share_log

DLP Resources Intersects 431m of 0.41% CuEq* on the Aurora Project in Southern Peru

DLP Resources Intersects 431m of 0.41% CuEq* on the Aurora Project in Southern Peru

DLP資源在秘魯南部的奧羅拉項目上交叉出4310萬噸0.41% CuEq*。
newsfile ·  07/16 06:00

Cranbrook, British Columbia--(Newsfile Corp. - July 16, 2024) - DLP Resources Inc. (TSXV:DLP) (OTCQB:DLPRF) ("DLP" or the "Company") announces receipt of complete drill results for drillhole A24-015 on the Aurora porphyry copper-molybdenum-silver project in southern Peru. (Figure 1).

加拿大哥倫比亞省克蘭布魯克--(新聞稿-2024年7月16日)--DLP 資源公司(TSXV:DLP) (OTCQB:DLPRF) ("DLP" 或"公司") 宣佈獲得智利南部奧羅拉斑岩銅鉬銀項目鑽孔A24-015的完整樣本結果。(圖1)

Results for the first fourteen drillholes, A22-001, A22-002, A22-003, A23-004, A23-005, A23-006, A23-007, A23-008, A23-009, A23-010, A23-011, A23-012, A23-013 and A24-014 were last released on January 04, 2024 and June 25th, 2024 (see DLP Resources Inc., news release of January 04, 2024 and June 25, 2024 for results for the previous fourteen drillholes).

前十四個鑽孔(A22-001, A22-002, A22-003, A23-004, A23-005, A23-006, A23-007, A23-008, A23-009, A23-010, A23-011, A23-012, A23-013和A24-014)的結果於2024年1月4日和2024年6月25日公佈 (參見 DLP 資源公司2024年1月4日和2024年6月25日發佈的新聞稿,介紹前十四個鑽孔的結果)。

Highlights

亮點

Drillhole A24-015 was drilled approximately 220m east-southeast of drillhole A24-014 and intersected copper-molybdenum and silver mineralization throughout the hole to a depth of 793.00m. From 793.00m to end of hole at 972.50m molybdenum mineralization was intersected at the contact of the hornfels and early quartz-eye-feldspar-biotite porphyry. A24-015 ended in molybdenum mineralization and the most significant mineralized intervals included:

A24-015 鑽孔鑽至 A24-014 鑽孔以東東南約22000萬處,穿過整個鑽孔交織着銅鉬銀礦物化合物,深度達到 79300萬。自79300萬到鑽孔的結束處97250萬,於角質巖和早期石英眼長石黑雲母斑岩交匯處,發現了鉬礦化合物。A24-015 鑽孔以鉬礦化合物結束,最顯著的礦化間隔包括:

  • 0.19% CuEq* over 966.50m (0.13% Cu, 0.0388% Mo and 1.70g/t Ag) from 6.00m to 972.50m.
  • 0.31% CuEq* over 32.00m (0.27% Cu, 0.0.0021% Mo and 3.62g/t Ag) from 36.00m to 68.00m.
  • 0.41% CuEq* over 431.00m (0.20% Cu, 0.0.0039% Mo and 1.75g/t Ag) from 362.00m to 793.00m.
  • 0.70% CuEq* over 179.50m (0.05% Cu, 0.1244% Mo and 0.70g/t Ag) from 793.00m to 972.50m.
  • 從600萬到97250萬共計96650萬,爲0.19% CuEq*含量(0.13% 銅, 0.0388% 鉬和1.70g/t 白銀)
  • 從3600萬到6800萬共計3200萬,爲0.31% CuEq*含量(0.27% 銅, 0.0.0021% 鉬和3.62g/t 白銀)
  • 從36200萬到79300萬共計43100萬,爲0.41% CuEq*含量(0.20% 銅,0.0.0039% 鉬和1.75g/t 銀)
  • 從79300萬到97250萬共計17950萬,爲0.70% CuEq*含量(0.05% 銅,0.1244% 鉬和0.70g/t 銀)

The complete set of results for A24-015 are summarized in Table 1 below.

