share_log

Anfield Engages Engineering Firm for Anticipated Resource Upgrade at Slick Rock

Anfield Engages Engineering Firm for Anticipated Resource Upgrade at Slick Rock

安菲爾德公司聘請工程公司,預計將在Slick Rock進行資源升級。
GlobeNewswire ·  08/02 19:38

VANCOUVER, British Columbia, Aug. 02, 2024 (GLOBE NEWSWIRE) -- Anfield Energy Inc. (TSX.V: AEC; OTCQB: ANLDF; FRANKFURT: 0AD) ("Anfield" or "the Company") is pleased to announce that it is to engage BRS, Inc., an engineering firm, to complete an updated uranium and vanadium resource for its Slick Rock property. The Company previously received final approvals for its drill permit application to commence a 20-hole, 20,000-foot rotary drill program at its Slick Rock uranium and vanadium project, located in San Miguel County, Colorado. Anfield is in the process of securing a local drilling contractor, after which it will commence its 20-hole drill program at Slick Rock. Once the drill program is complete, Anfield plans to both secure a large mine permit for this property and use the drill results to upgrade its uranium and vanadium resource for Slick Rock as found in its existing PEA.

溫哥華,卑詩省,2024年8月2日(環球新聞社)——鈾能量公司(tsx.v: AEC; OTCQB: ANLDF; FRANKFURT: 0AD)("Anfield"或"公司")很高興宣佈,將僱用工程公司BRS,Inc.完成其Slick Rock物業的更新鈾和釩資源。該公司此前已獲得鑽探許可申請的最終批准,以在其位於科羅拉多州San Miguel縣的Slick Rock鈾和釩項目中展開20個孔,20,000英尺的旋轉鑽井項目。鈾能量公司正在尋求當地的鑽探承包商,並在此之後開始在Slick Rock進行20個孔鑽井程序。一旦鑽井計劃完成,Anfield計劃爲該物業獲得大型礦山許可,並使用鑽井結果更新其現有PEA中Slick Rock的鈾和釩資源。

Corey Dias, Anfield's CEO commented: "We are very pleased to bring BRS onboard as we advance our Slick Rock project. BRS previously completed a PEA for a combination of our Slick Rock, Velvet-Wood and Shootaring mill projects; therefore, leveraging that experience with the Company's Slick Rock project – post-drilling - to both confirm existing historical results and provide an updated uranium and vanadium resource is warranted. As we aim to meet the criteria for a large mine permit, followed by a Plan of Operations, we intend to align the development timelines of both the Slick Rock and Velvet-Wood mines. Our aim is to have both ready for production prior to the restart of the Shootaring Canyon mill, with initial feed ready for transport once the mill is ready to receive it."

Anfield的首席執行官Corey Dias評論道:“我們很高興能將BRS引入我們的Slick Rock項目中。 BRS之前曾爲Slick Rock ,Velvet-Wood和Shootaring磨坊項目的組合完成PEA;因此,利用該公司在Slick Rock項目 - 鑽井後的經驗來確認現有的歷史結果,並提供更新的鈾和釩資源是必要的。隨着我們旨在滿足大型礦井許可證的標準,隨後是運營計劃,我們打算使Slick Rock和Velvet-Wood兩者的發展時間線保持一致。我們的目標是在Shootaring Canyon磨坊重新啓動之前,將兩者都準備就緒,並準備好進行最初的供料運輸。”

Additionally, the Company announces that a Director has provided a one-year loan of $1.65 million, with an effective annual interest rate of 10%, for working capital purposes. The loan is considered a "related party transaction" as defined under Multilateral Instrument 61-101 – Protection of Minority Securityholders in Special Transactions ("MI 61-101"). The Company has relied on the exemptions from the formal valuation and minority shareholder approval requirements of MI 61-101 pursuant to subsections 5.5(a) and 5.7(1)(a) of MI 61-101, as the loan does not exceed 25% of the Company's market capitalization.

此外,該公司宣佈一位董事提供了一筆爲期一年的165萬美元貸款,有效年利率爲10%,用於營運資金。該貸款被視爲"關聯方交易",根據《多邊協議61-101 - 針對特殊交易中少數股東的保護措施("MI 61-101")》中的定義。公司已依賴MI 61-101第5.5(a)和5.7(1)(a)條款的正式估值和少數股東批准豁免,因爲該貸款不超過公司市值的25%。

Qualified Persons

合格人員

Douglas L. Beahm, P.E., P.G., principal engineer at BRS Inc., is a Qualified Person as defined in NI 43-101 and has reviewed and approved the technical content of this news release.

