的1-30 Leduc油池發現大得多的結構,並且井距趨同,連同我們的4-29 Leduc井一起,迄今爲止已生產出113,000桶輕油,創造了1300萬美元的營業收入。”First氦的總裁兼首席執行官Ed Bereznicki說。“在接下來的幾個月裏,我們計劃測試Leduc結構並完成之前在產區西部的Blueridge地層中鑽探的水平井。 如果成功完成並測試該水平井,可能有助於建立一個區域型、可重複的天然氣開採,並具有天然氣含氦量帶來的極高價值收益的潛力,” Bereznicki先生補充道。

Corporate Update

公司更新。

The Company's Worsley Property encompasses more than 53,000 acres of 100% owned land along a trend of sizeable, past producing helium enriched natural gas pools (See Figure 1). This includes the 15-25 helium discovery well, with an independently evaluated resource of 323 million cubic feet of helium1,2, along with numerous multi-zone targets for helium, oil, and natural gas.

該公司的沃斯利物業涵蓋了53,000英畝的100%自有土地,沿着可觀的、過去出產氦富集的天然氣池的趨勢(見圖1)。這包括擁有由獨立評估師評定爲32300000立方英尺氦氣的資源的15-25氦氣發現井,以及衆多針對氦氣、原油和天然氣的多區段目標。

The Company has established several key priorities over the next three to six months to advance the Worsley project area, including:

該公司在未來三到六個月內確立了幾個關鍵優先事項,以推進沃斯利項目區域,包括:

  • Drilling the newly identified large Leduc feature - A successful oil well would be tied into existing infrastructure and brought into production in approximately 3 - 4 months. The Company would plan to bring a successful natural gas with associated helium well into production in conjunction with First Helium's 15 – 25 helium discovery;
  • Completing and testing the drilled, 100% owned 5-27 horizontal helium well at West Worsley - A successful test will establish a large, repeatable natural gas play with associated helium content that will generate significantly increased cash netbacks when compared to a typical natural gas play. The project's potential scale and enhanced profitability will serve to attract partnership opportunities; and
  • Re-entering and completing an existing vertical well bore to potentially expand our regional play, enabling further project growth and scalability.
  • 鑽探新發現的大型Leduc構造——如果成功發現油田,將在大約3-4個月內與現有基礎設施相連並開始生產。公司計劃與First Helium的15-25號氦氣發現一起進入生產,計劃推出成功的帶有富集氦氣的天然氣;
  • 在沃斯利西部完成和測試已鑽成的、100%自有的5-27橫向氦氣井——如果測試成功,將建立一個帶有富集氦氣含量的大規模、可重複的自然氣玩法,其現金淨退稅額將大大增加,與典型的天然氣玩法相比。該項目的潛在規模和增強的盈利能力將有助於吸引夥伴機會;以及
  • 重新進入並完成現有垂直井眼,以擴大我們的區域型開採,爲項目的進一步增長和擴展提供支持。

The timing and execution of the above operations will be dependent on capital availability.

以上操作的時機和執行將取決於資本的可用性。

Leduc Formation Targets

Leduc構造目標

First Helium has identified twelve vertical drilling targets in the Leduc Formation based on our new 3D seismic interpretation. In addition to 5 potential drill locations on the large, recently identified anomaly, these targets also include one drilling location (7-30) which was assigned "proved plus probable undeveloped" oil reserves of 196,700 barrels3 by Sproule, its independent evaluator (See Figure 2).

First Helium根據其新的三維地震解釋,確定了Leduc構造的十二個垂直鑽井目標。除了大型新發現的異常區域上潛在的5個鑽井位置外,這些目標還包括Sproule獨立評估師(請參見圖2)爲7-30號鑽探位置分配的196,700桶油的“已證明加概率未開發”油藏。

Figure 2:

圖2:

First Helium Worsley Proprietary 3D Seismic Leduc Interpretation

First Helium Worsley專有3D地震Leduc解釋

Blue Ridge Horizontal Targets

Blue Ridge水平目標

Successful completion and testing of the 5-27 horizontal well in the Blue Ridge Formation at West Worsley will begin to establish a regional, repeatable natural gas play with associated helium content of 0.8% to 1.0%, which will serve to enrich netback economics. Production-ready helium will enable the Company to increase the size of its helium gas processing requirements and secure helium facility financing on potentially more favorable terms. At West Worsley, initial mapping has identified an additional 14 primary horizontal drill locations and numerous follow up locations, all on 100% owned land. Additionally, the Company plans to re-enter, complete and test a second, existing 100% owned vertical well bore along the trend which would significantly expand this regional play.