表1總結了 A24-015 鑽孔的所有結果。

Mr. Gendall, President and CEO commented: "A24-015 was the first step-out hole to the east to extend copper mineralization another 220m east-southeast of A24-014. We continue to expand the footprint of copper-molybdenum and silver mineralization at Aurora and have two drill rigs currently drilling A24-016 and A24-017 in this east-northeast zone. We look forward to receiving further results in August."

總裁兼首席執行官 Gendall 先生評論說:「A24-015 是向東逐步延伸銅礦化的第一步,距 A24-014 以東東南22000萬。我們繼續擴大奧羅拉銅鉬銀礦物化足跡,目前有兩個鑽機正在鑽探A24-016和A24-017這一東北向區域。我們期待8月份進一步的結果。」

Aurora Cu-Mo Project - Summary of Drill Results for A24-015

奧羅拉銅鉬項目-A24-015 鑽孔結果總結

  • Drill hole A24-015 (Figures 2 and 3) commenced on May 23 on an azimuth of 245 degrees with an inclination of -70 degrees and ended on June 17 at 972.50m due to faulting in the hole. Summary geology is as follows:
    • 0 - 6.00m: Leached hornfels.
    • 6.00m -36.00m: Partially leached zone of hornfels.
    • 36.00m - 68.00m: Mineralized hornfels with chalcopyrite, chalcocite and covellite - weak enrichment zone.
    • 68.00m - 362.00m: Mineralized hornfels with disseminated and veined sulphides of chalcopyrite, pyrite, pyrrhotite and minor molybdenum.
    • 362.00 - 734.35m: Mineralized hornfels with intermineral porphyry from 435.10m to 447.00m and occasional E-type veins with chalcopyrite, sphalerite, pyrite and galena.
    • 734.00 - 972.50m: Molybdenum mineralized intermineral and early quartz-eye-feldspar-biotite porphyry with minor chalcopyrite and faulting at 957.00 to 972.50m. End of hole on June 17, 2024.
  • 鑽孔A24-015 (圖2和圖3)於5月23日開始,方位角爲245度,傾角爲-70度,由於井壁發生斷層於6月17日在深度97250萬處結束。摘要地質如下:
    • 0-6.00米: 粉化角質巖。
    • 600萬-36.00米: 局部粉化的角質巖帶。
    • 3600萬-68.00米: 礦化硬角質巖,黃銅礦,輝銅礦和青銅礦-弱富集區。
    • 6800萬-362.00米: 礦化硬角質巖,小斑晶狀和脈狀的黃銅礦,黃鐵礦,輝鐵礦和少量鉬礦散佈。
    • 從43510萬到44700萬是礦化角質巖,在此區段中有幾條E型脈狀方解石,含黃銅礦,閃鋅礦,黃鐵礦和方鉛礦。
    • 734.00-972.50米: 鉬礦化交織和早期石英眼長石黑雲母斑岩,少量黃銅礦和在957.00到97250萬處的斷層。鑽孔於2024年6月17日結束。

Table 1. Summary of Drill Results for Diamond Drillhole A24-015. All grades are length-weighted averages of samples within the interval reported.