股票分析師公司有限公司的首席工程師Douglas L. Beahm,PE,PG,是根據NI 43-101規定的合格人員,並已審查並批准了本新聞稿的技術內容。

About Anfield

關於安菲爾德

Anfield is a uranium and vanadium development and near-term production company that is committed to becoming a top-tier energy-related fuels supplier by creating value through sustainable, efficient growth in its assets. Anfield is a publicly traded corporation listed on the TSX-Venture Exchange (AEC-V), the OTCQB Marketplace (ANLDF) and the Frankfurt Stock Exchange (0AD). Anfield is focused on its conventional asset centre, as summarized below:

Anfield是一個鈾和釩開發和近期生產公司,致力於通過資產的可持續,高效增長創造價值,成爲一流的能源相關燃料供應商。Anfield是一家公開交易的公司,股票已上市於TSX Venture Exchange (AEC-V),OTCQb Marketplace (ANLDF)和Frankfurt證券交易所 (0AD)。Anfield專注於其傳統資產中心,如下所述:

Arizona/Utah/Colorado – Shootaring Canyon Mill

亞利桑那州/猶他州/科羅拉多州 - Shootaring Canyon磨坊

A key asset in Anfield's portfolio is the Shootaring Canyon Mill in Garfield County, Utah. The Shootaring Canyon Mill is strategically located within one of the historically most prolific uranium production areas in the United States, and is one of only three licensed uranium mills in the United States.

安菲爾德組合中的關鍵資產之一是位於猶他州加菲爾德縣的Shootaring Canyon Mill。Shootaring Canyon磨坊位於美國曆史上鈾產量最大的地區之一,是美國僅有的三個有許可的鈾磨坊之一。

Anfield's conventional uranium assets consist of mining claims and state leases in southeastern Utah, Colorado, and Arizona, targeting areas where past uranium mining or prospecting occurred. Anfield's conventional uranium assets include the Velvet-Wood Project, the Frank M Uranium Project, the West Slope Project, as well as the Findlay Tank breccia pipe. A NI 43-101 PEA has been completed for the Velvet-Wood Project. The PEA is preliminary in nature, and includes inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves and, resultantly, there is no certainty that the included preliminary economic assessment would be realized. All conventional uranium assets are situated within a 200-mile radius of the Shootaring Mill.

Anfield的傳統鈾資產包括在猶他州東南部,科羅拉多州和亞利桑那州的採礦權和州租賃權,目標是過去的鈾採礦或勘探區域。 Anfield的傳統鈾資產包括Velvet-Wood項目,Frank m鈾項目,West Slope項目以及Findlay Tank斷層管。 Velvet-Wood項目已完成NI 43-101 PEA。該PEA是初步的,包括被認爲在地質上過於投機而不能被分類爲礦產儲量的推論礦物資源,因此無法將經濟考慮應用於它們,因此沒有確定該初步經濟評估將被實現的確定性。所有傳統鈾資產都位於Shootaring磨坊的200英里半徑範圍內。

Technical Disclosure

技術披露

Table 1. Anfield's existing conventional uranium-vanadium project portfolio resources.

表1。安菲爾德現有的傳統鈾釩項目組合資源。

Project Location Classification Tons (kt) Uranium
Grade
(% U3O8)
Contained Uranium
(Mlbs U3O8)
Vanadium
Grade
(% V2O5)
Contained Vanadium
(Mlbs V2O5)
Velvet-Wood Utah M & I 811 0.29% 4.6 - -
Inferred 87 0.32% 0.6 0.404% 7.3
West Slope Colorado Indicated 1,367 0.197% 5.4 - -
Inferred 1,367 - - 0.984% 26.9
Historic* 630 0.31% 3.9 1.59% 20.0
Slick Rock Colorado Inferred 1,760 0.224% 7.9 1.35% 47.1
Frank M Utah Historic* 1,137 0.101% 2.3 - -
Findlay Tank Arizona Historic* 211 0.226% 1.0 - -
Date
Creek/Artillery
Peak
Arizona Historic* 2,602 0.054% 2.8
Marquez-Juan Tafoya New Mexico Historic* 7,100 0.127% 18.1
項目 地點 分類 噸(千噸)
品位
(% U3O8)
包含鈾
(Mlbs U3O8)