在West Worsley,成功完成和測試了Blue Ridge Formation中的5-27水平井,將開始建立一個區域性、可重複的天然氣含氦0.8%至1.0%的生產,這將有助於豐富淨回報經濟。 生產就緒的氦將使公司能夠增加其氦氣加工要求的規模,並在可能更優惠的條件下獲得氦氣設施融資。在West Worsley,初步勘探已發現額外的14個主要的水平鑽探位置和衆多後續位置,均位於100%擁有的土地上。此外,公司計劃重新進入、完善和測試一個第二個、現有的100%擁有的沿趨勢垂直井眼,這將極大擴展這個區域性的生產。

Together, the Blue Ridge horizontal play, along with the vertical Leduc play combine to provide tremendous opportunity for scalability and future growth, all on existing (100%) Company held lands. Given the large potential opportunity of the Worsley Project, the Company continues to explore potential partnership avenues to accelerate the development of its rich asset base.

Blueridge水平層與垂直Leduc開採相結合,爲擁有100%的公司土地提供了巨大的擴展和未來增長機會。鑑於Worsley項目的巨大潛力機會,公司繼續探索潛在的合作伙伴關係,以加快其豐富資產基礎的開發。

In addition, the Company will be completing pipeline maintenance and integrity work to fulfil regulatory obligations and prepare our pipeline network for future activation in conjunction with natural gas and helium production from the 15-25 helium discovery well, West Worsley and future discoveries along the play.

此外,公司將完成管道維護和完整性工作,以履行監管義務,並準備我們的管道網絡,與天然氣和氦氣的生產以及15-25氦發現井,West Worsley和沿着這個區域生產鏈未來的發現相結合啓動。

Management Changes

管理層變化

"We are excited to announce the addition of Marc Junghans, P. Geol. to the First Helium team. An advisor to the Company since mid-2023, Marc will assume the role of overseeing First Helium's exploration activities and asset development," said Ed Bereznicki, President & CEO of First Helium. Mr. Junghans has over 40 years of exploration, development, and asset evaluation experience in both the Western Canadian Sedimentary Basin and the U.S., at the senior and executive level roles, for both public and private oil & gas companies such as Compton Petroleum Corporation, Anderson Exploration Ltd., Husky Energy Inc., and Amicus Petroleum. He has also been the founding member of numerous private oil & gas entities, and during his career has overseen the drilling of over 170 horizontal and numerous vertical wells across Alberta, Saskatchewan and Manitoba. The Company also advises that David Safton, Vice President Exploration, and a founding member of First Helium, has announced his retirement from his role and daily activities at the Company. He will continue to be involved with First Helium on an advisory basis. The Board of Directors and his fellow team members wish to thank David for his contributions in establishing First Helium's premium asset base and wish him much enjoyment in his new pursuits.

“我們很高興宣佈Marc Junghans,P.Geol.加入First氦團隊。 自2023年中期起即是該公司的顧問,Marc 將擔任 First氦勘探活動和資產發展的監督角色。”First氦總裁兼首席執行官Ed Bereznicki說。Junghans先生擁有超過40年的勘探、開發和資產評估經驗,曾擔任過Compton Petroleum Corporation、Anderson Exploration Ltd.、Husky Energy Inc.和Amicus Petroleum等公共和私人油氣公司的高級和執行級角色。 他還是許多私人油氣實體的創始成員,並在他的職業生涯中負責指導了Alberta、Saskatchewan和Manitoba等地區的170多口水平井和衆多垂直井的鑽探工作。公司還發布聲明稱,First Helium的創始成員之一,勘探副總裁David Safton已宣佈退休,他將繼續擔任First Helium的顧問。董事會和他的團隊成員感謝David在建立First Helium的高品質資產基礎方面作出的貢獻,並祝願他在新職務中獲得更多樂趣。

Notes:

注意:

(1) Sproule Associates Limited ("Sproule") Contingent Resource Unrisked "Best Estimate".
(2) "Contingent Resources" are not, and should not be confused with, oil and gas, or helium reserves. Further information regarding Contingent Resources can be found in First Helium's Final Prospectus, dated June 28, 2021, filed on First Helium's SEDAR+ profile at
(3) Gross Proved plus Probable Undeveloped reserves, per Sproule, Evaluation of the P&NG Reserves of First Helium Inc. in the Beaton Area of Alberta (as of March 31, 2023).

(1) Sproule聯合有限公司(“Sproule”)未考慮風險的資源量“最佳估算”。
(2) "有待開採的儲量"不應與石油和天然氣或氦氣儲量混淆。有關儲量的進一步信息可以在First Helium2021年6月28日的最終招股說明書中找到,該招股說明書已在First Helium的SEDAR+配置文件中提交。
(3) 毛得證明加上概率不發展儲量,根據Sproule,《First Helium Inc.在阿爾伯塔州比頓地區P&NG儲量評估》(截至2023年3月31日)。

ABOUT FIRST HELIUM

關於First Helium

Led by a core Senior Executive Team with diverse and extensive backgrounds in Oil & Gas Exploration and Operations, Mining, Finance, and Capital Markets, First Helium seeks to be one of the leading independent providers of helium gas in North America.