表1: 鑽孔A24-015的結果總結,所有品位均爲區間中樣品加權平均值。

Hole From To Interval1 Description Cu (total) Mo Ag Cueq*
ID m m m % % g/t %
A24-015 0.00 6.00m 6.00m Leached Hornfels 0.05 0.0031 0.90 0.07
6.00 972.50 966.50 Mineralized hornfels and porphyry 0.13 0.0084 1.43 0.19
Includes 6.00 36.00 36.00 Partially leached zone within hornfels 0.13 0.0030 1.00 0.15
Includes 36.00 68.00 32.00 Hornfels with copper enrichment 0.27 0.0021 3.62 0.31
Includes 68.00 362.00 294.00 Mineralized hornfels 0.08 0.0023 0.70 0.10
Includes 362.00 793.00 431.00 Mineralized hornfels with early and intermineral quartz-eye-feldspar-biotite porphyry 0.20 0.0388 1.75 0.41
Includes 793.00 972.50 179.50 Mineralized early quartz-eye-feldspar-biotite porphyry 0.05 0.1244 0.50 0.70
起點 間隔1 描述 全銅 Mo 相當於Cu價值*
ID m m m % % 克/噸 %
A24-015 0.00 6.00米 6.00米 浸出角閃巖 0.05 0.0031 0.90 0.07
6.00 972.50 966.50 藏礦角閃巖和斑岩 0.13 0.0084 1.43 0.19
包括 6.00 36.00 36.00 角閃巖內的部分浸出帶 0.13 0.0030 1.00 0.15
包括 36.00 68.00 32.00 富銅角閃巖 0.27 0.0021 3.62 0.31
包括 68.00 362.00 294.00 藏礦角閃巖 0.08 0.0023 0.70 0.10
包括 362.00 793.00 431.00 早期和礦化石英眼長英雲母斑岩的藏礦角閃巖 0.20 0.0388 根據公司的固定費用覆蓋率,利率爲1.25% 至 1.75%每年,或者(b)有一個「備選主板利率」,並可減少至0.75%每年,取決於公司的固定費用覆蓋率。截至2021年7月3日,公司的基於LIBOR的利率爲% (對於$),公司的主板基準利率爲% (對於$)。根據未取出的貸款利率,每月應支付承諾費,利率爲%每年。根據與摩根大通銀行(「貸款協議」)的信貸協議的條款,現金收據將被存入鎖匣中,並由公司自行決定,除非處於「現金控制期」,在此期間,現金收據將用於減少貸款協議下的應付金額。現金控制期在事件違約或可用餘額連續三個工作日低於$時觸發,並將繼續到先前的連續天數中存在任何違約事件且多餘的可用餘額始終大於$(這樣的觸發器根據公司的循環承諾進行調整)。此外,如果依據信貸協議所定義的「額外可用餘額」小於$,則公司應維持最低固定費用覆蓋率爲1.0至1.0 (觸發器根據公司的循環承諾進行調整)。截至2021年7月3日,公司的可用餘額爲$25,764。信貸協議要求我們在判斷任何應支付股息或進行任何普通股分配時獲得摩根大通銀行的事先書面同意。信貸設施於2022年12月16日到期。若欲以普通股分紅派息,須獲得摩根大通銀行的事先書面同意。 0.41
包括 793.00 972.50 179.50 早期礦化石英眼長英雲母斑岩 0.05 0.1244 0.50 0.70

Note: *Copper equivalent grades (CuEq) are for comparative purposes only. Mo, Cu and Ag values are uncut, and core recovery is assumed to be 100% for the entire drilled length of A24-015 except for intervals from 10.00m to 12.00m, 86.00m to 90.00m, 118.00m to 120.00m, 957.00m to 961.00m, 967.00m to 969.00m and 971.00m to 972.50m where core recovery was below 50% due to faulting. The project is at an early stage of exploration and conceptual recoveries of Cu 85%, Mo 82%, and Ag 75% are assigned to the CuEq calculations. Conversion of metals to an equivalent copper grade based on these metal prices is relative to the copper price per unit mass factored by conceptual recoveries for those metals normalized to the conceptualized copper recovery. The metal equivalencies for each metal are added to the copper grade. The formula for this is: CuEq % = Cu% + (Mo% * (Mo recovery / Cu recovery) * (Mo $ per lb / Cu $ per lb) + (Ag g/t * (Ag recovery / Cu recovery) * (Ag $ per oz/ 31.1034768) / (Cu $ per lb* 22.04623)).

注:*銅當量品位(CuEq)僅用於比較目的。Mo、Cu和Ag的價值未削減,並且假定A24-015的整個鑽進長度的岩心恢復率爲100%,除了1000萬到1200萬、8600萬到9000萬、11800萬到12000萬、95700萬到96100萬、96700萬到96900萬和97100萬到97250萬等間隔,由於斷層導致岩心恢復率低於50%。該項目在勘探的早期階段,肉眼恢復率爲Cu 85%,Mo 82%和Ag 75%分配給CuEq計算。根據這些金屬價格將金屬轉換爲相當於每單位質量的銅品位,是相對於按金屬的概念化恢復率歸一化到概念化銅恢復率加權的銅價格。將每種金屬的金屬等價添加到銅品位中。其公式爲:CuEq %= Cu% +(Mo%×(Mo恢復率 / Cu恢復率)×(Mo美元/磅/銅美元/磅)+(Ag g / t×(Ag恢復率 / Cu恢復率)×(Ag $ per oz / 31.1034768)/(Cu $ per lb×22.04623))。

*Copper equivalent calculations use metal prices of Cu - US$3.34/lb, Mo - US$18/lb and Ag - US$21.87/oz.