品位
(% V2O5)
包含釩
(Mlbs V2O5)
Velvet-Wood 猶他州 中單與我 811 0.29% 4.6 - -
詳見2024年4月3日新聞稿 87 0.32% 0.6 0.404% 7.3
西斜坡 科羅拉多州 指示資源 1,367 0.197% 5.4 - -
詳見2024年4月3日新聞稿 1,367 - - 0.984% 26.9
歷史性的* 630 0.31% 3.9 1.59% 20.0
滑石 科羅拉多州 詳見2024年4月3日新聞稿 1,760 0.224% 7.9 1.35% 47.1
弗蘭克·M 猶他州 歷史性的* 1,137 0.101% 2.3 - -
芬德萊水箱 亞利桑那州 歷史性的* 211 0.226% 1.0 - -
日期
溪流/火炮
山峯
亞利桑那州 歷史性的* 2,602 0.054% 2.8
馬凱茲-胡安·陶福亞 新墨西哥州 歷史性的* 7,100 0.127% 18.1

* The Company's Qualified Person has not done sufficient work to classify these historic estimates as current mineral resources and Anfield is not treating such historical resources as current mineral resources.

*該公司的合格人員未進行足夠的工作來將這些歷史估計分類爲當前礦產資源,Anfield不將此類歷史資源視爲當前礦產資源。

Velvet-Wood: The PEA for Velvet-Wood/Slick Rock was authored by Douglas L. Beahm, P.E., P.G. Principal Engineer, of BRS Inc., Harold H. Hutson, P.E., P.G., Carl D. Warren, P.E., P.G., and Terence P. (Terry) McNulty, P.E., D. Sc., of T.P. McNulty and Associates Inc. (May 6, 2023). Mineral resources are not mineral reserves and do not have demonstrated economic viability in accordance with CIM standards. GT cut-off varies by locality from 0.25%-0.50%.

天鵝絨-伍德:天鵝絨-伍德/滑石的PEA由BRS公司的首席工程師、P.E.、P.G. Douglas L. Beahm、P.E.、P.G. Harold H. Hutson、P.E.、P.G. Carl D. Warren和T.P. McNulty和Associates Inc.的P.E.、D. Sc. Terence P.(Terry)McNulty編寫(2023年5月6日)。礦產資源不是礦藏,不符合CIM標準的經濟可行性。GT截止值因地而異,爲0.25%-0.50%。

West Slope: NI 43-101 resource estimate for the JD-6, JD-7, JD-8 and JD-9 properties, completed by BRS Inc. (effective March 2022); Historic resource estimate for the SR-11, SR-13A, SM-18 N, SM-18 S, LP-21 and CM-25 properties, completed by Behre Dolbear for Cotter Corporation (August 2007). Indicated and Inferred resources using GT cut-off of 0.1 ft% eU3O8; historic resources using cut-off of 0.05% U3O8.

West Slope:JD-6、JD-7、JD-8 和 JD-9 屬性的 NI 43-101 資源估算,由 BRS 公司完成(有效期爲 2022 年 3 月);SR-11、SR-13A、Sm-18 N、Sm-18 S、LP-21 和 Cm-25 屬性的歷史資源估算,由 Behre Dolbear 爲 Cotter Corporation 完成(2007 年 8 月)。採用 0.1 ft 割面折算的已指明和推論資源出自 Gt;採用 0.05% U3O8 割面的歷史資源。

Slick Rock: The PEA for Velvet-Wood/Slick Rock was authored by Douglas L. Beahm, P.E., P.G. Principal Engineer, of BRS Inc., Harold H. Hutson, P.E., P.G., Carl D. Warren, P.E., P.G., and Terence P. (Terry) McNulty, P.E., D. Sc., of T.P. McNulty and Associates Inc. (May 6, 2023). Mineral resources are not mineral reserves and do not have demonstrated economic viability in accordance with CIM standards. GT cut-off varies by locality from 0.25%-0.50%.