First氦的核心高級執行團隊擁有廣泛的油氣勘探和運營、礦業、金融和資本市場背景,旨在成爲北美領先的氦氣獨立提供商之一。

First Helium holds over 53,000 acres along the highly prospective Worsley Trend in Northern Alberta which has been the core of its exploration and development drilling activities to date.

First Helium持有北部阿爾伯塔省高度潛力的Worsley趨勢上的超過53,000英畝的土地,該趨勢是其迄今爲止在探索和開發鑽探活動方面的核心領土。

Building on its successful 15-25 helium discovery well at the Worsley project, the Company has identified numerous follow-up drill locations and acquired an expansive infrastructure system to facilitate future exploration and development across its Worsley land base. Cash flow from its successful oil wells at Worsley has helped support First Helium's ongoing exploration and development growth strategy. Further potential oil drilling locations have also been identified on the Company's Worsley land base.

通過在Worsley項目成功發現15-25號氦氣井的基礎上,公司確定了衆多後續鑽探位置,並收購了一個巨大的基礎設施系統,以促進未來的勘探和開發。來自Worsley產區成功油井的現金流有助於支持First氦不斷增長的勘探和開發增長策略。公司的Worsley土地基礎上還發現了其他潛在的油井鑽探位置。

For more information about the Company, please visit .

有關公司的更多信息,請訪問。

ON BEHALF OF THE BOARD OF DIRECTORS

董事會代表

Edward J. Bereznicki
President, CEO and Director

Edward J. Bereznicki
總裁、首席執行官和董事

CONTACT INFORMATION

聯繫信息

First Helium Inc.
Investor Relations
Email: ir@firsthelium.com
Phone: 1-833-HELIUM1 (1-833-435-4861)

First Helium Inc.
投資者關係
電子郵件:ir@firsthelium.com
電話:1-833-HELIUM1(1-833-435-4861)

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX創業公司交易所及其監管服務提供者(如TSX創業公司政策所定義)均不承擔本發佈信息充分性或準確性的責任。

FORWARD LOOKING STATEMENTS

前瞻性聲明

This press release contains forward looking statements within the meaning of applicable securities laws. The use of any of the words "anticipate", "plan", "continue", "expect", "estimate", "objective", "may", "will", "project", "should", "predict", "potential" and similar expressions are intended to identify forward looking statements. In particular, this press release contains forward looking statements concerning the completion of future planned activities. Although the Company believes that the expectations and assumptions on which the forward looking statements are based are reasonable, undue reliance should not be placed on the forward looking statements because the Company cannot give any assurance that they will prove correct. Since forward looking statements address future events and conditions, they involve inherent assumptions, risks and uncertainties. Actual results could differ materially from those currently anticipated due to a number of assumptions, factors and risks. These assumptions and risks include, but are not limited to, assumptions and risks associated with the state of the equity financing markets and regulatory approval.

本新聞稿包含適用證券法的前瞻性聲明。使用任何"預期"、"計劃"、"繼續"、"期待"、"估計"、"目標"、"可能"、"將"、"項目"、"應該"、"預測"、"潛在"和類似表達方式的語言旨在識別前瞻性聲明。特別是,本新聞稿包含關於完成未來計劃活動的前瞻性聲明。儘管公司認爲前瞻性聲明所基於的期望和假設是合理的,但不應過分依賴前瞻性聲明,因爲公司無法給予任何保證其將證明正確。由於前瞻性聲明針對未來事件和條件,它們涉及固有的假設、風險和不確定性。由於一系列的假設、因素和風險,實際結果可能與目前預期的結果存在重大差異。

Management has provided the above summary of risks and assumptions related to forward looking statements in this press release in order to provide readers with a more comprehensive perspective on the Company's future operations. The Company's actual results, performance or achievement could differ materially from those expressed in, or implied by, these forward looking statements and, accordingly, no assurance can be given that any of the events anticipated by the forward looking statements will transpire or occur, or if any of them do so, what benefits the Company will derive from them. These forward looking statements are made as of the date of this press release, and, other than as required by applicable securities laws, the Company disclaims any intent or obligation to update publicly any forward looking statements, whether as a result of new information, future events or results or otherwise.

管理層在本新聞稿中提供了有關前瞻性聲明相關的風險和假設的上述摘要,以便爲讀者提供公司未來運營的更全面的視角。公司的實際結果、表現或成就可能與本新聞稿中表述的前瞻性聲明不同,因此無法保證前瞻性聲明所預期的任何事件將發生或發生,或者如果事件發生,公司將從其中獲得任何好處。本新聞稿的前瞻性聲明是截至本新聞稿發佈之日作出的,除非適用的證券法另有規定,否則公司不聲明或保證將更新任何前瞻性聲明,無論是因爲新信息、未來事件或結果,還是以其他方式。

SOURCE: First Helium Inc.

來源:First Helium Inc。

Images accompanying this announcement are available at

附帶此公告的圖像可在此處獲得。


声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論