*銅當量計算使用Cu-US $ 3.34 / lb,Mo-US $ 18 / lb和Ag-US $ 21.87 / oz的金屬價格。

1 Intervals are downhole drilled core lengths. Drilling data to date is insufficient to determine true width of mineralization. Mo, Cu and Ag values are uncut.

1.間斷長鑽孔長度。截至目前爲止,鑽探數據不足以確定礦化帶的實際寬度。Mo、Cu和Ag的價值未經修剪。

Table 2: A24-015 Diamond drillhole location, depth, orientation and inclination.

表2:A24-015鑽孔的位置、深度、方向和傾角。

Hole Easting Northing Elevation Length Azimuth Inclination
ID m m m m Degrees Degrees
A24-015 190,326 8,566,022 2856 972.50 245 -70
東經(m) 北緯(m) 海拔高度(masl) 長度 方位角(度) 傾角
ID m m m
A24-015 190,326 8,566,022 2856 972.50 245 -70

Co-ordinates are in WGS84 Zone 19S.

座標爲WGS84區域19S。

Quality Control and Quality Assurance

質量控制和質量保證

DLP Resources Peru S.A.C, a subsidiary of DLP Resources Inc., supervises drilling and carries out sampling of HTW, NTW and BTW core. Logging and sampling are completed at a secured Company facility situated on the project site. Sample intervals are nominally 1m to 3m in length. Drill core is cut in half using a rotary diamond blade saw and samples are sealed on site before transportation to the ALS Peru S.A.C. sample preparation facility in Arequipa by Company vehicles and staff. Prepared samples are sent to Lima by ALS Peru S.A.C. for analysis. ALS Peru S.A.C. is an independent laboratory. Samples are analyzed for 48 elements using a four-acid digestion and ICP-MS analysis (ME-MS61). In addition, sequential copper analyses are done where secondary copper mineralization is observed and reports, soluble copper using sulphuric acid leach, soluble copper in cyanide leach, residual copper and total copper. ALS meets all requirements of International Standards ISO/IEC 17025:2005 and ISO 9001:2015 for analytical procedures.

DLP Resources Peru S.A.C是DLP Resources的子公司,負責HTW、NTW和BTW鑽芯的鑽探監督和採樣。測井和採樣在位於項目現場的保密公司設施中完成。樣品間隔長度名義上爲100萬至300萬。鑽芯用旋轉金剛石鋸切成兩半,在運輸到ALS Peru S.A.C.樣品製備設施之前,樣品在現場封存並由公司車輛和人員運輸到該設施。ALS Peru S.A.C.是一家獨立實驗室。樣品用四酸法消化和ICP-MS分析(ME-MS61)分析48個元素。此外,還進行順序銅分析,在觀察到二次銅礦化時,報告可溶性硫酸銅浸出、氰化物中可溶性銅浸出、殘留銅和總銅。ALS符合國際標準ISO/IEC 17025:2005和ISO 9001:2015的分析程序要求。

DLP Resources independently monitors quality control and quality assurance ("QA/QC") through a program that includes the insertion of blind certified reference materials (standards), blanks and pulp duplicate samples. The company is not aware of any drilling, sampling, recovery or other factors that could materially affect the accuracy or reliability of the data reported from 0m to 972.50m in A24-015 except for intervals from 10.00m to 12.00m, 86.00m to 90.00m, 118.00m to 120.00m, 957.00m to 961.00m, 967.00m to 969.00m and 971.00m to 972.50m where core recovery was below 50% due to faulting.