滑石:天鵝絨-伍德/滑石的PEA由BRS公司的首席工程師、P.E.、P.G. Douglas L. Beahm、P.E.、P.G. Harold H. Hutson、P.E.、P.G. Carl D. Warren和T.P. McNulty和Associates Inc.的P.E.、D. Sc. Terence P.(Terry)McNulty編寫(2023年5月6日)。礦產資源不是礦藏,不符合CIM標準的經濟可行性。GT截止值因地而異,爲0.25%-0.50%。

Frank M: Historic Technical Report for Frank M, prepared for Uranium One Americas, was authored by Douglas L. Beahm, P.E., P.G. Principal Engineer of BRS Inc., and Andrew C. Anderson, P.E., P.G. Senior Engineer/Geologist of BRS Inc., dated June 10, 2008. Frank M historic resource used a GT cut-off of 0.25%.

弗蘭克·M:Uranium One Americas準備的弗蘭克M歷史技術報告,由BRS公司的首席工程師、P.E.、P.G. Douglas L. Beahm和BRS公司的高級工程師/地質學家、P.E.、P.G. Andrew C. Anderson編寫,日期爲2008年6月10日。弗蘭克M歷史資源使用0.25%的GT截止值。

Findlay Tank: Historic Technical Report for Findlay Tank, prepared for Uranium One Americas, was authored by Douglas L. Beahm, P.E., P.G. Principal Engineer of BRS Inc., dated October 2, 2008. Findlay Tank historic resource used a grade cut-off of 0.05% eU3O8.

Findlay Tank:爲 Uranium One Americas 準備的 Findlay Tank 歷史技術報告,由 BRS 公司的主管工程師 Douglas L. Beahm,P.E.,P.G. 撰寫,日期爲 2008 年 10 月 2 日。Findlay Tank 歷史資源採用 0.05% eU3O8 的等級割面。

Artillery Peak: Artillery Peak Exploration Project, Mohave County, Arizona, 43-101 Technical Report, authored by Dr. Karen Wenrich, October 12, 2010. GT cut-off varies by locality from 0.01%-0.05%.

Artillery Peak:亞利桑那州Artillery Peak勘探項目43-101技術報告,由Karen Wenrich博士於2010年10月12日編寫。 GT截止值因地而異,爲0.01%-0.05%。

Marquez-Juan Tafoya: The Historical Technical Report, Preliminary Economic Assessment, for Marquez-Juan Tafoya, prepared for Uranium Energy Corporation, was authored by Douglas L. Beahm, P.E., P.G., Principal Engineer of BRS Inc., and Terence P. McNulty, P.E., PhD, McNulty & Associates, dated June 9, 2021. The mineral resources are reported at a 0.60 GT cut-off..

Marquez-Juan Tafoya:針對鈾能源公司準備的MARQUEZ-JUAN TAFOYA的歷史技術報告,初步經濟評估,由BRS Inc.的首席工程師Douglas L. Beahm, P.E., P.G.和McNulty & Associates的首席工程師Terence P. McNulty,P.E.,PhD編寫,日期爲2021年6月9日。礦產資源按0.60 Gt截止報告。

On behalf of the Board of Directors
ANFIELD ENERGY INC.
Corey Dias, Chief Executive Officer

謹代表董事會
鈾能量公司。
首席執行官 Corey Dias

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX Venture Exchange及其監管服務提供者(如TSX Venture Exchange的政策所定義的那樣)對此發佈的充分性或準確性不承擔任何責任。

Contact:
Anfield Energy, Inc.
Clive Mostert
Corporate Communications
780-920-5044
contact@anfieldenergy.com

聯繫方式:
Anfield Energy,Inc.
Clive Mostert
企業通訊
780-920-5044
contact@anfieldenergy.com

Safe Harbor Statement

Safe Harbor聲明

THIS NEWS RELEASE CONTAINS "FORWARD-LOOKING STATEMENTS". STATEMENTS IN THIS NEWS RELEASE THAT ARE NOT PURELY HISTORICAL ARE FORWARD-LOOKING STATEMENTS AND INCLUDE ANY STATEMENTS REGARDING BELIEFS, PLANS, EXPECTATIONS OR INTENTIONS REGARDING THE FUTURE.