DLP Resources通過一個包括插入盲標準準證參考材料(標準)、空白和製漿重複樣本的計劃,獨立監測質量控制和質量保證(「QA/QC」)。本公司不知道有從A24-015的0萬到97250萬的數據中能夠影響其準確性或可靠性的任何鑽井、採樣、採礦或其他因素,除了1000萬至1200萬、8600萬至9000萬、11800萬至12000萬、95700萬至96100萬、96700萬至96900萬和97100萬至97250萬的間隔由於斷層作用導致回收率低於50%。

Aurora Project

Aurora項目

Aurora Project is an advanced stage porphyry copper-molybdenum exploration project in the Province of Calca, SE Peru (Figure 1). The Aurora Project was previously permitted for drilling in 2015 but was never executed. Thirteen historical drillholes, drilled in 2001 and 2005 totaling 3,900m were drilled over an area of approximately 1000m by 800m, cut significant intervals of copper and molybdenum mineralization. From logging of the only three remaining holes DDA-01, DDA-3A and DDA-3 and data now available, it appears that only three of the thirteen holes tested the enriched copper zone and only one hole drilled deep enough to test the primary copper and molybdenum zone (see DLP Resources Inc. news release of May 18, 2021).

Aurora項目是秘魯東南部Calca省一個處於先進階段的斑岩銅鉬礦勘探項目,(圖1)。Aurora項目先前已被許可進行2015年的鑽探,但從未執行。在大約100000萬 x 80000萬的區域內鑽探了13個歷史鑽孔,它們於2001年和2005年鑽探,共計390000。這些鑽孔在銅和鉬的礦化中切割了顯著的間隔。從對僅剩的三個孔DDA-01、DDA-3A和DDA-3進行的記錄和現有數據顯示,在13個孔中只有三個孔測試了富集銅區,只有一個孔鑽得足夠深以測試主要的銅和鉬礦區(請參閱DLP Resources Inc.2021年5月18日新聞發佈)。

Salient historic drillhole data of the Aurora Project are:

Aurora項目的重要歷史鑽孔數據是:

  • 190m @ 0.57% Cu, 0.008% Mo in DDA-1 with a high-grade intercept of 20m @ 1.01% Cu related to a supergene enrichment zone of secondary chalcocite;

  • 142m @ 0.5% Cu, 0.004% Mo in DDA-3;

  • 71.7m @ 0.7% Cu, 0.007% Mo in DDA-3A (see historical Focus Ventures Ltd. news release July 11, 2012); and

  • One of the historical holes ABC-6 drilled on the edge of the system intersected 78m @ 0.45% Cu and 0.107% Mo (Figure 2).

  • DDA-1中19000萬 @ 0.57% Cu,0.008% Mo,其中高品位截獲2000萬 @ 1.01% Cu相關的超級富集區二次硫化銅;

  • DDA-3中14200萬 @ 0.5% Cu,0.004% Mo;

  • DDA-3A中7170萬 @ 0.7% Cu,0.007% Mo(參見歷史Focus Ventures Ltd.新聞發佈,2012年7月11日)。

  • 歷史孔ABC-6鑽在該系統的邊緣,與7800萬 @ 0.45% Cu和0.107% Mo相交(圖2)。

A review of the historical drilling indicates that the majority of the thirteen holes were drilled in the leached and partially leached zones of the porphyry system. Ten of the thirteen holes never fully tested the oxide and secondary enrichment zone and/or the primary copper zone at depth encountered in DDA-01. Copper-molybdenum mineralization is hosted by quartz-feldspar porphyries intruded into slates-hornfels and pelitic sandstones belonging to the Ordovician (439 - 463 ma) Sandia Formation.

對歷史鑽孔的審查表明,大多數的13個孔都鑽在斑岩系統的淋濾和部分淋濾帶上。十三個孔中有十個從未完全測試過氧化物和二次富集區域和/或在DDA-01中深度遇到的主要銅。銅鉬礦化由侵入片麻岩-角斑岩和屬於奧陶紀(439-463ma)桑迪亞巖系的泥板-角斑岩和頁岩石英斑岩所承載。

Figure 1: DLP Project areas in Peru with Aurora Project Shown.

圖1:秘魯DLP項目區域及Aurora項目顏色顯示。

Figure 2: Aurora Project - Plan view showing historic drilling and drilling by DLP in 2022-2023 with A24-015 in yellow and proposed holes in red lettering. Blue = Mo >500ppm and Brown = Cu>0.2%.

圖2:Aurora項目 - 平面圖顯示歷史鑽井和DLP在2022-2023年的鑽井,A24-015用黃色表示,建議的孔洞用紅色字母表示。藍色=Mo > 500ppm,棕色=Cu>0.2%。

Figure 3: Aurora Project - Simplified SW-NE geological section showing DLP and historic drillholes.

圖3:Aurora項目-簡化的SW-NE地質剖面圖,顯示DLP和歷史鑽孔。

Qualified Person

合格人士

David L. Pighin, consulting geologist and co-founder of DLP Resources, is the qualified person of the Company as defined by National Instrument 43-101. Mr. Pighin has reviewed and approved the technical contents of this news release.

David L. Pighin是DLP Resources的諮詢地質學家和聯合創始人,是根據43-101號國家儀器定義的公司的合格人員。Pighin先生已經審核並批准了本新聞稿的技術內容。

About DLP Resources Inc.

關於DLP Resources公司。

DLP Resources Inc. is a mineral exploration company operating in Southeastern British Columbia and Peru, exploring for Base Metals and Cobalt. DLP is listed on the TSX-V, trading symbol DLP and on the OTCQB, trading symbol DLPRF. Please refer to our web site for additional information.

DLP Resources Inc.是一家在不列顛哥倫比亞東南部和秘魯開展基礎金屬和鈷礦勘探的礦產勘探公司。DLP在TSX-V上市,交易代碼爲DLP,在OTCQb上市,交易代碼爲DLPRF。請參閱我們的網站以獲取更多信息。

FOR FURTHER INFORMATION PLEASE CONTACT:

有關信息,請聯繫:

DLP RESOURCES INC.
Ian Gendall, CEO & President
Jim Stypula, Executive Chairman
Robin Sudo, Corporate Secretary and Land Manager
Maxwell Reinhart, Investor Relations
Telephone: 250-426-7808
Email: iangendall@dlpresourcesinc.com

Email: jimstypula@dlpresourcesinc.com
Email: robinsudo@dlpresourcesinc.com
Email: maxreinhart@dlpresourcesinc.com

DLP RESOURCES公司。
Ian Gendall,首席執行官兼總裁。
Jim Stypula,執行主席。
Robin Sudo,公司秘書和土地經理
Maxwell Reinhart,投資者關係。
電話:250-426-7808。
電子郵件:iangendall@dlpresourcesinc.com。
電子郵件:jimstypula@dlpresourcesinc.com。
電子郵件:robinsudo@dlpresourcesinc.com
電子郵件:maxreinhart@dlpresourcesinc.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX Venture Exchange及其監管服務提供者(如TSX Venture Exchange的政策所定義的那樣)對此發佈的充分性或準確性不承擔任何責任。

Cautionary Note Regarding Forward-Looking Information

關於前瞻性信息的注意事項

This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". This information and these statements, referred to herein as "forward‐looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management's expectations and intentions with respect to drilling on the Aurora Project in Peru.

本發佈包含一些可能構成適用的加拿大證券法中的前瞻性信息的陳述和信息。前瞻性陳述涉及未來事件或未來表現,反映該公司管理層對未來事件的期望或信念。一般來說,前瞻性陳述和信息可以通過使用前瞻性術語,如「打算」或「預計」,或這些詞和短語的變體,或者表明某些行動,「可能」,「可能」,「應該」,「將」或「發生」的陳述。這些信息和這些陳述,稱爲「前瞻性陳述」,不是歷史事實,截至本新聞發佈的日期,幷包括不受限制地涉及討論未來計劃,估計和預測以及有關管理層對在秘魯Aurora項目進行鑽探的期望和意圖的陳述。

These forward‐looking statements involve numerous risks and uncertainties, and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things drill results expected from the Aurora Project in Peru.

這些前瞻性陳述涉及大量風險和不確定性,實際結果可能與任何前瞻性陳述中所建議的結果有所不同。這些風險和不確定性包括在秘魯Aurora項目中預期的鑽探結果。

Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.

儘管公司管理層試圖確認可能導致實際結果與前瞻性聲明或前瞻性信息不同的重要因素,或意圖,或預估,但可能還存在導致結果不如預期、估計或預期的其他因素。因此,讀者不應就前瞻性聲明和前瞻性信息做出過多的依賴。讀者應被告知,依賴這種信息可能不適合其他用途。該公司不承諾更新任何已被納入其中的前瞻性聲明、前瞻性信息或財務展望,除非按照適用的證券法規。我們尋求安全港。

声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論