本新聞稿包含“前瞻性聲明”。本新聞稿中非純粹歷史的聲明都是前瞻性聲明,幷包括關於未來信仰、計劃、期望或意圖的任何聲明。

EXCEPT FOR THE HISTORICAL INFORMATION PRESENTED HEREIN, MATTERS DISCUSSED IN THIS NEWS RELEASE CONTAIN FORWARD-LOOKING STATEMENTS THAT ARE SUBJECT TO CERTAIN RISKS AND UNCERTAINTIES THAT COULD CAUSE ACTUAL RESULTS TO DIFFER MATERIALLY FROM ANY FUTURE RESULTS, PERFORMANCE OR ACHIEVEMENTS EXPRESSED OR IMPLIED BY SUCH STATEMENTS. STATEMENTS THAT ARE NOT HISTORICAL FACTS, INCLUDING STATEMENTS THAT ARE PRECEDED BY, FOLLOWED BY, OR THAT INCLUDE SUCH WORDS AS "ESTIMATE," "ANTICIPATE," "BELIEVE," "PLAN" OR "EXPECT" OR SIMILAR STATEMENTS ARE FORWARD-LOOKING STATEMENTS. RISKS AND UNCERTAINTIES FOR THE COMPANY INCLUDE, BUT ARE NOT LIMITED TO, THE RISKS ASSOCIATED WITH MINERAL EXPLORATION AND FUNDING AS WELL AS THE RISKS SHOWN IN THE COMPANY'S MOST RECENT ANNUAL AND QUARTERLY REPORTS AND FROM TIME-TO-TIME IN OTHER PUBLICLY AVAILABLE INFORMATION REGARDING THE COMPANY. OTHER RISKS INCLUDE RISKS ASSOCIATED FUTURE CAPITAL REQUIREMENTS AND THE COMPANY'S ABILITY AND LEVEL OF SUPPORT FOR ITS EXPLORATION AND DEVELOPMENT ACTIVITIES. THERE CAN BE NO ASSURANCE THAT THE COMPANY'S EXPLORATION EFFORTS WILL SUCCEED OR THE COMPANY WILL ULTIMATELY ACHIEVE COMMERCIAL SUCCESS. THESE FORWARD-LOOKING STATEMENTS ARE MADE AS OF THE DATE OF THIS NEWS RELEASE, AND THE COMPANY ASSUMES NO OBLIGATION TO UPDATE THE FORWARD-LOOKING STATEMENTS, OR TO UPDATE THE REASONS WHY ACTUAL RESULTS COULD DIFFER FROM THOSE PROJECTED IN THE FORWARD-LOOKING STATEMENTS. ALTHOUGH THE COMPANY BELIEVES THAT THE BELIEFS, PLANS, EXPECTATIONS AND INTENTIONS CONTAINED IN THIS NEWS RELEASE ARE REASONABLE, THERE CAN BE NO ASSURANCE THOSE BELIEFS, PLANS, EXPECTATIONS OR INTENTIONS WILL PROVE TO BE ACCURATE. INVESTORS SHOULD CONSIDER ALL OF THE INFORMATION SET FORTH HEREIN AND SHOULD ALSO REFER TO THE RISK FACTORS DISCLOSED IN THE COMPANY'S PERIODIC REPORTS FILED FROM TIME-TO-TIME.

除此之外,本新聞稿所述事項還包含前瞻性聲明,這些聲明受某些風險和不確定性的影響,這些風險和不確定性可能導致實際結果與任何未來結果、績效或成就所述的或暗示的聲明有實質性的差異。不是歷史事實的聲明,包括在之前、之後或包含諸如“估計”、“預計”、“相信”、“計劃”或“期望”或類似聲明的聲明,都是前瞻性聲明。公司面臨的風險和不確定性包括,但不限於,與礦產勘探和融資有關的風險,以及公司在其最新的年度報告和季度報告中以及其他公開可獲得的公司信息中不時列出的風險。其他風險包括未來資本需求和公司對其勘探和開發活動的支持水平。公司的勘探工作是否成功或公司最終能否取得商業成功並不確定。這些前瞻性聲明是根據本新聞稿發佈日期作出的,公司不承擔更新前瞻性聲明或更新實際結果可能與前瞻性聲明所述預測存在差異的原因的責任。儘管公司認爲本新聞稿中包含的信仰、計劃、期望和意圖是合理的,但無法保證這些信仰、計劃、期望或意圖會被證明是準確的。投資者應考慮本文所提供的所有信息,還應參考公司不時提交的定期報告中披露的風險因素。

THIS NEWS RELEASE HAS BEEN PREPARED BY MANAGEMENT OF THE COMPANY WHO TAKES FULL RESPONSIBILITY FOR ITS CONTENTS.

本新聞稿由公司管理層編寫,他們對其內容負有全部責任。


声明:本內容僅用作提供資訊及教育之目的,不構成對任何特定投資或投資策略的推薦或認可。 更多信息
    搶先評論